S02 - Volume 1 Drawings.pdf

PDF 8 MB Posted

Attached to
Z1DA--607-21-155 UPGRADE EAGLE AND FREIGHT ELEVATORS (VA-23-00006591)
Solicitation number
36C25222B0034
Issued by

About this file

This solicitation is for upgrade work to eagle and freight elevators at the William S. Middleton VA Medical Center in Madison, Wisconsin. The solicitation number is 36C25222B0034 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.

The work includes modernizing four passenger elevators (P1 through P4) and one freight elevator (S5) located in Building 1. It will also modernize a second freight elevator (S6) and renovate associated third floor lobbies. The contractor will remove and replace elevator equipment and controls, structural elements, and perform other construction and demolition work. The estimated cost is $2-5 million. The response due date is July 15th, 2022 and the period of performance is 365 days. The set-aside is for verified service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
S06 - Spec Section 251300 - Integration.pdf PDF
S06 - SF 1442.pdf PDF
36C25222B0034 0003.docx DOCX document
P07 - Wage Determination Revised.pdf PDF
36C25222B0034 0002.docx DOCX document
S04 - Pre-Bid Sign in Sheet.pdf PDF
36C25222B0034 0001.docx DOCX document
S02 - Volume 2 Drawings.pdf PDF
S02 - Volume 2 Specifications.pdf PDF
S02 - Volume 1 Specifications.pdf PDF
P07 - Wage Determination.pdf PDF
36C25222B0034_1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARKING RAMP

BLDG #15

FLAG

'D' WING

CH

IL

LE

R

PL

AN

T

BLDG #19

'C ' W

IN

G

'G ' W

IN

G

'A' WING

'B' CORE

SWITCHGEAR

LAUNDRY

EMER. GENERATOR

WELL

PUMPHOUSE

MENTAL

HEALTH

CLINIC

ENTRANCE

MAIN

/LOBBY

BLDG #7

BLDG #12

BLDG #1

BLDG #2

BLDG #13

BLDG #3

BLDG #5

BL

DG

ELEC.

ENTRANCE

OLD MAIN

BLDG #22

MRI

COMMUNITY LIVING CENTER

HOSPICE

MENTAL HEALTH

EMERGENCY

UNIVERSITY OF

WISCONSIN

HOSPITAL

CO

NNEC

TI

NG C

ORR

ID

OR

BLDG #27

BLDG #17

OLD

BLDG #14

BLDG 20

SERVICE ENCLOSURE

CONTRACTOR PARKING

CONNECTING CORRIDOR

BLDG 21

ROOFTOP UNIT

'B' WING

BLDG 18

BL

DG

'A' WING

'B' WING

BLDG #1

'G' WING

BLDG #3

'C ' W

IN

G

'B' CORE

TITLE SHEET

SITE PLAN-CAMPUS

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS

WILLIAM S MIDDLETON VA MEDICAL CENTER

MADISON, WISCONSIN

Elevator:

PO Box 464

Phone: 608.616.2999 Mequon, WI 53092

UPGRADE EAGLE AND FREIGHT

ELEVATORS

Email: AdamS@pec-wi.com POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

35% Schematic Design 10.15.2021 5.27.22

Project Number

Building Number

607-21-155

POC: Adam Smith

65% Construction Documents 12.29.2021 95% Construction Documents 3.18.2022 100% Construction Documents 5.27.2022

G001

UPGRADE EAGLE AND FREIGHT ELEVATORS

PROJECT #607-21-155

BUILDING 1 -GENERAL ARRANGEMENT

ConsultantsA/E Seals

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text Not to Scale

AutoCAD SHX Text Area of Work

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text Not to Scale

AutoCAD SHX Text %%UQA/QC Consultants

AutoCAD SHX Text Henneman Engineering

AutoCAD SHX Text 1232 Fourier Drive, Suite 101, AutoCAD SHX Text Madison, Wisconsin 53717

AutoCAD SHX Text Phone: (608) 833-7000

AutoCAD SHX Text Fax: (608) 833-6996

AutoCAD SHX Text %%UMechanical, Plumbing, Electrical, Architectural, and Structural

AutoCAD SHX Text %%UElevator Consultants

AutoCAD SHX Text Performance Elevator

AutoCAD SHX Text E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES AND LIGHTING ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES AND LIGHTING SCHEDULES/PLAN ED100 NINTH FLOOR - ELECTRICA POWER AND LIGHTING DEMOLITION NINTH FLOOR - ELECTRICA POWER AND LIGHTING DEMOLITION EP100 NINTH FLOOR - ELECTRICAL POWER AND LIGHTING NEW WORK PLANS NINTH FLOOR - ELECTRICAL POWER AND LIGHTING NEW WORK PLANS ED101 FOURTH FLOOR AND FIFTH FLOOR - ELECTRICAL DEMOLITION FOURTH FLOOR AND FIFTH FLOOR - ELECTRICAL DEMOLITION EP101 FIFTH FLOOR - ELECTRICAL POWER AND LIGHTING NEW WORK PLANS FIFTH FLOOR - ELECTRICAL POWER AND LIGHTING NEW WORK PLANS EP600 ELECTRICAL SYSTEM AND RISER DIAGRAMSELECTRICAL SYSTEM AND RISER DIAGRAMS

AutoCAD SHX Text %%UGeneral Drawings

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text %%uElectrical Drawings

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text G001 TITLE SHEET TITLE SHEET G002 GENERAL, DEMOLITION, PHASING NOTES, SYMBOLS GENERAL, DEMOLITION, PHASING NOTES, SYMBOLS ,ABBREVIATIONS AND EXIT DIAGRAMS G003 ICRA AND PHASING PLANS -P1 THRU 4 AND S5 ICRA AND PHASING PLANS -P1 THRU 4 AND S5 G004 ICRA AND PHASING PLANS -S6ICRA AND PHASING PLANS -S6

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text %%UArchitectural Drawings

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text %%UEnvironmental Work Drawings

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text %%UMechanical Drawings

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text M001 MECHANICAL SYMBOLS, ABBREVIATIONS AND NOTES MECHANICAL SYMBOLS, ABBREVIATIONS AND NOTES MDMH100 NINTH FLOOR - MECHANICAL DEMOLITION AND NEW WORK PLANS NINTH FLOOR - MECHANICAL DEMOLITION AND NEW WORK PLANS MD105 FIFTH FLOOR PLAN- C-WING HVAC PIPING & DUCTWORK FIFTH FLOOR PLAN- C-WING HVAC PIPING & DUCTWORK DEMOLITION M105 FIFTH FLOOR PLAN- C-WING HVAC PIPING & DUCTWORK FIFTH FLOOR PLAN- C-WING HVAC PIPING & DUCTWORK NEW WORK PLANS MH500 MECHANICAL DETAILS MECHANICAL DETAILS MH600 MECHANICAL SCHEDULES AND CONTROL PARAMETERSMECHANICAL SCHEDULES AND CONTROL PARAMETERS

AutoCAD SHX Text

HA101 THIRD FLOOR PLAN- C-WING ABATEMENT DEMOLITION PLAN

AutoCAD SHX Text 9th flr Machine Room

AutoCAD SHX Text Area of Work

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text

& ELEVATORS P1-4

AutoCAD SHX Text

AND S-5

AutoCAD SHX Text Area of Work

AutoCAD SHX Text Freight Elevator S-6

AutoCAD SHX Text 3rd, 4th Flr. and Penthouse

AutoCAD SHX Text Area of Work

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text %%UStructural Drawings

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text A100 PROJECT SCOPE AND LOCATION DIAGRAMS PROJECT SCOPE AND LOCATION DIAGRAMS A201 THIRD FLOOR, FOURTH FLOOR AND FIFTH FLOOR - EXISTING THIRD FLOOR, FOURTH FLOOR AND FIFTH FLOOR - EXISTING DEMOLITION PLANS A202 THIRD FLOOR, FOURTH FLOOR AND FIFTH FLOOR - NEW THIRD FLOOR, FOURTH FLOOR AND FIFTH FLOOR - NEW CONSTRUCTION PLANS A500 DOOR SCHEDULES, FRAME AND PARTITIONS DETAILSDOOR SCHEDULES, FRAME AND PARTITIONS DETAILS

AutoCAD SHX Text S001 STRUCTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES STRUCTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES SDS100 NINTH FLOOR STRUCTURAL DEMOLITION AND NEW PLANS NINTH FLOOR STRUCTURAL DEMOLITION AND NEW PLANS SD101 FOURTH AND FIFTH FLOOR DEMOLITION PLAN FOURTH AND FIFTH FLOOR DEMOLITION PLAN S101 FOURTH AND FIFTH FLOOR NEW WORK PLANS FOURTH AND FIFTH FLOOR NEW WORK PLANS S500 STRUCTURAL DETAILS - SHEET 1 STRUCTURAL DETAILS - SHEET 1 S501 STRUCTURAL DETAILS - SHEET 2STRUCTURAL DETAILS - SHEET 2

AutoCAD SHX Text FP100 FIRE PROTECTION- NINTH FLOOR- EXISTING, DEMOLITION AND NEW WORK FIRE PROTECTION- NINTH FLOOR- EXISTING, DEMOLITION AND NEW WORK FP101 FIRE PROTECTION- FOURTH FLOOR AND FIFTH FLOOR - DEMOLITION AND FIRE PROTECTION- FOURTH FLOOR AND FIFTH FLOOR - DEMOLITION AND NEW WORK

AutoCAD SHX Text %%UFire Protection Drawings

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text %%UPlumbing Drawings

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text PD101 THIRD FLOOR PLAN- C-WING PLUMBING DEMOLITION PLANTHIRD FLOOR PLAN- C-WING PLUMBING DEMOLITION PLAN

AutoCAD SHX Text %%UFire Alarm Drawings

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text FA100 FIRE ALARM- NINTH FLOOR- EXISTING, DEMOLITION AND NEW WORK FIRE ALARM- NINTH FLOOR- EXISTING, DEMOLITION AND NEW WORK FA101 FIRE ALARM- FOURTH FLOOR AND FIFTH FLOOR - DEMOLITION AND FIRE ALARM- FOURTH FLOOR AND FIFTH FLOOR - DEMOLITION AND NEW WORK

AutoCAD SHX Text

%%UVOLUME 1

AutoCAD SHX Text

%%UVOLUME 2

AutoCAD SHX Text %%UArchitectural

AutoCAD SHX Text %%UEngineering:

AutoCAD SHX Text %%UStructural

AutoCAD SHX Text USFin

AutoCAD SHX Text 9245 Calumet Ave

AutoCAD SHX Text Munster, IN 46321

AutoCAD SHX Text Phone: (219) 836-2120

AutoCAD SHX Text Suite 205

AutoCAD SHX Text Fax: (219) 836-1129

AutoCAD SHX Text USFin

AutoCAD SHX Text 9245 Calumet Ave

AutoCAD SHX Text Munster, IN 46321

AutoCAD SHX Text Phone: (219) 836-2120

AutoCAD SHX Text Suite 205

AutoCAD SHX Text Fax: (219) 836-1129

AutoCAD SHX Text USFin

AutoCAD SHX Text 9245 Calumet Ave

AutoCAD SHX Text Munster, IN 46321

AutoCAD SHX Text Phone: (219) 836-2120

AutoCAD SHX Text Suite 205

AutoCAD SHX Text Fax: (219) 836-1129

Elevator:

PO Box 464

Phone: 608.616.2999 Mequon, WI 53092

UPGRADE EAGLE AND FREIGHT

ELEVATORS

Email: AdamS@pec-wi.com POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

35% Schematic Design 10.15.2021 5.27.22

Project Number

Building Number

607-21-155

POC: Adam Smith

65% Construction Documents 12.29.2021 95% Construction Documents 3.18.2022 100% Construction Documents 5.27.2022

G002

@ AT

GB GYPSUM BOARD

DTL DETAIL

W/ WITH

WD WOOD

W/O WITHOUT

WP WORK POINT

WPR WATERPROOFING

WVNR WOOD VENEER

WC WATER CLOSET

UNF UNFINISHED

EQ EQUAL

NTS NOT TO SCALE

VB VINYL BASE

UNO UNLESS NOTED OTHERWISE

VIF VERIFY IN FIELD

VCT VINYL COMPOSITION TILE

VWC VINYL WALL COVERING

VEST VESTIBULE

VERT VERTICAL

OPNG OPENING

OPP OPPOSITE

OA OVERALL

OC ON CENTER

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

OH OPPOSITE HAND

OD OUTSIDE DIAMETER

TLT TOILET

T TREAD

THK THICK

TYP TYPICAL

TS TUBE STEEL

TT TRAFFIC TOPPING

TEL TELEPHONE

TEF TOILET EXHAUST FAN

T/ TOP OF

NOM NOMINAL

NO NUMBER

MIN MINIMUM

MTL METAL

ELEV ELEVATOR

EL ELEVATION

DWG DRAWING

EA EACH

ECP EXPOSED CONSTRUCTION PAINTED

EFTS EXPANDING FOAM TAPE SEALANT

EPEJF EXPANDED POLYETHYLENE JOINT FILLER

EC EXPOSED CONSTRUCTION

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NC NOISE CRITERIA

MO MASONRY OPENING

MISC MISCELLANEOUS

RFS ROOM FINISH SCHEDULE

CLO CLOSET

ID INSIDE DIAMETER

SSS SILICONE SANITARY SEALANT

STL STEEL

STN STAIN

SV SHEET VINYL

SUSP SUSPENDED

STOR STORAGE

STRUCT STRUCTURAL

ST SEALANT TAPE

STD STANDARD

LAV LAVATORY

CMU CONCRETE MASONRY UNIT

MECH MECHANICAL

MED MEDIUM

MH MANHOLE

MACH MACHINE

MATL MATERIAL

MAX MAXIMUM

CPT CARPET

CO CLEAN OUT

CT CERAMIC TILE

DIA DIAMETER

DIM DIMENSION

DN DOWN

DF DRINKING FOUNTAIN

CMUP CMU PAINTED

LP LOW POINT

MFR MANUFACTURER

SIM SIMILAR

SHT SHEET

SQ SQUARE

SECT SECTION

SPEC SPECIFICATION

SS STAINLESS STEEL

SRS SILICONE RUBBER SEALANT

JT JOINT

LAM LAMINATED

IN INCH

INSUL INSULATION

INT INTERIOR

INFO INFORMATION

CORR CORRIDOR

CONT CONTINUOUS

COL COLUMN

CLG CEILING

CONCR CONCRETE

CONTR CONTRACTOR

CONCP CONCRETE PAINTED

CLR CLEAR OPENING

CONST CONSTRUCTION

JC JANITORS CLOSET

JB JUNCTION BOX

R RISER

HNCG HOLLOW NEOPRENE

RM ROOM

RBC RUBBERIZED BITUMINOUS COMPOUND

REF REFERENCE

REINF REINFORCED

REQ'D REQUIRED

REV REVISION

RO ROUGH OPENING

RB RESILIENT BASE

RD ROOF DRAIN

HORIZ HORIZONTAL

HT HEIGHT

HR HOURS

HP HIGH POINT

BLDG BUILDING

CL CENTER LINE

CB CERAMIC BASE TILE

C/C CENTER TO CENTER

CG CORNER GUARD

CIP CAST IN PLACE

CJ CONTROL JOINT

CH LNK CHAIN LINK FENCE

CJF CORK JOINT FILLER

HSKP HOUSEKEEPING

HM HOLLOW METAL

INCAND INCANDESCENT

(TWO PART)

PT PAINTED

PSI POUNDS PER SQUARE INCH

2-PUMS POLYURETHANE SEALANT

PVF POLYVINYLIDINE FINISH

QT QUARRY TILE

QTY QUALITY

QUANT QUANTITY

GL GLASS

HDW HARDWARE

GRND GROUND

BRK BRICK

BLK BLOCK

B/ BOTTOM OF

BD BOARD

BJF BITUMINOUS JOINT FILLER

BMT BUTYLMASTIC TAPE SEALANT

BRS BUTYL RUBBER SEALANT

BOH BACK OF HOUSE

GLB GLAZED BLOCK

GC GENERAL CONTRACTOR

GYP BD GYPSUM BOARD

GBP GYPSUM BOARD PAINTED

PBMR PRESHIMMED BUTYL MASTIC

ADJ ADJUSTABLES

FD FLOOR DRAIN

PERP PERPENDICULAR

PL PLASTIC

PLAM PLASTIC LAMINATE

PR PAIR

PLBG PLUMBING

PLWD PLYWOOD

PREFAB PREFABRICATED

PSF POUNDS PER SQUARE FOOT

PL PLATE

FIN FINISH

ALUM ALUMINUM

AFF ABOVE FINISHED FLOOR

ALS ACRYLIC LATEX SEALANT

GALV GALVANIZED

FLR FLOOR

GA GAUGE

APC ACOUSTICAL PANEL CEILING

A0RA AREA OF RESCUE ASSISTANCE

AP ACCESS PANEL

APPROX APPROXIMATELY

ARCH ARCHITECTURAL

ANOD ANODIZED

FDV FIRE DEPARTMENT VALVE

FLUOR FLUORESCENT

FHC FIRE HOSE CABINET

FEC FIRE EXTINGUISHER CABINET

PARTN PARTITION

AD AREA DRAIN

FC FOOT CANDLES

COMPRESSION GASKET

SSD SEE STRUCTURAL DRAWINGS

ARCHITECTURAL ABBREVIATIONS

REPLACE WITH INPRO PRODUCT. COLOR SELECTED BY VA DURING SUBMITTAL PROCESS

ELEVATOR FINISH SCHEDULE

EIGHT LED DOWNLIGHTS WITH GRIDS BRUSHED STAINLESS STEEL PANELS AND CONCEALED ACCESS PANEL- SEE E001 PASSENGER CEILING PLAN

RETAIN- VERIFY WITH ELEVATOR SPECIFICATION 14-21-10 P1 THROUGH P4

CURRENT WOOD SUBSTRATED REPLACE WITH MINIMUM 6-PLY FIRE TREATED PLYWOOD OF PROPER THICKNESS (3/4" MIN.)

RETAIN EXISTING HANDRAILING. POLISH AFTER COMPLETION

FLOOR: SUBSTRATE:

WALLS: SIDES-UPPER

CEILING

BASE

HANDRAILS

FINISH MATERIAL: RUBBER SHEET - NORA BRAND

WALLS: LOWER BACK WALL

RETAIN EXISTING. POLISH PER A100 NOTE NUMBER 2WALLS: SIDES-LOWER

M-14A

OFFICE

2A3A

A000

EQUIPMENT / FURNITURE TAG

1 CONSTRUCTION KEY NOTE

BATT INSULATION

DOOR AND FRAME

WALL TYPE TAG

ROOM NAME AND NUMBER

GLASS

ACOUSTICAL TILE - SECTION

DRYWALL

MEMBRANE

ELEVATION

DETAIL

A000

SEALANT AND BACKER RODSECTION1

WOOD BLOCKING

SYMBOLS

ARCHITECTURAL

MATERIAL SYMBOLS

ARCHITECTURAL

1A DEMOLITION KEY NOTE

WALLS

CEILING PLAN SYMBOLS

ARCHITECTURAL

ELEVATION REFERENCE

A000

GENERAL, DEMOLITION, PHASING NOTES,

SYMBOLS , ABBREVIATIONS AND EXIT

DIAGRAMS

BACK WALL PANELS TO HAVE NON ILLUMINATING GRAPHIC IMPRINT. OBTAIN FINAL IMAGE APPROVAL

FROM THE VA INTERIOR DEPARTMENT

WALLS: UPPER BACK WALL

(EAGLE CARS 1,2,3 AND 4)

SCALE: 1/16" = 1'-0"

EGRESS PLAN

B9001 LOWER LEVEL

RETAIN EXISTING. POLISH PER A100 NOTE NUMBER 2

AutoCAD SHX Text B9001

AutoCAD SHX Text B9001A

AutoCAD SHX Text B9000

AutoCAD SHX Text

NO.3

AutoCAD SHX Text

TO B9002

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text GENERAL DEMOLITION REQUIREMENTS: 1. ALL INFORMATION IS BASED ON OWNER SUPPLIED ALL INFORMATION IS BASED ON OWNER SUPPLIED DOCUMENTS AND FIELD OBSERVATIONS AND MAY NOT REFLECT COMPLETELY ACTUAL FIELD CONDITIONS, UPON DISCOVERY OF ANY INCONSISTENCIES BETWEEN THE DRAWINGS DESCRIBING THE EXISTING CONDITIONS OR UNKNOWN CONDITIONS THAT ARE DETRIMENTAL TO THE COMPLETION OF WORK AS DESCRIBED IN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR IN WRITING OF THE CONDITION IN QUESTION BEFORE PROCEEDING WITH THE WORK IN THAT AREA. 2. SALVAGE IS DEFINED AS CAREFULLY REMOVING AND SALVAGE IS DEFINED AS CAREFULLY REMOVING AND RETAINING ITEMS FOR RE-USE OR TO BE RETURNED TO THE OWNER. 3. THE CONTRACTOR IS RESPONSIBLE FOR ALL SHORING AND THE CONTRACTOR IS RESPONSIBLE FOR ALL SHORING AND BRACING NECESSARY TO MAINTAIN STRUCTURAL INTEGRITY. 4. THE CONTRACTOR SHALL NOT CUT STRUCTURAL WORK IN A THE CONTRACTOR SHALL NOT CUT STRUCTURAL WORK IN A MANNER RESULTING IN A REDUCTION OF THE LOAD CARRYING CAPACITY OR LOAD / DEFLECTION RATIO. 5. ALL EXISTING CONDITIONS REMAINING AFTER DEMOLITION ALL EXISTING CONDITIONS REMAINING AFTER DEMOLITION THAT INTERFERES WITH NEW CONSTRUCTION SHALL BE REMOVED OR RELOCATED AS REQUIRED TO COMPLETE THE NEW WORK AS DESCRIBED IN THE CONSTRUCTION DOCUMENTS. REFER TO ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR COORDINATION OF NEW WORK. 6. IF ANY EXISTING FIREPROOFING OR OTHER RATED IF ANY EXISTING FIREPROOFING OR OTHER RATED ASSEMBLIES WHICH ARE INDICATED TO REMAIN ARE DAMAGED DURING DEMOLITION, THE CONTRACTOR SMALL REPAIR DAMAGE TO THE LEVEL OF THE ORIGINAL FIRE PROTECTION REQUIREMENTS. 7. DEMOLITION WORK SHALL BE EXECUTED IN CONFORMANCE DEMOLITION WORK SHALL BE EXECUTED IN CONFORMANCE WITH ALL CODES AND ORDINANCES AS SET FORTH BY ALL GOVERNING AUTHORITIES. 8. THE CONTRACTOR SHALL MAINTAIN EGRESS FOR ALL THE CONTRACTOR SHALL MAINTAIN EGRESS FOR ALL OCCUPIED AREAS OF THE BUILDING THROUGHOUT CONSTRUCTION. 9. CONTRACTOR SHALL NOTIFY, COORDINATE, SCHEDULE AND CONTRACTOR SHALL NOTIFY, COORDINATE, SCHEDULE AND RECEIVE PRIOR PERMISSION FROM THE OWNER FOR SHUTDOWN OF SERVICES TO COMPLETE THE WORK. NOTIFICATION SHALL INCLUDE THE TYPE OF SERVICE TO BE SHUT-DOWN, AREAS AFFECTED, REQUESTED SHUT-DOWN DATES AN LENGTH OF TIME SERVICE WILL BE DOWN. 10. THE CONTRACTOR WILL NEED TO COORDINATE TIMES WITH THE CONTRACTOR WILL NEED TO COORDINATE TIMES WITH VA COR AND HOSPITAL STAFF TO ACCESS CEILING AREAS BEYOND SCOPE OF RELATED PROJECT AREAS AS DEFINED. 11. THE CONTRACTOR WILL NEED TO COORDINATE TIMES WITH THE CONTRACTOR WILL NEED TO COORDINATE TIMES WITH VA COR AND HOSPITAL STAFF FOR PROJECT RELATED DEMOLITION AND CONSTRUCTION WORK WITHIN SENSITIVE AREAS AS DEFINED. 12. COVER ANY RETURN AIR GRILLES AND EXHAUST GRILLES IN COVER ANY RETURN AIR GRILLES AND EXHAUST GRILLES IN CONSTRUCTION AREA WITH FILTER MEDIA AND CHANGE REGULARLY. 13. REFER TO MECHANICAL, AND ELECTRICAL DOCUMENTS FOR REFER TO MECHANICAL, AND ELECTRICAL DOCUMENTS FOR RESPECTIVE DEMOLITION INFORMATION. 14. PATCH AND REPAIR ALL WALLS WHERE EXISTING ITEMS PATCH AND REPAIR ALL WALLS WHERE EXISTING ITEMS AND/OR PARTITIONS ARE BEING REMOVED TO MATCH EXISTING ADJACENT FINISHES.

AutoCAD SHX Text GENERAL ARCHITECTURAL NOTES: 1. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION. 2. ALL DIMENSIONS ARE TO GRID LINES, FACE OF STUD FRAMING, ALL DIMENSIONS ARE TO GRID LINES, FACE OF STUD FRAMING, FINISHED FACE OF EXISTING WALL SURFACE, OR FACE OF CONCRETE / MASONRY UNITS UNLESS NOTED OTHERWISE. 3. AT FIRE RATED WALLS WHERE OPENINGS ARE GREATER THAN 16 AT FIRE RATED WALLS WHERE OPENINGS ARE GREATER THAN 16 SQUARE INCHES OR WHERE TOTAL AREA OF OPENINGS EXCEEDS 100 SQUARE INCHES IN 100 SQUARE FEET, WRAP 5/8" TYPE 'X' GYPSUM BOARD BEHIND OPENINGS PER U.L. DESIGN #U510. 4. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL FURNISH ALL NECESSARY PERMITS. 5. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR MECHANICAL, ELECTRICAL. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS INDICATED IN THE SPECIFICATIONS. 6. CONTRACTORS SHALL FOLLOW AND OBEY APPLICABLE FEDERAL, CONTRACTORS SHALL FOLLOW AND OBEY APPLICABLE FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ETC. 7. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN EACH DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN EACH BUILDING COMPONENT LOCATION. BRING DISCREPANCIES TO THE COR'S ATTENTION IN WRITING IMMEDIATELY. 8. ALL WORK SHALL BE PERFORMED IN A SKILLED WORKMANSHIP ALL WORK SHALL BE PERFORMED IN A SKILLED WORKMANSHIP TYPE AND MANNER ACCEPTABLE TO THE COR'S. 9. PROVIDE SHEET METAL OR FIRE RETARDANT WOOD BLOCKING IN PROVIDE SHEET METAL OR FIRE RETARDANT WOOD BLOCKING IN WALL CAVITIES FOR ITEMS THAT ARE REQUIRED TO BE SECURED TO THE WALLS. 10. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS. 11. EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR TO EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR TO BEGINNING OF WORK. ANY ERRORS OR OMISSIONS SHALL BE BROUGHT TO THE COR'S ATTENTION IN WRITING IMMEDIATELY. 12. ALL CARS TO BE CONSTRUCTED ON THE 8th FLOOR, INSIDE THE ALL CARS TO BE CONSTRUCTED ON THE 8th FLOOR, INSIDE THE SHAFT. 13. COMPLETE ONE PASSENGER ELEVATOR BEFORE STARTING COMPLETE ONE PASSENGER ELEVATOR BEFORE STARTING ANOTHER. CARS S-5 AND S-6 CAN NOT BE DOWN AT THE SAME TIME. 14. FOR OVERHEAD PIPING WORK ABOVE CEILING OUTSIDE THE AREA FOR OVERHEAD PIPING WORK ABOVE CEILING OUTSIDE THE AREA OF WORK FOR THIS PROJECT, COORDINATE WITH VA COR ABOUT OFF-HOUR SCHEDULE AND ICRA PROTECTION REQUIREMENTS. 15. ALL MAIN LOBBY WORK SHALL BE PERFORMED DURING AFTER ALL MAIN LOBBY WORK SHALL BE PERFORMED DURING AFTER HOURS. SEE PROJECT SCHEDULE SPECIFICATION AND WORK EXCLUSIONS INDICATED ELSEWHERE IN THIS PROJECT DOCUMENTS. S-6 LOBBY CONSTRUCTION WORK SHALL BE COORDINATED WITH OTHER USER GROUPS. SEE LIFE SAFETY AND INFECTION CONTROL PLANS FOR MORE INFORMATION.

AutoCAD SHX Text SUGGESTED PHASING GENERAL NOTES AND SEQUENCE: 1. CONTRACTOR TO COORDINATE A PHASING PLAN WITH THE VA PRIOR TO WORK. PHASING SHALL BE COORDINATED CONTRACTOR TO COORDINATE A PHASING PLAN WITH THE VA PRIOR TO WORK. PHASING SHALL BE COORDINATED BETWEEN EACH CONTRACTOR AND SUB-CONTRACTORS. ALL ELECTRICAL SHUTDOWN WORK FOR ELEVATOR CABS SHALL BE COMPLETED PRIOR TO SHUTDOWN OF THE ELEVATOR IN THE NEXT SEQUENCE. REFER TO ADDITIONAL WORK IMPACTS BY RESPECTIVE ARCHITECTURAL, STRUCTURAL AND MECHANICAL DISCIPLINE SHEETS. 2. ALL PROPOSED METHODS DEFINED FOR THE MODERNIZATION OF ELEVATOR SCOPE IN THE FOLLOWING PROJECT ALL PROPOSED METHODS DEFINED FOR THE MODERNIZATION OF ELEVATOR SCOPE IN THE FOLLOWING PROJECT DOCUMENTS AND SPECIFICATIONS SHOULD BE FULLY COORDINATED WITH A CONTRACTOR'S ELEVATOR SUB-CONTRACTOR FOR THEIR ANTICIPATED WORK PLAN. 3. ONE PASSENGER ELEVATOR MOST BE COMPLETED BEFORE STARTING ANOTHER. CARS S-5 AND S-6 CAN NOT BE ONE PASSENGER ELEVATOR MOST BE COMPLETED BEFORE STARTING ANOTHER. CARS S-5 AND S-6 CAN NOT BE DOWN AT THE SAME TIME. 4. ALL MAIN LOBBY WORK SHALL BE COORDINATED WITH THE VA OR PERFORMED DURING AFTER HOURS. SEE PROJECT ALL MAIN LOBBY WORK SHALL BE COORDINATED WITH THE VA OR PERFORMED DURING AFTER HOURS. SEE PROJECT SCHEDULE SPECIFICATION AND WORK EXCLUSIONS INDICATED ELSEWHERE IN THIS PROJECT DOCUMENTS. S-6, 3RD FLOOR LOBBY CONSTRUCTION WORK SHALL BE COORDINATED WITH VA AND OTHER USER GROUPS. SEE LIFE SAFETY AND INFECTION CONTROL PLANS FOR MORE INFORMATION. 5. CONTRACTOR SHALL USE MEANS AND METHODS AVAILABLE VIA C WING DOCK DOOR AT BASEMENT LEVEL TO CONTRACTOR SHALL USE MEANS AND METHODS AVAILABLE VIA C WING DOCK DOOR AT BASEMENT LEVEL TO EXISTING FREIGHT ELEVATORS TO DELIVER MATERIAL TO PROSPECTIVE LEVELS THROUGH B WING EIGHTH FLOOR ACCESS HATCH NEAR S5 TO NINTH FLOOR MACHINE ROOM. WORK FOR S6 IN CW ING PENTHOUSE MAY ENCOUNTER LIFTING PLANS TO THE CWING ROOF. PHASE 1. PASSENGER ELEVATORS P4 AND FREIGHT ELEVATOR S5 - DRAWING SHEET G003 PHASE 2. PASSENGER ELEVATORS P3 - DRAWING SHEET G003 PHASE 3. PASSENGER ELEVATORS P2 - DRAWING SHEET G003 PHASE 4. PASSENGER ELEVATORS P1 - DRAWING SHEET G003 PHASE 5. CWING 5TH FLOOR - PENTHOUSE. NEW MACHINE ROOM. DRAWING SHEET G004 PHASE 6. FREIGHT ELEVATOR S6. FOR THE DEMOLITION AND RENOVATION OF MODERNIZATIONS - DRAWING SHEET G004 6. FREIGHT ELEVATOR S6. FOR THE DEMOLITION AND RENOVATION OF MODERNIZATIONS - DRAWING SHEET G004 PHASE 7. FREIGHT ELEVATOR S6- 3RD FLOOR RENOVATIONS FOR LOBBY- DRAWING SHEET G004 7. FREIGHT ELEVATOR S6- 3RD FLOOR RENOVATIONS FOR LOBBY- DRAWING SHEET G004

AutoCAD SHX Text EXISTING 2X4 LIGHT FIXTURE- TO BE REMOVED, RELOCATED OR TO REMAIN- SEE CEILING PLAN WORK 2X2 CEILING PANEL GRID GYPSUM BOARD OR PLASTER CEILING- ALTERATIONS OR NEW- SEE SPECIFIC CONDITIONS UNLESS OTHER WISE INDICATED NEW CEILING WORK - GRID AND ACCOUSTICAL TILE

AutoCAD SHX Text A

AutoCAD SHX Text MECHANICAL CEILING DIFFUSERS (SUPPLY) MECHANICAL CEILING DIFFUSERS (RETURN EXHAUST) SPRINKLER HEAD WAP- WIRELESS ACCESS POINT

AutoCAD SHX Text A. ALL ITEMS NOT SYMBOLIZED OR NOTED ALL ITEMS NOT SYMBOLIZED OR NOTED ARE EXISTING TO REMAIN SHOWN ON THE PLANS.

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text N

AutoCAD SHX Text

LEGEND OF SYMBOLS

AutoCAD SHX Text

2 HOUR FIRE BARRIER

AutoCAD SHX Text

1 HOUR SMOKE BARRIER

AutoCAD SHX Text

DEVICE LIST

AutoCAD SHX Text

FIRE EXTINGUISHER

AutoCAD SHX Text

EXIT SIGN

AutoCAD SHX Text

TRAVEL ROUTE AND DIRECTION

NON RATED DUST/ SMOKE TIGHT BARRIER

ICRA AND PHASING PLANS

EAGLE ELEVATORS P1 THROUGH 4, AND S-5

Elevator:

PO Box 464

Phone: 608.616.2999 Mequon, WI 53092

UPGRADE EAGLE AND FREIGHT

ELEVATORS

Email: AdamS@pec-wi.com POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

35% Schematic Design 10.15.2021 5.27.22

Project Number

Building Number

607-21-155

B A

C G

POC: Adam Smith

B-Core

65% Construction Documents 12.29.2021 95% Construction Documents 3.18.2022 100% Construction Documents 5.27.2022

G003

SCALE: 1/4" = 1'-0"

PHASING PLAN -8TH FLOOR- CABS P1,P2,P3

SCALE: 1/4" = 1'-0"

PHASING PLAN

SCALE: 1/4" = 1'-0"

PHASING PLAN -8TH FLOOR- CAB P4 AND S5

SCALE: 1/4" = 1'-0"

PHASING PLAN

SECONDARY HOISTWAY SPACE BELOW MACHINE ROOM B9002

MACHINE ROOM B9002 SPACE

PHASE 1A

PHASE 2A

PHASE 1B

PHASE 1B

PHASE 3APHASE 4A

PHASE 2BPHASE 3BPHASE 4B

PHASE 1A

TEMPORARY CONSTRUCTION

AREA PARTITION NOTES

PHASE 1D

PHASE 1D

PHASE 2CPHASE 3CPHASE 4C

AutoCAD SHX Text B8057

AutoCAD SHX Text B8057A

AutoCAD SHX Text P1

AutoCAD SHX Text S5

AutoCAD SHX Text P2

AutoCAD SHX Text P3

AutoCAD SHX Text P4

AutoCAD SHX Text B8057

AutoCAD SHX Text B8057A

AutoCAD SHX Text P1

AutoCAD SHX Text S5

AutoCAD SHX Text P2

AutoCAD SHX Text P3

AutoCAD SHX Text P4

AutoCAD SHX Text B9002

AutoCAD SHX Text P1

AutoCAD SHX Text S5

AutoCAD SHX Text P2

AutoCAD SHX Text P3

AutoCAD SHX Text P4

AutoCAD SHX Text

HOIST BEAM

AutoCAD SHX Text P1

AutoCAD SHX Text S5

AutoCAD SHX Text P2

AutoCAD SHX Text P3

AutoCAD SHX Text P4

AutoCAD SHX Text Eagle Elevators-P1,2,3,4

AutoCAD SHX Text Freight Elevator S-5

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text N

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text Not to Scale

AutoCAD SHX Text Ground thru 8th floor

AutoCAD SHX Text Basement thru 8th floor

AutoCAD SHX Text 9th flr. Machine Room-B9002

AutoCAD SHX Text GENERAL INFECTION CONTROL REQUIREMENTS: ENERAL INFECTION CONTROL REQUIREMENTS: 1. SEE SPEC 013526 FOR ADDITIONAL REQUIREMENTS AND G002 SEE SPEC 013526 FOR ADDITIONAL REQUIREMENTS AND G002 FOR LEGEND OF SYMBOLS 2. DEMOLITION AND REMOVAL OF MATERIALS AND EQUIPMENT DEMOLITION AND REMOVAL OF MATERIALS AND EQUIPMENT WILL REQUIRE THE CONTRACTOR TO MOVE THESE ITEMS IN COVERED AND SEALED CARTS. REMOVAL SHOULD ONLY TAKE PLACE AFTER NORMAL BUSINESS HOURS, CLEANUP OF ANY LIMITED DEBRIS LEFT IN ACCESS ROUTE DURING REMOVAL IS THE RESPONSIBILITY OF THE CONTRACTOR, IF NOT CAPPED AND SEALED BASED ON SCOPE OF WORK, ISOLATE RETURN AND EXHAUST DUCT OPENINGS IN THE WORK AREA WITH TEMPORARY MERV 8 PLEATED MEDIA. 3. SPECIAL ATTENTION, SUCH AS PROVISION OF NEGATIVE AIR SPECIAL ATTENTION, SUCH AS PROVISION OF NEGATIVE AIR PRESSURIZATION WITH HEPA FILTER UNITS, WILL BE REQUIRED IN WORK AREAS ADJACENT TO PATIENT CARE AREAS. IN THESE AREAS, DUST PARTITIONS WILL REMAIN IN PLACE UNTIL WORK IN THE AREA IS APPROVED BY PROJECT ENGINEER AND VAMC AND THOROUGHLY CLEANED BY THE CONTRACTOR. 4. AT THE POINT OF EXIT FOR EACH PARTITIONED WORK AREA, AT THE POINT OF EXIT FOR EACH PARTITIONED WORK AREA, THE CONTRACTOR WILL PROVIDE AN EFFECTIVE ADHESIVE WALK-OFF MAT AT ALL TIMES. 5. THE CONTRACTOR WILL MAINTAIN AS NECESSARY THE THE CONTRACTOR WILL MAINTAIN AS NECESSARY THE CLEANLINESS OF THE AREA ADJACENT TO DUST PARTITION BY MOPPING OR VACUUM SWEEPING. 6. THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE TIGHT, TEMPORARY 1 AND 2-HOUR FIRE-RATED SMOKE-TIGHT PARTITIONS, TEMPORARY DOORS, WALK-OFF MATS AND EQUIPMENT PROTECTION WHERE SHOWN ON THE DOCUMENTS OR IMPLIED BY THE WORK BEING PERFORMED. SUCH PROTECTION SHALL BE MAINTAINED AND REPAIRED PROMPTLY IF DAMAGED TO AVOID DUST INFILTRATION INTO ADJACENT AREAS. 7. ALL DOORS IN TEMPORARY PARTITIONS SHALL BE ALL DOORS IN TEMPORARY PARTITIONS SHALL BE 3'-6"x7'-0" (SINGLE) AND 6'-0"x7'-0" (DOUBLE) U.N.O. REF. FLOOR PLANS FOR LOCATIONS. ALL TEMPORARY DOORS SHALL BE 1 AND 2-HOUR RATED W/ LEVER TYPE DOOR CONTROLS KEY/ PUNCH CODE ENTRY LOCKS AND CLOSERS. 8. STICKY MATS REQUIRED AT TOP OF STAIR NO.3 AND ALL STICKY MATS REQUIRED AT TOP OF STAIR NO.3 AND ALL BARRIERS DURING ALL WORK.

AutoCAD SHX Text

INFECTION CONTROL RISK ASSESSMENT AND ILSM MEASURES

AutoCAD SHX Text CONTRACTOR TO INSTALL TEMPORARY DUST PARTITION ( SMOKE-TIGHT WALL) WITH HOLLOW METAL DOOR WALL: METAL STUD & " TYPE 'X' GYPSUM BOARD (BOTH 58" TYPE 'X' GYPSUM BOARD (BOTH SIDES) PARTITION TO DECK ABOVE, TAPED AND PAINTED. .

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text AREAS OF WORK AND CONTRACTOR LEVEL OF INFECTION CONTROL WILL BE DETERMINED PRIOR TO CONSTRUCTION BY VA INFECTION CONTROL DEPARTMENT. MAJOR EXPECTED WORK CONTAINED WITHIN ELEVATOR CAB AND SHAFT POSE ZERO OR LOW RISK TO FLOOR LEVELS PROVIDED THE PROPER BARRIERS ARE IN PLACE. ANY PRECAUTIONARY HOT WORK ACTIVITIES OUTSIDE THE CABS SHOULD BE CONTAINED WITHIN WORK AREAS. PENTHOUSE WORK CWING OF THE FACILITY IS MOST SUSCEPTIBLE TO FIRE RELATED IMPACTS OR ELECTRICAL SHORTAGES THAT WOULD RESULT IN THE SHUTDOWN OF CRUCIAL HVAC HEATING AND COOLING EQUIPMENT.

AutoCAD SHX Text

INFECTION CONTROL RISK ASSESSMENT

AutoCAD SHX Text

INFECTION CONTROL NOTES

AutoCAD SHX Text

PASSENGER P1 THRU 4 AND S-5 PENTHOUSE

AutoCAD SHX Text RISK GROUP: LOW / PRECAUTION LEVEL ll

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text SUGGESTED PHASING NOTES AND SEQUENCE: PHASE 1. PASSENGER ELEVATORS P4 AND S5 A. PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER AND FREIGHT ELEVATORS S-5 MOTORS IN ORDER TO WORK ON P4 MOTOR. A.1. REMOVE S5 MOTOR AND ALL FOR THE MODERNIZATION REMOVE S5 MOTOR AND ALL FOR THE MODERNIZATION REQUIREMENTS A.2. REMOVE P4 MOTOR AND ALL FOR THE MODERNIZATION REMOVE P4 MOTOR AND ALL FOR THE MODERNIZATION REQUIREMENTS A.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 A.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 A.4. REMOVE MECHANICAL AND ASSOCIATED ELECTRICAL REMOVE MECHANICAL AND ASSOCIATED ELECTRICAL A.5. INSTALL NEW MECHANICAL AND ELECTRICAL INSTALL NEW MECHANICAL AND ELECTRICAL B. WORK IN SECONDARY HOISTWAY AREA AND CABS WORK IN SECONDARY HOISTWAY AREA AND CABS B.1. REMOVE ALL FIRE PROTECTION LINES WITHIN REMOVE ALL FIRE PROTECTION LINES WITHIN SECONDARY HOISTWAY. B.2. REMOVE ALL FIRE ALARMS REMOVE ALL FIRE ALARMS B.3. REMOVE ALL ELECTRICAL WITHIN SECONDARY HOISTWAY REMOVE ALL ELECTRICAL WITHIN SECONDARY HOISTWAY PERTAINING TO MODERNIZATION SCOPE OF WORK. B.4. REMOVE P4 RELATED TO THE UPGRADE FOR THE REMOVE P4 RELATED TO THE UPGRADE FOR THE MODERNIZATION OF ELEVATOR CABS. B.5. REMOVE S5 RELATED TO THE UPGRADE FOR THE REMOVE S5 RELATED TO THE UPGRADE FOR THE MODERNIZATION OF ELEVATOR CABS. B.6. PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR NEW PROPOSED WORK. B.7. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 B.8. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 C. WORK IN PIT AND PRIMARY HOISTWAY AREA- PASSENGER P4 WORK IN PIT AND PRIMARY HOISTWAY AREA- PASSENGER P4 & FREIGHT S5 C.1. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 C.2. WORK IN PIT AREA - BEGIN INSTALLATION WORK FOR WORK IN PIT AREA - BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 C.3. INSTALL SUMP WATER INTRUSION ALARM DEVICE FOR INSTALL SUMP WATER INTRUSION ALARM DEVICE FOR S5. SEE FA100 AND A100 NOTES D. CARS P1 AND S5 ARE REMOVED FROM SERVICE AND CARS P1 AND S5 ARE REMOVED FROM SERVICE AND LOCATED ON THE 8TH FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK. PHASE 2. PASSENGER ELEVATOR P3 A. PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER ELEVATOR MOTORS FOR P3 A.1. REMOVE P3 MOTOR FOR MODERNIZATION REMOVE P3 MOTOR FOR MODERNIZATION A.2. BEGIN INSTALLATION WORK FOR MODERNIZATION OF P3 BEGIN INSTALLATION WORK FOR MODERNIZATION OF P3 MOTOR B. WORK IN SECONDARY HOISTWAY AREA AND CAB WORK IN SECONDARY HOISTWAY AREA AND CAB B.1. REMOVE P3 WORK RELATED TO THE MODERNIZATION OF REMOVE P3 WORK RELATED TO THE MODERNIZATION OF ELEVATOR CAB. B.2. PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR NEW PROPOSED WORK. B.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P3. B.4. WORK IN PIT AND HOISTWAY AREA. WORK IN PIT AND HOISTWAY AREA. C. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P3. CAR IS TO BE REMOVED FROM SERVICE AND LOCATED ON THE 8TH FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK. PHASE 3. PASSENGER ELEVATOR P2 A. PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER ELEVATOR MOTOR FOR P2 A.1. REMOVE P2 MOTOR FOR MODERNIZATION REMOVE P2 MOTOR FOR MODERNIZATION A.2. BEGIN INSTALLATION WORK FOR MODERNIZATION OF P2 BEGIN INSTALLATION WORK FOR MODERNIZATION OF P2 MOTOR B. WORK IN SECONDARY HOISTWAY AREA AND CAB WORK IN SECONDARY HOISTWAY AREA AND CAB B.1. REMOVE P2 WORK RELATED TO THE MODERNIZATION OF REMOVE P2 WORK RELATED TO THE MODERNIZATION OF ELEVATOR CAB. B.2. PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR NEW PROPOSED WORK. B.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P2 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P2 B.4. WORK IN PIT AND HOISTWAY AREA WORK IN PIT AND HOISTWAY AREA C. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P2. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P2. CAR IS TO BE REMOVED FROM SERVICE AND LOCATED ON THE 8TH FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK. PHASE 4. PASSENGER ELEVATOR P1 A. PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER ELEVATOR MOTOR FOR P1 A.1. REMOVE P1 MOTOR FOR MODERNIZATION REMOVE P1 MOTOR FOR MODERNIZATION A.2. BEGIN INSTALLATION WORK FOR MODERNIZATION OF P1 BEGIN INSTALLATION WORK FOR MODERNIZATION OF P1 MOTOR B. WORK IN SECONDARY HOISTWAY AREA AND CAB WORK IN SECONDARY HOISTWAY AREA AND CAB B.1. REMOVE P1 WORK RELATED TO THE MODERNIZATION OF REMOVE P1 WORK RELATED TO THE MODERNIZATION OF ELEVATOR CAB. B.2. PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR NEW PROPOSED WORK. B.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P1 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P1 B.4. WORK IN PIT AND HOISTWAY AREA WORK IN PIT AND HOISTWAY AREA C. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P1. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P1. CAR IS TO BE REMOVED FROM SERVICE AND LOCATED ON THE 8TH FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK.

AutoCAD SHX Text

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text N

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text N

S6

ICRA AND PHASING PLANS

FREIGHT ELEVATORS S6

Elevator:

PO Box 464

Phone: 608.616.2999 Mequon, WI 53092

UPGRADE EAGLE AND FREIGHT

ELEVATORS

Email: AdamS@pec-wi.com POC: Aslam Husain

9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321

35% Schematic Design 10.15.2021 5.27.22

Project Number

Building Number

607-21-155

B A

C G

POC: Adam Smith

B-Core

65% Construction Documents 12.29.2021 95% Construction Documents 3.18.2022 100% Construction Documents 5.27.2022

G004

SCALE: 1/4" = 1'-0"

PHASING PLAN 6-4RTH FLOOR- WORK

SCALE: 1/4" = 1'-0"

PHASING PLAN 6 -3RD FLOOR- CAB S6

SCALE: 1/4" = 1'-0"

PHASING PLAN 5- PENTHOUSE - WORK

TEMPORARY CONSTRUCTION

AREA PARTITION NOTES

PHASE 5A

PHASE 6A&B

PHASE 6C

PHASE 7

PHASE 6B

PHASE 5A

AutoCAD SHX Text C4160

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

MECH ROOM

AutoCAD SHX Text C4143

AutoCAD SHX Text

MECH

AutoCAD SHX Text C4142

AutoCAD SHX Text

LAB

AutoCAD SHX Text C4144

AutoCAD SHX Text

ELEC VAULT

AutoCAD SHX Text C4144A

AutoCAD SHX Text

ELEVATOR MACHINE

AutoCAD SHX Text C4144B

AutoCAD SHX Text

ELEC VAULT

AutoCAD SHX Text C4149C

AutoCAD SHX Text

OFFICE, STAFF

AutoCAD SHX Text C4146

AutoCAD SHX Text

LAB, RESEARCH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EX. FEC

AutoCAD SHX Text

EX. FEC

AutoCAD SHX Text C3134A

AutoCAD SHX Text

DO NOT FILL IN THESE FIELDS

AutoCAD SHX Text

ELEC. CLO.

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C3134

AutoCAD SHX Text

EX. STAIR

AutoCAD SHX Text

NO. 6

AutoCAD SHX Text

DO NOT FILL IN THESE FIELDS

AutoCAD SHX Text

EX. ---

AutoCAD SHX Text C----

AutoCAD SHX Text

DO NOT FILL IN THESE FIELDS

AutoCAD SHX Text

EX. OFFICE

AutoCAD SHX Text C3135

AutoCAD SHX Text

DO NOT FILL IN THESE FIELDS

AutoCAD SHX Text

EX. STOR.

AutoCAD SHX Text C3128

AutoCAD SHX Text

DO NOT FILL IN THESE FIELDS

AutoCAD SHX Text

EX. KITCHEN

AutoCAD SHX Text C3133

AutoCAD SHX Text

DO NOT FILL IN THESE FIELDS

AutoCAD SHX Text

EX. MECH.

AutoCAD SHX Text C3132

AutoCAD SHX Text

DO NOT FILL IN THESE FIELDS

AutoCAD SHX Text

EX. REC./CORRIDORS

AutoCAD SHX Text C3127

AutoCAD SHX Text

DO NOT FILL IN THESE FIELDS

AutoCAD SHX Text

EX. LOUVER

AutoCAD SHX Text

EX. LOUVER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C5002

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text

EX. LOUVER

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text Freight Elevator S-6

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI

AutoCAD SHX Text

100% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text N

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text Not to Scale

AutoCAD SHX Text Basement thru 3rd floor

AutoCAD SHX Text Machine Room -4th floor

AutoCAD SHX Text Machine Room C4144A

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text GENERAL INFECTION CONTROL REQUIREMENTS: ENERAL INFECTION CONTROL REQUIREMENTS: 1. SEE SPEC 013526 FOR ADDITIONAL REQUIREMENTS AND G002 SEE SPEC 013526 FOR ADDITIONAL REQUIREMENTS AND G002 FOR LEGEND OF SYMBOLS 2. DEMOLITION AND REMOVAL OF MATERIALS AND EQUIPMENT DEMOLITION AND REMOVAL OF MATERIALS AND EQUIPMENT WILL REQUIRE THE CONTRACTOR TO MOVE THESE ITEMS IN COVERED AND SEALED CARTS. REMOVAL SHOULD ONLY TAKE PLACE AFTER NORMAL BUSINESS HOURS, CLEANUP OF ANY LIMITED DEBRIS LEFT IN ACCESS ROUTE DURING REMOVAL IS THE RESPONSIBILITY OF THE CONTRACTOR, IF NOT CAPPED AND SEALED BASED ON SCOPE OF WORK, ISOLATE RETURN AND EXHAUST DUCT OPENINGS IN THE WORK AREA WITH TEMPORARY MERV 8 PLEATED MEDIA. 3. SPECIAL ATTENTION, SUCH AS PROVISION OF NEGATIVE AIR SPECIAL ATTENTION, SUCH AS PROVISION OF NEGATIVE AIR PRESSURIZATION WITH HEPA FILTER UNITS, WILL BE REQUIRED IN WORK AREAS ADJACENT TO PATIENT CARE AREAS. IN THESE AREAS, DUST PARTITIONS WILL REMAIN IN PLACE UNTIL WORK IN THE AREA IS APPROVED BY PROJECT ENGINEER AND VAMC AND THOROUGHLY CLEANED BY THE CONTRACTOR. 4. AT THE POINT OF EXIT FOR EACH PARTITIONED WORK AREA, AT THE POINT OF EXIT FOR EACH PARTITIONED WORK AREA, THE CONTRACTOR WILL PROVIDE AN EFFECTIVE ADHESIVE WALK-OFF MAT AT ALL TIMES. 5. THE CONTRACTOR WILL MAINTAIN AS NECESSARY THE THE CONTRACTOR WILL MAINTAIN AS NECESSARY THE CLEANLINESS OF THE AREA ADJACENT TO DUST PARTITION BY MOPPING OR VACUUM SWEEPING. 6. THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE-TIGHT, TEMPORARY 1 AND 2-HOUR FIRE-RATED SMOKE-TIGHT PARTITIONS, TEMPORARY DOORS, WALK-OFF MATS AND EQUIPMENT PROTECTION WHERE SHOWN ON THE DOCUMENTS OR IMPLIED BY THE WORK BEING PERFORMED. SUCH PROTECTION SHALL BE MAINTAINED AND REPAIRED PROMPTLY IF DAMAGED TO AVOID DUST INFILTRATION INTO ADJACENT AREAS. 7. ALL DOORS IN TEMPORARY PARTITIONS SHALL BE ALL DOORS IN TEMPORARY PARTITIONS SHALL BE 3'-6"x7'-0" (SINGLE) AND 6'-0"x7'-0" (DOUBLE) U.N.O. REF. FLOOR PLANS FOR LOCATIONS. ALL TEMPORARY DOORS SHALL BE 1 AND 2-HOUR RATED W/ LEVER TYPE DOOR CONTROLS KEY/ PUNCH CODE ENTRY LOCKS AND CLOSERS. 8. STICKY MATS REQUIRED AT ALL BARRIERS DURING ALL WORK.STICKY MATS REQUIRED AT ALL BARRIERS DURING ALL WORK.

AutoCAD SHX Text

INFECTION CONTROL RISK ASSESSMENT AND ILSM MEASURES

AutoCAD SHX Text CONTRACTOR TO INSTALL TEMPORARY DUST PARTITION ( SMOKE-TIGHT WALL) WITH HOLLOW METAL DOOR WALL: METAL STUD & " TYPE 'X' GYPSUM BOARD (BOTH 58" TYPE 'X' GYPSUM BOARD (BOTH SIDES) PARTITION TO DECK ABOVE, TAPED AND PAINTED NOT USED. CONTRACTOR TO LEAVE ONE LEAF INACTIVE WHILE MAINTAINING ACCESS VIA EXISTING ACTIVE LEAF FOR OFFICE STAFF. CONTRACTOR TO PROVIDE DUST TIGHT CLOSER AT PENTHOUSE OVER WORK AREA- TIE INTO TEMPORARY CONSTRUCTION AREA BARRIER WALLS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text AREAS OF WORK AND CONTRACTOR LEVEL OF INFECTION CONTROL WILL BE DETERMINED PRIOR TO CONSTRUCTION BY VA INFECTION CONTROL DEPARTMENT. MAJOR EXPECTED WORK CONTAINED WITHIN ELEVATOR CAB AND SHAFT POSE ZERO OR LOW RISK TO FLOOR LEVELS PROVIDED THE PROPER BARRIERS ARE IN PLACE. ANY PRECAUTIONARY HOT WORK ACTIVITIES OUTSIDE THE CABS SHOULD BE CONTAINED WITHIN WORK AREAS. PENTHOUSE WORK CWING OF THE FACILITY IS MOST SUSCEPTIBLE TO FIRE RELATED IMPACTS OR ELECTRICAL SHORTAGES THAT WOULD RESULT IN THE SHUTDOWN OF CRUCIAL HVAC HEATING AND COOLING EQUIPMENT.

AutoCAD SHX Text

INFECTION CONTROL RISK ASSESSMENT

AutoCAD SHX Text

S-6 THIRD FLOOR

AutoCAD SHX Text RISK GROUP: LOW / PRECAUTION LEVEL ll OR III/IV

AutoCAD SHX Text

INFECTION CONTROL NOTES

AutoCAD SHX Text

S-6 PENTHOUSE FLOOR

AutoCAD SHX Text RISK GROUP: LOW / PRECAUTION LEVEL ll OR III/IV

AutoCAD SHX Text SUGGESTED PHASING NOTES AND SEQUENCE: PHASE 5 - CWING PENTHOUSE WORK A. WORK IN PENTHOUSE TO PREP FOR S-6 EXTENSION WORK IN PENTHOUSE TO PREP FOR S-6 EXTENSION A.1. REMOVE MECHANICAL DUCTWORK AND EQUIPMENT AS REMOVE MECHANICAL DUCTWORK AND EQUIPMENT AS WELL AS REROUTE ELECTRICAL AS REQUIRED. A.2. PROVIDE STRUCTURAL DEMOLITION WORK RELATED TO PROVIDE STRUCTURAL DEMOLITION WORK RELATED TO THE NEW PROPOSED WORK IN PENTHOUSE FLOOR. PHASE 6. FREIGHT ELEVATOR S6 A. WORK IN MACHINE ROOM 4RTH FLOOR WORK IN MACHINE ROOM 4RTH FLOOR A.1. REMOVE S6 MOTOR AND ALL FOR THE MODERNIZATION REMOVE S6 MOTOR AND ALL FOR THE MODERNIZATION REQUIREMENTS. SET ASIDE FOR RELOCATION A.2. REMOVE ALL FIRE PROTECTION LINES WITHIN MACHINE REMOVE ALL FIRE PROTECTION LINES WITHIN MACHINE ROOM. A.3. REMOVE ALL FIRE ALARM AND ELECTRICAL LIGHTING, REMOVE ALL FIRE ALARM AND ELECTRICAL LIGHTING, CABINETS, JUNCTION BOXES AND MECHANICAL COOLING EQUIPMENT. A.4. PROVIDE STRUCTURAL DEMOLITION WORK BY REMOVING PROVIDE STRUCTURAL DEMOLITION WORK BY REMOVING MACHINE ROOM FLOOR FOR NEW HOISTWAY. B. WORK IN PENTHOUSE AND PRIMARY HOISTWAY AREA WORK IN PENTHOUSE AND PRIMARY HOISTWAY AREA B.1. INSTALL ALL NEW ELECTRICAL WITHIN PENTHOUSE (NEW INSTALL ALL NEW ELECTRICAL WITHIN PENTHOUSE (NEW MACHINE ROOM) PERTAINING TO MODERNIZATION SCOPE OF WORK. B.2. REMOVE S6 RELATED TO THE UPGRADE FOR THE REMOVE S6 RELATED TO THE UPGRADE FOR THE MODERNIZATION OF ELEVATOR CAB. B.3. REMOVE LOUVER WITHIN SHAFT AND PROVIDE RATED REMOVE LOUVER WITHIN SHAFT AND PROVIDE RATED WALL ASSEMBLY. B.4. PROVIDE ALL NEW STRUCTURAL AND ARCHITECTURAL PROVIDE ALL NEW STRUCTURAL AND ARCHITECTURAL WORK RELATED TO MACHINE ROOM WALLS AND CEILING, STUDS AND JOISTS AND MACHINE ROOM CONCRETE PAD. B.5. PROVIDE NEW ENCLOSURE WITH COOLING AND PROVIDE NEW ENCLOSURE WITH COOLING AND ELECTRICAL FOR NEW PENTHOUSE MACHINE ROOM C. WORK IN PIT AND HOISTWAY AREA - FREIGHT S6 WORK IN PIT AND HOISTWAY AREA - FREIGHT S6 REMOVE AND BEGIN INSTALLATION WORK FOR THE MODERNIZATION FOR S6 WORK. INSTALLATION WORK FOR MODERNIZATION FOR S6. CAR IS TO BE REMOVED FROM CAR IS TO BE REMOVED FROM SERVICE AND LOCATED ON 3RD FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK. PHASE 7. FREIGHT ELEVATOR S6- WORK IN MACHINE ROOM 3RD FLOOR A.1 REMOVE WALLS, PLUMBING AND CABINETRY SHOWN REMOVE WALLS, PLUMBING AND CABINETRY SHOWN ON ARCHITECTURAL AND PLUMBING PLANS FOR THE PROPOSED NEW LOBBY ON 3RD FLOOR A.2 OPEN UP NEW WALL FOR SHAFT ELEVATOR DOOR OPEN UP NEW WALL FOR SHAFT ELEVATOR DOOR ENTRANCE ON 3RD FLOOR A.3 INSTALL NEW WALLS AND CEILING WORK FOR NEW INSTALL NEW WALLS AND CEILING WORK FOR NEW LOBBY.