S02 - Volume 1 Drawings.pdf
PDF 8 MB Posted
- Solicitation number
- 36C25222B0034
About this file
This solicitation is for upgrade work to eagle and freight elevators at the William S. Middleton VA Medical Center in Madison, Wisconsin. The solicitation number is 36C25222B0034 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
The work includes modernizing four passenger elevators (P1 through P4) and one freight elevator (S5) located in Building 1. It will also modernize a second freight elevator (S6) and renovate associated third floor lobbies. The contractor will remove and replace elevator equipment and controls, structural elements, and perform other construction and demolition work. The estimated cost is $2-5 million. The response due date is July 15th, 2022 and the period of performance is 365 days. The set-aside is for verified service-disabled veteran-owned small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 - Spec Section 251300 - Integration.pdf | ||
| S06 - SF 1442.pdf | ||
| 36C25222B0034 0003.docx | DOCX document | |
| P07 - Wage Determination Revised.pdf | ||
| 36C25222B0034 0002.docx | DOCX document | |
| S04 - Pre-Bid Sign in Sheet.pdf | ||
| 36C25222B0034 0001.docx | DOCX document | |
| S02 - Volume 2 Drawings.pdf | ||
| S02 - Volume 2 Specifications.pdf | ||
| S02 - Volume 1 Specifications.pdf | ||
| P07 - Wage Determination.pdf | ||
| 36C25222B0034_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARKING RAMP
BLDG #15
FLAG
'D' WING
CH
IL
LE
R
PL
AN
T
BLDG #19
'C ' W
IN
G
'G ' W
IN
G
'A' WING
'B' CORE
SWITCHGEAR
LAUNDRY
EMER. GENERATOR
WELL
PUMPHOUSE
MENTAL
HEALTH
CLINIC
ENTRANCE
MAIN
/LOBBY
BLDG #7
BLDG #12
BLDG #1
BLDG #2
BLDG #13
BLDG #3
BLDG #5
BL
DG
ELEC.
ENTRANCE
OLD MAIN
BLDG #22
MRI
COMMUNITY LIVING CENTER
HOSPICE
MENTAL HEALTH
EMERGENCY
UNIVERSITY OF
WISCONSIN
HOSPITAL
CO
NNEC
TI
NG C
ORR
ID
OR
BLDG #27
BLDG #17
OLD
BLDG #14
BLDG 20
SERVICE ENCLOSURE
CONTRACTOR PARKING
CONNECTING CORRIDOR
BLDG 21
ROOFTOP UNIT
'B' WING
BLDG 18
BL
DG
'A' WING
'B' WING
BLDG #1
'G' WING
BLDG #3
'C ' W
IN
G
'B' CORE
TITLE SHEET
SITE PLAN-CAMPUS
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
WILLIAM S MIDDLETON VA MEDICAL CENTER
MADISON, WISCONSIN
Elevator:
PO Box 464
Phone: 608.616.2999 Mequon, WI 53092
UPGRADE EAGLE AND FREIGHT
ELEVATORS
Email: AdamS@pec-wi.com POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
35% Schematic Design 10.15.2021 5.27.22
Project Number
Building Number
607-21-155
POC: Adam Smith
65% Construction Documents 12.29.2021 95% Construction Documents 3.18.2022 100% Construction Documents 5.27.2022
G001
UPGRADE EAGLE AND FREIGHT ELEVATORS
PROJECT #607-21-155
BUILDING 1 -GENERAL ARRANGEMENT
ConsultantsA/E Seals
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text Area of Work
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text %%UQA/QC Consultants
AutoCAD SHX Text Henneman Engineering
AutoCAD SHX Text 1232 Fourier Drive, Suite 101, AutoCAD SHX Text Madison, Wisconsin 53717
AutoCAD SHX Text Phone: (608) 833-7000
AutoCAD SHX Text Fax: (608) 833-6996
AutoCAD SHX Text %%UMechanical, Plumbing, Electrical, Architectural, and Structural
AutoCAD SHX Text %%UElevator Consultants
AutoCAD SHX Text Performance Elevator
AutoCAD SHX Text E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES AND LIGHTING ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES AND LIGHTING SCHEDULES/PLAN ED100 NINTH FLOOR - ELECTRICA POWER AND LIGHTING DEMOLITION NINTH FLOOR - ELECTRICA POWER AND LIGHTING DEMOLITION EP100 NINTH FLOOR - ELECTRICAL POWER AND LIGHTING NEW WORK PLANS NINTH FLOOR - ELECTRICAL POWER AND LIGHTING NEW WORK PLANS ED101 FOURTH FLOOR AND FIFTH FLOOR - ELECTRICAL DEMOLITION FOURTH FLOOR AND FIFTH FLOOR - ELECTRICAL DEMOLITION EP101 FIFTH FLOOR - ELECTRICAL POWER AND LIGHTING NEW WORK PLANS FIFTH FLOOR - ELECTRICAL POWER AND LIGHTING NEW WORK PLANS EP600 ELECTRICAL SYSTEM AND RISER DIAGRAMSELECTRICAL SYSTEM AND RISER DIAGRAMS
AutoCAD SHX Text %%UGeneral Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%uElectrical Drawings
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text G001 TITLE SHEET TITLE SHEET G002 GENERAL, DEMOLITION, PHASING NOTES, SYMBOLS GENERAL, DEMOLITION, PHASING NOTES, SYMBOLS ,ABBREVIATIONS AND EXIT DIAGRAMS G003 ICRA AND PHASING PLANS -P1 THRU 4 AND S5 ICRA AND PHASING PLANS -P1 THRU 4 AND S5 G004 ICRA AND PHASING PLANS -S6ICRA AND PHASING PLANS -S6
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%UArchitectural Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text %%UEnvironmental Work Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%UMechanical Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text M001 MECHANICAL SYMBOLS, ABBREVIATIONS AND NOTES MECHANICAL SYMBOLS, ABBREVIATIONS AND NOTES MDMH100 NINTH FLOOR - MECHANICAL DEMOLITION AND NEW WORK PLANS NINTH FLOOR - MECHANICAL DEMOLITION AND NEW WORK PLANS MD105 FIFTH FLOOR PLAN- C-WING HVAC PIPING & DUCTWORK FIFTH FLOOR PLAN- C-WING HVAC PIPING & DUCTWORK DEMOLITION M105 FIFTH FLOOR PLAN- C-WING HVAC PIPING & DUCTWORK FIFTH FLOOR PLAN- C-WING HVAC PIPING & DUCTWORK NEW WORK PLANS MH500 MECHANICAL DETAILS MECHANICAL DETAILS MH600 MECHANICAL SCHEDULES AND CONTROL PARAMETERSMECHANICAL SCHEDULES AND CONTROL PARAMETERS
AutoCAD SHX Text
HA101 THIRD FLOOR PLAN- C-WING ABATEMENT DEMOLITION PLAN
AutoCAD SHX Text 9th flr Machine Room
AutoCAD SHX Text Area of Work
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text
& ELEVATORS P1-4
AutoCAD SHX Text
AND S-5
AutoCAD SHX Text Area of Work
AutoCAD SHX Text Freight Elevator S-6
AutoCAD SHX Text 3rd, 4th Flr. and Penthouse
AutoCAD SHX Text Area of Work
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%UStructural Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text A100 PROJECT SCOPE AND LOCATION DIAGRAMS PROJECT SCOPE AND LOCATION DIAGRAMS A201 THIRD FLOOR, FOURTH FLOOR AND FIFTH FLOOR - EXISTING THIRD FLOOR, FOURTH FLOOR AND FIFTH FLOOR - EXISTING DEMOLITION PLANS A202 THIRD FLOOR, FOURTH FLOOR AND FIFTH FLOOR - NEW THIRD FLOOR, FOURTH FLOOR AND FIFTH FLOOR - NEW CONSTRUCTION PLANS A500 DOOR SCHEDULES, FRAME AND PARTITIONS DETAILSDOOR SCHEDULES, FRAME AND PARTITIONS DETAILS
AutoCAD SHX Text S001 STRUCTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES STRUCTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES SDS100 NINTH FLOOR STRUCTURAL DEMOLITION AND NEW PLANS NINTH FLOOR STRUCTURAL DEMOLITION AND NEW PLANS SD101 FOURTH AND FIFTH FLOOR DEMOLITION PLAN FOURTH AND FIFTH FLOOR DEMOLITION PLAN S101 FOURTH AND FIFTH FLOOR NEW WORK PLANS FOURTH AND FIFTH FLOOR NEW WORK PLANS S500 STRUCTURAL DETAILS - SHEET 1 STRUCTURAL DETAILS - SHEET 1 S501 STRUCTURAL DETAILS - SHEET 2STRUCTURAL DETAILS - SHEET 2
AutoCAD SHX Text FP100 FIRE PROTECTION- NINTH FLOOR- EXISTING, DEMOLITION AND NEW WORK FIRE PROTECTION- NINTH FLOOR- EXISTING, DEMOLITION AND NEW WORK FP101 FIRE PROTECTION- FOURTH FLOOR AND FIFTH FLOOR - DEMOLITION AND FIRE PROTECTION- FOURTH FLOOR AND FIFTH FLOOR - DEMOLITION AND NEW WORK
AutoCAD SHX Text %%UFire Protection Drawings
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text %%UPlumbing Drawings
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text PD101 THIRD FLOOR PLAN- C-WING PLUMBING DEMOLITION PLANTHIRD FLOOR PLAN- C-WING PLUMBING DEMOLITION PLAN
AutoCAD SHX Text %%UFire Alarm Drawings
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text FA100 FIRE ALARM- NINTH FLOOR- EXISTING, DEMOLITION AND NEW WORK FIRE ALARM- NINTH FLOOR- EXISTING, DEMOLITION AND NEW WORK FA101 FIRE ALARM- FOURTH FLOOR AND FIFTH FLOOR - DEMOLITION AND FIRE ALARM- FOURTH FLOOR AND FIFTH FLOOR - DEMOLITION AND NEW WORK
AutoCAD SHX Text
%%UVOLUME 1
AutoCAD SHX Text
%%UVOLUME 2
AutoCAD SHX Text %%UArchitectural
AutoCAD SHX Text %%UEngineering:
AutoCAD SHX Text %%UStructural
AutoCAD SHX Text USFin
AutoCAD SHX Text 9245 Calumet Ave
AutoCAD SHX Text Munster, IN 46321
AutoCAD SHX Text Phone: (219) 836-2120
AutoCAD SHX Text Suite 205
AutoCAD SHX Text Fax: (219) 836-1129
AutoCAD SHX Text USFin
AutoCAD SHX Text 9245 Calumet Ave
AutoCAD SHX Text Munster, IN 46321
AutoCAD SHX Text Phone: (219) 836-2120
AutoCAD SHX Text Suite 205
AutoCAD SHX Text Fax: (219) 836-1129
AutoCAD SHX Text USFin
AutoCAD SHX Text 9245 Calumet Ave
AutoCAD SHX Text Munster, IN 46321
AutoCAD SHX Text Phone: (219) 836-2120
AutoCAD SHX Text Suite 205
AutoCAD SHX Text Fax: (219) 836-1129
Elevator:
PO Box 464
Phone: 608.616.2999 Mequon, WI 53092
UPGRADE EAGLE AND FREIGHT
ELEVATORS
Email: AdamS@pec-wi.com POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
35% Schematic Design 10.15.2021 5.27.22
Project Number
Building Number
607-21-155
POC: Adam Smith
65% Construction Documents 12.29.2021 95% Construction Documents 3.18.2022 100% Construction Documents 5.27.2022
G002
@ AT
GB GYPSUM BOARD
DTL DETAIL
W/ WITH
WD WOOD
W/O WITHOUT
WP WORK POINT
WPR WATERPROOFING
WVNR WOOD VENEER
WC WATER CLOSET
UNF UNFINISHED
EQ EQUAL
NTS NOT TO SCALE
VB VINYL BASE
UNO UNLESS NOTED OTHERWISE
VIF VERIFY IN FIELD
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
VEST VESTIBULE
VERT VERTICAL
OPNG OPENING
OPP OPPOSITE
OA OVERALL
OC ON CENTER
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
OH OPPOSITE HAND
OD OUTSIDE DIAMETER
TLT TOILET
T TREAD
THK THICK
TYP TYPICAL
TS TUBE STEEL
TT TRAFFIC TOPPING
TEL TELEPHONE
TEF TOILET EXHAUST FAN
T/ TOP OF
NOM NOMINAL
NO NUMBER
MIN MINIMUM
MTL METAL
ELEV ELEVATOR
EL ELEVATION
DWG DRAWING
EA EACH
ECP EXPOSED CONSTRUCTION PAINTED
EFTS EXPANDING FOAM TAPE SEALANT
EPEJF EXPANDED POLYETHYLENE JOINT FILLER
EC EXPOSED CONSTRUCTION
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NC NOISE CRITERIA
MO MASONRY OPENING
MISC MISCELLANEOUS
RFS ROOM FINISH SCHEDULE
CLO CLOSET
ID INSIDE DIAMETER
SSS SILICONE SANITARY SEALANT
STL STEEL
STN STAIN
SV SHEET VINYL
SUSP SUSPENDED
STOR STORAGE
STRUCT STRUCTURAL
ST SEALANT TAPE
STD STANDARD
LAV LAVATORY
CMU CONCRETE MASONRY UNIT
MECH MECHANICAL
MED MEDIUM
MH MANHOLE
MACH MACHINE
MATL MATERIAL
MAX MAXIMUM
CPT CARPET
CO CLEAN OUT
CT CERAMIC TILE
DIA DIAMETER
DIM DIMENSION
DN DOWN
DF DRINKING FOUNTAIN
CMUP CMU PAINTED
LP LOW POINT
MFR MANUFACTURER
SIM SIMILAR
SHT SHEET
SQ SQUARE
SECT SECTION
SPEC SPECIFICATION
SS STAINLESS STEEL
SRS SILICONE RUBBER SEALANT
JT JOINT
LAM LAMINATED
IN INCH
INSUL INSULATION
INT INTERIOR
INFO INFORMATION
CORR CORRIDOR
CONT CONTINUOUS
COL COLUMN
CLG CEILING
CONCR CONCRETE
CONTR CONTRACTOR
CONCP CONCRETE PAINTED
CLR CLEAR OPENING
CONST CONSTRUCTION
JC JANITORS CLOSET
JB JUNCTION BOX
R RISER
HNCG HOLLOW NEOPRENE
RM ROOM
RBC RUBBERIZED BITUMINOUS COMPOUND
REF REFERENCE
REINF REINFORCED
REQ'D REQUIRED
REV REVISION
RO ROUGH OPENING
RB RESILIENT BASE
RD ROOF DRAIN
HORIZ HORIZONTAL
HT HEIGHT
HR HOURS
HP HIGH POINT
BLDG BUILDING
CL CENTER LINE
CB CERAMIC BASE TILE
C/C CENTER TO CENTER
CG CORNER GUARD
CIP CAST IN PLACE
CJ CONTROL JOINT
CH LNK CHAIN LINK FENCE
CJF CORK JOINT FILLER
HSKP HOUSEKEEPING
HM HOLLOW METAL
INCAND INCANDESCENT
(TWO PART)
PT PAINTED
PSI POUNDS PER SQUARE INCH
2-PUMS POLYURETHANE SEALANT
PVF POLYVINYLIDINE FINISH
QT QUARRY TILE
QTY QUALITY
QUANT QUANTITY
GL GLASS
HDW HARDWARE
GRND GROUND
BRK BRICK
BLK BLOCK
B/ BOTTOM OF
BD BOARD
BJF BITUMINOUS JOINT FILLER
BMT BUTYLMASTIC TAPE SEALANT
BRS BUTYL RUBBER SEALANT
BOH BACK OF HOUSE
GLB GLAZED BLOCK
GC GENERAL CONTRACTOR
GYP BD GYPSUM BOARD
GBP GYPSUM BOARD PAINTED
PBMR PRESHIMMED BUTYL MASTIC
ADJ ADJUSTABLES
FD FLOOR DRAIN
PERP PERPENDICULAR
PL PLASTIC
PLAM PLASTIC LAMINATE
PR PAIR
PLBG PLUMBING
PLWD PLYWOOD
PREFAB PREFABRICATED
PSF POUNDS PER SQUARE FOOT
PL PLATE
FIN FINISH
ALUM ALUMINUM
AFF ABOVE FINISHED FLOOR
ALS ACRYLIC LATEX SEALANT
GALV GALVANIZED
FLR FLOOR
GA GAUGE
APC ACOUSTICAL PANEL CEILING
A0RA AREA OF RESCUE ASSISTANCE
AP ACCESS PANEL
APPROX APPROXIMATELY
ARCH ARCHITECTURAL
ANOD ANODIZED
FDV FIRE DEPARTMENT VALVE
FLUOR FLUORESCENT
FHC FIRE HOSE CABINET
FEC FIRE EXTINGUISHER CABINET
PARTN PARTITION
AD AREA DRAIN
FC FOOT CANDLES
COMPRESSION GASKET
SSD SEE STRUCTURAL DRAWINGS
ARCHITECTURAL ABBREVIATIONS
REPLACE WITH INPRO PRODUCT. COLOR SELECTED BY VA DURING SUBMITTAL PROCESS
ELEVATOR FINISH SCHEDULE
EIGHT LED DOWNLIGHTS WITH GRIDS BRUSHED STAINLESS STEEL PANELS AND CONCEALED ACCESS PANEL- SEE E001 PASSENGER CEILING PLAN
RETAIN- VERIFY WITH ELEVATOR SPECIFICATION 14-21-10 P1 THROUGH P4
CURRENT WOOD SUBSTRATED REPLACE WITH MINIMUM 6-PLY FIRE TREATED PLYWOOD OF PROPER THICKNESS (3/4" MIN.)
RETAIN EXISTING HANDRAILING. POLISH AFTER COMPLETION
FLOOR: SUBSTRATE:
WALLS: SIDES-UPPER
CEILING
BASE
HANDRAILS
FINISH MATERIAL: RUBBER SHEET - NORA BRAND
WALLS: LOWER BACK WALL
RETAIN EXISTING. POLISH PER A100 NOTE NUMBER 2WALLS: SIDES-LOWER
M-14A
OFFICE
2A3A
A000
EQUIPMENT / FURNITURE TAG
1 CONSTRUCTION KEY NOTE
BATT INSULATION
DOOR AND FRAME
WALL TYPE TAG
ROOM NAME AND NUMBER
GLASS
ACOUSTICAL TILE - SECTION
DRYWALL
MEMBRANE
ELEVATION
DETAIL
A000
SEALANT AND BACKER RODSECTION1
WOOD BLOCKING
SYMBOLS
ARCHITECTURAL
MATERIAL SYMBOLS
ARCHITECTURAL
1A DEMOLITION KEY NOTE
WALLS
CEILING PLAN SYMBOLS
ARCHITECTURAL
ELEVATION REFERENCE
A000
GENERAL, DEMOLITION, PHASING NOTES,
SYMBOLS , ABBREVIATIONS AND EXIT
DIAGRAMS
BACK WALL PANELS TO HAVE NON ILLUMINATING GRAPHIC IMPRINT. OBTAIN FINAL IMAGE APPROVAL
FROM THE VA INTERIOR DEPARTMENT
WALLS: UPPER BACK WALL
(EAGLE CARS 1,2,3 AND 4)
SCALE: 1/16" = 1'-0"
EGRESS PLAN
B9001 LOWER LEVEL
RETAIN EXISTING. POLISH PER A100 NOTE NUMBER 2
AutoCAD SHX Text B9001
AutoCAD SHX Text B9001A
AutoCAD SHX Text B9000
AutoCAD SHX Text
NO.3
AutoCAD SHX Text
TO B9002
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text GENERAL DEMOLITION REQUIREMENTS: 1. ALL INFORMATION IS BASED ON OWNER SUPPLIED ALL INFORMATION IS BASED ON OWNER SUPPLIED DOCUMENTS AND FIELD OBSERVATIONS AND MAY NOT REFLECT COMPLETELY ACTUAL FIELD CONDITIONS, UPON DISCOVERY OF ANY INCONSISTENCIES BETWEEN THE DRAWINGS DESCRIBING THE EXISTING CONDITIONS OR UNKNOWN CONDITIONS THAT ARE DETRIMENTAL TO THE COMPLETION OF WORK AS DESCRIBED IN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR IN WRITING OF THE CONDITION IN QUESTION BEFORE PROCEEDING WITH THE WORK IN THAT AREA. 2. SALVAGE IS DEFINED AS CAREFULLY REMOVING AND SALVAGE IS DEFINED AS CAREFULLY REMOVING AND RETAINING ITEMS FOR RE-USE OR TO BE RETURNED TO THE OWNER. 3. THE CONTRACTOR IS RESPONSIBLE FOR ALL SHORING AND THE CONTRACTOR IS RESPONSIBLE FOR ALL SHORING AND BRACING NECESSARY TO MAINTAIN STRUCTURAL INTEGRITY. 4. THE CONTRACTOR SHALL NOT CUT STRUCTURAL WORK IN A THE CONTRACTOR SHALL NOT CUT STRUCTURAL WORK IN A MANNER RESULTING IN A REDUCTION OF THE LOAD CARRYING CAPACITY OR LOAD / DEFLECTION RATIO. 5. ALL EXISTING CONDITIONS REMAINING AFTER DEMOLITION ALL EXISTING CONDITIONS REMAINING AFTER DEMOLITION THAT INTERFERES WITH NEW CONSTRUCTION SHALL BE REMOVED OR RELOCATED AS REQUIRED TO COMPLETE THE NEW WORK AS DESCRIBED IN THE CONSTRUCTION DOCUMENTS. REFER TO ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR COORDINATION OF NEW WORK. 6. IF ANY EXISTING FIREPROOFING OR OTHER RATED IF ANY EXISTING FIREPROOFING OR OTHER RATED ASSEMBLIES WHICH ARE INDICATED TO REMAIN ARE DAMAGED DURING DEMOLITION, THE CONTRACTOR SMALL REPAIR DAMAGE TO THE LEVEL OF THE ORIGINAL FIRE PROTECTION REQUIREMENTS. 7. DEMOLITION WORK SHALL BE EXECUTED IN CONFORMANCE DEMOLITION WORK SHALL BE EXECUTED IN CONFORMANCE WITH ALL CODES AND ORDINANCES AS SET FORTH BY ALL GOVERNING AUTHORITIES. 8. THE CONTRACTOR SHALL MAINTAIN EGRESS FOR ALL THE CONTRACTOR SHALL MAINTAIN EGRESS FOR ALL OCCUPIED AREAS OF THE BUILDING THROUGHOUT CONSTRUCTION. 9. CONTRACTOR SHALL NOTIFY, COORDINATE, SCHEDULE AND CONTRACTOR SHALL NOTIFY, COORDINATE, SCHEDULE AND RECEIVE PRIOR PERMISSION FROM THE OWNER FOR SHUTDOWN OF SERVICES TO COMPLETE THE WORK. NOTIFICATION SHALL INCLUDE THE TYPE OF SERVICE TO BE SHUT-DOWN, AREAS AFFECTED, REQUESTED SHUT-DOWN DATES AN LENGTH OF TIME SERVICE WILL BE DOWN. 10. THE CONTRACTOR WILL NEED TO COORDINATE TIMES WITH THE CONTRACTOR WILL NEED TO COORDINATE TIMES WITH VA COR AND HOSPITAL STAFF TO ACCESS CEILING AREAS BEYOND SCOPE OF RELATED PROJECT AREAS AS DEFINED. 11. THE CONTRACTOR WILL NEED TO COORDINATE TIMES WITH THE CONTRACTOR WILL NEED TO COORDINATE TIMES WITH VA COR AND HOSPITAL STAFF FOR PROJECT RELATED DEMOLITION AND CONSTRUCTION WORK WITHIN SENSITIVE AREAS AS DEFINED. 12. COVER ANY RETURN AIR GRILLES AND EXHAUST GRILLES IN COVER ANY RETURN AIR GRILLES AND EXHAUST GRILLES IN CONSTRUCTION AREA WITH FILTER MEDIA AND CHANGE REGULARLY. 13. REFER TO MECHANICAL, AND ELECTRICAL DOCUMENTS FOR REFER TO MECHANICAL, AND ELECTRICAL DOCUMENTS FOR RESPECTIVE DEMOLITION INFORMATION. 14. PATCH AND REPAIR ALL WALLS WHERE EXISTING ITEMS PATCH AND REPAIR ALL WALLS WHERE EXISTING ITEMS AND/OR PARTITIONS ARE BEING REMOVED TO MATCH EXISTING ADJACENT FINISHES.
AutoCAD SHX Text GENERAL ARCHITECTURAL NOTES: 1. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION. 2. ALL DIMENSIONS ARE TO GRID LINES, FACE OF STUD FRAMING, ALL DIMENSIONS ARE TO GRID LINES, FACE OF STUD FRAMING, FINISHED FACE OF EXISTING WALL SURFACE, OR FACE OF CONCRETE / MASONRY UNITS UNLESS NOTED OTHERWISE. 3. AT FIRE RATED WALLS WHERE OPENINGS ARE GREATER THAN 16 AT FIRE RATED WALLS WHERE OPENINGS ARE GREATER THAN 16 SQUARE INCHES OR WHERE TOTAL AREA OF OPENINGS EXCEEDS 100 SQUARE INCHES IN 100 SQUARE FEET, WRAP 5/8" TYPE 'X' GYPSUM BOARD BEHIND OPENINGS PER U.L. DESIGN #U510. 4. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL FURNISH ALL NECESSARY PERMITS. 5. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR MECHANICAL, ELECTRICAL. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS INDICATED IN THE SPECIFICATIONS. 6. CONTRACTORS SHALL FOLLOW AND OBEY APPLICABLE FEDERAL, CONTRACTORS SHALL FOLLOW AND OBEY APPLICABLE FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ETC. 7. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN EACH DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN EACH BUILDING COMPONENT LOCATION. BRING DISCREPANCIES TO THE COR'S ATTENTION IN WRITING IMMEDIATELY. 8. ALL WORK SHALL BE PERFORMED IN A SKILLED WORKMANSHIP ALL WORK SHALL BE PERFORMED IN A SKILLED WORKMANSHIP TYPE AND MANNER ACCEPTABLE TO THE COR'S. 9. PROVIDE SHEET METAL OR FIRE RETARDANT WOOD BLOCKING IN PROVIDE SHEET METAL OR FIRE RETARDANT WOOD BLOCKING IN WALL CAVITIES FOR ITEMS THAT ARE REQUIRED TO BE SECURED TO THE WALLS. 10. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS. 11. EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR TO EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR TO BEGINNING OF WORK. ANY ERRORS OR OMISSIONS SHALL BE BROUGHT TO THE COR'S ATTENTION IN WRITING IMMEDIATELY. 12. ALL CARS TO BE CONSTRUCTED ON THE 8th FLOOR, INSIDE THE ALL CARS TO BE CONSTRUCTED ON THE 8th FLOOR, INSIDE THE SHAFT. 13. COMPLETE ONE PASSENGER ELEVATOR BEFORE STARTING COMPLETE ONE PASSENGER ELEVATOR BEFORE STARTING ANOTHER. CARS S-5 AND S-6 CAN NOT BE DOWN AT THE SAME TIME. 14. FOR OVERHEAD PIPING WORK ABOVE CEILING OUTSIDE THE AREA FOR OVERHEAD PIPING WORK ABOVE CEILING OUTSIDE THE AREA OF WORK FOR THIS PROJECT, COORDINATE WITH VA COR ABOUT OFF-HOUR SCHEDULE AND ICRA PROTECTION REQUIREMENTS. 15. ALL MAIN LOBBY WORK SHALL BE PERFORMED DURING AFTER ALL MAIN LOBBY WORK SHALL BE PERFORMED DURING AFTER HOURS. SEE PROJECT SCHEDULE SPECIFICATION AND WORK EXCLUSIONS INDICATED ELSEWHERE IN THIS PROJECT DOCUMENTS. S-6 LOBBY CONSTRUCTION WORK SHALL BE COORDINATED WITH OTHER USER GROUPS. SEE LIFE SAFETY AND INFECTION CONTROL PLANS FOR MORE INFORMATION.
AutoCAD SHX Text SUGGESTED PHASING GENERAL NOTES AND SEQUENCE: 1. CONTRACTOR TO COORDINATE A PHASING PLAN WITH THE VA PRIOR TO WORK. PHASING SHALL BE COORDINATED CONTRACTOR TO COORDINATE A PHASING PLAN WITH THE VA PRIOR TO WORK. PHASING SHALL BE COORDINATED BETWEEN EACH CONTRACTOR AND SUB-CONTRACTORS. ALL ELECTRICAL SHUTDOWN WORK FOR ELEVATOR CABS SHALL BE COMPLETED PRIOR TO SHUTDOWN OF THE ELEVATOR IN THE NEXT SEQUENCE. REFER TO ADDITIONAL WORK IMPACTS BY RESPECTIVE ARCHITECTURAL, STRUCTURAL AND MECHANICAL DISCIPLINE SHEETS. 2. ALL PROPOSED METHODS DEFINED FOR THE MODERNIZATION OF ELEVATOR SCOPE IN THE FOLLOWING PROJECT ALL PROPOSED METHODS DEFINED FOR THE MODERNIZATION OF ELEVATOR SCOPE IN THE FOLLOWING PROJECT DOCUMENTS AND SPECIFICATIONS SHOULD BE FULLY COORDINATED WITH A CONTRACTOR'S ELEVATOR SUB-CONTRACTOR FOR THEIR ANTICIPATED WORK PLAN. 3. ONE PASSENGER ELEVATOR MOST BE COMPLETED BEFORE STARTING ANOTHER. CARS S-5 AND S-6 CAN NOT BE ONE PASSENGER ELEVATOR MOST BE COMPLETED BEFORE STARTING ANOTHER. CARS S-5 AND S-6 CAN NOT BE DOWN AT THE SAME TIME. 4. ALL MAIN LOBBY WORK SHALL BE COORDINATED WITH THE VA OR PERFORMED DURING AFTER HOURS. SEE PROJECT ALL MAIN LOBBY WORK SHALL BE COORDINATED WITH THE VA OR PERFORMED DURING AFTER HOURS. SEE PROJECT SCHEDULE SPECIFICATION AND WORK EXCLUSIONS INDICATED ELSEWHERE IN THIS PROJECT DOCUMENTS. S-6, 3RD FLOOR LOBBY CONSTRUCTION WORK SHALL BE COORDINATED WITH VA AND OTHER USER GROUPS. SEE LIFE SAFETY AND INFECTION CONTROL PLANS FOR MORE INFORMATION. 5. CONTRACTOR SHALL USE MEANS AND METHODS AVAILABLE VIA C WING DOCK DOOR AT BASEMENT LEVEL TO CONTRACTOR SHALL USE MEANS AND METHODS AVAILABLE VIA C WING DOCK DOOR AT BASEMENT LEVEL TO EXISTING FREIGHT ELEVATORS TO DELIVER MATERIAL TO PROSPECTIVE LEVELS THROUGH B WING EIGHTH FLOOR ACCESS HATCH NEAR S5 TO NINTH FLOOR MACHINE ROOM. WORK FOR S6 IN CW ING PENTHOUSE MAY ENCOUNTER LIFTING PLANS TO THE CWING ROOF. PHASE 1. PASSENGER ELEVATORS P4 AND FREIGHT ELEVATOR S5 - DRAWING SHEET G003 PHASE 2. PASSENGER ELEVATORS P3 - DRAWING SHEET G003 PHASE 3. PASSENGER ELEVATORS P2 - DRAWING SHEET G003 PHASE 4. PASSENGER ELEVATORS P1 - DRAWING SHEET G003 PHASE 5. CWING 5TH FLOOR - PENTHOUSE. NEW MACHINE ROOM. DRAWING SHEET G004 PHASE 6. FREIGHT ELEVATOR S6. FOR THE DEMOLITION AND RENOVATION OF MODERNIZATIONS - DRAWING SHEET G004 6. FREIGHT ELEVATOR S6. FOR THE DEMOLITION AND RENOVATION OF MODERNIZATIONS - DRAWING SHEET G004 PHASE 7. FREIGHT ELEVATOR S6- 3RD FLOOR RENOVATIONS FOR LOBBY- DRAWING SHEET G004 7. FREIGHT ELEVATOR S6- 3RD FLOOR RENOVATIONS FOR LOBBY- DRAWING SHEET G004
AutoCAD SHX Text EXISTING 2X4 LIGHT FIXTURE- TO BE REMOVED, RELOCATED OR TO REMAIN- SEE CEILING PLAN WORK 2X2 CEILING PANEL GRID GYPSUM BOARD OR PLASTER CEILING- ALTERATIONS OR NEW- SEE SPECIFIC CONDITIONS UNLESS OTHER WISE INDICATED NEW CEILING WORK - GRID AND ACCOUSTICAL TILE
AutoCAD SHX Text A
AutoCAD SHX Text MECHANICAL CEILING DIFFUSERS (SUPPLY) MECHANICAL CEILING DIFFUSERS (RETURN EXHAUST) SPRINKLER HEAD WAP- WIRELESS ACCESS POINT
AutoCAD SHX Text A. ALL ITEMS NOT SYMBOLIZED OR NOTED ALL ITEMS NOT SYMBOLIZED OR NOTED ARE EXISTING TO REMAIN SHOWN ON THE PLANS.
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text N
AutoCAD SHX Text
LEGEND OF SYMBOLS
AutoCAD SHX Text
2 HOUR FIRE BARRIER
AutoCAD SHX Text
1 HOUR SMOKE BARRIER
AutoCAD SHX Text
DEVICE LIST
AutoCAD SHX Text
FIRE EXTINGUISHER
AutoCAD SHX Text
EXIT SIGN
AutoCAD SHX Text
TRAVEL ROUTE AND DIRECTION
NON RATED DUST/ SMOKE TIGHT BARRIER
ICRA AND PHASING PLANS
EAGLE ELEVATORS P1 THROUGH 4, AND S-5
Elevator:
PO Box 464
Phone: 608.616.2999 Mequon, WI 53092
UPGRADE EAGLE AND FREIGHT
ELEVATORS
Email: AdamS@pec-wi.com POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
35% Schematic Design 10.15.2021 5.27.22
Project Number
Building Number
607-21-155
B A
C G
POC: Adam Smith
B-Core
65% Construction Documents 12.29.2021 95% Construction Documents 3.18.2022 100% Construction Documents 5.27.2022
G003
SCALE: 1/4" = 1'-0"
PHASING PLAN -8TH FLOOR- CABS P1,P2,P3
SCALE: 1/4" = 1'-0"
PHASING PLAN
SCALE: 1/4" = 1'-0"
PHASING PLAN -8TH FLOOR- CAB P4 AND S5
SCALE: 1/4" = 1'-0"
PHASING PLAN
SECONDARY HOISTWAY SPACE BELOW MACHINE ROOM B9002
MACHINE ROOM B9002 SPACE
PHASE 1A
PHASE 2A
PHASE 1B
PHASE 1B
PHASE 3APHASE 4A
PHASE 2BPHASE 3BPHASE 4B
PHASE 1A
TEMPORARY CONSTRUCTION
AREA PARTITION NOTES
PHASE 1D
PHASE 1D
PHASE 2CPHASE 3CPHASE 4C
AutoCAD SHX Text B8057
AutoCAD SHX Text B8057A
AutoCAD SHX Text P1
AutoCAD SHX Text S5
AutoCAD SHX Text P2
AutoCAD SHX Text P3
AutoCAD SHX Text P4
AutoCAD SHX Text B8057
AutoCAD SHX Text B8057A
AutoCAD SHX Text P1
AutoCAD SHX Text S5
AutoCAD SHX Text P2
AutoCAD SHX Text P3
AutoCAD SHX Text P4
AutoCAD SHX Text B9002
AutoCAD SHX Text P1
AutoCAD SHX Text S5
AutoCAD SHX Text P2
AutoCAD SHX Text P3
AutoCAD SHX Text P4
AutoCAD SHX Text
HOIST BEAM
AutoCAD SHX Text P1
AutoCAD SHX Text S5
AutoCAD SHX Text P2
AutoCAD SHX Text P3
AutoCAD SHX Text P4
AutoCAD SHX Text Eagle Elevators-P1,2,3,4
AutoCAD SHX Text Freight Elevator S-5
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text N
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text Ground thru 8th floor
AutoCAD SHX Text Basement thru 8th floor
AutoCAD SHX Text 9th flr. Machine Room-B9002
AutoCAD SHX Text GENERAL INFECTION CONTROL REQUIREMENTS: ENERAL INFECTION CONTROL REQUIREMENTS: 1. SEE SPEC 013526 FOR ADDITIONAL REQUIREMENTS AND G002 SEE SPEC 013526 FOR ADDITIONAL REQUIREMENTS AND G002 FOR LEGEND OF SYMBOLS 2. DEMOLITION AND REMOVAL OF MATERIALS AND EQUIPMENT DEMOLITION AND REMOVAL OF MATERIALS AND EQUIPMENT WILL REQUIRE THE CONTRACTOR TO MOVE THESE ITEMS IN COVERED AND SEALED CARTS. REMOVAL SHOULD ONLY TAKE PLACE AFTER NORMAL BUSINESS HOURS, CLEANUP OF ANY LIMITED DEBRIS LEFT IN ACCESS ROUTE DURING REMOVAL IS THE RESPONSIBILITY OF THE CONTRACTOR, IF NOT CAPPED AND SEALED BASED ON SCOPE OF WORK, ISOLATE RETURN AND EXHAUST DUCT OPENINGS IN THE WORK AREA WITH TEMPORARY MERV 8 PLEATED MEDIA. 3. SPECIAL ATTENTION, SUCH AS PROVISION OF NEGATIVE AIR SPECIAL ATTENTION, SUCH AS PROVISION OF NEGATIVE AIR PRESSURIZATION WITH HEPA FILTER UNITS, WILL BE REQUIRED IN WORK AREAS ADJACENT TO PATIENT CARE AREAS. IN THESE AREAS, DUST PARTITIONS WILL REMAIN IN PLACE UNTIL WORK IN THE AREA IS APPROVED BY PROJECT ENGINEER AND VAMC AND THOROUGHLY CLEANED BY THE CONTRACTOR. 4. AT THE POINT OF EXIT FOR EACH PARTITIONED WORK AREA, AT THE POINT OF EXIT FOR EACH PARTITIONED WORK AREA, THE CONTRACTOR WILL PROVIDE AN EFFECTIVE ADHESIVE WALK-OFF MAT AT ALL TIMES. 5. THE CONTRACTOR WILL MAINTAIN AS NECESSARY THE THE CONTRACTOR WILL MAINTAIN AS NECESSARY THE CLEANLINESS OF THE AREA ADJACENT TO DUST PARTITION BY MOPPING OR VACUUM SWEEPING. 6. THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE TIGHT, TEMPORARY 1 AND 2-HOUR FIRE-RATED SMOKE-TIGHT PARTITIONS, TEMPORARY DOORS, WALK-OFF MATS AND EQUIPMENT PROTECTION WHERE SHOWN ON THE DOCUMENTS OR IMPLIED BY THE WORK BEING PERFORMED. SUCH PROTECTION SHALL BE MAINTAINED AND REPAIRED PROMPTLY IF DAMAGED TO AVOID DUST INFILTRATION INTO ADJACENT AREAS. 7. ALL DOORS IN TEMPORARY PARTITIONS SHALL BE ALL DOORS IN TEMPORARY PARTITIONS SHALL BE 3'-6"x7'-0" (SINGLE) AND 6'-0"x7'-0" (DOUBLE) U.N.O. REF. FLOOR PLANS FOR LOCATIONS. ALL TEMPORARY DOORS SHALL BE 1 AND 2-HOUR RATED W/ LEVER TYPE DOOR CONTROLS KEY/ PUNCH CODE ENTRY LOCKS AND CLOSERS. 8. STICKY MATS REQUIRED AT TOP OF STAIR NO.3 AND ALL STICKY MATS REQUIRED AT TOP OF STAIR NO.3 AND ALL BARRIERS DURING ALL WORK.
AutoCAD SHX Text
INFECTION CONTROL RISK ASSESSMENT AND ILSM MEASURES
AutoCAD SHX Text CONTRACTOR TO INSTALL TEMPORARY DUST PARTITION ( SMOKE-TIGHT WALL) WITH HOLLOW METAL DOOR WALL: METAL STUD & " TYPE 'X' GYPSUM BOARD (BOTH 58" TYPE 'X' GYPSUM BOARD (BOTH SIDES) PARTITION TO DECK ABOVE, TAPED AND PAINTED. .
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text AREAS OF WORK AND CONTRACTOR LEVEL OF INFECTION CONTROL WILL BE DETERMINED PRIOR TO CONSTRUCTION BY VA INFECTION CONTROL DEPARTMENT. MAJOR EXPECTED WORK CONTAINED WITHIN ELEVATOR CAB AND SHAFT POSE ZERO OR LOW RISK TO FLOOR LEVELS PROVIDED THE PROPER BARRIERS ARE IN PLACE. ANY PRECAUTIONARY HOT WORK ACTIVITIES OUTSIDE THE CABS SHOULD BE CONTAINED WITHIN WORK AREAS. PENTHOUSE WORK CWING OF THE FACILITY IS MOST SUSCEPTIBLE TO FIRE RELATED IMPACTS OR ELECTRICAL SHORTAGES THAT WOULD RESULT IN THE SHUTDOWN OF CRUCIAL HVAC HEATING AND COOLING EQUIPMENT.
AutoCAD SHX Text
INFECTION CONTROL RISK ASSESSMENT
AutoCAD SHX Text
INFECTION CONTROL NOTES
AutoCAD SHX Text
PASSENGER P1 THRU 4 AND S-5 PENTHOUSE
AutoCAD SHX Text RISK GROUP: LOW / PRECAUTION LEVEL ll
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text SUGGESTED PHASING NOTES AND SEQUENCE: PHASE 1. PASSENGER ELEVATORS P4 AND S5 A. PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER AND FREIGHT ELEVATORS S-5 MOTORS IN ORDER TO WORK ON P4 MOTOR. A.1. REMOVE S5 MOTOR AND ALL FOR THE MODERNIZATION REMOVE S5 MOTOR AND ALL FOR THE MODERNIZATION REQUIREMENTS A.2. REMOVE P4 MOTOR AND ALL FOR THE MODERNIZATION REMOVE P4 MOTOR AND ALL FOR THE MODERNIZATION REQUIREMENTS A.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 A.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 A.4. REMOVE MECHANICAL AND ASSOCIATED ELECTRICAL REMOVE MECHANICAL AND ASSOCIATED ELECTRICAL A.5. INSTALL NEW MECHANICAL AND ELECTRICAL INSTALL NEW MECHANICAL AND ELECTRICAL B. WORK IN SECONDARY HOISTWAY AREA AND CABS WORK IN SECONDARY HOISTWAY AREA AND CABS B.1. REMOVE ALL FIRE PROTECTION LINES WITHIN REMOVE ALL FIRE PROTECTION LINES WITHIN SECONDARY HOISTWAY. B.2. REMOVE ALL FIRE ALARMS REMOVE ALL FIRE ALARMS B.3. REMOVE ALL ELECTRICAL WITHIN SECONDARY HOISTWAY REMOVE ALL ELECTRICAL WITHIN SECONDARY HOISTWAY PERTAINING TO MODERNIZATION SCOPE OF WORK. B.4. REMOVE P4 RELATED TO THE UPGRADE FOR THE REMOVE P4 RELATED TO THE UPGRADE FOR THE MODERNIZATION OF ELEVATOR CABS. B.5. REMOVE S5 RELATED TO THE UPGRADE FOR THE REMOVE S5 RELATED TO THE UPGRADE FOR THE MODERNIZATION OF ELEVATOR CABS. B.6. PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR NEW PROPOSED WORK. B.7. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 B.8. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 C. WORK IN PIT AND PRIMARY HOISTWAY AREA- PASSENGER P4 WORK IN PIT AND PRIMARY HOISTWAY AREA- PASSENGER P4 & FREIGHT S5 C.1. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P4 C.2. WORK IN PIT AREA - BEGIN INSTALLATION WORK FOR WORK IN PIT AREA - BEGIN INSTALLATION WORK FOR MODERNIZATION FOR S5 C.3. INSTALL SUMP WATER INTRUSION ALARM DEVICE FOR INSTALL SUMP WATER INTRUSION ALARM DEVICE FOR S5. SEE FA100 AND A100 NOTES D. CARS P1 AND S5 ARE REMOVED FROM SERVICE AND CARS P1 AND S5 ARE REMOVED FROM SERVICE AND LOCATED ON THE 8TH FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK. PHASE 2. PASSENGER ELEVATOR P3 A. PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER ELEVATOR MOTORS FOR P3 A.1. REMOVE P3 MOTOR FOR MODERNIZATION REMOVE P3 MOTOR FOR MODERNIZATION A.2. BEGIN INSTALLATION WORK FOR MODERNIZATION OF P3 BEGIN INSTALLATION WORK FOR MODERNIZATION OF P3 MOTOR B. WORK IN SECONDARY HOISTWAY AREA AND CAB WORK IN SECONDARY HOISTWAY AREA AND CAB B.1. REMOVE P3 WORK RELATED TO THE MODERNIZATION OF REMOVE P3 WORK RELATED TO THE MODERNIZATION OF ELEVATOR CAB. B.2. PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR NEW PROPOSED WORK. B.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P3. B.4. WORK IN PIT AND HOISTWAY AREA. WORK IN PIT AND HOISTWAY AREA. C. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P3. CAR IS TO BE REMOVED FROM SERVICE AND LOCATED ON THE 8TH FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK. PHASE 3. PASSENGER ELEVATOR P2 A. PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER ELEVATOR MOTOR FOR P2 A.1. REMOVE P2 MOTOR FOR MODERNIZATION REMOVE P2 MOTOR FOR MODERNIZATION A.2. BEGIN INSTALLATION WORK FOR MODERNIZATION OF P2 BEGIN INSTALLATION WORK FOR MODERNIZATION OF P2 MOTOR B. WORK IN SECONDARY HOISTWAY AREA AND CAB WORK IN SECONDARY HOISTWAY AREA AND CAB B.1. REMOVE P2 WORK RELATED TO THE MODERNIZATION OF REMOVE P2 WORK RELATED TO THE MODERNIZATION OF ELEVATOR CAB. B.2. PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR NEW PROPOSED WORK. B.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P2 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P2 B.4. WORK IN PIT AND HOISTWAY AREA WORK IN PIT AND HOISTWAY AREA C. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P2. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P2. CAR IS TO BE REMOVED FROM SERVICE AND LOCATED ON THE 8TH FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK. PHASE 4. PASSENGER ELEVATOR P1 A. PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER PREPARE B9002 MACHINE ROOM TO REMOVE PASSENGER ELEVATOR MOTOR FOR P1 A.1. REMOVE P1 MOTOR FOR MODERNIZATION REMOVE P1 MOTOR FOR MODERNIZATION A.2. BEGIN INSTALLATION WORK FOR MODERNIZATION OF P1 BEGIN INSTALLATION WORK FOR MODERNIZATION OF P1 MOTOR B. WORK IN SECONDARY HOISTWAY AREA AND CAB WORK IN SECONDARY HOISTWAY AREA AND CAB B.1. REMOVE P1 WORK RELATED TO THE MODERNIZATION OF REMOVE P1 WORK RELATED TO THE MODERNIZATION OF ELEVATOR CAB. B.2. PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR PROVIDE STRUCTURAL DEMOLITION WORK RELATED FOR NEW PROPOSED WORK. B.3. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P1 BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P1 B.4. WORK IN PIT AND HOISTWAY AREA WORK IN PIT AND HOISTWAY AREA C. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P1. BEGIN INSTALLATION WORK FOR MODERNIZATION FOR P1. CAR IS TO BE REMOVED FROM SERVICE AND LOCATED ON THE 8TH FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK.
AutoCAD SHX Text
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text N
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text N
S6
ICRA AND PHASING PLANS
FREIGHT ELEVATORS S6
Elevator:
PO Box 464
Phone: 608.616.2999 Mequon, WI 53092
UPGRADE EAGLE AND FREIGHT
ELEVATORS
Email: AdamS@pec-wi.com POC: Aslam Husain
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
35% Schematic Design 10.15.2021 5.27.22
Project Number
Building Number
607-21-155
B A
C G
POC: Adam Smith
B-Core
65% Construction Documents 12.29.2021 95% Construction Documents 3.18.2022 100% Construction Documents 5.27.2022
G004
SCALE: 1/4" = 1'-0"
PHASING PLAN 6-4RTH FLOOR- WORK
SCALE: 1/4" = 1'-0"
PHASING PLAN 6 -3RD FLOOR- CAB S6
SCALE: 1/4" = 1'-0"
PHASING PLAN 5- PENTHOUSE - WORK
TEMPORARY CONSTRUCTION
AREA PARTITION NOTES
PHASE 5A
PHASE 6A&B
PHASE 6C
PHASE 7
PHASE 6B
PHASE 5A
AutoCAD SHX Text C4160
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
MECH ROOM
AutoCAD SHX Text C4143
AutoCAD SHX Text
MECH
AutoCAD SHX Text C4142
AutoCAD SHX Text
LAB
AutoCAD SHX Text C4144
AutoCAD SHX Text
ELEC VAULT
AutoCAD SHX Text C4144A
AutoCAD SHX Text
ELEVATOR MACHINE
AutoCAD SHX Text C4144B
AutoCAD SHX Text
ELEC VAULT
AutoCAD SHX Text C4149C
AutoCAD SHX Text
OFFICE, STAFF
AutoCAD SHX Text C4146
AutoCAD SHX Text
LAB, RESEARCH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Q
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EX. FEC
AutoCAD SHX Text
EX. FEC
AutoCAD SHX Text C3134A
AutoCAD SHX Text
DO NOT FILL IN THESE FIELDS
AutoCAD SHX Text
ELEC. CLO.
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text C3134
AutoCAD SHX Text
EX. STAIR
AutoCAD SHX Text
NO. 6
AutoCAD SHX Text
DO NOT FILL IN THESE FIELDS
AutoCAD SHX Text
EX. ---
AutoCAD SHX Text C----
AutoCAD SHX Text
DO NOT FILL IN THESE FIELDS
AutoCAD SHX Text
EX. OFFICE
AutoCAD SHX Text C3135
AutoCAD SHX Text
DO NOT FILL IN THESE FIELDS
AutoCAD SHX Text
EX. STOR.
AutoCAD SHX Text C3128
AutoCAD SHX Text
DO NOT FILL IN THESE FIELDS
AutoCAD SHX Text
EX. KITCHEN
AutoCAD SHX Text C3133
AutoCAD SHX Text
DO NOT FILL IN THESE FIELDS
AutoCAD SHX Text
EX. MECH.
AutoCAD SHX Text C3132
AutoCAD SHX Text
DO NOT FILL IN THESE FIELDS
AutoCAD SHX Text
EX. REC./CORRIDORS
AutoCAD SHX Text C3127
AutoCAD SHX Text
DO NOT FILL IN THESE FIELDS
AutoCAD SHX Text
EX. LOUVER
AutoCAD SHX Text
EX. LOUVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C5002
AutoCAD SHX Text Q
AutoCAD SHX Text P
AutoCAD SHX Text
EX. LOUVER
AutoCAD SHX Text Q
AutoCAD SHX Text P
AutoCAD SHX Text Freight Elevator S-6
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text William S. Middleton Memorial VA, Madison WI
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text N
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text Basement thru 3rd floor
AutoCAD SHX Text Machine Room -4th floor
AutoCAD SHX Text Machine Room C4144A
AutoCAD SHX Text
PENTHOUSE
AutoCAD SHX Text GENERAL INFECTION CONTROL REQUIREMENTS: ENERAL INFECTION CONTROL REQUIREMENTS: 1. SEE SPEC 013526 FOR ADDITIONAL REQUIREMENTS AND G002 SEE SPEC 013526 FOR ADDITIONAL REQUIREMENTS AND G002 FOR LEGEND OF SYMBOLS 2. DEMOLITION AND REMOVAL OF MATERIALS AND EQUIPMENT DEMOLITION AND REMOVAL OF MATERIALS AND EQUIPMENT WILL REQUIRE THE CONTRACTOR TO MOVE THESE ITEMS IN COVERED AND SEALED CARTS. REMOVAL SHOULD ONLY TAKE PLACE AFTER NORMAL BUSINESS HOURS, CLEANUP OF ANY LIMITED DEBRIS LEFT IN ACCESS ROUTE DURING REMOVAL IS THE RESPONSIBILITY OF THE CONTRACTOR, IF NOT CAPPED AND SEALED BASED ON SCOPE OF WORK, ISOLATE RETURN AND EXHAUST DUCT OPENINGS IN THE WORK AREA WITH TEMPORARY MERV 8 PLEATED MEDIA. 3. SPECIAL ATTENTION, SUCH AS PROVISION OF NEGATIVE AIR SPECIAL ATTENTION, SUCH AS PROVISION OF NEGATIVE AIR PRESSURIZATION WITH HEPA FILTER UNITS, WILL BE REQUIRED IN WORK AREAS ADJACENT TO PATIENT CARE AREAS. IN THESE AREAS, DUST PARTITIONS WILL REMAIN IN PLACE UNTIL WORK IN THE AREA IS APPROVED BY PROJECT ENGINEER AND VAMC AND THOROUGHLY CLEANED BY THE CONTRACTOR. 4. AT THE POINT OF EXIT FOR EACH PARTITIONED WORK AREA, AT THE POINT OF EXIT FOR EACH PARTITIONED WORK AREA, THE CONTRACTOR WILL PROVIDE AN EFFECTIVE ADHESIVE WALK-OFF MAT AT ALL TIMES. 5. THE CONTRACTOR WILL MAINTAIN AS NECESSARY THE THE CONTRACTOR WILL MAINTAIN AS NECESSARY THE CLEANLINESS OF THE AREA ADJACENT TO DUST PARTITION BY MOPPING OR VACUUM SWEEPING. 6. THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE-TIGHT, TEMPORARY 1 AND 2-HOUR FIRE-RATED SMOKE-TIGHT PARTITIONS, TEMPORARY DOORS, WALK-OFF MATS AND EQUIPMENT PROTECTION WHERE SHOWN ON THE DOCUMENTS OR IMPLIED BY THE WORK BEING PERFORMED. SUCH PROTECTION SHALL BE MAINTAINED AND REPAIRED PROMPTLY IF DAMAGED TO AVOID DUST INFILTRATION INTO ADJACENT AREAS. 7. ALL DOORS IN TEMPORARY PARTITIONS SHALL BE ALL DOORS IN TEMPORARY PARTITIONS SHALL BE 3'-6"x7'-0" (SINGLE) AND 6'-0"x7'-0" (DOUBLE) U.N.O. REF. FLOOR PLANS FOR LOCATIONS. ALL TEMPORARY DOORS SHALL BE 1 AND 2-HOUR RATED W/ LEVER TYPE DOOR CONTROLS KEY/ PUNCH CODE ENTRY LOCKS AND CLOSERS. 8. STICKY MATS REQUIRED AT ALL BARRIERS DURING ALL WORK.STICKY MATS REQUIRED AT ALL BARRIERS DURING ALL WORK.
AutoCAD SHX Text
INFECTION CONTROL RISK ASSESSMENT AND ILSM MEASURES
AutoCAD SHX Text CONTRACTOR TO INSTALL TEMPORARY DUST PARTITION ( SMOKE-TIGHT WALL) WITH HOLLOW METAL DOOR WALL: METAL STUD & " TYPE 'X' GYPSUM BOARD (BOTH 58" TYPE 'X' GYPSUM BOARD (BOTH SIDES) PARTITION TO DECK ABOVE, TAPED AND PAINTED NOT USED. CONTRACTOR TO LEAVE ONE LEAF INACTIVE WHILE MAINTAINING ACCESS VIA EXISTING ACTIVE LEAF FOR OFFICE STAFF. CONTRACTOR TO PROVIDE DUST TIGHT CLOSER AT PENTHOUSE OVER WORK AREA- TIE INTO TEMPORARY CONSTRUCTION AREA BARRIER WALLS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text AREAS OF WORK AND CONTRACTOR LEVEL OF INFECTION CONTROL WILL BE DETERMINED PRIOR TO CONSTRUCTION BY VA INFECTION CONTROL DEPARTMENT. MAJOR EXPECTED WORK CONTAINED WITHIN ELEVATOR CAB AND SHAFT POSE ZERO OR LOW RISK TO FLOOR LEVELS PROVIDED THE PROPER BARRIERS ARE IN PLACE. ANY PRECAUTIONARY HOT WORK ACTIVITIES OUTSIDE THE CABS SHOULD BE CONTAINED WITHIN WORK AREAS. PENTHOUSE WORK CWING OF THE FACILITY IS MOST SUSCEPTIBLE TO FIRE RELATED IMPACTS OR ELECTRICAL SHORTAGES THAT WOULD RESULT IN THE SHUTDOWN OF CRUCIAL HVAC HEATING AND COOLING EQUIPMENT.
AutoCAD SHX Text
INFECTION CONTROL RISK ASSESSMENT
AutoCAD SHX Text
S-6 THIRD FLOOR
AutoCAD SHX Text RISK GROUP: LOW / PRECAUTION LEVEL ll OR III/IV
AutoCAD SHX Text
INFECTION CONTROL NOTES
AutoCAD SHX Text
S-6 PENTHOUSE FLOOR
AutoCAD SHX Text RISK GROUP: LOW / PRECAUTION LEVEL ll OR III/IV
AutoCAD SHX Text SUGGESTED PHASING NOTES AND SEQUENCE: PHASE 5 - CWING PENTHOUSE WORK A. WORK IN PENTHOUSE TO PREP FOR S-6 EXTENSION WORK IN PENTHOUSE TO PREP FOR S-6 EXTENSION A.1. REMOVE MECHANICAL DUCTWORK AND EQUIPMENT AS REMOVE MECHANICAL DUCTWORK AND EQUIPMENT AS WELL AS REROUTE ELECTRICAL AS REQUIRED. A.2. PROVIDE STRUCTURAL DEMOLITION WORK RELATED TO PROVIDE STRUCTURAL DEMOLITION WORK RELATED TO THE NEW PROPOSED WORK IN PENTHOUSE FLOOR. PHASE 6. FREIGHT ELEVATOR S6 A. WORK IN MACHINE ROOM 4RTH FLOOR WORK IN MACHINE ROOM 4RTH FLOOR A.1. REMOVE S6 MOTOR AND ALL FOR THE MODERNIZATION REMOVE S6 MOTOR AND ALL FOR THE MODERNIZATION REQUIREMENTS. SET ASIDE FOR RELOCATION A.2. REMOVE ALL FIRE PROTECTION LINES WITHIN MACHINE REMOVE ALL FIRE PROTECTION LINES WITHIN MACHINE ROOM. A.3. REMOVE ALL FIRE ALARM AND ELECTRICAL LIGHTING, REMOVE ALL FIRE ALARM AND ELECTRICAL LIGHTING, CABINETS, JUNCTION BOXES AND MECHANICAL COOLING EQUIPMENT. A.4. PROVIDE STRUCTURAL DEMOLITION WORK BY REMOVING PROVIDE STRUCTURAL DEMOLITION WORK BY REMOVING MACHINE ROOM FLOOR FOR NEW HOISTWAY. B. WORK IN PENTHOUSE AND PRIMARY HOISTWAY AREA WORK IN PENTHOUSE AND PRIMARY HOISTWAY AREA B.1. INSTALL ALL NEW ELECTRICAL WITHIN PENTHOUSE (NEW INSTALL ALL NEW ELECTRICAL WITHIN PENTHOUSE (NEW MACHINE ROOM) PERTAINING TO MODERNIZATION SCOPE OF WORK. B.2. REMOVE S6 RELATED TO THE UPGRADE FOR THE REMOVE S6 RELATED TO THE UPGRADE FOR THE MODERNIZATION OF ELEVATOR CAB. B.3. REMOVE LOUVER WITHIN SHAFT AND PROVIDE RATED REMOVE LOUVER WITHIN SHAFT AND PROVIDE RATED WALL ASSEMBLY. B.4. PROVIDE ALL NEW STRUCTURAL AND ARCHITECTURAL PROVIDE ALL NEW STRUCTURAL AND ARCHITECTURAL WORK RELATED TO MACHINE ROOM WALLS AND CEILING, STUDS AND JOISTS AND MACHINE ROOM CONCRETE PAD. B.5. PROVIDE NEW ENCLOSURE WITH COOLING AND PROVIDE NEW ENCLOSURE WITH COOLING AND ELECTRICAL FOR NEW PENTHOUSE MACHINE ROOM C. WORK IN PIT AND HOISTWAY AREA - FREIGHT S6 WORK IN PIT AND HOISTWAY AREA - FREIGHT S6 REMOVE AND BEGIN INSTALLATION WORK FOR THE MODERNIZATION FOR S6 WORK. INSTALLATION WORK FOR MODERNIZATION FOR S6. CAR IS TO BE REMOVED FROM CAR IS TO BE REMOVED FROM SERVICE AND LOCATED ON 3RD FLOOR. TEMPORARY SMOKE TIGHT CONSTRUCTION BARRIER ARE ERECTED TO ISOLATE THE AREA OF WORK. PHASE 7. FREIGHT ELEVATOR S6- WORK IN MACHINE ROOM 3RD FLOOR A.1 REMOVE WALLS, PLUMBING AND CABINETRY SHOWN REMOVE WALLS, PLUMBING AND CABINETRY SHOWN ON ARCHITECTURAL AND PLUMBING PLANS FOR THE PROPOSED NEW LOBBY ON 3RD FLOOR A.2 OPEN UP NEW WALL FOR SHAFT ELEVATOR DOOR OPEN UP NEW WALL FOR SHAFT ELEVATOR DOOR ENTRANCE ON 3RD FLOOR A.3 INSTALL NEW WALLS AND CEILING WORK FOR NEW INSTALL NEW WALLS AND CEILING WORK FOR NEW LOBBY.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .