S02 - Drawings Part 1.pdf
PDF 5 MB Posted
- Attached to
- Z1DA--695-22-107 Replace Building 5 AHUs Federal contract opportunity
- Solicitation number
- 36C25223B0010
About this file
This document package includes construction drawings and specifications for replacing air handling units in Building 5 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves demolishing existing AHUs on the basement, first, second and third floors and replacing them with new units. Infection control protocols are specified, including barrier walls, negative air pressure and HEPA filtration within the work areas. Life safety plans show existing egress routes and fire ratings. The solicitation number is 36C25223B0010 for project number 695-22-107 to replace the Building 5 AHUs at the Zablocki VAMC in Milwaukee under the Department of Veterans Affairs Veterans Health Administration VISN 12. The response due date and award date are not provided.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• NFPA 70 NATIONAL ELECTRIC CODE
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 011000 OF
THE VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
BUILDING 5
BUILDING 5
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2 /2
:5
:5
P M
C U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-3
M ilw a u k e e B
A
H U
R e p la c e m e n t_ d c o rd o n a c g
-p a
.c o m
.r v t
G-001
COVER SHEET
1 5DGC
REPLACE BUILDING 5 AHUS
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 NOVEMBER 23, 2022
100% CONSTRUCTION DOCUMENTS
695-22-10721-319-Q30
B5
REPLACE BUILDING 5 AHUS
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295
VA PROJECT #: 695-22-107
HD
N N
DRAWING LISTDRAWING LIST
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 10
M-100 MECHANICAL ROOM 111 DEMO AND HVAC PLAN-PHASE 1 2 10
M-101 MECHANICAL ROOM 203 DEMO AND HVAC PLAN-PHASE 2 3 10
M-102 BASEMENT DEMO AND HVAC PLAN - PHASE 3 4 10
M-103 FIRST FLOOR DEMO AND HVAC PLAN - PHASE 3 5 10
M-104 SECOND FLOOR DEMO AND HVAC PLAN - PHASE 3 6 10
M-105 THIRD FLOOR DEMO AND HVAC PLAN - PHASE 3 7 10
M-501 MECHANICAL DETAILS 8 10
M-502 MECHANICAL CONTROLS 9 10
M-601 MECHANICAL SCHEDULES 10 10
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6
E-100 BASEMENT ELECTRICAL PLAN 2 6
E-101 FIRST FLOOR ELECTRICAL PLAN 3 6
E-102 SECOND FLOOR ELECTRICAL PLAN 4 6
E-103 THIRD FLOOR ELECTRICAL PLAN 5 6
E-104 PANEL SCHEDULES 6 6
DRAWING LIST
GENERAL
G-001 COVER SHEET 1 5
G-002 ICRA INFORMATION AND DETAILS 2 5
LS101 BASEMENT AND FIRST FLOOR LIFE SAFETY PLANS 3 5
LS102 SECOND AND THIRD FLOOR LIFE SAFETY PLANS 4 5
LS103 TEMPORARY CONSTRUCTION LIFE SAFETY PLANS 5 5
STRUCTURAL
S-001 GENERAL NOTES 1 3
S-101 FIRST FLOOR FRAMING PLAN 2 3
S-102 SECOND FLOOR FRAMING PLAN 3 3
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 8
A-002 ARCHITECTURAL SITE PLAN 2 8
AD100 BASEMENT DEMOLITION / ICRA, REFLECTED CEILING PLANS 3 8
AD101 FIRST FLOOR DEMOLITION / ICRA, REFLECTED CEILING PLANS 4 8
AD102 SECOND FLOOR DEMOLITION / ICRA, REFLECTED CEILING PLANS 5 8
AD103 THIRD FLOOR DEMOLITION / ICRA, REFLECTED CEILING PLANS 6 8
A-100 BASEMENT AND FIRST FLOORS - NEW WORK, REFLECTED CEILING PLANS 7 8
A-101 SECOND AND THIRD FLOORS - NEW WORK, REFLECTED CEILING PLANS 8 8
CODE STANDARDS AND EXECUTIVE ORDERS
DocuSign Envelope ID: C7A11FCE-2DC0-4945-ADC2-185C2F86D091
11/22/2022
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
A B
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419
SMOKE RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE
DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE CLASS OF
PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD
SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA
FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND
ACTIVE.
1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES
(PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE
PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE
CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE
CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION
PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE
SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY
DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.
2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR
MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS
INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS
CONTROL
3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND
ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND
THE CONSTRUCTION STAGING/PREP AREA.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.
IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE
USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT
OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
4C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL
BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION
PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE
CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE
OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW
FROM CLEAN TO DIRTY AREAS.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE
(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE
FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR
AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS
DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
ICRA NOTES
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Bldg. #69 Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.A
P P
R O
X
A .F
.F
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR REPLACING BUILDING 5 AHU'S
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:5
:5
P M
C U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-3
M ilw a u k e e B
A
H U
R e p la c e m e n t_ d c o rd o n a c g
-p a
.c o m
.r v t
G-002
ICRA INFORMATION AND DETAILS
2 5DGC
REPLACE BUILDING 5 AHUS
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 NOVEMBER 23, 2022
100% CONSTRUCTION DOCUMENTS
695-22-10721-319-Q30
B5
HD
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3/4" = 1'-0"
ROOM ELEVATION
Scale: 12" = 1'-0"
ILSM TEMPORARY TAG
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
DN
UP
DN
DN
UP
P
IP
E T
U N
N E
L
TO TUNNEL DN
WALKWAY
FDC
TRAVEL DISTANCE: 64'-8"
T R
A V
E L D
IS
T
A N
C E
TRAVEL DISTANCE: 114'-5"
CAPACITYCLR
EXIT
33" 165
COMMON PATH OF TRAVEL: 65'-9"
CAPACITYCLR
EXIT
45" 225
CAPACITYCLR
EXIT
31" 155
Bldg.
M
XFEB
Y
L
AA
WALKWAY
EXISTING TREE
CANOPY OUTLINE
EXISTING TREE
CANOPY OUTLINE
LOADING
DOCK
MECHANICAL YARD
LANDSCAPING
LANDSCAPING
LANDSCAPING
EXISTING TREE
CANOPY OUTLINE
UP
UPDN
B04
AIR
COMPRESSOR/STORAGE
B06HC
HAC
B11
CORRIDOR
B01
STORAGE
B02
COPY ROOM
(RICOH)
B-03
STAIR
B10
ELEV LOBBY
B-04
STAIR
B08
PAYROLL
STORAGE
B12
CORRIDOR
B14
EQUIP AND
POWER
STAIRS
B13
ELEVATOR
EQUIP
B07
STORAGE
B13EC
ELEC
K
EVACUATION PLAN
J N
LANDSCAPING
B
1 2 3 4
A
C
EXIT ACCESS TRAVEL
(per NFPA 101, TABLE 39.26.2)
# OF MEANS OF
EGREES REQUIRED
(per NFPA 101, CHAPTER 7)
300'-00" MAXIMUM DISTANCE
(W/SPRINKLERED)
2 REQUIRED
OCCUPANT LOAD
(per NFPA 101, TABLE 7.3.1.2)
OCC. 3 = 5,184 GSF/150 = 35 PPL
OCC. 2 = 5,488 GSF/150 = 37 PPL
OCC. 1 = 5,608 GSF/150 = 38 PPL
OCC. B = 5,353 GSF/150 = 36 PPL
TOTAL OCCUPANCY = 146 PPL
GROSS BUILDING AREA
(OUTSIDE FACE WALLS)
LEVEL 3 - 5,184 SF
LEVEL 1 - 5,608 SF
REQUIRED # OF EXITS
(per NFPA 101, CHAPTER 7)
2 EXITS REQUIRED IF UNDER
49 TOTAL OCCUPANTS
# OF MEANS OF
EGRESS PROVIDED
2 MEANS OF EGRESS (EXISTING)
EGRESS INFORMATION
LEVEL 2 - 5,488 SF
BASEMENT - 5,353 SF
EXITS / EGRESS
ENCLOSURE (per NFPA
101, TABLE 7.1.3.2)
1 HR RATED ENCLOSURE
(EXISTING)
2 HR RATED ENCLOSURE
(EXISTING)
- 3 FLOORS OR FEWER
- 4 FLOORS
EGRESS PATH
EGRESS IDENTIFICATION
EXISTING FIRE EXTINGUISHER BRACKET
EXISTING FIRE EXTINGUISHER CABINET
EXISTING FDC
EXISTING AED CABINET
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
EXIT SIGN
PHOTO REFERENCE - LETTER AND
DIRECTION
CA
XFEB
XFEC
FDC
XAED
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
K
MECHANICAL
ROOM 112
OFFICE
5-1-SH-01
SHAFT
OFFICE
STORAGE
109EC
ELEC
5-1-001
VESTIBULE
OFFICE
5-1-012
ELEV LOBBY
5-1-006
JAN
5-1-CR-01
CORRIDOR
5-1-010
RECEPTION
OFFICE
CONFERENCE
OFFICE
OFFICE
IT
5-1-CR-02
CORRIDOR
KITCHEN
OFFICE
5-1-007
TLT
CLOSET
CL
5-1-004
OFFICE
CL106
CL
ENTRY
UP
STAIR
ST-04
STAIR
ST-03
ST-05
STAIR
5-1-009
TOILET
5-1-EL-01
ELEV CAB
5-1-002
TOILET
DN
DN
DN
DN
UP
UPDN
DN DN
DN
STAIR EXITS AT
LANDING LEVEL
TRAVEL DISTANCE: 81'-2"
T R
A V
E L D
IS
T
A N
C E
TRAVEL DISTANCE: 65'-9"
CAPACITYCLR
EXIT
33" 165
CAPACITYCLR
EXIT
39" 195
CAPACITYCLR
EXIT
33" 165
CAPACITYCLR
EXIT
68" 340
CAPACITYCLR
EXIT
33" 165
O
B
A
CC
XFEC
XFEC
XAED
DD
EE
CDE F/G/H
I
XFEB
EVACUATION
SIGN
Z
B
1 2 3 4
A
C
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2 /2
:1
:1
A M
A
-3
M ilw a u k e e B
A
H U
R e p la c e m e n t_ d e ta c h e d .r v t
LS101
BASEMENT AND FIRST FLOOR LIFE
SAFETY PLANS
3 5DGC
REPLACE BUILDING 5 AHUS
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 NOVEMBER 23, 2022
100% CONSTRUCTION DOCUMENTS
695-22-10721-319-Q30
B5
HD
Scale: 1/8" = 1'-0"
EXISTING CONDITIONS - BASEMENT FLOOR LIFE SAFETY PLAN
NORTH
0 4 8 16
PROPOSED USE:
OWNED BY: FEDERAL GOVERNMENT
CODE ENFORCEMENT JURISDICTION: FEDERAL
APPLICABLE CODES:
GENERAL CODE INFORMATION:
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
PRIMARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
SPRINKLERED
2021 ENERGY CONSERVATION CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL FIRE CODE
OFFICE
2HH (PER NFPA 101)
BUSINESS
2020 NFPA 70 NATIONAL ELECTRIC CODE
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN CODE
2021 NFPA 101 LIFE SAFETY CODE
2017 PG 18-13 VA BARRIER FREE DESIGN STANDARDS
REPLACE BUILDING 5 AHUS
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295
CLEMENT J. ZABLOCKI VAMC
CODE INFORMATION
LIFE SAFETY LEGEND
Scale: 1/8" = 1'-0"
EXISTING CONDITIONS - FIRST FLOOR LIFE SAFETY PLAN
NORTH
0 4 8 16
A B C
D E F
G H I
J K L
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
BASEMENT
FIRST FLOOR
M N O
THE INFORMATION CONTAINED IN THESE DRAWINGS
ARE NOT A VERIFIED LIFE SAFETY SURVEY NOR ARE
THEY TO BE USED AS OFFICIAL DOCUMENTATION IN
THE LIFE SAFETY NARRATIVE OF BUILDING 5.
A NON-DESTRUCTIVE VISUAL OBSERVATION OF
BUILDING 5 WAS PERFORMED ON 7/72022. THE
PHOTOGRAPHS ON THE LIFE SAFETY DRAWINGS ARE
THE BASIS FOR DESIGN ASSUMPTIONS CONTAINED
WITHIN THE DOCUMENT DRAWINGS.
WALL RATINGS SHOWN IN THESE PLANS ARE TO
SERVE AS THE BASIS OF DESIGN FOR ANY
REPLACEMENT, PATCHWORK OR PENETRATIONS FOR
FIRE RATED CONSTRUCTION REQUIRED TO
ADEQUATELY PERFORM THE SCOPE OF WORK.
EXISTING WALL RATINGS HAVE NOT BEEN VERIFIED.
WE NOTE THE PROBABLE LOCATIONS OF FIRE RATED
CONSTRUCTION BASED UPON PHOTOGRAPHS OF THE
EXISTING CONDITIONS. THE WALL RATINGS FOR
STAIRS AND SHAFTS DESIGNATE THE REQUIRED 2HR
RATING IN COMPLIANCE WITH NFPA 101, 2021 EDITION.
ANY NEW PENETRATIONS IN EXISTING WALLS SHOWN
TO BE RATED SHALL RECEIVE FIRESTOPPING TO MEET
THE DESIGNATED WALL RATING.
NO EVACUATION PLANS SHOWING EGRESS AND EXIT
FROM THE BUILDING WERE PRESENT ON THE WALLS
OF THE BUILDING 5.
PATHS OF TRAVEL ARE INTENDED TO FOLLOW THE
EXISTING EGRESS SIGNS AND SHOULD NOT BE
MODIFIED UNLESS IT IS REQUIRED TO DO SO DURING
CONSTRUCTION IN ORDER TO COMPLETE THE SCOPE
OF WORK.
CONTRACTOR IS TO NOTIFY THE COR AND ARCHITECT
IF ANY EXISTING EGRESS LIGHTS ARE REQUIRED TO
BE TEMPORARILY DISABLED DURING CONSTRUCTION.
TEMPORARY MODIFICATIONS TO THE PATH OF TRAVEL
ARE TO BE COMMUNICATED TO AND COORDINATED
WITH THE COR AND ARCHITECT.
ALL LIFE SAFETY CONDITIONS TEMPORARILY MODIFIED
DURING CONSTRUCTION WILL REVERT TO THEIR
ORIGINAL CONDITION ONCE THE WORK HAS BEEN
COMPLETED.
A PATH FOR REMOVAL OF CONSTRUCTION WASTE
SHALL BE COORDINATED WITH THE COR .
A PATH FOR THE REMOVAL OF ASBESTOS AND OTHER
HAZARDOUS MATERIALS SHALL BE COORDINATED
WITH THE COR .
FIG. 1 EXISTING EVACUATION PLAN
File details come from the government source that posted it. Updated .