S02 - Drawings Part 1.pdf

PDF 5 MB Posted

Attached to
Z1DA--695-22-107 Replace Building 5 AHUs Federal contract opportunity
Solicitation number
36C25223B0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document package includes construction drawings and specifications for replacing air handling units in Building 5 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves demolishing existing AHUs on the basement, first, second and third floors and replacing them with new units. Infection control protocols are specified, including barrier walls, negative air pressure and HEPA filtration within the work areas. Life safety plans show existing egress routes and fire ratings. The solicitation number is 36C25223B0010 for project number 695-22-107 to replace the Building 5 AHUs at the Zablocki VAMC in Milwaukee under the Department of Veterans Affairs Veterans Health Administration VISN 12. The response due date and award date are not provided.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--695-22-107 Replace Building 5 AHUs, newest first.
File Type Posted
S06 - 695-22-107 Amend 0006 Questions 02.27.23.pdf PDF
36C25223B0010 0006.docx DOCX document
S06 - 695-22-107 Amend 0005 Questions 02.24.23.pdf PDF
36C25223B0010 0005.docx DOCX document
Attachment 3B - ACM Report Bldg. 5 Basement.pdf PDF
S06 - 695-22-107 Amend 0004 Questions 02.21.23.pdf PDF
36C25223B0010 0004.docx DOCX document
Attachment 2D - VA Temp AC Unit Photo 4.pdf PDF
Attachment 2C - VA Temp AC Unit Photo 3.pdf PDF
Attachment 2B - VA Temp AC Unit Photo 2.pdf PDF
Attachment 4 - Bldg. 5 Tab Report.pdf PDF
Attachment 3A - ACM Report Bldg. 5 MERs.pdf PDF
Attachment 2G - VA Temp AC Unit Photo 7.pdf PDF
Attachment 2F - VA Temp AC Unit Photo 6.pdf PDF
Attachment 2E - VA Temp AC Unit Photo 5.pdf PDF
Attachment 2A - VA Temp AC Unit Photo 1.pdf PDF
Attachment 1 - VA Temp AC Unit Cutsheets and O_M.pdf PDF
S06 - 695-22-107 Amend 0004 Specifications.pdf PDF
36C25223B0010 0003.docx DOCX document
36C25223B0010 0002.docx DOCX document
36C25223B0010 0001.docx DOCX document
S06 - Site Visit Attendance Sheet_695-22-107 01.11.23.pdf PDF
S02 - Drawings Part 2.pdf PDF
S02 - Drawings Part 4.pdf PDF
S02 - Wage Determination_11_11_22.pdf PDF
S02 - HVAC_BAS_Controls_SingleSourceJustification_MPT-SAT_SIGNED.pdf PDF
S02 - Drawings Part 3.pdf PDF
S02 - Firestop_SingleSourceJustification_MPT-SAT_SIGNED.pdf PDF
S02 - Specifications.pdf PDF
36C25223B0010.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• NFPA 70 NATIONAL ELECTRIC CODE

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 011000 OF

THE VA MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019.

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION

FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

BUILDING 5

BUILDING 5

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/2 /2

:5

:5

P M

C U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-3

M ilw a u k e e B

A

H U

R e p la c e m e n t_ d c o rd o n a c g

-p a

.c o m

.r v t

G-001

COVER SHEET

1 5DGC

REPLACE BUILDING 5 AHUS

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 NOVEMBER 23, 2022

100% CONSTRUCTION DOCUMENTS

695-22-10721-319-Q30

B5

REPLACE BUILDING 5 AHUS

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295

VA PROJECT #: 695-22-107

HD

N N

DRAWING LISTDRAWING LIST

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 10

M-100 MECHANICAL ROOM 111 DEMO AND HVAC PLAN-PHASE 1 2 10

M-101 MECHANICAL ROOM 203 DEMO AND HVAC PLAN-PHASE 2 3 10

M-102 BASEMENT DEMO AND HVAC PLAN - PHASE 3 4 10

M-103 FIRST FLOOR DEMO AND HVAC PLAN - PHASE 3 5 10

M-104 SECOND FLOOR DEMO AND HVAC PLAN - PHASE 3 6 10

M-105 THIRD FLOOR DEMO AND HVAC PLAN - PHASE 3 7 10

M-501 MECHANICAL DETAILS 8 10

M-502 MECHANICAL CONTROLS 9 10

M-601 MECHANICAL SCHEDULES 10 10

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6

E-100 BASEMENT ELECTRICAL PLAN 2 6

E-101 FIRST FLOOR ELECTRICAL PLAN 3 6

E-102 SECOND FLOOR ELECTRICAL PLAN 4 6

E-103 THIRD FLOOR ELECTRICAL PLAN 5 6

E-104 PANEL SCHEDULES 6 6

DRAWING LIST

GENERAL

G-001 COVER SHEET 1 5

G-002 ICRA INFORMATION AND DETAILS 2 5

LS101 BASEMENT AND FIRST FLOOR LIFE SAFETY PLANS 3 5

LS102 SECOND AND THIRD FLOOR LIFE SAFETY PLANS 4 5

LS103 TEMPORARY CONSTRUCTION LIFE SAFETY PLANS 5 5

STRUCTURAL

S-001 GENERAL NOTES 1 3

S-101 FIRST FLOOR FRAMING PLAN 2 3

S-102 SECOND FLOOR FRAMING PLAN 3 3

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 8

A-002 ARCHITECTURAL SITE PLAN 2 8

AD100 BASEMENT DEMOLITION / ICRA, REFLECTED CEILING PLANS 3 8

AD101 FIRST FLOOR DEMOLITION / ICRA, REFLECTED CEILING PLANS 4 8

AD102 SECOND FLOOR DEMOLITION / ICRA, REFLECTED CEILING PLANS 5 8

AD103 THIRD FLOOR DEMOLITION / ICRA, REFLECTED CEILING PLANS 6 8

A-100 BASEMENT AND FIRST FLOORS - NEW WORK, REFLECTED CEILING PLANS 7 8

A-101 SECOND AND THIRD FLOORS - NEW WORK, REFLECTED CEILING PLANS 8 8

CODE STANDARDS AND EXECUTIVE ORDERS

DocuSign Envelope ID: C7A11FCE-2DC0-4945-ADC2-185C2F86D091

11/22/2022

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H E

IG

H

T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

4 7/8"

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

/2

4 7/8"

3 5/8" 16 GAUGE METAL

STUDS @ 16" O.C. WALL TO

EXTEND TO UNDERSIDE OF

DECK

A B

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. (2) LAYERS 5/8"

GYPSUM BOARD EACH SIDE.

WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

6 1/8"

C

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

1-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U419

SMOKE RATED 2-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U419

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V .I

.F

V .I

.F

V.I.F.

V .I .F

E X

IS

T

IN

G

W A

L L

V .I .F

E X

IS

T

IN

G

W A

L L

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

F L E

X D

U C

T

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE

DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE CLASS OF

PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD

SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON

THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA

FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND

ACTIVE.

1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES

(PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE

PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY

SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE

CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE

MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.

ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE

CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION

PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE

SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY

DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.

AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.

2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER

ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR

MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS

INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS

CONTROL

3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND

ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE

CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC

AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION

MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;

THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND

THE CONSTRUCTION STAGING/PREP AREA.

4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.

EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.

IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY

PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE

USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.

FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT

OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.

4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

4C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL

BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION

PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

5. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE

CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE

OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS

COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW

FROM CLEAN TO DIRTY AREAS.

5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA

SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO

DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE

AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL

PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER

CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE

(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY

VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A

PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO

PREVENT CONTAMINATION OF THE DUCTS.

5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

INTACT CEILING SHALL BE VERIFIED DAILY.

5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL

AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-

CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA

ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE

PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED

AREAS

6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE

FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION

AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR

AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE

DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE

APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR

ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT

(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS

TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM

DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR

REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL

HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,

VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS

DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.

ICRA NOTES

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Bldg. #69 Therapy areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD; AMCU;

- Respiratory Isolation Rooms

- Surgery

III

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.A

P P

R O

X

A .F

.F

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR REPLACING BUILDING 5 AHU'S

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2 /2

:5

:5

P M

C U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-3

M ilw a u k e e B

A

H U

R e p la c e m e n t_ d c o rd o n a c g

-p a

.c o m

.r v t

G-002

ICRA INFORMATION AND DETAILS

2 5DGC

REPLACE BUILDING 5 AHUS

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 NOVEMBER 23, 2022

100% CONSTRUCTION DOCUMENTS

695-22-10721-319-Q30

B5

HD

Scale: 1/2" = 1'-0"

ICRA MOBILE CONTAINMENT CART

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE

Scale: 1/2" = 1'-0"

CROSS SECTION "A"

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 3/4" = 1'-0"

ROOM ELEVATION

Scale: 12" = 1'-0"

ILSM TEMPORARY TAG

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

DN

UP

DN

DN

UP

P

IP

E T

U N

N E

L

TO TUNNEL DN

WALKWAY

FDC

TRAVEL DISTANCE: 64'-8"

T R

A V

E L D

IS

T

A N

C E

TRAVEL DISTANCE: 114'-5"

CAPACITYCLR

EXIT

33" 165

COMMON PATH OF TRAVEL: 65'-9"

CAPACITYCLR

EXIT

45" 225

CAPACITYCLR

EXIT

31" 155

Bldg.

M

XFEB

Y

L

AA

WALKWAY

EXISTING TREE

CANOPY OUTLINE

EXISTING TREE

CANOPY OUTLINE

LOADING

DOCK

MECHANICAL YARD

LANDSCAPING

LANDSCAPING

LANDSCAPING

EXISTING TREE

CANOPY OUTLINE

UP

UPDN

B04

AIR

COMPRESSOR/STORAGE

B06HC

HAC

B11

CORRIDOR

B01

STORAGE

B02

COPY ROOM

(RICOH)

B-03

STAIR

B10

ELEV LOBBY

B-04

STAIR

B08

PAYROLL

STORAGE

B12

CORRIDOR

B14

EQUIP AND

POWER

STAIRS

B13

ELEVATOR

EQUIP

B07

STORAGE

B13EC

ELEC

K

EVACUATION PLAN

J N

LANDSCAPING

B

1 2 3 4

A

C

EXIT ACCESS TRAVEL

(per NFPA 101, TABLE 39.26.2)

# OF MEANS OF

EGREES REQUIRED

(per NFPA 101, CHAPTER 7)

300'-00" MAXIMUM DISTANCE

(W/SPRINKLERED)

2 REQUIRED

OCCUPANT LOAD

(per NFPA 101, TABLE 7.3.1.2)

OCC. 3 = 5,184 GSF/150 = 35 PPL

OCC. 2 = 5,488 GSF/150 = 37 PPL

OCC. 1 = 5,608 GSF/150 = 38 PPL

OCC. B = 5,353 GSF/150 = 36 PPL

TOTAL OCCUPANCY = 146 PPL

GROSS BUILDING AREA

(OUTSIDE FACE WALLS)

LEVEL 3 - 5,184 SF

LEVEL 1 - 5,608 SF

REQUIRED # OF EXITS

(per NFPA 101, CHAPTER 7)

2 EXITS REQUIRED IF UNDER

49 TOTAL OCCUPANTS

# OF MEANS OF

EGRESS PROVIDED

2 MEANS OF EGRESS (EXISTING)

EGRESS INFORMATION

LEVEL 2 - 5,488 SF

BASEMENT - 5,353 SF

EXITS / EGRESS

ENCLOSURE (per NFPA

101, TABLE 7.1.3.2)

1 HR RATED ENCLOSURE

(EXISTING)

2 HR RATED ENCLOSURE

(EXISTING)

- 3 FLOORS OR FEWER

- 4 FLOORS

EGRESS PATH

EGRESS IDENTIFICATION

EXISTING FIRE EXTINGUISHER BRACKET

EXISTING FIRE EXTINGUISHER CABINET

EXISTING FDC

EXISTING AED CABINET

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

EXIT SIGN

PHOTO REFERENCE - LETTER AND

DIRECTION

CA

XFEB

XFEC

FDC

XAED

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS

CAPACITY

K

MECHANICAL

ROOM 112

OFFICE

5-1-SH-01

SHAFT

OFFICE

STORAGE

109EC

ELEC

5-1-001

VESTIBULE

OFFICE

5-1-012

ELEV LOBBY

5-1-006

JAN

5-1-CR-01

CORRIDOR

5-1-010

RECEPTION

OFFICE

CONFERENCE

OFFICE

OFFICE

IT

5-1-CR-02

CORRIDOR

KITCHEN

OFFICE

5-1-007

TLT

CLOSET

CL

5-1-004

OFFICE

CL106

CL

ENTRY

UP

STAIR

ST-04

STAIR

ST-03

ST-05

STAIR

5-1-009

TOILET

5-1-EL-01

ELEV CAB

5-1-002

TOILET

DN

DN

DN

DN

UP

UPDN

DN DN

DN

STAIR EXITS AT

LANDING LEVEL

TRAVEL DISTANCE: 81'-2"

T R

A V

E L D

IS

T

A N

C E

TRAVEL DISTANCE: 65'-9"

CAPACITYCLR

EXIT

33" 165

CAPACITYCLR

EXIT

39" 195

CAPACITYCLR

EXIT

33" 165

CAPACITYCLR

EXIT

68" 340

CAPACITYCLR

EXIT

33" 165

O

B

A

CC

XFEC

XFEC

XAED

DD

EE

CDE F/G/H

I

XFEB

EVACUATION

SIGN

Z

B

1 2 3 4

A

C

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2 /2

:1

:1

A M

A

-3

M ilw a u k e e B

A

H U

R e p la c e m e n t_ d e ta c h e d .r v t

LS101

BASEMENT AND FIRST FLOOR LIFE

SAFETY PLANS

3 5DGC

REPLACE BUILDING 5 AHUS

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 NOVEMBER 23, 2022

100% CONSTRUCTION DOCUMENTS

695-22-10721-319-Q30

B5

HD

Scale: 1/8" = 1'-0"

EXISTING CONDITIONS - BASEMENT FLOOR LIFE SAFETY PLAN

NORTH

0 4 8 16

PROPOSED USE:

OWNED BY: FEDERAL GOVERNMENT

CODE ENFORCEMENT JURISDICTION: FEDERAL

APPLICABLE CODES:

GENERAL CODE INFORMATION:

RENOVATION (EXISTING BUILDING)

CONSTRUCTION TYPE:

PRIMARY OCCUPANCY:

PROJECT NAME:

PROJECT ADDRESS:

OWNER OR AGENT:

SPRINKLERED

2021 ENERGY CONSERVATION CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL FIRE CODE

OFFICE

2HH (PER NFPA 101)

BUSINESS

2020 NFPA 70 NATIONAL ELECTRIC CODE

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN CODE

2021 NFPA 101 LIFE SAFETY CODE

2017 PG 18-13 VA BARRIER FREE DESIGN STANDARDS

REPLACE BUILDING 5 AHUS

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295

CLEMENT J. ZABLOCKI VAMC

CODE INFORMATION

LIFE SAFETY LEGEND

Scale: 1/8" = 1'-0"

EXISTING CONDITIONS - FIRST FLOOR LIFE SAFETY PLAN

NORTH

0 4 8 16

A B C

D E F

G H I

J K L

N

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

BASEMENT

FIRST FLOOR

M N O

THE INFORMATION CONTAINED IN THESE DRAWINGS

ARE NOT A VERIFIED LIFE SAFETY SURVEY NOR ARE

THEY TO BE USED AS OFFICIAL DOCUMENTATION IN

THE LIFE SAFETY NARRATIVE OF BUILDING 5.

A NON-DESTRUCTIVE VISUAL OBSERVATION OF

BUILDING 5 WAS PERFORMED ON 7/72022. THE

PHOTOGRAPHS ON THE LIFE SAFETY DRAWINGS ARE

THE BASIS FOR DESIGN ASSUMPTIONS CONTAINED

WITHIN THE DOCUMENT DRAWINGS.

WALL RATINGS SHOWN IN THESE PLANS ARE TO

SERVE AS THE BASIS OF DESIGN FOR ANY

REPLACEMENT, PATCHWORK OR PENETRATIONS FOR

FIRE RATED CONSTRUCTION REQUIRED TO

ADEQUATELY PERFORM THE SCOPE OF WORK.

EXISTING WALL RATINGS HAVE NOT BEEN VERIFIED.

WE NOTE THE PROBABLE LOCATIONS OF FIRE RATED

CONSTRUCTION BASED UPON PHOTOGRAPHS OF THE

EXISTING CONDITIONS. THE WALL RATINGS FOR

STAIRS AND SHAFTS DESIGNATE THE REQUIRED 2HR

RATING IN COMPLIANCE WITH NFPA 101, 2021 EDITION.

ANY NEW PENETRATIONS IN EXISTING WALLS SHOWN

TO BE RATED SHALL RECEIVE FIRESTOPPING TO MEET

THE DESIGNATED WALL RATING.

NO EVACUATION PLANS SHOWING EGRESS AND EXIT

FROM THE BUILDING WERE PRESENT ON THE WALLS

OF THE BUILDING 5.

PATHS OF TRAVEL ARE INTENDED TO FOLLOW THE

EXISTING EGRESS SIGNS AND SHOULD NOT BE

MODIFIED UNLESS IT IS REQUIRED TO DO SO DURING

CONSTRUCTION IN ORDER TO COMPLETE THE SCOPE

OF WORK.

CONTRACTOR IS TO NOTIFY THE COR AND ARCHITECT

IF ANY EXISTING EGRESS LIGHTS ARE REQUIRED TO

BE TEMPORARILY DISABLED DURING CONSTRUCTION.

TEMPORARY MODIFICATIONS TO THE PATH OF TRAVEL

ARE TO BE COMMUNICATED TO AND COORDINATED

WITH THE COR AND ARCHITECT.

ALL LIFE SAFETY CONDITIONS TEMPORARILY MODIFIED

DURING CONSTRUCTION WILL REVERT TO THEIR

ORIGINAL CONDITION ONCE THE WORK HAS BEEN

COMPLETED.

A PATH FOR REMOVAL OF CONSTRUCTION WASTE

SHALL BE COORDINATED WITH THE COR .

A PATH FOR THE REMOVAL OF ASBESTOS AND OTHER

HAZARDOUS MATERIALS SHALL BE COORDINATED

WITH THE COR .

FIG. 1 EXISTING EVACUATION PLAN