S02 - Drawings.pdf
PDF 7 MB Posted
- Attached to
- Z1DA--Replace Fire Sprinkler System Risers Bldg. 111 Project 695-19-104 Federal contract opportunity
- Solicitation number
- 36C25221B0021
About this file
This pre-solicitation notice announces a requirement to replace fire sprinkler risers in Building 111 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves infection control, plumbing, and demolition work and has an estimated price range between $1,000,000 to $2,000,000. The NAICS code is 238220 for specialty trade contractors with a size standard of $16.5 million. The period of performance is 660 calendar days from notice to proceed. The solicitation will post to beta.sam.gov on July 8, 2021 with a bid opening tentatively scheduled for August 10, 2021. A pre-bid conference and site walkthrough will be held. The solicitation will be issued as a 100% Service Disabled Veteran Owned Small Business set-aside. Bidders must represent SDVOSB status, small business size, and CVE verification at time of submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 695-19-104 Amend 05 Spec 00 01 10 TOC.pdf | ||
| 695-19-104 Amend 05 Drawings.pdf | ||
| 695-19-104 Amend 05 Spec 01 01 10SN.pdf | ||
| 36C25221B0021 0005.docx | DOCX document | |
| 695-19-104 Amend 05 Spec 01 35 26 Safety Requirements.pdf | ||
| 36C25221B0021 0004.docx | DOCX document | |
| S06 - Pre-Bid Walkthru Roster 07.20.21.pdf | ||
| 36C25221B0021 0003.docx | DOCX document | |
| 36C25221B0021 0002.docx | DOCX document | |
| S02 - Combined Riser PDF Attachment.pdf | ||
| S02 - Haz Material Report Attachment.pdf | ||
| S02 - Pre-Bid Walkthru Roster.pdf | ||
| 36C25221B0021_1.pdf | ||
| S02 - Project Specifications updated 7 7 21.pdf | ||
| 36C25221B0021 0001.docx | DOCX document | |
| S02 - Project Specifications.pdf | ||
| S02 - DB Wage Determination.pdf | ||
| S02 - JNA for Fire Alarm Components.pdf | ||
| S02 - JNA for Hilti Firestop.pdf | ||
| 36C25221B0021_1.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/1
/2
:2
:2
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
GI001
PROJECT COVER SHEET
1 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
REPLACE FIRE SPRINKLERS BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
VA PROJECT #: 695-19-104
RBK
DRAWING LIST
No. Description Dwg of Dwg
GI001 PROJECT COVER SHEET 1 17
FX001 FIRE SUPPRESSION GENERAL INFORMATION AND DETAILS 2 17
FX002 FIRE SUPPRESSION ELECTRICAL GENERAL INFORMATION 3 17
FX101A SUBBASEMENT FIRE SUPPRESSION PLAN AND DETAILS - AREA A 4 17
FX101B SUBBASEMENT FIRE SUPPRESSION PLANS AND PUMP ROOM ISOMETRIC - AREA B 5 17
FX101C SUBBASEMENT FIRE SUPPRESSION PLAN - AREA C 6 17
FX101D SUBBASEMENT FIRE SUPPRESSION PLAN - AREA D 7 17
FX102 FIRST FLOOR FIRE SUPPRESSION PLAN 8 17
FX411 FIRE SUPPRESSION PLANS AND SECTIONS - STAIR 1 9 17
FX421 FIRE SUPPRESSION PLANS AND SECTIONS - STAIR 2 10 17
FX431 FIRE SUPPRESSION PLANS AND SECTIONS - STAIR 3 11 17
FX441 FIRE SUPPRESSION PLANS AND SECTIONS - STAIR 4 12 17
FX451 FIRE SUPPRESSION PLANS AND SECTIONS - STAIR 5 13 17
FX461 FIRE SUPPRESSION PLANS - STAIR 6 14 17
FX462 FIRE SUPPRESSION PLAN AND SECTIONS - STAIR 6 15 17
FX901 EXISTING FIRE SUPPRESSION RISER SCHEMATIC 16 17
FX902 NEW FIRE SUPPRESSION RISER SCHEMATIC 17 17
BUILDING 111
DocuSign Envelope ID: A5708963-1A4E-4D4B-AABB-7C3E65938954
6/14/2021
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
UPRIGHT SPRINKLER HEAD
FIRE LINE (NEW - BOLD)FL
PENDANT SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
FIRE LINE (EXISTING - LIGHT - ITALIC)FL
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
TAMPER SWITCH
FLOW SWITCH
CHECK VALVE
GATE VALVE
TEST AND DRAIN ASSEMBLY
BACKFLOW PREVENTER
T&D
TS
FS
ORDINARY HAZARD
GROUP 1 OCCUPANCY
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
ORDINARY HAZARD
GROUP 2 OCCUPANCY
LIGHT HAZARD
BUTTERFLY VALVE
DRAIN VALVE WITH SIGHT GLASS
FIRE LINE (DEMOLITION - DASHED BOLD - ITALIC)FL
FIRE DRAIN (EXISTING - LIGHT - ITALIC)DRAIN
CALLOUT LINE
MATCHLINE
FIRE LINE (PREVIOUS PHASE - MEDIUM - ITALIC)FL
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA
13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE
PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS
DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE
PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION
SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS
DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE
BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING
CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING
CODE, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION
REQUIREMENTS.
FLUSHING CONNECTION
FEED OR CROSS MAIN.
TYPICAL TEE WITH
CROSS MAIN PITCH
TOWARDS FEED MAIN.
NOTE: INSTALL FLUSHING
CONNECTION AT END OF
CROSS MAINS.
2" NIPPLE 4" LONG
WITH CAP.
MECHANICAL TEE
NEW PIPING
MECHANICAL TEE
SCREWED END
NOTE: SEE FLOOR
PLAN FOR EXISTING
AND NEW PIPE SIZES.
STEEL BEAM
RETAINING STRAP
C-CLAMP
THREADED HANGER ROD
ADJUSTABLE RING HANGER
EXPANSION ANCHOR.
ANCHOR SHALL BE FM
LISTED AND APPROVED
FOR USE IN CRACKED
CONCRETE PER ACI 355.2
EXISTING CONCRETE SLAB
SPRINKLER PIPE
SET SCREW
SURGE RESTRAINER
INSTALL INSULATION AFTER
CAULKING SLEEVE, SEAL AS
REQUIRED.
FIRE RATED WALL AND OR SLAB.
STEEL PIPE SLEEVE TERMINATE
SLEEVE FLUSH WITH FINISHED
SURFACE.
FIRESTOPPING APPROVED
(BY LOCAL CODES)
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND OF
SIZE TO COMPLETELY COVER
OPENING.
APPROVED TYPE FIRE SAFE &
SMOKE TIGHT CAULKING SEALER
BETWEEN BARE PIPE AND SLEEVE.
SPRINKLER RISER
INDICATING BUTTERFLY VALVE
WITH TAMPER SWITCH AT OR ABOVE 7'- 0" AFF
WATER FLOW SWITCH
PRESSURE GAUGE
SPRINKLER PIPE TO ZONE
AUXILIARY DRAIN VALVE
1" INSPECTOR'S TEST VALVE
SIGHT GLASS
2" DRAIN CONNECTION TO EXISTING
DRAIN PIPING
CHECK VALVE
STANDPIPE HOSE CONNECTION
MOUNT 4'- 0" AFF
1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR TO START OF
WORK.
2. COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. GIVE THE COR AT LEAST TWENTY-EIGHT (28) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.
3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
4. FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE AND
DISPOSED OF.
5. REMOVE SPRINKLER MAINS AND BRANCHES TO THE ZONE CONTROL VALVE AS NEEDED TO INSTALL NEW SPRINKLER
SYSTEM.
1. USE NFPA-13 (CURRENT EDITION) AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC
SPRINKLER SYSTEM.
2. THIS FACILITY IS FULLY SPRINKLERED. EXISTING FIRE SUPPRESSION SYSTEM IS WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. STANDPIPE SIZES SHALL MATCH EXISTING.
3. FIRE PROTECTION CONTRACTOR SHALL TEST EXISTING FIRE PUMP AND RECORD STATIC AND RESIDUAL PRESSURE AT MOST REMOTE OUTLET. TEST SHALL BE PERFORMED BEFORE START AND AFTER COMPLETION OF NEW WORK.
4. SUBMIT ONE COMPLETE SET OF PUMP AND RISER TEST DATA, CERTIFIED AND STAMPED BY A PROFESSIONAL ENGINEER.
5. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.
6. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS
AT PRIMARY BUILDING STRUCTURAL MEMBERS.
7. CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.
8. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
9. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.
10. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS, AND CEILINGS.
11. ELECTRONIC FLOW AND TAMPER SWITCHES ARE TO BE REUSED AND INSTALLED AS WORK OF DIVISION 21. PROVIDE WIRING
TO FLOW AND TAMPER SWITCHES AS WORK OF DIVISION 26.
12. FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.
13. LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS IN ACCORDANCE WITH NFPA-13.
14. NEW STANDPIPES SHALL BE LOCATED AT EXISTING STANDPIPE LOCATIONS AND USE EXISTING OPENINGS IN THE FLOORS
EXCEPT IN PLACES NOTED ON THE PLANS.
15. STANDPIPE SYSTEM IS CLASS 1.
16. CONTRACTOR SHALL TEST EVERY VALVE AND ALARM DEVICE PRIOR TO BEGINNING WORK TO ENSURE WORKING CONDITION. PROVIDE TWO (2) NEW 6" ZONE ISOLATION VALVES AND THREE (3) 3" ZONE ISOLATION VALVES WITH TAMPER SWITCHES TO REPLACE EXISTING VALVES THAT CANNOT BE REUSED. PROVIDE A UNIT PRICE INCLUDING LABOR COST FOR REPLACING ANY ADDITIONAL VALVES IF REQUIRED. IF VALVES ARE NOT REQUIRED, TURN THEM OVER TO THE COR AT THE
END OF THE PROJECT.
17. PROVIDE FIVE (5) NEW HOSE CONNECTION VALVES WITH CAPS TO REPLACE EXISTING VALVES THAT CANNOT BE REUSED.
PROVIDE A UNIT PRICE INCLUDING LABOR COST FOR REPLACING ANY ADDITIONAL VALVES IF REQUIRED. IF VALVES ARE NOT
REQUIRED, TURN THEM OVER TO THE COR AT THE END OF THE PROJECT.
1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE CODE CHAPTER 9, SECTION 901.7.
2. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS
PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.
3. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.
4. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST
CONTROL PLAN.
2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.
3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC
PATHOGENS.
5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S
ACCEPTANCE.
BOLT
FLOOR SLAB
ESCUTCHEON
PLATE
PIPE SLEEVE
RISER CLAMP
FIRE-STOPPING
MATERIAL
BOLT
RISER CLAMP
PIPE SLEEVE
RISER PIPE
SECTION
TOP RISER PIPE
FINAL SEQUENCE OF PHASING SHALL BE PER SITE REQUIREMENTS AND VA DIRECTION.
FOR ALL PHASES:
• CONSTRUCTION AND DEMOLITION SHALL BE COORDINATED TO MINIMIZE UNNECESSARY SHUTDOWNS AND DRAINAGE OF
PIPING.
• FOR SPRINKLER SYSTEM IMPAIRMENTS LASTING MORE THAN 8 HOURS:
○ FIRE DEPARTMENT MUST BE NOTIFIED.
○ VA POLICE MUST BE NOTIFIED.
○ DEDICATED FIRE WATCH MUST BE PRESENT.
PHASE 1 - SUB-BASEMENT:
A. INSTALL NEW MAINS IN SUB-BASEMENT PARALLEL TO EXISTING PIPING. PREPARE FUTURE CONNECTIONS AND CONNECT
DRAIN PIPING AS NECESSARY TO MINIMIZE DOWN TIME IN PHASE 1B.
B. SELECTIVE DEMOLITION AND REPLACEMENT OF EXISTING PIPING TO CONNECT EXISTING RISERS AND SYSTEM COMPONENTS
TO NEW MAINS.
C. COMPLETE DEMOLITION OF DISCONNECTED MAINS IN SUB-BASEMENT.
FOR PHASES 2 THROUGH 7:
• THE ALLOTTED SHUTDOWN DURATION IS FROM FRIDAY AT 16:00 TO MONDAY AT 06:00.
• THE SYSTEM IS TO BE DRAINED AT THE BEGINNING OF THE SHUTDOWN DURATION AND MUST BE REFILLED AND FULLY
OPERATIONAL BY THE END OF THE ALLOTTED SHUTDOWN DURATION.
PHASE 2 - STAIRWELL 4:
A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN
DURATION.
PHASE 3 - STAIRWELL 5:
A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN
DURATION.
PHASE 4 - STAIRWELL 2:
A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN
DURATION.
PHASE 5 - STAIRWELL 3:
A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN
DURATION.
PHASE 6 - STAIRWELL 1:
A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN
DURATION.
PHASE 7 - STAIRWELL 6:
A. CONSTRUCT NEW RISER IN STAIRWELL 6. PREPARE FUTURE CONNECTIONS AND CONNECT DRAIN PIPING AS NECESSARY TO
MINIMIZE DOWN TIME IN PHASE 7B.
B. CONNECT EXISTING ZONE VALVES TO NEW RISER AND REINSTALL EXISTING HOSE VALVES ON NEW RISER.
C. DEMOLISH DISCONNECTED RISER PIPING EXPOSED IN STAIRWELL AND CAP PIPING AT WALL AND FLOOR.
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
M METER
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
PA PASCAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PPM PARTS PER MILLION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
SAN SANITARY SEWER
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VB VACUUM BREAKER
WCO WALL CLEANOUT
WG WATER GAUGE
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
YCO YARD CLEANOUT
A/E ARCHITECT/ENGINEER
AFF ABOVE FINISHED FLOOR
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
BAS BUILDING AUTOMATION SYSTEM
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BHP BREAK HORSEPOWER
BOP BOTTOM OF PIPE
C CELSIUS
CO CLEANOUT
DCW DOMESTIC COLD WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EPA ENVIRONMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ET EXPANSION TANK
EX EXISTING
F FAHRENHEIT
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FPC FIRE PROTECTION CONTRACTOR
FS FLOOR SINK
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HD HUB DRAIN
HP HORSEPOWER
HYD HYDRANT
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IW INDIRECT WASTE
1. REHABILITATION WORK CATEGORY: RENOVATION. SWAPPING OF FIRE SPRINKLER RISERS ON ONE-TO-ONE BASIS.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:3
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
FX001
FIRE SUPPRESSION GENERAL
INFORMATION AND DETAILS
2 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
RBK
FIRE SUPPRESSION SYMBOLS
Scale: No Scale
MECHANICAL TEE AND FLUSHING CONNECTION DETAIL
Scale: No Scale
PIPE HANGER SUPPORT DETAIL
Scale: No Scale
SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL
Scale: No Scale
TYPICAL FLOOR CONTROL VALVE ASSEMBLY DETAIL
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
FIRE SUPPRESSION GENERAL NOTES
BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF
FIRE PROTECTION SERVICE
INFECTION CONTROL MEASURES
Scale: No Scale
PIPE FLOOR SUPPORT DETAIL
PHASING PLAN
FIRE SUPPRESSION ABBREVIATIONS
LIFE SAFETY NOTES (NFPA-101)
GENERAL ELECTRICAL NOTES
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE
WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL
APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST
EDITION OF THE NATIONAL ELECTRICAL CODE.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE
BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL
PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH
THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE
APPLICABLE BUILDING CODES.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED
MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.
6. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID
CONFLICT DURING CONSTRUCTION.
7. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR
SPARE, OR SPACE.
8. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.
PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS
MUST COMPLY WITH "BUY AMERICAN ACT".
9. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR
EQUIPMENT MANUFACTURER'S SPECIFICATIONS.
10. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE
DEVICE'S SCREW TERMINALS.
11. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS
NOTED OTHERWISE.
12. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
13. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
14. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC
CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.
15. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN
APPROVED THIRD PARTY TESTING AGENCY.
16. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.
17. ALL ELECTRICAL WORK IS INDICATED ON THE FIRE SUPPRESSION PLANS.
A1 b
E1 c d
T1
'LPN'
ELECTRICAL SYMBOL NOTES
THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER
CASE LETTER AND NUMBER.
THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.
EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.
EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING
MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES
DIRECTIONAL ARROW ON ILLUMINATED FACE(S).
DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER
FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR
THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND
REQUIREMENTS.
PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING
SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR
DESIGNATION CODES.
SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE
NUMBER INDICATED IN THE HEXAGON.
HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT
DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.
CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL
SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.
SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE
A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.
'LPN'-1,3,5
EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE
AND DIRECTIONAL ARROW.
EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE
FACE AND DIRECTIONAL ARROWS.
E2
EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS
CONTROLLED BY SWITCH 'c'.
EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.
EXAMPLE: TRANSFORMER TYPE 'T1'.
EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.
# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE
NOTE NUMBER INDICATED IN THE SQUARE.
L L
ELECTRICAL ABBREVIATIONS LIST
SS STAINLESS STEEL
SSW SELECTOR SWITCH
STD STANDARD
SURF SURFACE MOUNTED
SW SWITCH
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
TC TIMECLOCK
TEL TELEPHONE
TEL/DATA TELEPHONE/DATA
TERM TERMINAL
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TR TAMPER RESISTANT
T-STAT THERMOSTAT
TTB TELEPHONE TERMINAL BOARD
TTC TELEPHONE TERMINAL CABINET
TV TELEVISION
TYP TYPICAL
UC UNDER COUNTER
UE UNDERGROUND ELECTRICAL
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
UT UNDERGROUND TELEPHONE
UTP UNSHIELDED TWISTED PAIR
UTIL UTILITY
UV UNIT VENTILATOR
ULTRAVIOLET
V VOLT
VA VOLT-AMPERES
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WATT
W/ WITH
WH WATER HEATER
W/O WITHOUT
WP WEATHERPROOF
XFMR TRANSFORMER
XFR TRANSFER
ANGLE
@ AT
DELTA
' FEET
" INCHES
# NUMBER
Φ PHASE
C CENTER LINE
P PLATE
MTS MANUAL TRANSFER SWITCH
MTR MOTOR, MOTORIZED
NA NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
NFDS NON-FUSED SAFETY DISCONNECT SWITCH
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OL OVERLOAD
PA PUBLIC ADDRESS
PB PULL BOX OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PCB POLYCHLORINATED BIPHENYL
PC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PIV POST INDICATING VALVE
PNL PANEL
POE POWER-OVER-ETHERNET
PR PAIR
PRI PRIMARY
PROJ PROJECTION
PRV POWER ROOF VENTILATOR
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (CONDUIT)
PWR POWER
QTY QUANTITY
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
REQD REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
RTU ROOF TOP UNIT
SC SURFACE CONDUIT
SEC SECONDARY
SF SQUARE FEET/FOOT
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SIM SIMILAR
S/N SOLID NEUTRAL
SPEC SPECIFICATION
SPKR SPEAKER
SP SPARE
SR SURFACE RACEWAY
1P 1 POLE (2P, 3P, 4P, ETC.)
1PH 1 PHASE
2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)
W2 TWO-WIRE (3W, 4W, ETC.)
3PH 3 PHASE
A AMPERE
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT
ACC ACCESSIBLE
ACLG ABOVE CEILING
ADO AUTOMATIC DOOR OPENER
A/E ARCHITECT/ENGINEER
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT (KILOAMPS)
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFI ARC FAULT CIRCUIT INTERRUPTER
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
APPROX APPROXIMATELY
ARCH ARCHITECT, ARCHITECTURAL
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BATT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BYP BYPASS
C CONDUIT
CAB CABINET
CALC CALCULATED
CAP CAPACITY
CAT CATALOG, CATEGORY
CATV COMMUNITY ANTENNA TELEVISION
CB CIRCUIT BREAKER
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR-FURNISHED
CKT CIRCUIT
CLG CEILING
COAX COAXIAL CABLE
COMM COMMUNICATION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION OR CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CTR CENTER
CU COPPER
CU FT CUBIC FEET
dB DECIBEL
DB DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLISH/DEMOLITION
DEPT DEPARTMENT
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DN DOWN
DS SAFETY DISCONNECT SWITCH
DT DOUBLE THROW
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EG EQUIPMENT GROUND
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
EPO EMERGENCY POWER OFF
EQUIP EQUIPMENT
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WALL HEATER
ELECTRIC WATER HEATER
EX EXISTING
EXP EXPLOSION PROOF
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FCU FAN COIL UNIT
FIXT FIXTURE
FLR FLOOR
FLUOR FLUORESCENT
FU FUSE
FUDS FUSED SAFETY DISCONNECT SWITCH
FVR FULL VOLTAGE REVERSING
FVNR FULL VOLTAGE NON-REVERSING
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
GRS GALVANIZED RIGID STEEL (CONDUIT)
GYP GYPSUM
HID HIGH-INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HTR HEATER
HV HIGH VOLTAGE
HVAC HEATING, VENTILATING AND AIR CONDITIONING
IES ILLUMINATION ENGINEERING SOCIETY
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
I/W INTERLOCK WITH
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
LED LIGHT-EMITTING DIODE
LF LINEAR FEET/FOOT
LM LUMEN
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
METAL-CLAD (CONDUIT)
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MFR MANUFACTURER
MFS MAIN FUSED DISCONNECT SWITCH
MH MANHOLE
MIC MICROPHONE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MOA MULTIOUTLET ASSEMBLY
MSBD MAIN SWITCHBOARD
MT MOUNT
SPRINKLER RISER
INDICATING BUTTERFLY VALVE
WITH TAMPER SWITCH AT OR ABOVE
7'-0" AFF, CONNECT TO EXISTING
WIRES TO CONTROL PANEL
WATER FLOW SWITCH, CONNECT TO
EXISTING WIRES TO CONTROL PANEL
PRESSURE GAUGE
SPRINKLER PIPE TO ZONE
AUXILIARY DRAIN VALVE
1" INSPECTOR'S TEST VALVE
SIGHT GLASS
2" DRAIN
CHECK VALVE
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:3
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
FX002
FIRE SUPPRESSION ELECTRICAL
GENERAL INFORMATION
3 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
RBK
Scale: No Scale
TYPICAL FLOOR CONTROL VALVE WIRING DETAIL
1 2 3 4 5 6 7 8 9 10 10' 11 12 13 13' 14 15 16 17 19 20
C
D
E
H
J
K
L
M
N
O
P
Q
R
S
T
B
6" FL
2" DRAIN
6" FL
FL
FL
FL
3" FL
FL
FL
3" FL
FL
2" DRAIN
6" FL 6" FL
6" FL
FL
EX. 6" FL UP
TO FDC
SEE SHEET
FX441 FOR
PHASE 2
WORK
FL
FL
6" FL
6" FL
F L
F L
6" FL 6" FL
F L
F X
B
/1 FX101B
/1 FX101C /1 FX101D/1 FX101C
SEE SHEET
FX411 FOR
PHASE 6
WORK
6" FL
6" FL
4" FL
3" FL
2" DRAIN
6" FL
6" FL
FL
F L
3" FL
2" DRAIN
D R A
IN
1" DRAIN
2" DRAIN
3" FL
ABANDONED 6" FL RISER
ABANDONED 6" FL RISER
6" FL
6" FL
3/4" DRAIN
2" DRAIN
FL
2 2
EX. 6" FL TO FDC AT
BUILDING PERIMETER
D R A
IN
EX. ABANDONED
PIPING TO
SUBBASEMENT
CONVEYOR
TUNNELS, TYP.
6" FL
EX. ABANDONED PIPING TO
SUBBASEMENT CONVEYOR
TUNNELS, TYP.
EX. ABANDONED
PIPING TO
SUBBASEMENT
CONVEYOR
TUNNELS, TYP.
STAIR 4 AREA
SUBBASEMENT
STAIR 1 AREA
NEW SPRINKLER MAIN
EXISTING SPRINKLER
MAIN
EXISTING BRANCH TO RISER TO BE
REPLACED IN FUTURE PHASE.
PHASE 1A
PHASE 1B
EXISTING RISER ISOLATION VALVE
NEW BRANCH PIPING
PREPARED FOR CONNECTION
PIPING SECTION TO BE
DEMOLISHED AT PHASE 1B.
PIPE SECTION TO BE
CONNECTED AT PHASE 1B.
NOTE:
1. PIPING TO BE REPLACED UP TO EXISTING VALVE. EXACT PIPING
ARRANGEMENT MAY VARY.
2. RECONNECT DRAIN PIPING AS NECESSARY. MAKE CONNECTION BEFORE
CHANGEOVER OF MAINS WHERE POSSIBLE.
NEW SPRINKLER MAIN
EXISTING SPRINKLER
MAIN
PHASE 1A
PHASE 1B
EXISTING BRANCH TO REMAIN
NEW BRANCH PIPING
PREPARED FOR CONNECTION
PIPE FITTING OR SECTION TO BE
DEMOLISHED AT PHASE 1B.
PIPE SECTION TO BE
CONNECTED AT PHASE 1B.
NOTE:
1. MINIMAL PIPING TO BE REPLACED. EXACT PIPING ARRANGEMENT MAY
VARY.
2. RECONNECT DRAIN PIPING AS NECESSARY. MAKE CONNECTION BEFORE
CHANGEOVER OF MAINS WHERE POSSIBLE.
Engineers Architects
# DEMOLITION KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:3
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
FX101A
SUBBASEMENT FIRE SUPPRESSION
PLAN AND DETAILS - AREA A
4 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
RBK
KEY PLAN
SCALE: NO SCALE
STAIR 3
STAIR 2
STAIR 1
STAIR 6
STAIR 4
STAIR 5
A B
C D
N
TRUE
NORTH
Scale: 1/8" = 1'-0"
SUBBASEMENT FIRE SUPPRESSION PLAN - AREA A 0 4 8 16
A. SUBBASEMENT FIRE SERVICE MAINS ARE TO BE
REPLACED AS PART OF PHASE 1. SEE LIMITS OF
DEMOLITION AND CONNECTION SYMBOLS FOR
EXTENTS OF REPLACEMENT. SEE PHASING NOTES
ON FX001 FOR PHASING REQUIREMENTS.
B. DEMOLITION AND NEW CONSTRUCTION ARE
SHOWN ON THE SAME PLAN FOR CLARITY.
CONSTRUCT AND TEST NEW FIRE SERVICE MAINS
ADJACENT TO EXISTING BEFORE BEGINNING
DEMOLITION.
C. EXISTING INDICATING VALVES, FLOW SWITCHES
AND TAMPER SWITCHES SHALL BE REUSED.
CONTRACTOR SHALL TEST EVERY VALVE AND
ALARM DEVICE PRIOR TO BEGINNING WORK TO
ENSURE WORKING CONDITION.
D. ALL DEMOLISHED MATERIALS SHALL BE REMOVED
FROM SITE.
Scale: No Scale
TYPICAL SPRINKLER MAIN
REPLACEMENT AT RISER
ISOLATION VALVE DETAIL
Scale: No Scale
TYPICAL SPRINKLER MAIN
REPLACEMENT AT BRANCH
DETAIL
1 DEMOLISH BRANCH PIPING TO VALVE.
COORDINATE WITH CONSTRUCTION OF
NEW FIRE MAIN. SEE DETAIL 2/FX101A FOR
MORE INFORMATION.
2 DEMOLISH BRANCH PIPING TO FITTING.
COORDINATE WITH CONSTRUCTION OF
NEW FIRE MAIN. SEE DETAIL 3/FX101A FOR
MORE INFORMATION.
3 REMOVE EXISTING TAMPER SWITCH AT
EXISTING GATE VALVE.
4 DEMOLISH BRANCH PIPING TO RISER.
DRAIN RISER AND CAP AT FLOOR.
1 EXTEND NEW BRANCH PIPING AND CONNECT
TO EXISTING VALVE. COORDINATE
CONSTRUCTION WITH DEMOLITION OF
EXISTING FIRE MAIN. SEE DETAIL 2/FX101A
FOR MORE INFORMATION.
2 EXTEND NEW BRANCH PIPING AND CONNECT
TO EXISTING BRANCH PIPING. COORDINATE
CONSTRUCTION WITH DEMOLITION OF
EXISTING FIRE MAIN. SEE DETAIL 3/FX101A
FOR MORE INFORMATION.
3 RECONNECT EXISTING TAMPER SWITCH TO
NEW GATE VALVE.
19 20 21 22 23 23a 24 25 26 27 28 29
C
D
E
H
J
K
L
M
N
O
P
Q
R
S
T
B
6" FL
2" DRAIN
FL
4" FL4" FL
FL
2" DRAIN
EX. 2" DRAIN TO
HUB IN MER
SEE SHEET
FX451 FOR
PHASE 5
WORK
SEE SHEET
FX461 FOR
PHASE 7
WORK
REFER TO
2/FX101B FOR
WORK IN
PUMP ROOM
6" FL
FL
FL
6" FL6" FL
F L
F L
4" FL
/1 FX101A
F X
A
/1 FX101C /1 FX101D /1 FX101D
6" FL
6" FL
3" FL
2" DRAIN
6" FL
6" FL
FL
F L
FL
2" DRAIN
6" FL
6" FL
ABANDONED 4" FL RISER
UP TO HOSE CABINET
FL
FL
ABANDONED
6" FL RISER
3" FL
FL
F L
2" DRAIN
D R A
IN
2" DRAIN
2" DRAIN
4" FL
4" FL
4" FL
EX. ABANDONED PIPING TO
SUBBASEMENT CONVEYOR
TUNNELS, TYP.
SUBBASEMENT
MER
MER
FIRE PUMP ROOM
ENTRY
STAIR 5 AREA
SUBBASEMENT
SUBBASEMENT
STAIR 6 AREA
C
D
E
EXISTING 4" FIRE SERVICE MAIN TO DRY
SYSTEM ZONE VALVES IN PUMP ROOM
B
6" FL
6" FL
F L
F L
FL
FL
NEW 6" FIRE SERVICE MAIN TO CRAWLSPACE
EXTEND EXISTING 8" HEADER AND
CONNECT NEW 6" FIRE MAIN.
DEMOLISH EXISTING 6" FIRE MAIN BACK
TO FIRE PUMP HEADER AND CAP.
EXISTING 8" DOUBLE CHECK DETECTOR
ASSEMBLY BACKFLOW PREVENTER
EXISTING INLINE FIRE PUMP
EXISTING FDC
SERVICE DOOR AT BASEMENT LEVEL
ROLL UP DOOR
TO EXTERIOR
8" FIRE SERVICE UP FROM BELOW SLAB
E X
T E
R
IO
R L
O A
D
IN
G R
A M
P
6" FL
DEMOLISH EXISTING 2" FIRE TEST/
DRAIN AND CONNECT NEW DRAIN TO
EXISTING
2"
"2
4" FL
6" FL
D R
A
IN
EXISTING INLINE JOCKEY PUMP
EXISTING HEADER ISOLATION VALVE
EXISTING FIRE PUMP TEST
EXISTING DRAIN DISCHARGE
NEW 6" SERVICE MAIN FROM NEW HEADER
EXTENSION WITH MONITORED ISOLATION
VALVE
EXISTING 6" SERVICE MAIN FROM HEADER
WITH MONITORED ISOLATION VALVE TO BE
DEMOLISHED
EXISTING 8" FIRE PUMP HEADER
MER
FIRE PUMP ROOM
ENTRY
EXISTING 8" HEADER
EXISTING 8" FIRE SERVICE
EXISTING 8" BACKFLOW PREVENTOR
EXISTING FIRE PUMP ASSEMBLY
EXISTING 6" MAIN TO BE REMOVED
EXISTING 6" FROM FIRE DEPARTMENT
CONNECTION.
EXISTING JOCKY PUMP (BEHIND VALVE)
NEW 6" MAIN (MEDIUM WITH HEAVY
OUTLINE, TYP.)
EXISTING PIPE (LIGHT WITH THIN
OUTLINE, TYP.)
ISOLATION VALVE, TYP
NEW 6" MAIN
EXISTING 4"
MAIN TO DRY
SYSTEM
EXISTING FIRE PUMP TEST
CONNECTION
EXISTING 6" MAIN TO BE REMOVED
(DARK WITH HEAVY DASHED
OUTLINE, TYP.)
NEW CAP
EXISTING FIRE PUMP TEST CONNECTION
EXISTING 2" DRAIN OUTLET
NEW 6" MAIN
NEW 2" MAIN TEST/DRAIN
NEW 3/4" DRIP DRAIN
EXISTING HEADER ISOLATION VALVE
EXISTING JOCKY PUMP PIPING
NEW 8" HEADER END SECTION
Engineers Architects
# DEMOLITION KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:4
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
FX101B
SUBBASEMENT FIRE SUPPRESSION
PLANS AND PUMP ROOM ISOMETRIC -
AREA B
5 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
RBK
KEY PLAN
SCALE: NO SCALE
STAIR 3
STAIR 2
STAIR 1
STAIR 6
STAIR 4
STAIR 5
A B
C D
N
TRUE
NORTH
Scale: 1/8" = 1'-0"
SUBBASEMENT FIRE SUPPRESSION PLAN - AREA B 0 4 8 16
A. SUBBASEMENT FIRE SERVICE MAINS ARE TO BE
REPLACED AS PART OF PHASE 1. SEE LIMITS OF
DEMOLITION AND CONNECTION SYMBOLS FOR
EXTENTS OF REPLACEMENT. SEE PHASING NOTES
ON FX001 FOR PHASING REQUIREMENTS.
B. DEMOLITION AND NEW CONSTRUCTION ARE
SHOWN ON THE SAME PLAN FOR CLARITY.
CONSTRUCT AND TEST NEW FIRE SERVICE MAINS
ADJACENT TO EXISTING BEFORE BEGINNING
DEMOLITION.
C. EXISTING INDICATING VALVES, FLOW SWITCHES
AND TAMPER SWITCHES SHALL BE REUSED.
CONTRACTOR SHALL TEST EVERY VALVE AND
ALARM DEVICE PRIOR TO BEGINNING WORK TO
ENSURE WORKING CONDITION.
D. ALL DEMOLISHED MATERIALS SHALL BE REMOVED
FROM SITE.
Scale: 1/4" = 1'-0"
PUMP ROOM FIRE SUPPRESSION PLAN 0 2 4 8
1 DEMOLISH BRANCH PIPING TO VALVE.
COORDINATE WITH CONSTRUCTION OF
NEW FIRE MAIN. SEE DETAIL 2/FX101A FOR
MORE INFORMATION.
3 DEMOLISH PIPING THROUGH WALL FOR
CHANGEOVER OF FIRE MAINS.
4 REMOVE EXISTING TAMPER SWITCH AT
EXISTING GATE VALVE.
1 EXTEND NEW BRANCH PIPING AND CONNECT
TO EXISTING VALVE. COORDINATE
CONSTRUCTION WITH DEMOLITION OF
EXISTING FIRE MAIN. SEE DETAIL 2/FX101A
FOR MORE INFORMATION.
3 ROUTE NEW MAIN THROUGH EXISTING
PENETRATION.
4 RECONNECT EXISTING TAMPER SWITCH TO
NEW GATE VALVE.
5 CONNECT NEW 1" DRAIN INTO TOP OF
EXISTING DRAIN. RUN HORIZONTAL WITH
ISOLATION VALVE FOR CONNECTION IN
PHASE 7.
Scale:
PUMP ROOM FIRE SUPPRESSION ISOMETRIC
1 2 3 4 5 6 7 8 9 10 10' 11 12 13 13' 14 15 16 17 19
KK
T
U
V
W
X
Y
Z
AA
BB
CC
FF
GG
HH
JJ
FL
6" FL
D R A
IN
6" FL6" FL
FL
2" DRAIN 2" DRAIN
6" FL
4" FL
FL
SEE SHEET
FX411 FOR
PHASE 6
WORK
SEE SHEET
FX431 FOR
PHASE 5
WORK
FL
FL
6" FL
2" DRAIN
F L
6" FL 6" FL 6" FL 6" FL
/1 FX101A /1 FX101A /1 FX101B
/1 FX101D
F X
D
EX 6" FL UP TO FDC
4" FL
FL
D R A
IN
2" DRAIN
4" FL
4" FLABANDONED 4" FL RISER
UP TO HOSE CABINET ABANDONED 4" FL RISER
UP TO HOSE CABINET
ABANDONED 6" FL RISER
1"
D R A
IN
1" DRAIN VALVE OF BOT OF FL
EX. ABANDONED PIPING TO
SUBBASEMENT CONVEYOR
TUNNELS, TYP.
6" FL
ABANDONED 4" FL RISER
UP TO HOSE CABINET
FL
6" FL
FL
ABANDONED 6" FL RISER
ABANDONED 6" FL RISER
ABANDONED 4" FL RISER
UP TO HOSE CABINET
SUBBASEMENT
MER
POOL EQUIPMENT
B0529A
SUBBASEMENT
STAIR 3 AREA
Engineers Architects
# DEMOLITION KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:4
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
FX101C
SUBBASEMENT FIRE SUPPRESSION
PLAN - AREA C
6 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
RBK
KEY PLAN
SCALE: NO SCALE
STAIR 3
STAIR 2
STAIR 1
STAIR 6
STAIR 4
STAIR 5
A B
C D
N
TRUE
NORTH
Scale: 1/8" = 1'-0"
SUBBASEMENT FIRE SUPPRESSION PLAN - AREA C 0 4 8 16
A. SUBBASEMENT FIRE SERVICE MAINS ARE TO BE
REPLACED AS PART OF PHASE 1. SEE LIMITS OF
DEMOLITION AND CONNECTION SYMBOLS FOR
EXTENTS OF REPLACEMENT. SEE PHASING NOTES
ON FX001 FOR PHASING REQUIREMENTS.
B. DEMOLITION AND NEW CONSTRUCTION ARE
SHOWN ON THE SAME PLAN FOR CLARITY.
CONSTRUCT AND TEST NEW FIRE SERVICE MAINS
ADJACENT TO EXISTING BEFORE BEGINNING
DEMOLITION.
C. EXISTING INDICATING VALVES, FLOW SWITCHES
AND TAMPER SWITCHES SHALL BE REUSED.
CONTRACTOR SHALL TEST EVERY VALVE AND
ALARM DEVICE PRIOR TO BEGINNING WORK TO
ENSURE WORKING CONDITION.
D. ALL DEMOLISHED MATERIALS SHALL BE REMOVED
FROM SITE.
1 DEMOLISH BRANCH PIPING TO VALVE.
COORDINATE WITH CONSTRUCTION OF
NEW FIRE MAIN. SEE DETAIL 2/FX101A FOR
MORE INFORMATION.
2 DEMOLISH BRANCH PIPING TO FITTING.
COORDINATE WITH CONSTRUCTION OF
NEW FIRE MAIN. SEE DETAIL 3/FX101A FOR
MORE INFORMATION.
4 REMOVE EXISTING TAMPER SWITCH AT
EXISTING GATE VALVE.
5 DEMOLISH ABANDONED SPRINKLER PIPING
AS NECESSARY TO ROUTE NEW MAINS.
6 DEMOLISH ABANDONED SPRINKLER PIPING
AND CAP FLUSH WITH FLOOR OR WALL.
1 EXTEND NEW BRANCH PIPING AND CONNECT
TO EXISTING VALVE. COORDINATE
CONSTRUCTION WITH DEMOLITION OF
EXISTING FIRE MAIN. SEE DETAIL 2/FX101A
FOR MORE INFORMATION.
2 EXTEND NEW BRANCH PIPING AND CONNECT
TO EXISTING BRANCH PIPING. COORDINATE
CONSTRUCTION WITH DEMOLITION OF
EXISTING FIRE MAIN. SEE DETAIL 3/FX101A
FOR MORE INFORMATION.
4 RECONNECT EXISTING TAMPER SWITCH TO
NEW GATE VALVE.
19 20 21 22 23 23a 24 25 26 27 28 29
KK
T
U
V
W
X
Y
Z
AA
BB
CC
FF
GG
HH
JJ
6" FL
4" FL
FL
FL
SEE SHEET
FX421 FOR
PHASE 4
WORK
F L
F L
/1 FX101A /1 FX101B
/1 FX101C
/1 FX101B
F X
C
4" FL
2" DRAIN
6" FL
6" FL
FL
FL
6" FL FROM FDC AT
BUILDING PERIMETER
ABANDONED 4" FL FOR
REMOVED HOSE
CABINET RISER
FL
ABANDONED 4" FL FOR
REMOVED HOSE
CABINET RISER
ABANDONED 4" FL RISER
UP TO HOSE CABINET
2 1/2" FL
3" FL
EX. 2-1/2" FL SERVING
LOGISTICS WAREHOUSE
EX. 3" FL SERVING CANTEEN
ABANDONED 6" FL RISER
ABANDONED 6" FL RISER
UP TO HOSE CABINET SUBBASEMENT
STAIR 2 AREA
Engineers Architects
# DEMOLITION KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:4
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
FX101D
SUBBASEMENT FIRE SUPPRESSION
PLAN - AREA D
7 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
RBK
KEY PLAN
SCALE: NO SCALE
STAIR 3
STAIR 2
STAIR 1
STAIR 6
STAIR 4
STAIR 5
A B
C D
N
TRUE
NORTH
Scale: 1/8" = 1'-0"
SUBBASEMENT FIRE SUPPRESSION PLAN - AREA D 0 4 8 16
A. SUBBASEMENT FIRE SERVICE MAINS ARE TO BE
REPLACED AS PART OF PHASE 1. SEE LIMITS OF
DEMOLITION AND CONNECTION SYMBOLS FOR
EXTENTS OF REPLACEMENT. SEE PHASING NOTES
ON FX001 FOR PHASING REQUIREMENTS.
B. DEMOLITION AND NEW CONSTRUCTION ARE
SHOWN ON THE SAME PLAN FOR CLARITY.
CONSTRUCT AND TEST NEW FIRE SERVICE MAINS
ADJACENT TO EXISTING BEFORE BEGINNING
DEMOLITION.
C. EXISTING INDICATING VALVES, FLOW SWITCHES
AND TAMPER SWITCHES SHALL BE REUSED.
CONTRACTOR SHALL TEST EVERY VALVE AND
ALARM DEVICE PRIOR TO BEGINNING WORK TO
ENSURE WORKING CONDITION.
D. ALL DEMOLISHED MATERIALS SHALL BE REMOVED
FROM SITE.
1 DEMOLISH BRANCH PIPING TO VALVE.
COORDINATE WITH CONSTRUCTION OF
NEW FIRE MAIN. SEE DETAIL 2/FX101A FOR
MORE INFORMATION.
2 DEMOLISH BRANCH PIPING TO FITTING.
COORDINATE WITH CONSTRUCTION OF
NEW FIRE MAIN. SEE DETAIL 3/FX101A FOR
MORE INFORMATION.
3 DEMOLISH ABANDONED SPRINKLER PIPING
AS NECESSARY TO ROUTE NEW MAINS.
1 EXTEND NEW BRANCH PIPING AND CONNECT
TO EXISTING VALVE. COORDINATE
CONSTRUCTION WITH DEMOLITION OF
EXISTING FIRE MAIN. SEE DETAIL 2/FX101A
FOR MORE INFORMATION.
2 EXTEND NEW BRANCH PIPING AND CONNECT
TO EXISTING BRANCH PIPING. COORDINATE
CONSTRUCTION WITH DEMOLITION OF
EXISTING FIRE MAIN. SEE DETAIL 3/FX101A
FOR MORE INFORMATION, SIMILAR, BUT WITH
OFFSET ELBOWS TO CONNECT.
FEC
DN
UP
2R
C H
AR
TI
N G
DN
7) R
PDP01
D N D N
F.E.
EMPLOYEE
SMOKING
SHELTER D
N
D N
G R
EASE
D N
D N
D N
1 2 3 4 5 6 7 8 9 10 10' 11 12 13 13' 14 15 16 17 19 20 21 22 23 24 25 26 27 28 29
LL
KK
A
C
D
E
H
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
BB
CC
FF
GG
HH
JJ
EAST ENTRANCE
STAIR 4
STAIR 1
STAIR 3
STAIR 2
STAIR 6
STAIR 5
B
SEE SHEET
FX441 FOR
WORK IN
THIS AREA
SEE SHEET
FX451 FOR
WORK IN
THIS AREA
SEE SHEET
FX461 FOR
WORK IN
THIS AREA
SEE SHEET
FX411 FOR
WORK IN
THIS AREA
SEE SHEET
FX431 FOR
WORK IN
THIS AREA
SEE SHEET
FX421 FOR
WORK IN
THIS AREA
SOUTH ENTRANCE
CORRIDOR TO BUILDING 70
EXISTING TEMPORARY FDC FOR ADDITION PROJECT
EXISTING FDC
EXISTING FDC
EXISTING FDC
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:5
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
FX102
FIRST FLOOR FIRE SUPPRESSION
PLAN
8 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
RBK
Scale: 3/64" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN
KEY PLAN
SCALE: NO SCALE
STAIR 3
STAIR 2
STAIR 1
STAIR 6
STAIR 4
STAIR 5
N
TRUE
NORTH
A. FIRE RISERS ABOVE THE SUBBASEMENT LEVEL
AND IN THE INDICATED STAIRWELLS ARE TO BE
REPLACED AS PART OF PHASES 2 THROUGH 7.
SEE PLANS AND SECTIONS SHEETS FOR RISER
SPECIFIC PHASING REQUIREMENTS AND EXTENTS
OF REPLACEMENT.
0 168 32
STAIR 1 AREA
13' 14 15
Q
R
S
T
FX411
FX411
FL
2" DRAIN
FL
6" FL
6" FL
FL
13' 14 15
ELEV 3-B-9
ELEVATOR
ELEV 3-B-12
ELEVATOR
STR-3-1
STAIRWELL
3409EC
EC
EC
OFFICE
3410A
OFFICE
C3B03
CORRIDOR
OFFICE
Q
R
S
T
FX411
TO SPRINKLER
ZONE
TO SPRINKLER
ZONE
FX411
13' 14 15
Q
R
S
T
FX411
TO SPRINKLER
ZONE
FIRE DRAIN FROM
PENTHOUSE
6" DOWN
FROM TANK
FX411
FIRST FLOOR
13' - 9"
SECOND FLOOR
27' - 6"
THIRD FLOOR
41' - 3"
FOURTH FLOOR
52' - 9"
FIFTH FLOOR
64' - 3"
SIXTH FLOOR
75' - 9"
SEVENTH FLOOR
87' - 3"
EIGHTH FLOOR
98' - 9"
NINTH FLOOR
110' - 3"
TENTH FLOOR
121' - 9"
ELEVENTH FLOOR
133' - 3"
TWELFTH FLOOR
147' - 3"
BASEMENT
0' - 0"
SUB-BASEMENT
-10' - 0"
14 15
TYP OF 2
FIRST FLOOR
13' - 9"
SECOND FLOOR
27' - 6"
THIRD FLOOR
41' - 3"
FOURTH FLOOR
52' - 9"
FIFTH FLOOR
64' - 3"
SIXTH FLOOR
75' - 9"
SEVENTH FLOOR
87' - 3"
EIGHTH FLOOR
98' - 9"
NINTH FLOOR
110' - 3"
TENTH FLOOR
121' - 9"
ELEVENTH FLOOR
133' - 3"
TWELFTH FLOOR
147' - 3"
BASEMENT
0' - 0"
SUB-BASEMENT
-10' - 0"
RS
6 6
5 5
1 1
4 4
Engineers Architects
# DEMOLITION KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:2
:0
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
FX411
FIRE SUPPRESSION PLANS AND
SECTIONS - STAIR 1
9 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
RBK
KEY PLAN
SCALE: NO SCALE
STAIR 3
STAIR 2
STAIR 1
STAIR 6
STAIR 4
STAIR 5
N
TRUE
NORTH
0 2 4 8
A. REFER TO PHASING NOTES ON FX001 FOR
PHASING REQUIREMENTS.
B. PRESSURE TEST AND RECERTIFY FIRE
SUPPRESSION SYSTEM AFTER EACH
SHUTDOWN.
C. EXISTING INDICATING VALVES, FLOW SWITCHES
AND TAMPER SWITCHES SHALL BE REUSED.
CONTRACTOR SHALL TEST EVERY SUPERVISED
VALVE AND ALARM DEVICE PRIOR TO BEGINNING
WORK TO ENSURE WORKING CONDITION.
D. ALL DEMOLISHED MATERIALS SHALL BE
REMOVED FROM SITE.
1 DEMOLISH RISER PIPING BEYOND GATE
VALVE.
2 DEMOLISH RISER PIPING BETWEEN
SUBBASEMENT GATE VALVE AND ZONE
CONTROL VALVES. TYPICAL OF ALL LEVELS.
3 REMOVE EXISTING HOSE VALVES AND
RETAIN FOR REUSE. TYPICAL OF ALL
LEVELS.
4 REMOVE EXISTING RISER FLOW SWITCH
AND RETAIN FOR REUSE.
5 DEMOLISH RISER BRANCH PIPING TO RISER
DRAIN.
6 DEMOLISH PENTHOUSE STORAGE TANK
SUPPLY PIPING TO THIS POINT.
1 CONNECT NEW RISER PIPING AT EXISTING
VALVE.
2 CONNECT NEW RISER PIPING TO EXISTING
ZONE CONTROL VALVES. TYPICAL OF ALL
LEVELS.
3 RECONNECT EXISTING HOSE VALVES.
TYPICAL OF ALL LEVELS.
4 RECONNECT EXISTING FLOW SWITCH.
5 CONNECT TO EXISTING RISER DRAIN PIPING.
6 CONNECT NEW RISER PIPING TO EXISTING
SUPPLY PIPING FROM PENTHOUSE STORAGE
TANK.
0 2 4 8
0 2 4 80 4 8 160 4 8 16
Scale: 1/4" = 1'-0"
SUBBASEMENT FIRE SUPPRESSION PLAN -
STAIR 1
Scale: 1/4" = 1'-0"
TYPICAL FIRE SUPPRESSION PLAN - STAIR 1
Scale: 1/4" = 1'-0"
ELEVENTH FLOOR FIRE SUPPRESSION PLAN -
STAIR 1
Scale: 1/8" = 1'-0"
FIRE SUPPRESSION SECTION -
STAIR 1 - WEST
Scale: 1/8" = 1'-0"
FIRE SUPPRESSION SECTION -
STAIR 1 - NORTH
S
SS
S S
S S
S
STAIR 2 AREA
20 21 22 23 23a
FF
GG
HH
FX421
FX421
6" FL
F L
6" FL
6" FL
2" DRAIN
20 21 22 23
B0622A
OFFICE
B0622
OFFICE
B0621A
OFFICE
B0630EC
ELEC.
CLOSET
FF
GG
HH
FX421
FX421
3" FL
F L
UP FROM
SUBBASEMENT
UP TO FIRST
FLOOR
TO SPRINKLER
ZONE
20 21 22 23
C3C10
CORRIDOR
HAC
STAIR
STR-3-2
SUNROOM
DAYROOM
FF
GG
HH
FX421
FX421
TO SPRINKLER
ZONE
20 21 22 23
10636
OFFICE
10634
HAC
C10C10
CORRIDOR
STR 10-2
STAIRWELL
10632A
OFFICE
FF
GG
HH
FX421
FX421
FL
FL
TO SPRINKLER
ZONE
TO ROOF
MANIFOLD
FIRST FLOOR
13' - 9"
SECOND FLOOR
27' - 6"
THIRD FLOOR
41' - 3"
FOURTH FLOOR
52' - 9"
FIFTH FLOOR
64' - 3"
SIXTH FLOOR
75' - 9"
SEVENTH FLOOR
87' - 3"
EIGHTH FLOOR
98' - 9"
NINTH FLOOR
110' - 3"
TENTH FLOOR
121' - 9"
ELEVENTH FLOOR
133' - 3"
BASEMENT
0' - 0"
SUB-BASEMENT
-10' - 0"
GG HH
LOGISTICS
B0622
CORRIDOR
CO25C1
FIRST FLOOR
13' - 9"
SECOND FLOOR
27' - 6"
THIRD FLOOR
41' - 3"
FOURTH FLOOR
52' - 9"
FIFTH FLOOR
64' - 3"
SIXTH FLOOR
75' - 9"
SEVENTH FLOOR
87' - 3"
EIGHTH FLOOR
98' - 9"
NINTH FLOOR
110' - 3"
TENTH FLOOR
121' - 9"
ELEVENTH FLOOR
133' - 3"
BASEMENT
0' - 0"
SUB-BASEMENT
-10' - 0"
21 22
Engineers Architects
# DEMOLITION KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:2
:1
P
M C
U s e rs \n s to lt z \D o c u m e n ts \F
-2
-1
R n s to lt z .r v t
FX421
FIRE SUPPRESSION PLANS AND
SECTIONS - STAIR 2
10 17NAS, WLF
REPLACE FIRE SPRINKLERS
BLDG. 111
5000 W. NATIONAL AVENUE
MILWAULKEE, WI 53295
MAY 18, 2021
BID SET
695-19-10420-137
RBK
KEY PLAN
SCALE: NO SCALE
STAIR 3
STAIR 2
STAIR 1
STAIR 6
STAIR 4
STAIR 5
N
TRUE
NORTH
A. REFER TO PHASING NOTES ON FX001 FOR
PHASING REQUIREMENTS.
B. PRESSURE TEST AND RECERTIFY FIRE
SUPPRESSION SYSTEM AFTER EACH
SHUTDOWN.
C. EXISTING INDICATING VALVES, FLOW SWITCHES
AND TAMPER SWITCHES SHALL BE REUSED.
CONTRACTOR SHALL TEST EVERY SUPERVISED
VALVE AND ALARM DEVICE PRIOR TO BEGINNING
WORK TO ENSURE WORKING CONDITION.
D. ALL DEMOLISHED MATERIALS SHALL BE
REMOVED FROM SITE.
1 DEMOLISH RISER PIPING BEYOND GATE
VALVE.
2 DEMOLISH RISER PIPING BETWEEN
SUBBASEMENT GATE VALVE AND ZONE
CONTROL VALVES. TYPICAL OF ALL LEVELS.
3 REMOVE EXISTING HOSE VALVES AND
RETAIN FOR REUSE. TYPICAL OF ALL
LEVELS.
4 REMOVE EXISTING RISER FLOW SWITCH
AND RETAIN FOR REUSE.
5 DEMOLISH RISER BRANCH PIPING TO RISER
DRAIN.
6 DEMOLISH ROOF MANIFOLD SUPPLY PIPING
TO THIS POINT.
7 REMOVE GYPSUM BOARD OR PLASTER
WALLS AND FLOORING AS REQUIRED TO
PERFORM PIPING REPLACEMENT IN SPACE.
1 CONNECT NEW RISER PIPING AT EXISTING
VALVE.
2 CONNECT NEW RISER PIPING TO EXISTING
ZONE CONTROL VALVES. TYPICAL OF ALL
LEVELS.
3 RECONNECT EXISTING HOSE VALVES.
TYPICAL OF ALL LEVELS.
4 RECONNECT EXISTING FLOW SWITCH.
5 CONNECT TO EXISTING RISER DRAIN PIPING.
6 CONNECT NEW RISER PIPING TO EXISTING
SUPPLY TO ROOF MANIFOLD.
7 INSTALL GYPSUM BOARD ON EXISTING STUD
WALL FRAMING. FEATHER EXISTING GYPSUM
BOARD OR PLASTER FINISH INTO NEW
GYPSUM BOARD. FINISH AND PAINT TO
MATCH ADJACENT EXISTING WALL.
0 2 4 8
0 2 4 8
0 2 4 8
0 2 4 8
0 4 8 160 4 8 16
Scale: 1/4" = 1'-0"
SUBBASEMENT FIRE SUPPRESSION PLAN -
STAIR 2
Scale: 1/4" = 1'-0"
BASEMENT FIRE SUPPRESSION PLAN - STAIR 2
Scale: 1/4" = 1'-0"
TYPICAL FIRE SUPPRESSION PLAN - STAIR 2
Scale: 1/4" = 1'-0"
TENTH FLOOR FIRE SUPPRESSION PLAN - STAIR 2
Scale: 1/8" = 1'-0"
FIRE SUPPRESSION SECTION -
STAIR 2 - SOUTH
Scale: 1/8" = 1'-0"
FIRE SUPPRESSION SECTION -
STAIR 2 - WEST
STAIR 3 AREA
2 3 4 5
FF
GG
HH
FX431
FX431
2" DRAIN
6" FL
F L
2 3 4 5
BARIATRIC
RM
C3C04
CORRIDOR
FF
GG
HH
FX431
FX431
STR 3-3
STAIRWELL
TO SPRINKLER ZONE
2 3 4 5
10528
10526
HAC
STR 10-3
STAIRWELL
FF
GG
HH
FX431
FX431
OFFICE
TO SPRINKLER ZONE
TO ROOF MANIFOLD
FIRST FLOOR
13' - 9"
SECOND FLOOR
27' - 6"
THIRD FLOOR
41' - 3"
FOURTH FLOOR
52' - 9"
FIFTH FLOOR
64' - 3"
SIXTH FLOOR
75' - 9"
SEVENTH FLOOR
87' - 3"
EIGHTH FLOOR
98' - 9"
NINTH FLOOR
110' - 3"
TENTH FLOOR
121' - 9"
ELEVENTH FLOOR
133' - 3"
BASEMENT
0' - 0"
SUB-BASEMENT
-10' - 0"
GGHH
TYP. OF 2
TYP OF 2
FIRST FLOOR
13' - 9"
SECOND FLOOR
27' - 6"
THIRD FLOOR
41' - 3"
FOURTH FLOOR
52' - 9"
FIFTH FLOOR
64' - 3"
SIXTH FLOOR
75' - 9"
SEVENTH FLOOR
87' - 3"
EIGHTH FLOOR
98' - 9"
NINTH FLOOR
110' - 3"
TENTH FLOOR
121' - 9"
ELEVENTH FLOOR
133' - 3"
BASEMENT
0' - 0"
SUB-BASEMENT
-10' - 0"
3 4
Engineers Architects
# DEMOLITION KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .