36C25221B0021 0005.docx

DOCX document 37 KB Posted

Attached to
Z1DA--Replace Fire Sprinkler System Risers Bldg. 111 Project 695-19-104 Federal contract opportunity
Solicitation number
36C25221B0021
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This solicitation and related documents outline requirements for a federal construction contract opportunity to replace fire sprinkler system risers in Building 111 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves infection control, plumbing, and demolition work with a price range between $1,000,000 to $2,000,000. The North American Industry Classification System code is 238220. The period of performance is 660 calendar days from notice to proceed. The solicitation and drawings will be posted on July 8, 2021, with bid opening scheduled for August 10, 2021. A pre-bid conference will be held. This opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Bidders must be verified as eligible in the Vendor Information Pages database at time of bid submission.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Fire Sprinkler System Risers Bldg. 111 Project 695-19-104, newest first.
File Type Posted
695-19-104 Amend 05 Drawings.pdf PDF
695-19-104 Amend 05 Spec 01 01 10SN.pdf PDF
695-19-104 Amend 05 Spec 01 35 26 Safety Requirements.pdf PDF
695-19-104 Amend 05 Spec 00 01 10 TOC.pdf PDF
36C25221B0021 0004.docx DOCX document
S06 - Pre-Bid Walkthru Roster 07.20.21.pdf PDF
36C25221B0021 0003.docx DOCX document
S02 - Combined Riser PDF Attachment.pdf PDF
S02 - Haz Material Report Attachment.pdf PDF
S02 - Pre-Bid Walkthru Roster.pdf PDF
36C25221B0021 0002.docx DOCX document
S02 - Project Specifications updated 7 7 21.pdf PDF
36C25221B0021 0001.docx DOCX document
36C25221B0021_1.pdf PDF
S02 - DB Wage Determination.pdf PDF
S02 - JNA for Fire Alarm Components.pdf PDF
S02 - JNA for Hilti Firestop.pdf PDF
S02 - Drawings.pdf PDF
36C25221B0021_1.docx DOCX document
S02 - Project Specifications.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

NO CHANGE

695-19-104 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 To all Offerors/Bidders

36C25221B0021 08-11-2021

X X X

Wednesday, August 18, 1000 LOCAL TIME

NO CHANGE

X The subject solicitation is amended per this amendment. The bid opening date is hereby changed to Wednesday August 18, 1000 local time to be held at the Greate Lakes Acquisition Center. No virtual bid opening will be held. Mask wearing and social distancing will be enforced for the bid opening. See continuation pages(s) for amended documents. The answers in this amendment superscede the answers provided to RFIs in amendment 4.

RYAN MCMILLIN

CONTRACTING OFFICER

CONTINUATION PAGE

AMENDMENT NO. 005

DATE: August 11, 2021

RE: VA Medical Center 5000 West National Avenue Milwaukee, WI 53295 VA No. 695-19-137

This Addendum consists of (2) Narrative pages, (21) pages of Amended Specifications, (1) pages of Amended Drawings, and (8) Question and Answer pages. The following changes are hereby provided by amendment.

SPECIFICATIONS:

1. Specification 00 01 10 Table of Contents

a. ADD 01 01 10SN to Table of Contents

b. REMOVE 01 45 00 from Table of Contents

2. Specification 01 01 10SN

a. MODIFY Section 3.21 Paragraph A to read “Excluding Phase 1 construction work. the usual hours of contract work shall be from Friday 4:00pm – Monday 6:00am. Upon approval of VAMC, Contractor will propose scope or extent of differing-hour work due to individual Contractor resources available to accomplish this project in time allotted. In addition, these differing-hours may be required for utility/service interruptions, and any/other work that may interrupt operation of occupied space, i.e., some road construction, demolition, work in occupied areas, work affecting occupied areas, etc. Some noise producing demolition operations may be required to be scheduled for differing work hours as directed by COR and described on drawings

b. MODIFY Section 3.21 Paragraph B to read “All outages shall be done between Friday 4:00pm and Monday 6:00am.”

3. Specification 01 35 26 Safety Requirements

a. MODIFY Section 1.4 Paragraph B.4.f. to read “OSHA 10-hour training is required for all workers on site and the OSHA 30-hour training is required for Site Superintendent, Safety Officer/SSHO, and all trade Competent Persons (CPs)

b. MODIFY Section 1.7 to read “SUPERINTENDENT, SITE SAFETY AND HEALTH OFFICER (SSHO), COMPETENT PERSONS (CP), AND CONSTRUCTION HEALTH AND SAFETY TECHNICIAN(CHST)/CERTIFIED SAFETY PROFESSIONAL (CSP):

c. REMOVE Section 1.7 Paragraph D.

d. MODIFY Section 1.7 Paragraph F to read “The Superintendent and SSHO shall maintain a presence on the site during construction operations in accordance with FAR Clause 52.236-6: Superintendence by the Contractor. CPs will maintain presence during their construction activities in accordance with above mentioned clause. A listing of the designated Superintendent, SSHO, CHST/CSP and all known CPs shall be submitted prior to the start of work as part of the APP with the training documentation and/or AHA as listed in Section 1.8 below.

4. Specification 01 45 00 Quality Control

a. REMOVE this Specification in its entirety

DRAWINGS (attached):

1. Sheet FX001: REMOVE Phasing Plan Note “FINAL SEQUENCE OF PHASING SHALL BE PER SITE REQUIREMENT AND VA DIRECTION.”

2. Sheet FX001: ADD Phasing Plan Note under For All Phases: “PHASE 1 MUST BE COMPLETED BEFORE PHASES 2 THROUGH 7. PHASES 2 THROUGH 7 SHALL BE COMPLETED IN ORDER.”

3. Sheet FX001: ADD Phasing Plan Note under For All Phases: “WORK FOR MULTIPLE PHASES MAY NOT OCCUR CONCCURENTLY.”

4. Sheet FX001: ADD Phasing Plan Note under For Phases 2 Through 7: “ALL WORK WITHIN THE STAIRWELLS INCLUDING BUT NOT LIMITED TO: INFECTION CONTROL, DEMOLITION, AND ABATEMENT SHALL BE PERFORMED FROM FRIDAY AT 16:00 TO MONDAY AT 06:00. BARRIERS, CORED HOLES, AND EXPOSED ABATEMENT AREAS SHALL NOT BE LEFT BEHIND.”

BIDDER QUESTIONS AND ANSWERS:

The questions from prospective bidders collected through date of this Amendment have been answered in the attachment. Answers resulting in changes to contract specifications, drawings, and Scope of Work are reflected above.

Replace Fire Sprinkler System Risers Bldg 111 Solicitation Number: 36C252-21-B-0021 Project Number: 695-19-104 Solicitation Requests for Information

Q1. Please confirm personnel requirements for this project. Can (1) superintendent fulfill SSHO requirements? Or does (1) superintendent and (1) SSHO need to be on site full-time?

A1. No, the superintendent and the SSHO must be separate individuals. Refer to Specification 01 35 26 Section 1.7 Paragraph F for superintendent and SSHO site presence requirements.

Q2. Does prime contractor need to hire 23 09 23 controls? Does prime contractor have hire third-party DIV 25 integration contractors?

A2. There is no Division 23 or 25 work in this project. Any references to these divisions are not applicable.

Q3. Please confirm work hours for this project. Are there any specific tasks or trade division that must be on overtime (01 Infection Control, 02 Demolition, 02 Abatement)? Are there any areas of work that must be on overtime (Hallways, Occupied Areas, Etc.)?

A3. See Drawing Sheet FX001 Phasing Plan, which has been updated as part of amendment 05. See Specification 01 01 10SN Section 3.21, which has been updated as part of amendment 05.

Phase 1 does not have any hour restrictions.

Q4. Please provide listed abatement quantities. Specs list pipe to be abated but no quantities are given. If no quantities, please give assumed amount for bidding purposes.

A4. Per table 4 of Appendix D, Limited Asbestos and Lead Survey Report, red paint on sprinkler piping being replaced in Stairs 1 through 5 tested positive for significant lead concentration.

The paint on the sprinkler piping being demolished does not require abatement. An infection control barrier will be adequate for containment. Contractor to use lead-safe construction practices. Demolished sprinkler piping is to be disposed as recycled metal.

Q5. Please provide listed abatement quantities. Specs list flooring to be abated but no quantities are given. If no quantities, please give assumed amount for bidding purposes.

A5. Section 5.1 of Appendix D, Limited Asbestos and Lead Survey Report, specific quantities and recommendations for abatement. Contractor to use asbestos-safe construction practices.

Q6. Is there a proprietary DIV23 controls contractor at the facility? If so, please provide company and point of contact.

A6. See A2.

Q7. Is there a proprietary DIV28 Fire Alarm contractor at the facility? If so, please provide company and point of contact.

A7. The proprietary fire alarm contractor is Systec for Siemens. Establishing a point of contact shall be the responsibility of the contractor.

Q8. Please confirm if contract has material staging location at facility. If so, where is it? Is prime contractor responsible for any costs associated with staging?

A8. VA will provide limited storage outside of the main hospital to be coordinated with COR.

Q9. Is the prime contractor responsible for submittal exchange? Or is this on the VA?

A9. The VA will host an online submittal exchange with the contractor once the contract has been awarded.

Q10. Please confirm if this is a hard bid turn in or email submission.

A10. As this solicitation is a FAR 14 IFB, a physical copy of the bid is required to be received by the bid opening date and time. No virtual bid opening will occur, and the bid opening will be a public bid opening at the Great Lakes Acquisition Center in Milwaukee, WI. Social distancing and make wearing will be mandatory for the bid opening.

Q11. Please provide as built drawings of existing ceiling type as there is no indication on the contract drawings. Is prime contractor to assume ACT?

A11. Contractor shall field verify. The ceiling types in areas of work are:

a. 2/FX421 – Office B0622: ACT at approx. 7’-6”.

b. 2/FX451 – Corridor: ACT at approx. 8’-6”.

c. 2/FX461:

i. Corridor: Metal Pan Tile System at approx. 10’-0”.

ii. Scrubber Room: Gypsum board at approx. 8’0”.

d. 3/FX461 – Corridor: ACT at approx. 8’-6”.

e. ALL Other Areas: No Ceilings, exposed structure.

Q12. Provide clarification of required on site personnel. Comment by Schwarz, Linda Sue: Should be Q12 not Q13 Comment by McMillin, Ryan J.:

a. Can superintendent also be SSHO?

b. Can superintendent also be QCM?

A12. ---

a. Refer to question A1.

b. QCM is not required for this project. See Specification 01 35 26 Safety Requirements which has been updated as part of amendment 03.

Q13. Verify that project is taxable?

A13. Yes, all applicable taxes will apply to this project.

Q14. Can work be completed during regular business hours?

A14. See A3.

Q15. Are there costs associated with drain down of piping systems?

A15. Contractor shall provide personnel to do the drain down and to provide the fire watch personnel for the areas affected, as indicated in the contract documents.

Q16. Are submittal drawings and hydraulic calculations required where we are removing and replacing with like piping A16. Submittal drawings are required. Hydraulic calculations are not required. Test data for the risers is required per contract documents Drawing FX001, Fire Suppression General Notes 3 and 4.

Q17. Are existing fire pumps in acceptable working condition?

a. Are existing fire pumps capable of being de-energized / re-energized for this work.

A17. The fire pumps are in acceptable working condition.

a. Per the contract documents Drawing FX001, Fire Suppression General Note 3, the Contractor is to test the pump before work begins and after work is complete to show adequate flow and pressures for the new risers.

Q18. Can phasing be adjusted in order?

A18. See Drawing Sheet FX001 Phasing Plan, which has been updated as part of amendment 03.

Q19. Is existing steel fireproofed in any location?

A19. The Building Construction is Poured Concrete. The areas of work do not appear to have any fireproofing of steel. Contractor shall field verify the existing conditions prior to proceeding with work.

Q20. Can multiple phases be completed at one time?

A20. See A18.

Q21. Are existing tamper switches all operational?

A21. All tamper switches should be assumed to be operational. Per the contract documents Drawing FX001, Fire Suppression General Note 16, the Contractor shall test every alarm device prior to the beginning of work.

Q22. What are thicknesses of all floor slabs / floor construction to be core drilled?

A22. Assume all floor slabs to be 6” thick in all core locations. Comment by Schwarz, Linda Sue: Is this correct? Just checking.

Q23. Is core drilling to be completed during off hours?

A23. Core drilling shall be performed during Friday 4pm – 9 pm, Saturday and Sunday 8am – 9pm. Comment by Schwarz, Linda Sue: Are we letting them core in the middle of the night – should not. Change to “Friday 4 pm – 9 pm, Saturday and Sunday 8 am – 9 pm.”

Q24. Are any new piping installations to have exposed / painted piping? Provide color required and locations where this is to occur.

A24. Specification 09 91 00 – 3.13.A.6. and 21 12 00 – 3.1.I. calls for piping to be painted ‘Fire Safety Red’ unless otherwise designated by COR. Comment by Schwarz, Linda Sue: The painting specification 09….. has the sprinkler pipe painting requirements, if this spec section is not included, review to ensure standards are being met to include for painting submittal, etc.

Q25. Appendix D / Hazmat report:

a. Report calls out locations of VCT / base to be removed. Is material to be replaced for only areas being remediated or entire areas? If entire areas are to be replaced, provide detailed plans reflecting areas.

b. Provide floor tile & base specifications for any materials to be replaced.

c. Appendix A / HA No 12 Plaster off white with light texture. Provide details for repair of this area including wall construction information.

d. Fire stop caulking is not showing ACM materials. Confirm that this is NOT to be removed? If to be removed provide all specific fire ratings to be replaced.

e. Table 4. LBP Sample Summary report shows that sprinkler line samples 1 – 5 contain concentration above 1%.

i. Clarify this is the existing vertical sprinkler main pipe to be removed during remediation processes?

A25. ---

a. Only material being affected by demolition/construction is to be abated.

b. Replace any tile damaged by demolition/construction with matching finish. Materials are only to be abated as necessary to perform work in scope

c. Use metal lathe secured to substrate. Apply scratch coat and then finish coat flush to adjacent surface. San and prep finish coat for new painted finish. Pain entire wall for like new appearance.

d. Fire stop caulking is to be removed and replaced as necessary to carry out project scope

e. ---

i. See A4.

Q26. Sheet FX101A (some notes refer to multiple sheets):

a. At what hgt, above FF are pipes installed?

b. Is existing abandoned piping in sub-basement conveyor tunnel to be removed?

c. Note calls for abandoning riser.

i. Is riser piping to be removed?

ii. What is closure detail if required?

A26. ---

a. Reference sections on drawings. Sub-Basement varies from approximately 23 feet high at Mechanical Room MER 1 and 6 to 10 feet in other areas. Most of the Sub-Basement floor is not finished.

b. No, the piping in the conveyor tunnels is not in the project scope.

c. Clarification, notes call out risers that are currently abandoned. These risers are not in the scope of this work.

i. No, riser piping for abandoned risers is to remain unless noted otherwise.

ii. Only where noted, cap the piping at the floor penetration into the Sub-Basement.

Q27. Sheet FX101B:

a. Note calls for abandoned 4” fl. riser up to floor hose cabinet. Are piping and fire cabinets to be removed? If removal required provide complete removal / repairs details A27. ---

a. Note only clarifies existing conditions that there are abandoned risers in some locations. They are not to be modified as part of this project.

Q28. Sheet FX411:

a. Demolition Note 6: Provide photos and details of existing storage tank to be removed.

b. Provide information on existing storage tank materials to be removed.

A28. ---

a. Existing storage tank is not be removed. Demolition Note 6 specifies to remove supply piping. New Work Note 6 specifies to reconnect new riser at same point.

b. Existing storage tank is not to be removed.

Q29. Sheet FX421:

a. New Work Note 7: Provide wall construction where repairs required.

A29. ---

a. Wall construction between B0622 and corridor is gypsum on metal stud. This wall goes up to deck.

Q30. Sheet FX451:

a. What is hgt, above finished floor for both ceiling tile-grid and to structure above ceiling?

A30. ---

a. See answer A11 for ceiling heights. See riser sections for floor elevations.

Q31. Sheet FX461:

a. Note 6: provide specifications / details of existing perforated metal tiles-grid.

b. Clarify that perforated metal tiles-grid can in fact be dis-assembled for reuse.

c. Are perforated metal ceiling tiles secured in place for security?

A31. ---

a. Existing are to be reused. Tiles have vertical slides that slide into a grid channel.

b. Yes, the metal ceiling tiles are press fit in place and can be removed and reused.

c. No.

Q32. Sheet FX901:

a. Provide details / information of existing storage tank to be removed on sheet FX411.

b. Provide information on where piping is to be capped from existing storage tank removal.

A32.

a. Existing storage tank is not be removed. See answer A28.

b. Existing storage tank is not to be removed. New riser is to connect to point indicated by New Work Note 6 on FX411.

Q33. Is there any work required on the Fire Alarm system with the work happening on the sprinkler system flows and tampers? If so, could details and drawings be provided to reflect this work?

A33. Existing flow switches are to be reconnected to new piping where being replaced. Existing tamper switches are to be reconnected to new valves where being replaced.

Q34. Could spec section 28 31 00, 1.2 Scope be revised to match the work that is associated with any required fire alarm work for the project?

A34. The scope will not be changed, as it reflects the project scope when referencing the drawings and other specification sections. Paragraph 2.8.B. gives further clarification regarding fire suppression devices in reference to this project.

Q35. Will the bid submission and opening be done virtually or in-person for this job? The solicitation states that the bid opening will be in-person, but all bids since the COVID-19 pandemic have been submitted and opened virtually. Please provide further clarification on the bid submission requirements.

A35. Although many bids have been done virtually, the GLAC has in fact held IFB bid openings in person since March of 2020. This bid opening will be held in person at the address located in the IFB. Firms are of course allowed to mail/drop off their bids at the GLAC prior to the bid opening and need not be present. For firms that opt to attend the public bid opening in person, social distancing procedures and the wearing of masks will be enforced. The CO will allow entry into the building and location of bid opening approx. 10 minutes prior.

Q36. Reference section 01 35 26 1.8.E: requested to submit training records for all associated construction workers within 60 calendar days of the Notice to Proceed. This is not feasible. Is it acceptable to submit training records within two weeks before subcontractor work commences?

A36. All training records shall be submitted with the respective AHA per Specification 01 35 26 Section 1.5 Paragraph C.3.

Q37. Reference the specification, pages 62 and 63 are blank pages. Is there content that should have printed or were they intentionally left blank?

A37. These pages have breaks due to the large tables on the following pages. The single line of text at the top of the page is relevant to the preceding or following information.

Q38. Reference 01 10 00 SN 3.35.D Scheduling of Work states four weeks in advance notice of an outage. Typical outage requests require submission two-weeks notice prior to work commencing. Please advise what is the required notice for sprinkler outages.

A38. It is required for this project that outages must be requested four weeks in advance. An outage request form must be submitted for sprinkler outages.

Q39. Is the commissioning agent and all associated costs being supplied by the VA?

A39. Contractor is responsible for startup, manufacturer commissioning, and training as per the specifications. The VA will not hire an external commissioning agent for 3rd party services.

Q40. Can all work be done during normal daytime work shifts?

A40. Refer to A3.

Q41. Can sprinkler outages be scheduled during the day?

A41. No, sprinkler outages may only occur from Friday 1600 – Monday 0600.

Q42. Is an offer guarantee (Bid Bond) required?

A43. Yes, see page 1 of the IFB.

Q43. What percent SDVOSB labor is required?

A43. As this solicitation is being conducted under a specialty NAICS code, the contractor must not pay more than 75% of labor costs to firms not similarly situated.

Q44. Fire penetration inspector hired by contractor?

A44. Fire penetration inspector shall be hired by Contractor. Specification Section 07 84 00 – 1.5.C details inspector requirements.

Q45. How many copies of the O&M do you require?

A45. Digital copy along with (1) hard copy.

Q46. Spec say all OSHA cards and AHAs need to be submitted with APP. This is not feasible. Is it acceptable to submit OSHA cards and AHAs during the project, but prior to related work starting?

A46. See A36.

Q47. There are no Infection Control walls shown on the drawings. Please advise what will be required for infection control measures.

A47. Construction in stairwells shall be classified as Level II infection control. Construction outside of the stairwells shall be classified as Level III infection control. Refer to specification 01 01 10SN and specification 01 35 26 – 1.12 and supporting documents for required infection control measures.

Q48. Is full time SSHO required?

A48. See A1.

Q49. Does the SSHO need to be a separate individual from the prime contractor’s superintendent?

A49. See A1.

Q50. Specification Section 01 00 00, Section 1.24 refers to refers to section 23 05 93 for written testing and commissioning plan. Section 23 05 93 has been crossed out of the table of contents as not applicable to the job. Please confirm this is correct.

A50. Correct, there is no HVAC work in scope. Section 23 05 93 is not applicable. See amended Specification 01 00 00 Section 1.24.

See attached document: 695-19-104 Amend 05 Spec 00 01 10 TOC.

See attached document: 695-19-104 Amend 05 Spec 01 01 10SN.

See attached document: 695-19-104 Amend 05 Spec 01 35 26 Safety Requirements.

See attached document: 695-19-104 Amend 05 Drawings.