695-19-104 Amend 05 Drawings.pdf

PDF 403 KB Posted

Attached to
Z1DA--Replace Fire Sprinkler System Risers Bldg. 111 Project 695-19-104 Federal contract opportunity
Solicitation number
36C25221B0021
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document package includes construction drawings and specifications for replacing fire sprinkler risers in Building 111 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves demolishing existing risers and installing new sprinkler risers in seven phases over multiple weekends to minimize disruptions. Key details include replacing six-inch and three-inch zone isolation valves, installing new risers in Stairwell 6, and demolishing disconnected piping. Infection control measures and maintaining life safety are priorities. The related federal contract opportunity is a pre-solicitation notice for project 695-19-104 with a value between $1-2 million. The solicitation will be posted on July 8th with bid opening on August 10th. The project has a 660-day period of performance. The procurement is a 100% SDVOSB set-aside under NAICS 238220 with a $16.5 million size standard.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Fire Sprinkler System Risers Bldg. 111 Project 695-19-104, newest first.
File Type Posted
695-19-104 Amend 05 Spec 01 01 10SN.pdf PDF
36C25221B0021 0005.docx DOCX document
695-19-104 Amend 05 Spec 00 01 10 TOC.pdf PDF
695-19-104 Amend 05 Spec 01 35 26 Safety Requirements.pdf PDF
36C25221B0021 0004.docx DOCX document
S06 - Pre-Bid Walkthru Roster 07.20.21.pdf PDF
36C25221B0021 0003.docx DOCX document
S02 - Combined Riser PDF Attachment.pdf PDF
36C25221B0021 0002.docx DOCX document
S02 - Haz Material Report Attachment.pdf PDF
S02 - Pre-Bid Walkthru Roster.pdf PDF
S02 - Project Specifications updated 7 7 21.pdf PDF
36C25221B0021_1.pdf PDF
36C25221B0021 0001.docx DOCX document
S02 - DB Wage Determination.pdf PDF
S02 - JNA for Fire Alarm Components.pdf PDF
S02 - JNA for Hilti Firestop.pdf PDF
S02 - Project Specifications.pdf PDF
S02 - Drawings.pdf PDF
36C25221B0021_1.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

UPRIGHT SPRINKLER HEAD

FIRE LINE (NEW - BOLD)FL

PENDANT SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION (FDC)

FIRE LINE (EXISTING - LIGHT - ITALIC)FL

POINT OF NEW CONNECTION

LIMIT OF DEMOLITION

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

TAMPER SWITCH

FLOW SWITCH

CHECK VALVE

GATE VALVE

TEST AND DRAIN ASSEMBLY

BACKFLOW PREVENTER

T&D

TS

FS

ORDINARY HAZARD

GROUP 1 OCCUPANCY

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

ORDINARY HAZARD

GROUP 2 OCCUPANCY

LIGHT HAZARD

BUTTERFLY VALVE

DRAIN VALVE WITH SIGHT GLASS

FIRE LINE (DEMOLITION - DASHED BOLD - ITALIC)FL

FIRE DRAIN (EXISTING - LIGHT - ITALIC)DRAIN

CALLOUT LINE

MATCHLINE

FIRE LINE (PREVIOUS PHASE - MEDIUM - ITALIC)FL

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA

13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE

PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS

DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE

PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION

SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS

DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE

BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING

CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING

CODE, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION

REQUIREMENTS.

FLUSHING CONNECTION

FEED OR CROSS MAIN.

TYPICAL TEE WITH

CROSS MAIN PITCH

TOWARDS FEED MAIN.

NOTE: INSTALL FLUSHING

CONNECTION AT END OF

CROSS MAINS.

2" NIPPLE 4" LONG

WITH CAP.

MECHANICAL TEE

NEW PIPING

MECHANICAL TEE

SCREWED END

NOTE: SEE FLOOR

PLAN FOR EXISTING

AND NEW PIPE SIZES.

STEEL BEAM

RETAINING STRAP

C-CLAMP

THREADED HANGER ROD

ADJUSTABLE RING HANGER

EXPANSION ANCHOR.

ANCHOR SHALL BE FM

LISTED AND APPROVED

FOR USE IN CRACKED

CONCRETE PER ACI 355.2

EXISTING CONCRETE SLAB

SPRINKLER PIPE

SET SCREW

SURGE RESTRAINER

INSTALL INSULATION AFTER

CAULKING SLEEVE, SEAL AS

REQUIRED.

FIRE RATED WALL AND OR SLAB.

STEEL PIPE SLEEVE TERMINATE

SLEEVE FLUSH WITH FINISHED

SURFACE.

FIRESTOPPING APPROVED

(BY LOCAL CODES)

FINISHED ESCUTCHEON PLATE

FLUSH AGAINST WALL AND OF

SIZE TO COMPLETELY COVER

OPENING.

APPROVED TYPE FIRE SAFE &

SMOKE TIGHT CAULKING SEALER

BETWEEN BARE PIPE AND SLEEVE.

SPRINKLER RISER

INDICATING BUTTERFLY VALVE

WITH TAMPER SWITCH AT OR ABOVE 7'- 0" AFF

WATER FLOW SWITCH

PRESSURE GAUGE

SPRINKLER PIPE TO ZONE

AUXILIARY DRAIN VALVE

1" INSPECTOR'S TEST VALVE

SIGHT GLASS

2" DRAIN CONNECTION TO EXISTING

DRAIN PIPING

CHECK VALVE

STANDPIPE HOSE CONNECTION

MOUNT 4'- 0" AFF

1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR TO START OF

WORK.

2. COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. GIVE THE COR AT LEAST TWENTY-EIGHT (28) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.

3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT

OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.

4. FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE AND

DISPOSED OF.

5. REMOVE SPRINKLER MAINS AND BRANCHES TO THE ZONE CONTROL VALVE AS NEEDED TO INSTALL NEW SPRINKLER

SYSTEM.

1. USE NFPA-13 (CURRENT EDITION) AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC

SPRINKLER SYSTEM.

2. THIS FACILITY IS FULLY SPRINKLERED. EXISTING FIRE SUPPRESSION SYSTEM IS WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. STANDPIPE SIZES SHALL MATCH EXISTING.

3. FIRE PROTECTION CONTRACTOR SHALL TEST EXISTING FIRE PUMP AND RECORD STATIC AND RESIDUAL PRESSURE AT MOST REMOTE OUTLET. TEST SHALL BE PERFORMED BEFORE START AND AFTER COMPLETION OF NEW WORK.

4. SUBMIT ONE COMPLETE SET OF PUMP AND RISER TEST DATA, CERTIFIED AND STAMPED BY A PROFESSIONAL ENGINEER.

5. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.

6. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS

AT PRIMARY BUILDING STRUCTURAL MEMBERS.

7. CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.

8. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS

SPECIFIED AND INDICATED ON THE DRAWINGS.

9. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.

10. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS, AND CEILINGS.

11. ELECTRONIC FLOW AND TAMPER SWITCHES ARE TO BE REUSED AND INSTALLED AS WORK OF DIVISION 21. PROVIDE WIRING

TO FLOW AND TAMPER SWITCHES AS WORK OF DIVISION 26.

12. FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.

13. LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS IN ACCORDANCE WITH NFPA-13.

14. NEW STANDPIPES SHALL BE LOCATED AT EXISTING STANDPIPE LOCATIONS AND USE EXISTING OPENINGS IN THE FLOORS

EXCEPT IN PLACES NOTED ON THE PLANS.

15. STANDPIPE SYSTEM IS CLASS 1.

16. CONTRACTOR SHALL TEST EVERY VALVE AND ALARM DEVICE PRIOR TO BEGINNING WORK TO ENSURE WORKING CONDITION. PROVIDE TWO (2) NEW 6" ZONE ISOLATION VALVES AND THREE (3) 3" ZONE ISOLATION VALVES WITH TAMPER SWITCHES TO REPLACE EXISTING VALVES THAT CANNOT BE REUSED. PROVIDE A UNIT PRICE INCLUDING LABOR COST FOR REPLACING ANY ADDITIONAL VALVES IF REQUIRED. IF VALVES ARE NOT REQUIRED, TURN THEM OVER TO THE COR AT THE

END OF THE PROJECT.

17. PROVIDE FIVE (5) NEW HOSE CONNECTION VALVES WITH CAPS TO REPLACE EXISTING VALVES THAT CANNOT BE REUSED.

PROVIDE A UNIT PRICE INCLUDING LABOR COST FOR REPLACING ANY ADDITIONAL VALVES IF REQUIRED. IF VALVES ARE NOT

REQUIRED, TURN THEM OVER TO THE COR AT THE END OF THE PROJECT.

1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE CODE CHAPTER 9, SECTION 901.7.

2. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS

PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.

3. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.

4. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND

ROOM OF THE FIRE AREA IS COVERED.

1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST

CONTROL PLAN.

2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.

3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.

PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.

4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC

PATHOGENS.

5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S

ACCEPTANCE.

BOLT

FLOOR SLAB

ESCUTCHEON

PLATE

PIPE SLEEVE

RISER CLAMP

FIRE-STOPPING

MATERIAL

BOLT

RISER CLAMP

PIPE SLEEVE

RISER PIPE

SECTION

TOP RISER PIPE

FOR ALL PHASES:

• CONSTRUCTION AND DEMOLITION SHALL BE COORDINATED TO MINIMIZE UNNECESSARY SHUTDOWNS AND DRAINAGE OF

PIPING.

• FOR SPRINKLER SYSTEM IMPAIRMENTS LASTING MORE THAN 8 HOURS:

○ FIRE DEPARTMENT MUST BE NOTIFIED.

○ VA POLICE MUST BE NOTIFIED.

○ DEDICATED FIRE WATCH MUST BE PRESENT.

• PHASE 1 MUST BE COMPLETED BEFORE PHASES 2 THROUGH 7. PHASES 2 THROUGH 7 SHALL BE COMPLETED IN ORDER.

• WORK FOR MULTIPLE PHASES MAY NOT OCCUR CONCURRENTLY.

PHASE 1 - SUB-BASEMENT:

A. INSTALL NEW MAINS IN SUB-BASEMENT PARALLEL TO EXISTING PIPING. PREPARE FUTURE CONNECTIONS AND CONNECT

DRAIN PIPING AS NECESSARY TO MINIMIZE DOWN TIME IN PHASE 1B.

B. SELECTIVE DEMOLITION AND REPLACEMENT OF EXISTING PIPING TO CONNECT EXISTING RISERS AND SYSTEM COMPONENTS

TO NEW MAINS.

C. COMPLETE DEMOLITION OF DISCONNECTED MAINS IN SUB-BASEMENT.

FOR PHASES 2 THROUGH 7:

• THE ALLOTTED SHUTDOWN DURATION IS FROM FRIDAY AT 16:00 TO MONDAY AT 06:00.

• THE SYSTEM IS TO BE DRAINED AT THE BEGINNING OF THE SHUTDOWN DURATION AND MUST BE REFILLED AND FULLY

OPERATIONAL BY THE END OF THE ALLOTTED SHUTDOWN DURATION.

• ALL WORK WITHIN THE STAIRWELLS INCLUDING BUT NOT LIMITED TO: INFECTION CONTROL, DEMOLITION, AND ABATEMENT SHALL BE PERFORMED FROM FRIDAY AT 16:00 TO MONDAY AT 06:00. BARRIERS, CORED HOLES, AND EXPOSED ABATEMENT

AREAS SHALL NOT BE LEFT BEHIND.

PHASE 2 - STAIRWELL 4:

A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN

DURATION.

PHASE 3 - STAIRWELL 5:

A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN

DURATION.

PHASE 4 - STAIRWELL 2:

A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN

DURATION.

PHASE 5 - STAIRWELL 3:

A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN

DURATION.

PHASE 6 - STAIRWELL 1:

A. REPLACE STAIRWELL RISER PIPING BETWEEN THE SUB-BASEMENT RISER ISOLATION VALVE AND ALL ZONE VALVES. REPLACE RISER IN SEGMENTS ALLOWING FOR RETURN OF THE SYSTEM TO FULL OPERATION WITHIN THE ALLOTTED SHUTDOWN

DURATION.

PHASE 7 - STAIRWELL 6:

A. CONSTRUCT NEW RISER IN STAIRWELL 6. PREPARE FUTURE CONNECTIONS AND CONNECT DRAIN PIPING AS NECESSARY TO

MINIMIZE DOWN TIME IN PHASE 7B.

B. CONNECT EXISTING ZONE VALVES TO NEW RISER AND REINSTALL EXISTING HOSE VALVES ON NEW RISER.

C. DEMOLISH DISCONNECTED RISER PIPING EXPOSED IN STAIRWELL AND CAP PIPING AT WALL AND FLOOR.

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

M METER

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

PA PASCAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PPM PARTS PER MILLION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

SAN SANITARY SEWER

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VB VACUUM BREAKER

WCO WALL CLEANOUT

WG WATER GAUGE

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

YCO YARD CLEANOUT

A/E ARCHITECT/ENGINEER

AFF ABOVE FINISHED FLOOR

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

BAS BUILDING AUTOMATION SYSTEM

BFF BELOW FINISHED FLOOR

BFP BACKFLOW PREVENTER

BHP BREAK HORSEPOWER

BOP BOTTOM OF PIPE

C CELSIUS

CO CLEANOUT

DCW DOMESTIC COLD WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EPA ENVIRONMENTAL PROTECTION AGENCY

EPACT ENERGY POLICY ACT

ET EXPANSION TANK

EX EXISTING

F FAHRENHEIT

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE) CONNECTION

FM FLOW METER

FPC FIRE PROTECTION CONTRACTOR

FS FLOOR SINK

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HD HUB DRAIN

HP HORSEPOWER

HYD HYDRANT

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IW INDIRECT WASTE

1. REHABILITATION WORK CATEGORY: RENOVATION. SWAPPING OF FIRE SPRINKLER RISERS ON ONE-TO-ONE BASIS.

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/4

/2

:3

:0

A M

C

U s e rs \n s to lt z \D o c u m e n ts \F

-2

-1

R n s to lt z .r v t

FX001

FIRE SUPPRESSION GENERAL

INFORMATION AND DETAILS

2 17NAS, WLF

REPLACE FIRE SPRINKLERS

BLDG. 111

5000 W. NATIONAL AVENUE

MILWAULKEE, WI 53295

MAY 18, 2021

BID SET

695-19-10420-137

RBK

FIRE SUPPRESSION SYMBOLS

Scale: No Scale

MECHANICAL TEE AND FLUSHING CONNECTION DETAIL

Scale: No Scale

PIPE HANGER SUPPORT DETAIL

Scale: No Scale

SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL

Scale: No Scale

TYPICAL FLOOR CONTROL VALVE ASSEMBLY DETAIL

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

FIRE SUPPRESSION GENERAL NOTES

BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF

FIRE PROTECTION SERVICE

INFECTION CONTROL MEASURES

Scale: No Scale

PIPE FLOOR SUPPORT DETAIL

PHASING PLAN

FIRE SUPPRESSION ABBREVIATIONS

LIFE SAFETY NOTES (NFPA-101)

1 AMENDMENT NO. 05 08/02/2021

DocuSign Envelope ID: 59B571C7-4F53-404E-B75F-6E06FB2A110E

8/4/2021

Sheets
FX001 - FIRE SUPPRESSION GENERAL INFORMATION AND DETAILS
2021-08-04T11:28:22-0700
Digitally verifiable PDF exported from www.docusign.com