This is a Solicitation, Offer, and Award form (Standard Form 1442) and comprehensive solicitation package for construction services issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 21 (VA VISN 21).

The solicitation seeks firm-fixed-price construction services for Project No. 593-25-301: "Repair Road Cracks and Slurry Seal" at the Southern Nevada VA Health Care System (SNVAHCS), located at 6900 N Pecos Road, North Las Vegas, NV 89086-4400. The work includes localized asphalt and concrete repairs, crack sealing, and slurry seal applications to extend the service life of existing roadway pavements. The project must be completed within 180 calendar days from issuance of the Notice to Proceed. This is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), with offerors required to be verified in the SBA DSBS database at time of submission and prior to award. The NAICS code is 237310 (Highway, Street, and Bridge Construction) with a small business size standard of $45 million. The project magnitude falls between $250,000 and $500,000. Award will be made on a price-only basis to the responsible offeror offering best value. Sealed email proposals are due by 12:00 PM PDT on March 24, 2026, with a mandatory pre-proposal site visit scheduled for March 02, 2026 at 09:00 AM PST. Requests for Information must be submitted by 12:00 PM PDT on March 09, 2026. Offerors must submit detailed price breakdown sheets, phasing schedules, completed representations and certifications, bid bonds (20 percent of bid price or $3,000,000, whichever is less), and evidence of required insurance coverage including general liability ($500,000 per occurrence), workers' compensation with $100,000 employer's liability, and automobile liability ($200,000 per person/$500,000 per occurrence). Performance and payment bonds are required within 10 calendar days of Notice to Proceed. Applicable wage determination NV20260058 (dated January 30, 2026) governs prevailing wage requirements for laborers and mechanics. Proposals should be emailed to David Rovner (Contract Specialist) at david.rovner@va.gov and Charee Harris (Contracting Officer) at charee.harris@va.gov. The solicitation incorporates extensive FAR and VAAR clauses addressing contract administration, labor standards, security requirements, small business compliance, environmental regulations, and dispute resolution procedures.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26126R0025

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C26126R0025

X

TBD

593-26-2-5914-0005

593-25-301 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21 975 Kirman Avenue Reno NV 89502-0993 Offers have been authorized and are to be emailed to David.Rovner@va.gov and cc: charee.harris@va.gov.

David Rovner 925-372-4614

a. Project Title: Repair Road Cracks and Slurry Seal. Project #: 593-25-301.

Project Location: Southern Nevada VA Health Care System (SNVAHCS), 6900 N Pecos Road, North Las Vegas, NV 89086-4400.

Project Completion: 180 calendar days from when Notice To Proceed (NTP) is issued.

b. This is a firm-fixed price construction requirement. Offeror must furnish all supervision, labor, materials, services, tools, equipment, transportation, required engineering services, and overhead and profit to Repair Road Cracks and Slurry Seal at Las Vegas in accordance with (IAW) the Statement of Work (SOW), Drawings, and Specifications.

c. In accordance with FAR 36.204, the magnitude of the project is between $250,000 and $500,000.

This project is being solicited under NAICS Code 237310 with a Small Business Size Standard of $45 Million.

d. The basis for award is price only. The Government intends to award without discussions the proposal offering the Best Value to the Government. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. Offeror shall be verified as SDVOSB to be eligible for an award in Small Business Administration (SBA) DSBS Database at: https://veterans.certify.sba.gov/ pursuant to 38 U.S.C. 8127 and VAAR subpart

819.70. A proposal will be rejected and will not be considered for an award if offeror’s SDVOSB/VOSB status cannot be verified at the time of submission of proposal and prior to award.

e. Applicable Wage Determination: NV20260058 dated January 30, 2026 is applicable for this solicitation and resulting award.

f. This requirement is an open market total set-aside for eligible SDVOSBs.

g. Questions and/or request for information (RFI) must be submitted using the RFI form, attached and are due by 12:00 PM PDT on March 09, 2026, to the Contract Specialist, David Rovner, by email david.rovner@va.gov and Contracting Officer, Charee Harris, by email charee.harris@va.gov. Please see Instructions To Offerors for the Pre-Solicitation Site Visit information. All potential Offerors are highly encouraged to attend the scheduled Pre-Solicitation Site Visit.

h. All Offerors must complete all representations and certifications in the solicitation. Incomplete solicitations may be removed from consideration.

i. Pursuant to 40 U.S.C. Chapter 31, subchapter III, Bonds (formerly known as the Miller Act), requires performance and payment bonds for any construction contract exceeding $150,000, the successful contractor is required to submit payment bond, and certificate of insurance within 10 calendar days of NTP. Only emailed bonds will be accepted.

EMAIL ONLY 1

12:00

PDT

03-24-2026

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Northern California HealthCare System 3237 Peacekeeper Way Bldg 200 Suite 204 McClellan CA 95652-2613

Department of Veterans Affairs FMS-VA-2(101) Financial Services Center

PO Box 149971 Austin TX 78714-9971

Charee Harris Contracting Officer

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE7
ITEM INFORMATION7
A.4 DELIVERY SCHEDULE7
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS7
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS8
2.1 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (NOV 2021) (DEVIATION NOV 2025)8
2.2 INSTRUCTIONS TO OFFERORS – 36C26126R002512
2.3 Information Regarding Bidding Bonds and Bid Guarantee17
REPRESENTATIONS AND CERTIFICATIONS19
3.1 SUPPLEMENTAL INSURANCE REQUIREMENTS19
3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) (DEVIATION NOV 2025)19
3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)(DEVIATION NOV 2025)20
3.4 52.216-1 TYPE OF CONTRACT (APR 1984) (DEVIATION NOV 2025)22
3.5 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024) (DEVIATION NOV 2025)22
3.6 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION NOV 2025)25
3.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)25
3.8 52.228-1 BID GUARANTEE (SEP 1996)26
3.9 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)27
3.10 52.233-2 SERVICE OF PROTEST (SEP 2006) (DEVIATION NOV 2025)27
3.11 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (DEVIATION NOV 2025)27
3.12 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)32
3.13 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)32
3.14 52.204-7 SYSTEM FOR AWARD MANAGEMENT (NOV 2024)(DEVIATION NOV 2025)32
3.15 52.237-1 SITE VISIT (APR 1984)35
3.16 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)35
GENERAL CONDITIONS37
4.1 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)37
4.2 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)(DEVIATION NOV 2025)37
4.3 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)(DEVIATION NOV 2025)38
4.4 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)(DEVIATION NOV 2025)40
4.5 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)(DEVIATION NOV 2025)43
4.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) (DEVIATION NOV 2025)43
4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) (DEVIATION NOV 2025)44
4.8 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (DEVIATION NOV 2025)49
4.9 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)59
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)59
4.11 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018) (DEVIATION NOV 2025)60
4.12 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016) (DEVIATION NOV 2025)61
4.13 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (JAN 2025)(DEVIATION NOV 2025)62
4.14 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)(DEVIATION NOV 2025)63
4.15 52.215-2 AUDIT AND RECORDS—NEGOTIATION (JUN 2020)(DEVIATION NOV 2025)64
4.16 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2025)(DEVIATION NOV 2025)66
4.17 52.219-27 NOTICE OF SET-ASIDE FOR, OR SOLE-SOURCE AWARD TO, SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) CONCERNS ELIGIBLE UNDER THE SDVOSB PROGRAM (FEB 2024)(DEVIATION NOV 2025)68
4.18 52.222-3 CONVICT LABOR (JUN 2003) (DEVIATION NOV 2025)69
4.19 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018) (DEVIATION NOV 2025)70
4.20 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) (DEVIATION NOV 2025)72
4.21 52.222-8 PAYROLLS AND BASIC RECORDS (JUL 2021) (DEVIATION NOV 2025)72
4.22 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)(DEVIATION NOV 2025)74
4.23 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) (DEVIATION NOV 2025)74
4.24 52.222-12 CONTRACT TERMINATION—DEBARMENT (MAY 2014) (DEVIATION FEB 2025)75
4.25 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988) (DEVIATION NOV 2025)76
4.26 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) (DEVIATION NOV 2025)76
4.27 52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020) (DEVIATION NOV 2025)76
4.28 52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021) (DEVIATION NOV 2025)77
4.29 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2025) (DEVIATION NOV 2025)85
4.30 52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026 (JAN 2022) (DEVIATION NOV 2025)88
4.31 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022) (DEVIATION NOV 2025)92
4.32 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (MAY 2024) (DEVIATION NOV 2025)97
4.33 52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2024) (DEVIATION NOV 2025)98
4.34 52.223-23 SUSTAINABLE PRODUCTS (MAY 2024) (DEVIATION NOV 2025)99
4.35 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) (DEVIATION NOV 2025)100
4.36 52.233-1 DISPUTES (MAY 2014)(DEVIATION NOV 2025)101
4.37 52.233-3 PROTEST AFTER AWARD (AUG 1996) (DEVIATION NOV 2025)103
4.38 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) (DEVIATION NOV 2025)104
4.39 52.236-2 DIFFERING SITE CONDITIONS (APR 1984) (DEVIATION AUG 2025)104
4.40 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984) (DEVIATION AUG 2025)104
4.41 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) (DEVIATION AUG 2025)105
4.42 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) (DEVIATION AUG 2025)106
4.43 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) (DEVIATION AUG 2025)106
4.44 52.236-8 OTHER CONTRACTS (NOV 2025) (DEVIATION)106
4.45 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984) (DEVIATION AUG 2025)107
4.46 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984) (DEVIATION AUG 2025)107
4.47 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984) (DEVIATION AUG 2025)108
4.48 52.236-12 CLEANING UP (APR 1984) (DEVIATION AUG 2025)108
4.49 52.236-13 ACCIDENT PREVENTION (NOV 1991) (DEVIATION AUG 2025)108
4.50 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984) (DEVIATION AUG 2025)109
4.51 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984) (DEVIATION AUG 2025)110
4.52 52.236-17 LAYOUT OF WORK (APR 1984) (DEVIATION AUG 2025)110
4.53 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION ALTERNATE I (FEB 1997) (DEVIATION AUG 2025)111
4.54 52.242-13 BANKRUPTCY (JUL 1995)112
4.55 52.242-14 SUSPENSION OF WORK (APR 1984)112
4.56 52.243-4 CHANGES (JUN 2007) (DEVIATION JUL 2025)113
4.57 52.244-6DEV SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) (DEVIATION OCT 2025)114
4.58 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2025)116
4.59 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) (DEVIATION NOV 2025)119
4.60 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)120
4.61 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)123
4.62 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)125
4.63 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)126
4.64 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)127
4.65 List of Attachments127

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
jb
__________________
__________________

The purpose of this project is to repair and extend the service life of existing roadway pavements at the VA Southern Nevada Healthcare System (VASNHS). Pavement surfaces have deteriorated due to normal wear, vehicular traffic, and environmental exposure. The work includes localized asphalt and concrete repairs, crack sealing, and slurry seal applications.

PRINCIPAL NAICS CODE: 237310 - Highway, Street, and Bridge Construction PRODUCT/SERVICE CODE: Z2LB - Repair or Alteration of Highways, Roads, Streets, Bridges, and Railways

MANUFACTURER PART NUMBER (MPN): N/A

GRAND TOTAL
__________________

A.4 DELIVERY SCHEDULE

ITEM NUMBER
SHIPPING INFORMATION
QUANTITY
DELIVERY DATE
0001
SHIP TO:
Department of Veterans Affairs

VA Southern Nevada Health Care System (VASNHCS) 6900 North Pecos Road North Las Vegas, NV 89086 4400

USA

1.00
180 DAYS FROM NTP

MARK FOR:

FOB:
DESTINATION

Page 1 of Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (NOV 2021) (DEVIATION NOV 2025)

(a) Definitions. As used in this provision- In writing, writing, or written means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

Proposal modification is a change made to a proposal before the request for proposal closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

Proposal revision is a change to material elements of a proposal made after the request for proposal closing date, at the request of or as allowed by a Contracting Officer, as the result of negotiations.

Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to requests for proposals. If this request for proposal (RFP) is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this RFP by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals.(1)(i) Proposals and modifications to proposals shall be—

(A) Submitted using the method and the format specified in the RFP;

(B) Addressed to the office specified in the RFP; and

(C) Showing the time and date specified for receipt, the RFP number, and the name and address of the offeror.

(ii) Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i)(B) and (C) of this provision.

(2) The first page of the proposal must show—

(i) The RFP number;

(ii) The name, address, and telephone number of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the RFP and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone number (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

(3)(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the RFP by the time specified in the RFP. If no time is specified in the RFP, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.(ii)(A) Any proposal, modification, or revision received at the Government office designated in the RFP after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-

(1) If it was transmitted through an electronic commerce method authorized by the RFP, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the RFP, and urgent Government requirements preclude amendment of the RFP, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the RFP on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral RFPs may be withdrawn orally. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the RFP, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this RFP in English, unless otherwise permitted by the RFP, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the RFP.

(6) Offerors may submit modifications to their proposals at any time before the RFP closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this RFP will be valid for the number of days specified on the RFP cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall-

(1) Mark the title page with the following legend:

Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of, or in connection with, the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award.(1) The Government intends to award a contract or contracts resulting from this RFP to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the RFP.

(2) The Government may reject any or all proposals if such action is in the Government’s interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without negotiations with offerors (except clarifications as described in FAR 15.202(b)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct negotiations if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly evaluated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.

(7) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(8) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(9) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(10) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency's evaluation of the significant weaknesses or deficiencies in the debriefed offeror's offer.

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial products, the make and model of the product to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the RFP, applicable regulations, and other applicable authorities were followed by the agency.

(vii) For DoD contracts in excess of $10 million but not in excess of $100 million with a small business or nontraditional defense contractor (10 U.S.C. 3014), an option for the contractor to request disclosure of the agency's written source selection decision document, redacted to protect the confidential and proprietary information of other offerors for the contract award.

(viii) For award of a DoD contract in excess of $100 million, disclosure of the agency's written source selection decision document, redacted to protect the confidential and proprietary information of other offerors for the contract award.

(End of Provision)

2.2 INSTRUCTIONS TO OFFERORS – 36C26126R0025

1. INTRODUCTION:

a. These instructions prescribe the format of Offers. Offers are defined as consisting of the Prime Contractor’s Price Proposal with a Phasing Schedule. These instructions describe the approach for the development and presentation of the required information and documentation. These instructions are designed to ensure the submission of necessary information and documentation to provide for the comprehensive evaluation of offers.

b. This solicitation is a firm-fixed price with a phasing schedule solicitation. This procurement action is a Total SDVOSB set-aside. As a result of this solicitation, a single firm-fixed price contract will result from this solicitation. Your company must be a verified SDVOSB firm in SBA VetCert and SAM.gov at the time of proposal submission and before award to be eligible. Proposals submitted by Offerors who cannot be verified in SBA SDBS VetCert and registered in SAM.gov will not be considered.

c. Offerors are cautioned to carefully review this solicitation prior to commencing preparation. For offers to receive full consideration for award, offerors shall ensure the information and documentation furnished in support of the price proposal with phasing schedule are current, factual, complete, and accurate.

d. Offerors are strictly advised to comply with all instructions within this solicitation to ensure submission of a complete Prime Contractor Offer. Failure to furnish a complete offer per the instructions of this solicitation by the required time and date may result in the Offeror’s proposal being determined ineligible.

e. The Government intends to award without discussions unless discussions are in the best interest of the Government.

f. AVAILABILITY OF SOLICITATION DOCUMENTS: All solicitation related documents will be published to and to, and only be accessible via, https://sam.gov/.

g. AMENDMENTS: Amendments to this solicitation will be posted at https://sam.gov/. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential Offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.

h. PREPARATION OF PROPOSALS: The Government will not pay for any costs incurred in the preparation and submission of proposals.

i. SELECTION PROCEDURES: All proposals shall be subject to evaluation by a team of Government personnel. You are required to submit a completed and detailed price breakdown sheet for your base offer (see Attachment I - Pricing Breakdown 36C26126R0025) and Phasing Schedule. All proposals received will be evaluated per the content provided in the solicitation and the details of items listed in the price breakdown sheet and phasing schedule as cited in the Statement of Work (SOW), Drawings, and Specifications provided.

j. The Government intends to award a firm fixed-price (FFP) contract, as required by the procedures pursuant to FAR Part 15.101-2, based on price with a phasing schedule only, FAR Subparagraph 6.401(b)(1) and VAAR 852.236-92 NOTICE TO BIDDERS–ADDITIVE OR DEDUCTIVE BID LINE ITEMS (APR 2019).

All offers will be evaluated individually on their merit and per the following evaluation factor: Price only with phasing schedule.

Per FAR 15.308, a source selection decision will be completed, after determination of responsibility by the Contracting Officer.

2. CONTRACT TYPE:

a. The awarded contract will be a firm fixed price (FFP) Construction contract.

This solicitation is set aside for Service-Disabled Veteran Owned Small-Businesses (SDVOSB’s). The offeror MUST have an active UEI Sam.gov number and be current in System for Award Management (SAM). Offerors must be verified in the SBA Veteran Small Business Certification Program as an SDVOSB to be eligible for an award. The Contracting Officer (CO) will use the SBA Dynamic Small Business Search (SBA DSBS) (https://dsbs.sba.gov/search/dsp_dsbs.cfm ) to verify SDVOSB status until further guidance is provided by the Department of Veterans Affairs.

b. Proposal will be rejected and not considered for an award if the offeror's SDVOSB status cannot be verified in the SBA DSBS database at the time of proposal submission and prior to award. This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offers received from other than SDVOSB concerns will not be considered at this time.

3. PROPOSAL SUBMISSION INSTRUCTIONS:

a. All proposals must contain a cover letter at least one (1) page minimum and a detailed price breakdown sheet due by the date cited on page 1, block 13 of the SF 1442 form of this solicitation. All price breakdown sheets must be detailed, contain all divisions in the specifications, and include a base offer as cited in the Statement of Work (SOW).

b. All offerors will provide a complete copy of their proposal with all representations and certifications completed, completed/signed VAAR clauses 852.219-75, bid bonds, a detailed price breakdown sheet, and phasing schedule. Send offers via electronic mail (e-mail) to: Mr. David Rovner, Contract Specialist, at e-mail: David.rovner@va.gov and copy, Ms. Charee Harris, Contracting Officer, at e-mail: Charee.harris@va.gov.

c. The subject line of the e-mail must cite RFP: 36C26126R0025, Repair Road Cracks and Slurry Seal at Las Vegas VA Medical Center. In no circumstances will a single file size exceed 7MB. Multiple emails are acceptable.

d. Faxed or hard-mailed proposals are not permitted under any circumstances. Only emailed proposals will be accepted.

e. All solicitation pages are required to be submitted with your proposal. Failure to submit all pages of the solicitation will result in your proposal being considered unacceptable.

f. All Representations and Certifications within the solicitation are required to be completed. Failure to complete all representations and certification may result in your proposal being considered unacceptable.

g. A complete and detailed Price Breakdown worksheet utilizing Attachment I - Pricing Breakdown 36C26126R0025 is required. Failure to submit a complete and detailed Price Breakdown may result in your proposal being considered unacceptable.

h. A detailed phasing schedule is required to be submitted with your proposal. Failure to submit a detailed phasing schedule will result in your proposal being eliminated from consideration.

i. Offeror is required to provide bid bonds. Failure to submit bid bonds will result in your proposal being eliminated from consideration. One (1) bid bond guarantee. Electronic submission of the Bid Guarantee is required via email only. Mailed bid bonds will not be accepted. Bid Guarantee part must include an electronic copy of the bid guarantee scanned in a manner that the raised seal is clearly visible. A bid guarantee must be submitted in a form of bid bond by the proposal submission due date and time.

j. Offerors are responsible for ensuring and verifying their price and all required documents are received at the email address designated in block 8 of the SF 1442 Solicitation and by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment). Any exception to the terms and conditions of this request for proposal will result in a nonresponsive proposal.

4. TECHINCAL QUESTIONS/REQUESTS FOR INFORMATION (RFI’s):

All Requests for Information (RFIs) regarding this solicitation must be submitted in writing and received no later than Monday, March 09, 2026, at 12:00 pm, Pacific Time to allow replies to reach all prospective offerors in a timely manner. All RFIs must be sent via email to David Rovner at David.rovner@va.gov and Copy: Charee.harris@va.gov .

RFIs will be responded to as necessary in amendment format and will be posted on SAM.gov. No questions will be answered after the date/time above unless determined to be in the best interest of the Government as determined by the Contracting Officer. Telephone requests for information will not be accepted or returned.

5. PRE-PROPOSAL SITE VISIT:

Potential Offerors are strongly urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing these services. In no event will failure to inspect the site constitute grounds for a claim after contract award. See the attached Site Visit Information PowerPoint and FAR Provision 52.237-1 for all site visit information. This pre-proposal site visit will be the only opportunity for potential offerors to visit the site. All potential contractors, subcontractors, and suppliers are strongly encouraged to attend this pre-proposal site visit.

The only pre-proposal site visit is scheduled for March 02, 2026, at 09:00 AM PST. Potential offerors are to meet the COR in the valet parking area next to the Northwest. This will be the only opportunity for potential offerors to visit the site. All potential offerors, subcontractors, and suppliers are strongly encouraged and expected to attend the pre-offer site visit.

6. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://sam.gov/SAM/ and enter all mandatory information into the system. Award cannot be made until the contractor has been registered. Offerors must ensure that they are registered in SAM prior to submitting their proposal. (See FAR 4.1102).

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

7. ADDITIONAL SBA INFORMATION:

(a) Eligibility of SDVOSBs continues to be governed by the Small Business Administration regulations, 13 CFR subparts 125.8 through 125.13, as well as the FAR, except where expressly directed otherwise by the VAAR, and 38 CFR verification regulations for SDVOSBs.

(b) At the time of submission of offer, the offeror must represent to the contracting officer that it is a—

(1) SDVOSB concern

(2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and

(3) Offerors must be verified in the SBA Veteran Small Business Certification Program as an SDVOSB to be eligible for an award. The Contracting Officer (CO) will use the SBA Dynamic Small Business Search (SBA DSBS) (https://dsbs.sba.gov/search/dsp_dsbs.cfm ) to verify SDVOSB status until further guidance is provided by the Department of Veterans Affairs.

(c) A joint venture may be considered an SDVOSB or VOSB concern if

(1) At least one member of the joint venture is an SDVOSB or VOSB concern, and makes the representations in paragraph (b) of this section;

(2) Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement;

(3) The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in FAR 19.101; and

(4) The joint venture meets the requirements of 13 CFR 125.15(b), modified to include Veteran-owned small businesses where this CFR section refers to SDVOSB concerns.

(d) Any SDVOSB or VOSB concern (nonmanufacturer) must meet the requirements in FAR 19.102(f) to receive a benefit under this program.

8. VETS 4212:

Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at: http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.

9. JOINT VENTURES: See 13 C.F.R. § 121.103(h)

(h) Affiliation based on joint ventures. A joint venture is an association of individuals and/or concerns with interests in any degree or proportion consorting to engage in and carry out no more than three specific or limited-purpose business ventures for joint profit over a two year period, for which purpose they combine their efforts, property, money, skill, or knowledge, but not on a continuing or permanent basis for conducting business generally.

This means that a specific joint venture entity generally may not be awarded more than three contracts over a two-year period, starting from the date of the award of the first contract, without the partners to the joint venture being deemed affiliated for all purposes. Once a joint venture receives one contract, SBA will determine compliance with the three awards in two years rule for future awards as of the date of initial offer including price.

As such, an individual joint venture may be awarded more than three contracts without SBA finding general affiliation between the joint venture partners where the joint venture had received two or fewer contracts as of the date it submitted one or more additional offers which thereafter result in one or more additional contract awards. The same two (or more) entities may create additional joint ventures, and each new joint venture entity may be awarded up to three contracts in accordance with this section. At some point, however, such a longstanding inter-relationship or contractual dependence between the same joint venture partners will lead to a finding of general affiliation between and among them.

For purposes of this provision and in order to facilitate tracking of the number of contract awards made to a joint venture, a joint venture must be in writing and must do business under its own name, and it may (but need not) be in the form of a separate legal entity, and if it is a separate legal entity it may (but need not) be populated (i.e., have its own separate employees). SBA may also determine that the relationship between a prime contractor and its subcontractor is a joint venture, and that affiliation between the two exists, pursuant to paragraph (h)(4) of this section.

10. NOTICE TO PROCEED (NTP): A notice to proceed (NTP) must be issued after award of a fully executed contract. The NTP date and time are “to be determined” after award to a successful offeror. Primary factor in determination to issue NTP must be the Prime Contractor submission of, and the Government review and approval of both Payment and Performance Bonds, both of which are enforceable legal documents.

11 . SECURITY REQUIREMENTS (GENERAL):

1. All personnel employed by the contractor in the performance of work, issued under this contract, or any representative of the contractor must abide by all security instructions and directives of the Department of Veterans Affairs. Employees are responsible for safeguarding all government property provided for contractor use.

1. At the close for each work period, government facilities, equipment and materials must be secured, lights, and all doors and window secured.

1. The contractor and, as applicable, subcontractor must not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the station/campus and its population, nor must the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during background checks.

1. Contractors must ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities.

1. Contractor Badge Policies: All requests for contractor ID badges will be submitted through the station COR, and Police/Security office.

1. Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the station/campus. All vehicles entering the station/campus are subject to search. Any refusal or non-consent by an employee will result in termination of their access and immediate confiscation of their ID badge.

12. BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:

All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform the statement of work is: Low Risk. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor.

13. REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER:

Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”

End of Instructions to Offerors

2.3 Information Regarding Bidding Bonds and Bid Guarantee

This requirement is being solicited utilizing the procedure outlined in FAR 16.202 Firm Fixed Price Contracts. The Government intends to solicit all eligible SDVOSBs on the Open Market thereby providing Fair Opportunity as required by FAR 16.202 Firm Fixed Price Contracts. The selection will be a price with a phasing schedule. One firm-fixed price construction contract will be awarded as a result of this solicitation.

BID GUARANTEE:

Electronic submission of the Bid Guarantee via email is authorized and required. Bid Guarantee part must include an electronic copy of the bid guarantee scanned in a manner that the raised notary seals are all clearly visible. A bid guarantee must be submitted in a form of bid bond by the proposal submission due date and time.

PERFORMANCE & PAYMENT BONDS:

Bid Bonds, Payment Bonds, and Performance Bonds are all required.

LIQUIDATED DAMAGES:

Not Applicable

REPRESENTATIONS AND CERTIFICATIONS

3.1 SUPPLEMENTAL INSURANCE REQUIREMENTS

In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:

(a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

(b) General Liability: $500,000.00 per occurrences.

(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.

(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.

(End of Clause)

3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) (DEVIATION NOV 2025)

(a) Definitions. As used in this provision— Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

Federal contracts and grants with total value greater than $10,000,000 means—

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(b) The offeror □ has □ does not have current active Federal contracts and grants with total value greater than $10,000,000.

(c) If the offeror checked "has" in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .