Attachment I - Pricing Breakdown 36C26126R0025.docx

DOCX document 54 KB Posted

Attached to
Repair Road Cracks and Slurry Seal
Solicitation number
36C26126R0025_3
Issued by

About this file

This is a Price Breakdown template for RFP No. 36C26126R0025 related to construction services for road crack repair and slurry seal work at the VA Las Vegas Medical Center in North Las Vegas, Nevada. The template is designed to capture labor and material costs organized by the MasterFormat Division structure, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, Utilities, Transportation, and Electrical Power Generation. Each division section requires contractors to input the number of personnel, hourly rates, number of hours, total labor costs, quantity of materials, and total material costs.

The template culminates in a summary section that aggregates all division subtotals and applies overhead, profit, and bonds and insurance calculations to arrive at a total offer price. This blank template serves as the pricing submission format that bidders must complete and return with their proposals. The RFP due date is March 24, 2026 by 12:00 PM PDT, with proposals to be submitted to david.rovner@va.gov and charee.harris@va.gov. A mandatory site visit is scheduled for March 2, 2026 at 9:00 AM PDT, and an RFI due date of March 9, 2026 by 12:00 PM PDT is also established.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 36C26126R0025 PRICE BREAKDOWN

RFP No. 36C26126R0025 PRICE BREAKDOWN

PRICE BREAKDOWN

Repair Road Cracks and Slurry Seal, Las Vegas, NV

DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

01. General Requirements (Division 01)

A. Project Manager

$
$

B. Superintendent

$
$

C. General Requirements

$
$

D. Mobilization

$
$

E. Premium After Hours Work

$
$

F. Infection Control (ICRA)

$
$

G. Storage Container/Office (rent)

$
$

H. Dumpster (rent)

$
$

I. Design Fee (Engineer stamped shop drawings)

$
$
$
$
$
$
$
$
$
$
$
$

01. General Requirements Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

02. Existing Conditions (Division 02)

$
$
$
$
$
$
$
$
$
$

02. Existing Conditions Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

03. Concrete (Division 03)

$
$
$
$
$
$
$
$

03. Concrete Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

04. Masonry (Division 04)

$
$
$
$
$
$
$
$

04. Masonry Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

05. Metals (Division 05)

$
$
$
$
$
$
$
$

05. Metals Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

06. Wood and Plastic (Division 06)

$
$
$
$
$
$
$
$

06. Wood and Plastic Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

07. Thermal and Moisture Protection (Division 07)

$
$
$
$
$
$
$
$

07. Thermal and Moisture Protection Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

08. Doors and Windows (Division 08)

$
$
$
$
$
$
$
$

08. Doors and Windows Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

09. Finishes (Division 09)

$
$
$
$
$
$
$
$

09. Finishes Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

08. Specialties (Division 10)

$
$
$
$
$
$
$
$

10. Specialties Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

11. Equipment (Division 11)

$
$
$
$
$
$
$
$

11. Equipment Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

12. Furnishings (Division 12)

$
$
$
$
$
$
$
$

12. Furnishing Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

13. Special Construction (Division 13)

$
$
$
$
$
$
$
$

13. Special Construction Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

14. Conveying Equipment (Division 14)

$
$
$
$
$
$
$
$

13. Conveying Equipment Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

14. Fire Suppression (Division 21)

$
$
$
$
$
$
$
$

14. Fire Suppression Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

15. Plumbing (Division 22)

$
$
$
$
$
$

15. Plumbing Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

16. Heating, Ventilating, and Air Conditioning (Division 23)

$
$
$
$
$
$

16. Heating, Ventilating, and Air Conditioning Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

17. Integrated Automation (Division 25)

$
$
$
$
$
$

17. Integrated Automation Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

18. Electrical (Division 26)

$
$
$
$
$
$

18. Electrical Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

19. Communications (Division 27)

$
$
$
$
$
$

19. Communications Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

20. Electronic Safety and Security (Division 28)

$
$
$
$
$
$

20. Electronic Safety and Security Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

21. Earthwork (Division 31)

$
$
$
$
$
$

21. Earthwork Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

22. Exterior Improvements (Division 32)

$
$
$
$
$
$

22. Exterior Improvements Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

23. Utilities (Division 33)

$
$
$
$
$
$

23. Utilities Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

24. Transportation (Division 34)

$
$
$
$
$
$

24. Transportation Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

25. Electrical Power Generation (Division 48)

$
$
$
$
$
$

25. Electrical Power Generation Subtotal

$
$

SUB TOTAL (Items 1 – 25)

Overhead

$
$

Profit

$
$

Bonds and Insurance

$
$

Total

$
$

TOTAL OFFER

Note: All other costs may be included as a separate item and shall be specified in this breakdown.

File details come from the government source that posted it. Updated .