Roadside Vegetation Management - USDA Grant Project Summary

This is a Project Plans and Specifications document issued by the Town of Los Gatos for roadside vegetation management services funded through a USDA grant (CIP# 8115). The project involves treatment of 22.3 miles of roadway within high and very high fire hazard severity zones throughout the Town of Los Gatos, California. The primary scope of work includes removal, chipping, and disposal of brush and live and dead trees along the project route, as well as removal of approximately 110 eucalyptus trees. Electronic bids are due by Wednesday, September 2, 2026, at 2:00 pm via the Town's electronic bidding portal (https://procurement.opengov.com/portal/losgatosca), with bids to be opened and publicly read aloud during a Zoom meeting immediately following closure. The work must be fully completed within 120 calendar days from the Notice to Proceed, with an anticipated start date of October 13, 2026. The successful bidder must possess a valid California contractor's license in classification D-49 and must be registered with the California Department of Industrial Relations to perform public work.

The estimated construction cost is approximately $1,000,000. Bid security of 10% of the maximum bid amount is required, submitted as a cashier's check, certified check, or bid bond. The successful bidder must provide payment and performance bonds, each for 100% of the contract price, within ten days of the Notice of Potential Award. The project is subject to California prevailing wage requirements, with prevailing wage rates available on the DIR website. A 5% retention rate will be applied to progress payments. Liquidated damages are assessed at $200 per day for each day of unexcused delay beyond the contract time. The prime contractor must perform at least 80% of the work with its own forces, with any specialty work performed by qualified subcontractors. All subcontractors must be registered with DIR and obtain a Town business license. The project includes requirements for commercial general liability insurance ($2,000,000 per occurrence/$4,000,000 aggregate), automobile liability ($2,000,000 combined single-limit), workers' compensation, and pollution liability ($2,000,000) insurance. The contract is subject to federal terms and conditions associated with USDA grant funding.

View the file

Other files

File Type Posted
C-Labor_Performance_Bonds.pdf PDF
F-Federal_Terms.pdf PDF
G2-2026_Environmental_Update.pdf PDF
I-Storm_Water_Pollution_Control_Ordinance.pdf PDF
E-USDA_Terms.pdf PDF
Scope.pdf PDF
D-USDA_Agreement.pdf PDF
G1-2023_CEQA.pdf PDF
H-Blueprint_for_a_Clean_Bay.pdf PDF
Sample_Contract.pdf PDF
00-Form_AD-1048_(to_be_Submitted_with_Bid_Proposal).pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT

PLANS AND SPECIFICATIONS

FOR

ROADSIDE VEGETATION MANAGEMENT - USDA

GRANT

CIP# 8115

Bid Opening

Wednesday, September 2, 2026, 2:00 pm

ISSUE DATE: August 7, 2026

PPW Projects - Formal bids #CIP# 8115 Title: Roadside Vegetation Management - USDA Grant

ROADSIDE VEGETATION MANAGEMENT - USDA GRANT

# CIP# 8115

TABLE OF CONTENTS

1. NOTICE INVITING BIDS

2. Instructions to Bidders

3. Bid Schedule

4. Vendor Questionnaire

5. General Conditions

6. Special Conditions

7. General Constructions Requirements

Attachments:

A - Form_AD-1048_(to_be_Submitted_with_Bid_Proposal)

B - Scope

C - Sample Contract

D - Labor_Performance_Bonds

E - USDA_Agreement

F - USDA_Terms

G - Federal_Terms

H - 2023_CEQA

I - 2026_Environmental Update

J - Blueprint_for_a_Clean_Bay

K - Storm_Water_Pollution_Control_Ordinance

1. NOTICE INVITING BIDS

1.1. Bid Submission

The Town of Los Gatos (“Town”) will accept electronic bids for its Roadside Vegetation Management - USDA Grant

Project CIP# 8115 (“Project”), by or before Wednesday, September 2, 2026, at 2:00 pm, via the Town’s bidding site at https://procurement.opengov.com/portal/losgatosca, at which time the bids will be opened electronically, as further specified in the Instructions to Bidders.

1.2. Project Information

A. Location and Description - The Project is located throughout the Town of Los Gatos and involves the treatment of 22.3 miles of roadway within the high and very high fire hazard severity zones, as described in Attachment B, incorporated herein.

B. Time for Final Completion - The Project must be fully completed within 120 calendar days from the start date set forth in the Notice to Proceed. Town anticipates that the Work will begin on or about October 13, 2026 but the anticipated start date is provided solely for convenience and is neither certain nor binding.

C. Estimated Cost. The estimated construction cost is approximately $1,000,000.

1.3. License and Registration Requirements

A. License - This Project requires a valid California contractor’s license for the following classification(s): D-49.

B. DIR Registration - Town may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations (“DIR”) to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions.

1.4. Contract Documents

The plans, specifications, bid forms and contract documents for the Project, and any addenda thereto (“Contract

Documents”) may be downloaded from Town’s bidding site https://procurement.opengov.com/portal/losgatosca.

Printed copy of the Contract Documents is not available from the Town.

1.5. Bid Security

The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier’s or certified check made payable to Town, or a bid bond executed by a surety licensed to do business in the

State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after Town issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, valid Certificates of Reported

Compliance as required under the California Air Resources Board’s In-Use Off-Road Diesel-Fueled Fleets Regulation (13

CCR § 2449 et seq.) (“Off-Road Regulation”), if applicable, and any other submittals required by the Contract Documents and as specified in the Notice of Potential Award.

1.6. Prevailing Wage Requirements

A. General - Pursuant to California Labor Code § 1720 et seq., this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type https://procurement.opengov.com/portal/losgatosca https://procurement.opengov.com/portal/losgatosca of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes.

B. Rates - The prevailing rates are on file with the Town and are available online at http://www.dir.ca.gov/DLSR.

Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half.

C. Compliance - The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor

Code § 1771.4.

1.7. Retention

The percentage of retention that will be withheld from progress payments is 5 %.

1.8. Performance and Payment Bonds

The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents.

1.9. Substitution of Securities

Substitution of appropriate securities in lieu of retention amounts from progress payments is permitted under Public

Contract Code § 22300

1.10. Subcontractor List

Each Subcontractor must be registered with the DIR to perform work on public projects. Each bidder must submit a completed Subcontractor List form with its Bid Proposal, including the name, location of the place of business, California contractor license number, DIR registration number, and portion of the Work to be performed for each Subcontractor that will perform Work or service, or fabricate or install Work for the prime contractor in excess of one-half of 1% of the bid price, using the Subcontractor List form included with the Contract Documents.

1.11. Instructions to Bidders

All bidders should carefully review the Instructions to Bidders for more detailed information before submitting a Bid

Proposal. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, as defined therein, including this Notice Inviting Bids.

By: /s/ Wendy Wood, Town Clerk

Publication Date: Friday, August 7, 2026 http://www.dir.ca.gov/DLSR

2. Instructions to Bidders

Each Bid Proposal submitted to Town of Los Gatos (“Town”) for its Roadside Vegetation Management - USDA Grant

Project #CIP# 8115 (“Project”) must be submitted in accordance with the following instructions and requirements:

2.1. Bid Submission

A. General - Each bidder must register for an account on the Town’s bidding site, https://procurement.opengov.com/portal/losgatosca to submit the Bid Proposal electronically. Plans, Specifications, and Addendums (if any) may be viewed and downloaded free of charge via the internet at https://procurement.opengov.com/portal/losgatosca. To be included on the Plan Holder’s List for the Project, registered users must download the Plans and Specifications from the bidding website. Each Bid Proposal must be completed and submitted electronically through the bidding site, with all required forms and attachments, by or before the date and time set forth in Section 1 of the Notice Inviting Bids, or as amended by subsequent addendum. Faxed or emailed Bid Proposals will not be accepted. Late submissions will not be considered. Town reserves the right to postpone the date or time for receiving or opening bids. Each bidder is solely responsible for all of its costs to prepare and submit its bid and by submitting a bid waives any right to recover those costs from Town. The bid price(s) must include all costs to perform the Work as specified, including all labor, material, supplies, and equipment and all other direct or indirect costs such as applicable taxes, insurance and overhead.

B. Bid Opening - Bids timely submitted via the Town’s bidding portal will be opened and publicly read aloud during a Zoom meeting after bids have closed on the day and time listed above. Here is the Zoom link to participate:

https://losgatosca-gov.zoom.us/j/82958074942

A. DIR Registration - Subject to limited legal exceptions for joint venture bids and federally-funded projects, Town may not accept a Bid Proposal from a bidder without proof that the bidder is registered with the DIR to perform public work under Labor Code § 1725.5. If Town is unable to confirm that the bidder is currently registered with the DIR, Town may disqualify the bidder and disregard its bid. (Labor Code §§ 1725.5 and 1771.1(a).)

2.2. Bid Proposal

Each Bid Proposal must be completed using the Bid Proposal form included with the Contract Documents. The Bid Proposal form must be fully completed without interlineations, alterations, or erasures. A Bid Proposal submitted with exceptions or terms such as “negotiable,” “will negotiate,” or similar, will be considered nonresponsive. Each Bid Proposal must be accompanied by bid security, as set forth in Section titled "Bid Security" below, and by a completed Subcontractor List and

Non-Collusion Declaration using the forms included with the Contract Documents, and any other required enclosures, as applicable. Attention is specifically called to Form AD-1048 in the Attachments, which must be included with the proposal.

The Bid Proposal must be electronically signed by the bidder’s authorized representative as directed on the Bid Proposal.

Those submitting the Bid Proposal must have full authority to bind the Submitter to the terms of the Bid Proposal.

2.3. Bid Security

Each Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier’s check or certified check, made payable to the Town, or bid bond using the form included in the Contract

Documents and executed by a surety licensed to do business in the State of California. The bid security must guarantee that, within ten days after issuance of the Notice of Potential Award, the bidder will: execute and submit the enclosed

Contract for the bid price; submit payment and performance bonds for 100% of the maximum Contract Price; submit the https://procurement.opengov.com/portal/losgatosca insurance certificates and endorsements; and submit valid Certificates of Reported Compliance as required by the Off-

Road Regulation, if applicable, and any other submittals, if any, required by the Contract Documents or the Notice of

Potential Award. A Bid Proposal may not be withdrawn for a period of 60 days after the bid opening without forfeiture of the bid security, except as authorized for material error under Public Contract Code § 5100 et seq.

2.4. Liquidated Damages

As further specified in Section 5.4 of the General Conditions, if Contractor fails to complete the Work within the Contract

Time, Town will assess liquidated damages in the amount of $200 per day for each day of unexcused delay in achieving

Final Completion, and such liquidated damages may be deducted from Town’s payments due or to become due to

Contractor under this Contract.

2.5. Requests for Information

Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted through the Town’s bidding site https://procurement.opengov.com/portal/losgatosca and received a minimum of five (5) working days prior to the scheduled bid opening. Oral responses are not authorized and are not binding on the Town. Bidders should submit any such written inquiries at least five Working Days before the scheduled bid opening. Questions received any later might not be addressed before the bid deadline. An interpretation or clarification by Town in response to written inquiries will be issued in an Addendum.

2.6. Pre-Bid Investigation

A. General - Each bidder is solely responsible at its sole expense for diligent and thorough review of the Contract

Documents, examination of the Project site, and reasonable and prudent inquiry concerning known and potential site and area conditions prior to submitting a Bid Proposal. Each bidder is responsible for knowledge of conditions and requirements which reasonable review and investigation would have disclosed. However, except for any areas that are open to the public at large, bidders may not enter property owned or leased by the Town or the Project site without prior written authorization from Town.

B. Document Review - Each bidder is responsible for review of the Contract Documents and any informational documents provided “For Reference Only,” e.g., as-builts, technical reports, test data, and the like. A bidder is responsible for notifying Town of any errors, omissions, inconsistencies, or conflicts it discovers in the Contract

Documents, acting solely in its capacity as a contractor and subject to the limitations of Public Contract Code §

1104. Notification of any such errors, omissions, inconsistencies, or conflicts must be submitted in writing to the

Town no later than five Working Days before the scheduled bid opening. (See Section 5, above.) Town expressly disclaims responsibility for assumptions a bidder might draw from the presence or absence of information provided by Town.

C. Project Site - Questions regarding the availability of soil test data, water table elevations, and the like should be submitted to the Town through the bidding site, as specified in Section 5, above. Any subsurface exploration at the Project site must be done at the bidder’s expense, but only with prior written authorization from Town. All soil data and analyses available for inspection or provided in the Contract Documents apply only to the test hole locations. Any water table elevation indicated by a soil test report existed on the date the test hole was drilled.

The bidder is responsible for determining and allowing for any differing soil or water table conditions during construction. Because groundwater levels may fluctuate, difference(s) in elevation between ground water shown in soil boring logs and ground water actually encountered during construction will not be considered changed Project site conditions. Actual locations and depths must be determined by bidder’s field investigation.

The bidder may request access to underlying or background information on the Project site in Town’s possession that is necessary for the bidder to form its own conclusions, including, if available, record drawings or other documents indicating the location of subsurface lines, utilities, or other structures.

D. Utility Company Standards - The Project must be completed in a manner that satisfies the standards and requirements of any affected utility companies or agencies (collectively, “utility owners”). The successful bidder may be required by the third party utility owners to provide detailed plans prepared by a California registered civil engineer showing the necessary temporary support of the utilities during coordinated construction work.

Bidders are directed to contact the affected third party utility owners about their requirements before submitting a Bid Proposal.

2.7. Bidders Interested in More Than One Bid

No person, firm, or corporation may submit or be a party to more than one Bid Proposal unless alternate bids are specifically called for. However, a person, firm, or corporation that has submitted a subcontract proposal or quote to a bidder may submit subcontract proposals or quotes to other bidders.

2.8. Addenda

Subject to the limitations of Public Contract Code § 4104.5, Town reserves the right to issue addenda prior to bid time.

Any addenda issued prior to the bid opening are part of the Contract Documents. S Each bidder is solely responsible for ensuring it has received and reviewed all addenda prior to submitting its bid. Bidders should check Town’s bidding site periodically for any addenda or updates on the Project at https://procurement.opengov.com/portal/losgatosca.

2.9. Brand Designations and “Or Equal” Substitutions

Any specification designating a material, product, thing, or service by specific brand or trade name, followed by the words “or equal,” is intended only to indicate quality and type of item desired, and bidders may request use of any equal material, product, thing, or service. All data substantiating the proposed substitute as an equal item must be submitted with the written request for substitution. A request for substitution must be submitted within 35 days after Notice of

Potential Award unless otherwise provided in the Contract Documents. This provision does not apply to materials, products, things, or services that may lawfully be designated by a specific brand or trade name under Public Contract

Code § 3400(c).

2.10. Bid Protest

Any bid protest against another bidder must be submitted in writing via email to Gary Heap, Town Engineer, at gheap@losgatosca.gov and received by Town before 5:00 p.m. no later than two Working Days following bid opening

(“Bid Protest Deadline”) and must comply with the following requirements:

A. General - Only a bidder who has actually submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. For purposes of this Section 10, a

“Working Day” means a day that Town is open for normal business, and excludes weekends and holidays observed by Town. Pursuant to Public Contract Code § 4104, inadvertent omission of a Subcontractor’s DIR registration number on the Subcontractor List form is not grounds for a bid protest, provided it is corrected within 24 hours of the bid opening or as otherwise provided under Labor Code § 1771.1(b).

mailto:gheap@losgatosca.gov

B. Protest Contents - The bid protest must contain a complete statement of the basis for the protest and must include all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered.

The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the protesting bidder and any person submitting the protest on behalf of or as an authorized representative of the protesting bidder.

C. Copy to Protested Bidder - Upon submission of its bid protest to Town, the protesting bidder must also concurrently transmit the protest and all supporting documents to the protested bidder, and to any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest, by email or hand delivery to ensure delivery before the Bid Protest Deadline.

D. Response to Protest - The protested bidder may submit a written response to the protest, provided the response is received by Town before 5:00 p.m., within two Working Days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must attach all supporting documentation. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person responding on behalf of or representing the protested bidder if different from the protested bidder.

E. Copy to Protesting Bidder - Upon submission of its response to the bid protest to the Town, the protested bidder must also concurrently transmit by email or hand delivery, by or before the Response Deadline, a copy of its response and all supporting documents to the protesting bidder and to any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.

F. Exclusive Remedy - The procedure and time limits set forth in this Section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings.

G. Right to Award - Town reserves the right, acting in its sole discretion, to reject any bid protest that it determines lacks merit, to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a Notice to Proceed with the Work notwithstanding any pending or continuing challenge to its determination.

2.11. Reservation of Rights

Town reserves the unfettered right, acting in its sole discretion, to waive or to decline to waive any immaterial bid irregularities; to accept or reject any or all bids; to cancel or reschedule the bid; to postpone or abandon the Project entirely; or to perform all or part of the Work with its own forces. The Contract will be awarded, if at all, within 60 days after opening of bids or as otherwise specified in the Special Conditions, to the responsible bidder that submitted the lowest responsive bid. Any planned start date for the Project represents the Town’s expectations at the time the Notice

Inviting Bids was first issued. Town is not bound to issue a Notice to Proceed by or before such planned start date, and it reserves the right to issue the Notice to Proceed when the Town determines, in its sole discretion, the appropriate time for commencing the Work. The Town expressly disclaims responsibility for any assumptions a bidder might draw from the presence or absence of information provided by the Town in any form. Each bidder is solely responsible for its costs to prepare and submit a bid, including site investigation costs.

2.12. Bonds

Within ten calendar days following Town’s issuance of the Notice of Potential Award to the successful bidder, the bidder must submit payment and performance bonds to Town as specified in the Contract Documents using the bond forms included in the Contract Documents. All required bonds must be calculated on the maximum total Contract Price as awarded, including additive alternates, if applicable.

2.13. License(s)

The successful bidder and its Subcontractor(s) must possess the California contractor’s license(s) in the classification(s) required by law to perform the Work. The successful bidder must also obtain a Town business license within ten (10) days following Town’s issuance of the Notice of Potential Award. Subcontractors must also obtain a Town business license before performing any Work.

2.14. Ineligible Subcontractor

Any Subcontractor who is ineligible to perform work on a public works project under Labor Code §§ 1777.1 or 1777.7 is prohibited from performing work on the Project.

2.15. Safety Orders

If the Project includes construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five feet or deeper, each bid must include a bid item for adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life or limb, which comply with safety orders as required by Labor Code § 6707.

2.16. In-Use Off-Road Diesel-Fueled Fleets

If the Project involves the use of vehicles subject to the California Air Resources Board’s In-Use Off-Road Diesel-Fueled

Fleets Regulation (13 CCR § 2449 et seq.) (“Off-Road Regulation”), then within ten calendar days following Town’s issuance of the Notice of Potential Award to the successful bidder, the bidder must submit to Town valid Certificates of

Reported Compliance for its fleet and its listed Subcontractors, if applicable, in accordance with the Off-Road Regulation, unless exempt under the Off-Road Regulation.

2.17. Subcontractor Work Limits

The prime contractor must perform at least 80% of the Work on the Project, calculated as a percentage of the base bid price, with its own forces, except for any Work identified as “Specialty Work” in the Contract Documents. The total bid amount for any such Specialty Work, as shown on the Bid Schedule, may be deducted from the base bid price before computing the 80% self-performance requirement. The remaining Work may be performed by qualified

Subcontractor(s).

2.18. Additive and Deductive Alternates

As required by Public Contract Code § 20103.8, if this bid solicitation includes additive or deductive items, the following method will be used to determine the lowest bid: The lowest bid will be the lowest bid price on the base contract without consideration of the prices on the additive or deductive items.

2.19. Bid Schedule

Each bidder must complete the Bid Schedule form with unit prices as indicated, and submit the completed Bid Schedule with its Bid Proposal.

A. Estimated Quantities - Unless identified as a “Final Pay Quantity,” the quantities shown on the Bid Schedule are estimated and the actual quantities required to perform the Work may be greater or less than the estimated amount. The Contract Price will be adjusted to reflect the actual quantities required for the Work based on the itemized or unit prices provided in the Bid Schedule, with no allowance for anticipated profit for quantities that are deleted or decreased, and no increase in the unit price, and without regard to the percentage increase or decrease of the estimated quantity and the actual quantity.

2.20. For Reference Only

The following documents are provided “For Reference Only,” as defined in Section 3.4 of the General Conditions:

• ATTACHMENT G - Blueprint for a Clean Bay

• ATTACHMENT H - Town of Los Gatos Storm Water Pollution Control Ordinance

3. Bid Schedule

This Bid Schedule must be completed and included with the Bid Proposal. Pricing must be provided for each Bid Item as indicated. Items marked “(SW)” are Specialty Work that must be performed by a qualified Subcontractor. The lump sum or unit cost for each item must be inclusive of all costs, whether direct or indirect, including profit and overhead. The sum of all amounts entered in the “Extended Total Amount” column must be identical to the Base Bid price entered in

Section 1 of the Bid Proposal form.

AL = Allowance CF = Cubic Feet CY = Cubic Yard EA = Each LB = Pounds LF = Linear Foot LS = Lump Sum SF = Square Feet TON = Ton (2000 lbs)

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Roadside vegetation management -remove, chip and dispose of brush and live and dead trees

22.3 mile

2 Remove eucalyptus trees along project route 110 tree

TOTAL

4. Vendor Questionnaire

1. Formation date of company*

*Response required

2. Number of years providing the specified services*

*Response required

3. Please list names and titles of all officers and directors. If an individual or partnership, please list names and addresses of all partners, indicating whether they are general or limited partners.*

*Response required

4. Indicate whether Proposer has ever failed to complete any Agreement awarded to it. If so, note when, where, and why. Attach additional sheets, if necessary. *

*Response required

5. Indicate whether Proposer has been or is the subject of a bankruptcy or insolvency proceeding or subject to assignment for the benefit of creditors. *

*Response required

6. Will you be using subcontractor/s?*

☐ Yes

☐ No

*Response required

When equals "Yes"

6.1. Subcontractor's list*

Please download the below documents, complete, and upload.

• Subsontractors_list.pdf

*Response required

7. Please provide Bid Bond*

Please download the below documents, complete, and upload.

• bid_bond.pdf

*Response required

8. Noncollusion Declaration*

Please download the below documents, complete, and upload.

• Noncollusion_declaration_fo...

*Response required

9. Bidder’s Certifications and Warranties. *

By confirming and submitting this Bid Proposal, Bidder certifies and warrants the following:

A. Examination of Contract Documents. Bidder has thoroughly examined the Contract Documents and represents that, to the best of Bidder’s knowledge, there are no errors, omissions, or discrepancies in the Contract

Documents, subject to the limitations of Public Contract Code § 1104.

B. Addenda. Bidder agrees that it has confirmed receipt of or access to, and reviewed, all addenda issued for this bid. Bidder waives any claims it might have against the Town based on its failure to receive, access, or review any addenda for any reason.

C. Examination of Worksite. Bidder has had the opportunity to examine the Worksite and local conditions at the

Project location.

D. Bidder Responsibility. Bidder is a responsible bidder, with the necessary ability, capacity, experience, skill, qualifications, workforce, equipment, and resources to perform or cause the Work to be performed in accordance with the Contract Documents and within the Contract Time.

E. Responsibility for Bid. Bidder has carefully reviewed this Bid Proposal and is solely responsible for any errors or omissions contained in its completed bid. All statements and information provided in this Bid Proposal and enclosures are true and correct to the best of Bidder’s knowledge.

F. Nondiscrimination. In preparing this bid, the Bidder has not engaged in discrimination against any prospective or present employee or Subcontractor on grounds of race, color, ancestry, national origin, ethnicity, religion, sex, sexual orientation, age, disability, or marital status.

G. Iran Contracting Act. If the Contract Price exceeds $1,000,000, Bidder is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.

https://government-project.s3.us-west-2.amazonaws.com/84832/25d81afc-a9ce-48f1-9486-1d729224fbf8_Subsontractors_list.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LKHFMLWZ%2F20260807%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260807T202244Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIANafOcn6AIrm2ItT3JYzl1sysJOBBjChi2BimMOc30wAiEA0IFeJo%2FmnxhpytQtQdpGbU0QHGc0EIO%2FjN27ZpRkGWkqjAUIXBACGgw4OTIzNjQ2ODc2NzIiDH3S1pq4nQv6VoyBuirpBAi8AKAcREg450iTHK5vblgpR5m5G5BPPuxB6IYJiIZT0SFkNdHhluvwWlMHNz7MCXX%2Fn%2F%2FrRJJSz7NCwJUc77u2DzFYEBkvRWKnF09FI2HWKsjORtjWMMUinuRx5Aa6O0nNzhQrKtfxpT4LhYl5xTig44W7TNJ%2BbFm9Hc5FZMohtjhhgQQHQv22rH2%2BK538GdfDY1budOy31560VzhWpDi3N%2F5A8hVsW4ohkqJnngw20EYNlgMrNcjACXsOYZP7kWx%2FSxKeOAig3ySLs84jh5dLIQ90t3drf2TYHq%2F2trbchkjZaGmVFhFYHt4fi3m2ricr6sZqUhNx2d%2FkgvPdPZ7yvqUpcv%2FaATP2Sl7GmSGfAWfDj7ECaoIkNOcfokMBREbVtybuNuhSpQE13cHWmHm4J7ix7uf0twZCkXqrQxCcB7mhsRMdlaXthrDWVRpMs7rR%2Bbbwn7VWnzg5ko%2FK%2FUiVE7UctGCmpMR3IJDwy5VcjXZFkiMXRQUilemdcg5D6MvjS3BNxFo%2Fm0wOePDqQxlvd8rzhHN3Qr1Mwr2vi%2B0qAHvsyuGE6MDlqWAUZ8gDcPaYZADWmF3Jzm5g2ZNyLSaJRfE2VQCnsRPlG0eZxZVTzKADn%2BxYBskZFGOJrM%2BVvoGf7KuC6NicQ8BCmKqJ4GPpcUVL7hfpNaaHFj2UIigA%2FecOIJHh1fzTSG3Bn80jBcCAXQQHp55%2FZmbNXDcaSM8%2F7j8EFMvwmViycsRoIZBx%2BagcMt8ZFJO9tfLz8cOBUGcCKnsGJmSujIM%2BwQ5bJVncumMJWcWg1HtvbQv7vgYlFdLtfUqEnjq0MO%2FP2NMGOpkBIrENmf%2FcXNBdMsUo29xEy38XltcjdYFIeXfERurC26is3wwyy6P8n%2FEKHEKtdKRvgIpoMrNw1pJmwbnmvF7vR21iF0KzyutG%2Fp9KWMMb50KrvSqcx8xnvEt0WjECthWnovormDy9Xed6zZy9fAUr1t%2FCwic77G0WbyVZRW2kcVe3J4pbWxpkqO4qslNwIaoKhczxKZPaQDkh&X-Amz-Signature=31be0e5ef8533b4a560ae53bd8cb9225196be843cc2dcad8776c073ccca9c415&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Subsontractors_list.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/84832/1a0b1765-e5c2-498c-b241-e0c627072d0a_bid_bond.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LKHFMLWZ%2F20260807%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260807T202244Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIANafOcn6AIrm2ItT3JYzl1sysJOBBjChi2BimMOc30wAiEA0IFeJo%2FmnxhpytQtQdpGbU0QHGc0EIO%2FjN27ZpRkGWkqjAUIXBACGgw4OTIzNjQ2ODc2NzIiDH3S1pq4nQv6VoyBuirpBAi8AKAcREg450iTHK5vblgpR5m5G5BPPuxB6IYJiIZT0SFkNdHhluvwWlMHNz7MCXX%2Fn%2F%2FrRJJSz7NCwJUc77u2DzFYEBkvRWKnF09FI2HWKsjORtjWMMUinuRx5Aa6O0nNzhQrKtfxpT4LhYl5xTig44W7TNJ%2BbFm9Hc5FZMohtjhhgQQHQv22rH2%2BK538GdfDY1budOy31560VzhWpDi3N%2F5A8hVsW4ohkqJnngw20EYNlgMrNcjACXsOYZP7kWx%2FSxKeOAig3ySLs84jh5dLIQ90t3drf2TYHq%2F2trbchkjZaGmVFhFYHt4fi3m2ricr6sZqUhNx2d%2FkgvPdPZ7yvqUpcv%2FaATP2Sl7GmSGfAWfDj7ECaoIkNOcfokMBREbVtybuNuhSpQE13cHWmHm4J7ix7uf0twZCkXqrQxCcB7mhsRMdlaXthrDWVRpMs7rR%2Bbbwn7VWnzg5ko%2FK%2FUiVE7UctGCmpMR3IJDwy5VcjXZFkiMXRQUilemdcg5D6MvjS3BNxFo%2Fm0wOePDqQxlvd8rzhHN3Qr1Mwr2vi%2B0qAHvsyuGE6MDlqWAUZ8gDcPaYZADWmF3Jzm5g2ZNyLSaJRfE2VQCnsRPlG0eZxZVTzKADn%2BxYBskZFGOJrM%2BVvoGf7KuC6NicQ8BCmKqJ4GPpcUVL7hfpNaaHFj2UIigA%2FecOIJHh1fzTSG3Bn80jBcCAXQQHp55%2FZmbNXDcaSM8%2F7j8EFMvwmViycsRoIZBx%2BagcMt8ZFJO9tfLz8cOBUGcCKnsGJmSujIM%2BwQ5bJVncumMJWcWg1HtvbQv7vgYlFdLtfUqEnjq0MO%2FP2NMGOpkBIrENmf%2FcXNBdMsUo29xEy38XltcjdYFIeXfERurC26is3wwyy6P8n%2FEKHEKtdKRvgIpoMrNw1pJmwbnmvF7vR21iF0KzyutG%2Fp9KWMMb50KrvSqcx8xnvEt0WjECthWnovormDy9Xed6zZy9fAUr1t%2FCwic77G0WbyVZRW2kcVe3J4pbWxpkqO4qslNwIaoKhczxKZPaQDkh&X-Amz-Signature=08afdb18aabc340f86415e1f9c3b84d584f90cfc695107b45258c2b68ebe8750&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22bid_bond.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/84832/4c95c0e3-5c57-4ee3-ad4b-240cfc73ff06_Noncollusion_declaration_form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LKHFMLWZ%2F20260807%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260807T202244Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIANafOcn6AIrm2ItT3JYzl1sysJOBBjChi2BimMOc30wAiEA0IFeJo%2FmnxhpytQtQdpGbU0QHGc0EIO%2FjN27ZpRkGWkqjAUIXBACGgw4OTIzNjQ2ODc2NzIiDH3S1pq4nQv6VoyBuirpBAi8AKAcREg450iTHK5vblgpR5m5G5BPPuxB6IYJiIZT0SFkNdHhluvwWlMHNz7MCXX%2Fn%2F%2FrRJJSz7NCwJUc77u2DzFYEBkvRWKnF09FI2HWKsjORtjWMMUinuRx5Aa6O0nNzhQrKtfxpT4LhYl5xTig44W7TNJ%2BbFm9Hc5FZMohtjhhgQQHQv22rH2%2BK538GdfDY1budOy31560VzhWpDi3N%2F5A8hVsW4ohkqJnngw20EYNlgMrNcjACXsOYZP7kWx%2FSxKeOAig3ySLs84jh5dLIQ90t3drf2TYHq%2F2trbchkjZaGmVFhFYHt4fi3m2ricr6sZqUhNx2d%2FkgvPdPZ7yvqUpcv%2FaATP2Sl7GmSGfAWfDj7ECaoIkNOcfokMBREbVtybuNuhSpQE13cHWmHm4J7ix7uf0twZCkXqrQxCcB7mhsRMdlaXthrDWVRpMs7rR%2Bbbwn7VWnzg5ko%2FK%2FUiVE7UctGCmpMR3IJDwy5VcjXZFkiMXRQUilemdcg5D6MvjS3BNxFo%2Fm0wOePDqQxlvd8rzhHN3Qr1Mwr2vi%2B0qAHvsyuGE6MDlqWAUZ8gDcPaYZADWmF3Jzm5g2ZNyLSaJRfE2VQCnsRPlG0eZxZVTzKADn%2BxYBskZFGOJrM%2BVvoGf7KuC6NicQ8BCmKqJ4GPpcUVL7hfpNaaHFj2UIigA%2FecOIJHh1fzTSG3Bn80jBcCAXQQHp55%2FZmbNXDcaSM8%2F7j8EFMvwmViycsRoIZBx%2BagcMt8ZFJO9tfLz8cOBUGcCKnsGJmSujIM%2BwQ5bJVncumMJWcWg1HtvbQv7vgYlFdLtfUqEnjq0MO%2FP2NMGOpkBIrENmf%2FcXNBdMsUo29xEy38XltcjdYFIeXfERurC26is3wwyy6P8n%2FEKHEKtdKRvgIpoMrNw1pJmwbnmvF7vR21iF0KzyutG%2Fp9KWMMb50KrvSqcx8xnvEt0WjECthWnovormDy9Xed6zZy9fAUr1t%2FCwic77G0WbyVZRW2kcVe3J4pbWxpkqO4qslNwIaoKhczxKZPaQDkh&X-Amz-Signature=01b582aa22d90b701e530142226b22bdf1b6cadaac2d14cbd89d9ef8dfb1e8c4&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Noncollusion_declaration_form.pdf%22&x-id=GetObject

☐ Please confirm

*Response required

10. Award of Contract*

Award of Contract. By confirming and submitting this Bid Proposal, Bidder agrees that, if Town issues the Notice of

Potential Award to Bidder, then within ten days following issuance of the Notice of Potential Award to Bidder, Bidder will do all of the following:

A. Execute Contract. Enter into the Contract with Town in accordance with the terms of this Bid Proposal, by signing and submitting to Town the Contract prepared by Town using the form included with the Contract

Documents;

B. Submit Required Bonds. Submit to Town a payment bond and a performance bond, each for 100% of the

Contract Price, using the bond forms provided and in accordance with the requirements of the Contract

Documents;

C. Insurance Requirements. Submit to Town the insurance certificate(s) and endorsement(s) as required by the

Contract Documents; and

D. Certificates of Reported Compliance. Submit to Town valid Certificates of Reported Compliance for its fleet and its listed Subcontractors, if applicable, if the Project involves the use of vehicles subject to the Off-Road

Regulation. (See Section 16 of the Instructions to Bidders.)

☐ Please confirm

*Response required

5. General Conditions

Article 1 - Definitions

Definitions - The following definitions apply to all of the Contract Documents unless otherwise indicated, e.g., additional definitions that apply solely to the Specifications or other technical documents. Defined terms and titles of documents are capitalized in the Contract Documents, with the exception of the following (in any tense or form): “day,” “furnish,”

“including,” “install,” “work day,” or “working day.”

Allowance means a specific amount that must be included in the Bid Proposal for a specified purpose.

Article, as used in these General Conditions, means a numbered Article of the General Conditions, unless otherwise indicated by the context.

Change Order means a written document duly approved and executed by Town, which changes the scope of Work, the

Contract Price, or the Contract Time.

Claim means a separate demand by Contractor for a change in the Contract Time or Contract Price, that has previously been submitted to Town in accordance with the requirements of the Contract Documents, and which has been rejected by Town, in whole or in part; or a written demand by Contractor objecting to the amount of Final Payment.

Contract means the signed agreement between Town and Contractor for performing the Work required for the Project, and all documents expressly incorporated therein.

Contract Documents means, collectively, all of the documents listed as such in Section 2 of the Contract, including the

Notice Inviting Bids; the Instructions to Bidders; addenda, if any; the Bid Proposal and attachments thereto; the

Contract; the Notice of Potential Award and Notice to Proceed; the payment and performance bonds; the General

Conditions; the Special Conditions; the Project Plans and Specifications; any Change Orders; and any other documents which are clearly and unambiguously made part of the Contract Documents. The Contract Documents do not include documents provided “For Reference Only,” or documents that are intended solely to provide information regarding existing conditions.

Contract Price means the total compensation to be paid to Contractor for performance of the Work, as set forth in the

Contract and as may be amended by Change Order or adjusted for an Allowance. The Contract Price is not subject to adjustment due to inflation or due to the increased cost of labor, material, supplies, or equipment following submission of the Bid Proposal.

Contract Time means the time specified for complete performance of the Work, as set forth in the Contract and as may be amended by Change Order.

Contractor means the individual, partnership, corporation, or joint-venture that has signed the Contract with Town to perform the Work.

Day means a calendar day unless otherwise specified.

Design Professional means the licensed individual(s) or firm(s) retained by Town to provide architectural, engineering, or other design professional services for the Project. If no Design Professional has been retained for this Project, any reference to Design Professional is deemed to refer to the Engineer.

DIR means the California Department of Industrial Relations.

Drawings has the same meaning as Plans.

Engineer means the Town Engineer and his or her authorized delegees.

Excusable Delay is defined in Section 5.3(B), Excusable Delay.

Extra Work means new or unforeseen work added to the Project, as determined by the Engineer in his or her sole discretion, including Work that was not part of or incidental to the scope of the Work when the Contractor’s bid was submitted; Work that is substantially different from the Work as described in the Contract Documents at bid time; or

Work that results from a substantially differing and unforeseeable condition.

Final Completion means Contractor has fully completed all of the Work required by the Contract Documents to the

Town’s satisfaction, including all punch list items and any required commissioning or training, and has provided the

Town with all required submittals, including the instructions and manuals, product warranties, and as-built drawings.

Final Payment means payment to Contractor of the unpaid Contract Price, including release of undisputed retention, less amounts withheld or deducted pursuant to the Contract Documents.

Furnish means to purchase and deliver for the Project.

Government Code Claim means a claim submitted pursuant to California Government Code § 900 et seq.

Hazardous Materials means any substance or material identified now or in the future as hazardous under any Laws, or any other substance or material that may be considered hazardous or otherwise subject to Laws governing handling, disposal, or cleanup.

Including, whether or not capitalized, means “including, but not limited to,” unless the context clearly requires otherwise.

Inspector means the individual(s) or firm(s) retained or employed by Town to inspect the workmanship, materials, and manner of construction of the Project and its components to ensure compliance with the Contract Documents and all

Laws.

Install means to fix in place for materials, and to fix in place and connect for equipment.

Laws means all applicable local, state, and federal laws, regulations, rules, codes, ordinances, permits, orders, and the like enacted or imposed by or under the auspices of any governmental entity with jurisdiction over any of the Work or any performance of the Work, including health and safety requirements.

Non-Excusable Delay is defined in Section 5.3(D), Non-Excusable Delay.

Plans means the Town-provided plans, drawings, details, or graphical depictions of the Project requirements, but does not include Shop Drawings.

Project means the public works project referenced in the Contract, as modified by any Project alternates elected by

Town, if any.

Project Manager means the individual designated by Town to oversee and manage the Project on Town’s behalf and may include his or her authorized delegee(s) when the Project Manager is unavailable. If no Project Manager has been designated for this Project, any reference to Project Manager is deemed to refer to the Engineer.

Recoverable Costs is defined in Section 5.3(F), Recoverable Costs.

Request for Information or RFI means Contractor’s written request for information about the Contract Documents, the

Work or the Project, submitted to Town in the manner and format specified by Town.

Section, when capitalized in these General Conditions, means a numbered section or subsection of the General

Conditions, unless the context clearly indicates otherwise.

Shop Drawings means drawings, plan details or other graphical depictions prepared by or on behalf of Contractor, and subject to Town acceptance, which are intended to provide details for fabrication, installation, and the like, of items required by or shown in the Plans or Specifications.

Specialty Work means Work that must be performed by a specialized Subcontractor with the specified license or other special certification, and that the Contractor is not qualified to self-perform.

Specifications means the technical, text specifications describing the Project requirements, which are prepared for and incorporated into the Contract by or on behalf of Town, and does not include the Contract, General Conditions or Special

Conditions.

Subcontractor means an individual, partnership, corporation, or joint-venture retained by Contractor directly or indirectly through a subcontract to perform a specific portion of the Work. The term Subcontractor applies to subcontractors of all tiers, unless otherwise indicated by the context. A third party such as a utility performing related work on the Project is not a Subcontractor, even if Contractor must coordinate its Work with the third party.

Technical Specifications has the same meaning as Specifications.

Town means the Town of Los Gatos, acting through its Town Council, officers, employees, Town Engineer, and any other authorized representatives.

Town Engineer means the Engineer for Town and his or her authorized delegee(s).

Work means all of the construction and services necessary for or incidental to completing the Project in conformance with the requirements of the Contract Documents.

Work Day or Working Day, whether or not capitalized, means a weekday when the Town is open for business, and does not include holidays observed by the Town.

Worksite means the place or places where the Work is performed, which includes, but may extend beyond the Project site, including separate locations for staging, storage, or fabrication.

Article 2 - Roles and Responsibilities

2.1 Town.

A. Town Council. The Town Council has final authority in all matters affecting the Project, except to the extent it has delegated authority to the Engineer.

B. Engineer. The Engineer, acting within the authority conferred by the Town Council, is responsible for administration of the Project on behalf of Town, including authority to provide directions to the Design

Professional and to Contractor to ensure proper and timely completion of the Project. The Engineer’s decisions are final and conclusive within the scope of his or her authority, including interpretation of the Contract

Documents.

C. Project Manager. The Project Manager assigned to the Project will be the primary point of contact for the

Contractor and will serve as Town’s representative for daily administration of the Project on behalf of Town.

Unless otherwise specified, all of Contractor’s communications to Town (in any form) will go to or through the

Project Manager. Town reserves the right to reassign the Project Manager role at any time or to delegate duties to additional Town representatives, without prior notice to or consent of Contractor.

D. Design Professional. The Design Professional is responsible for the overall design of the Project and, to the extent authorized by Town, may act on Town’s behalf to ensure performance of the Work in compliance with the Plans and Specifications, including any design changes authorized by Change Order. The Design

Professional’s duties may include review of Contractor’s submittals, visits to any Worksite, inspecting the Work, evaluating test and inspection results, and participation in Project-related meetings, including any pre-construction conference, weekly meetings, and coordination meetings. The Design Professional’s interpretation of the Plans or Specifications is final and conclusive.

2.2 Contractor.

A. General. Contractor must provide all labor, materials, supplies, equipment, services, and incidentals necessary to perform and timely complete the Work in strict accordance with the Contract Documents, and in an economical and efficient manner in the best interests of Town, and with minimal inconvenience to the public.

B. Responsibility for the Work and Risk of Loss. Contractor is responsible for supervising and directing all aspects of the Work to facilitate the efficient and timely completion of the Work. Contractor is solely responsible for and required to exercise full control over the Work, including the construction means, methods, techniques, sequences, procedures, safety precautions and programs, and coordination of all portions of the Work with that of all other contractors and Subcontractors, except to the extent that the Contract Documents provide other specific instructions. Contractor’s responsibilities extend to any plan, method or sequence suggested, but not required by Town or specified in the Contract Documents. From the date of commencement of the Work until either the date on which Town formally accepts the Project or the effective date of termination of the Contract, whichever is later, Contractor bears all risks of injury or damage to the Work and the materials and equipment delivered to any Worksite, by any cause including fire, earthquake, wind, weather, vandalism, or theft.

C. Project Administration. Contractor must provide sufficient and competent administration, staff, and skilled workforce necessary to perform and timely complete the Work in accordance with the Contract Documents.

Before starting the Work, Contractor must designate in writing and provide complete contact information, including telephone numbers and email address, for the officer or employee in Contractor’s organization who is to serve as Contractor’s primary representative for the Project, and who has authority to act on Contractor’s behalf. A Subcontractor may not serve as Contractor’s primary representative.

D. On-Site Superintendent. Contractor must, at all times during performance of the Work, provide a qualified and competent full-time superintendent acceptable to Town, and assistants as necessary, who must be physically present at the Project site while any aspect of the Work is being performed. The superintendent must have full authority to act and communicate on behalf of Contractor, and Contractor will be bound by the superintendent’s communications to Town. Town’s approval of the superintendent is required before the Work commences. If Town is not satisfied with the superintendent’s performance, Town may request a qualified replacement of the superintendent. Failure to comply may result in temporary suspension of the Work, at

Contractor’s sole expense and with no extension of Contract Time, until an approved superintendent is physically present to supervise the Work. Contractor must provide written notice to Town, as soon as practicable, before replacing the superintendent.

E. Standards. Contractor must, at all times, ensure that the Work is performed in an efficient, skillful manner following best practices and in full compliance with the Contract Documents, Laws, and applicable manufacturer’s recommendations. Contractor has a material and ongoing obligation to provide true and complete information, to the best of its knowledge, with respect to all records, documents, or communications pertaining to the Project, including oral or written reports, statements, certifications, Change Order requests, or

Claims.

F. Meetings. Contractor, its project manager, superintendent and any primary Subcontractors requested by Town, must attend a…