RFQ27006912 DOH Lobby Security Renovations SOW.pdf
PDF 228 KB Posted
- Solicitation number
- RFQ27006912
- Issued by
- Providence County, Rhode Island
About this file
This is a Scope of Work document for the Rhode Island Department of Health's lobby security upgrades project located at 3 Capitol Hill, Providence. The project seeks experienced general contractors to renovate the existing public entrance into a secure visitor screening vestibule. Work includes selective demolition, installation of a new interior aluminum storefront with laminated glazing and access-controlled security doors, construction of a security screening area with walk-through metal detector and baggage screening equipment, electrical modifications, and coordination with the Owner's Division 28 Security System Integrator. The contractor must demonstrate experience performing similar renovations in occupied institutional or government facilities, with particular expertise in aluminum storefront systems, automatic door operators, and security vestibules. A mandatory pre-bid conference is scheduled for August 20 at 1:00 PM at the project location. Construction is scheduled to begin approximately November 1, 2026, with substantial completion required by April 1, 2027, and final completion by June 1, 2027.
Bid and performance surety bonds are required for this project. The contract will be executed using the AIA A104-2017 Standard Abbreviated Form of Agreement with State of Rhode Island revisions. Bidders must submit company history, a list of proposed subcontractors, and a minimum of three projects completed within the last five years demonstrating relevant experience. Subcontractors responsible for aluminum storefront systems, automatic door operators, and electrical work must meet all applicable licensing and manufacturer qualification requirements. Liquidated damages are set at $500 per day. The State of Rhode Island Department of Administration reserves the right to review and approve subcontractor qualifications and determine whether submitted experience demonstrates sufficient qualifications to perform the work. No allowances, alternates, or unit pricing options are included in this contract.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021-1.A Page 1 of 4 Revised 01/17/2023
TITLE: RFQ27006912 DOH Lobby Security Upgrades 3 Capitol Hill Providence
PRE-BID CONFERENCE: YES
Mandatory: NO Location: August 20, 1:00 PM 3 Capitol Hill, Providence RI.
BONDING REQUIREMENTS
Bid Surety Bond Required: YES Payment and Performance Bond Required: YES
CONTRACT TERMS
The Contractor shall begin work Approximately November 1, 2026.
Substantial Completion by April 1, 2027 Final Completion by June 1, 2027, in accordance with the Contract Documents.
AIA CONTRACT REQUIREMENT
Rhode Island custom AIA contract designated below outlining the scope and special terms and conditions covering the work, executed by an authorized representative of your company. Vendor shall obtain the Rhode Island custom AIA contract at:
https://documentsondemand.aia.org/?filter=Rhode.
9b) ☒ AIA A104-2017 Standard Abbreviated Form of Agreement Between Owner and Contractor with State of Rhode Island revisions dated 9-10-19.
SECTION A. BACKGROUND
The Rhode Island Department of Health is undertaking improvements to the public entrance at its facility located at 3 Capitol Hill, Providence, Rhode Island, to enhance visitor screening, building security, and controlled access. The project will establish a secure entry vestibule that supports visitor processing while maintaining safe and efficient public access to the facility.
The work includes modifications to the existing entrance area to accommodate new architectural improvements, security screening equipment, and associated building systems. Construction will occur within an occupied government facility and shall be carefully coordinated to minimize disruption to ongoing operations, maintain building security, and provide continued access for employees and visitors throughout the construction period.
The project has been designed by Weston & Sampson in coordination with Good Harbor Techmark. The successful Contractor shall furnish all labor, materials, equipment, supervision, and coordination necessary to complete the Work in accordance with the Contract Documents.
https://documentsondemand.aia.org/?filter=Rhode
2021-1.A Page 2 of 4
SECTION B: SCOPE OF WORK AND REQUIREMENTS
The Rhode Island Department of Health is seeking quotes from experienced general contractors to renovate the existing public entrance at 3 Capitol Hill, Providence, Rhode Island, to create a secure visitor screening vestibule. The project consists of selective demolition, architectural modifications, electrical work, and coordination with security system contractors to improve the security of the facility while maintaining normal building operations.
Work includes selective demolition of existing finishes necessary to accommodate the new construction, including removal and modification of existing walk-off matting, limited ceiling demolition for installation of a new storefront system, and restoration of all disturbed finishes. A new interior aluminum storefront with laminated glazing and an access-controlled pair of security doors will be installed to separate the public entrance from the secured elevator lobby. The work also includes installation of associated door hardware, an automatic door operator, and all required structural blocking and framing necessary to support the new storefront assembly.
The project includes construction of a new security screening area incorporating a walk-through metal detector, baggage screening equipment, associated conveyor components, and a new security reception desk. Electrical work includes new power distribution, receptacles, conduit modifications, and connections necessary to support the screening equipment, automatic door operator, reception desk, and associated building systems. Additional work includes relocation of existing devices where required, installation of a new exit sign, and restoration of ceilings and finishes impacted by construction.
The Contractor shall coordinate closely with the Owner, building management, electrical contractor, and the Owner's Division 28 Security System Integrator to facilitate installation of the access-controlled opening and associated security devices. Security system programming, final integration into the existing access control and video management systems, and owner system commissioning will be performed by the Owner's Division 28 Security System Integrator under a separate contract. The Contractor shall provide all coordination necessary to support that work.
The selected Contractor shall demonstrate experience performing similar renovations in occupied institutional or government facilities, including installation of aluminum storefront systems, automatic door operators, security vestibules, and coordination of multi-discipline construction activities. The Contractor shall furnish all labor, materials, equipment, supervision, permits, temporary protection, and incidentals necessary to deliver a complete and fully operational project in accordance with the Contract Documents.
The Work includes, but is not limited to, the work described in the attached Project Manual, Specifications, and Drawings prepared by Weston & Sampson and Good Harbor Techmark, LLC.
The Contractor shall coordinate the work of all trades, including Division 08 (Doors and Hardware), Division 26 (Electrical), the Owner's Division 28 Security System Integrator, equipment manufacturers, and the Owner's representatives to provide a complete and coordinated installation.
The Contractor shall furnish, install, and coordinate manufacturer startup, commissioning, testing, operator training, and final acceptance of the baggage X-ray screening system and walk-through metal detection system in accordance with the Contract Documents.
2021-1.A Page 3 of 4
The Contractor shall provide all rough-in work, mounting provisions, conduit coordination, and physical installation necessary to support the work of the Owner's Division 28 Security System Integrator where indicated in the Contract Documents. Final programming, integration, and commissioning of the Owner's access control and video management systems shall be performed by the Owner's Division 28 Security System Integrator under a separate contract.
The Contractor shall maintain the security of the facility throughout construction. Existing security systems, building entrances, and life safety systems shall remain operational unless temporary outages are approved in advance by the Owner. The Contractor shall provide temporary barriers and security measures as necessary to maintain building security during construction. Temporary partitions shall be maintained in a neat, secure condition and shall prevent unauthorized access to active construction areas.
Work requiring interruption of normal building operations, electrical systems, access control systems, or public entrances shall be coordinated with the Owner and performed only during approved periods.
Prior to Final Completion, the Contractor shall coordinate all required testing, demonstrations, operator training, delivery of operation and maintenance manuals, warranties, and record documentation in accordance with the Contract Documents.
Division 28 specifications are included for coordination purposes only and are not part of the Contractor's scope of work except as specifically noted elsewhere in the Contract Documents.
Vendors/General Contractors Additional Requirements
The Contractor shall demonstrate experience performing work of similar size and complexity in occupied institutional, healthcare, or government facilities.
At a minimum, the Contractor shall submit the following with its bid:
1) Company history, including years in business.
2) A list of proposed subcontractors.
3) A minimum of three (3) projects completed within the last five (5) years involving work similar in size and scope to this project, including experience in one or more of the following:
a) Aluminum storefront and glazing systems
b) Automatic door operators
c) Security vestibules or controlled entrances
d) Electrical renovations
e) Integration with owner-furnished security systems For each project include the following:
• Project name and location
• Owner
• Contract value
• Brief description of work
• Date of completion
The Owner reserves the right to determine whether the submitted experience demonstrates sufficient qualifications to perform the Work.
2021-1.A Page 4 of 4
Subcontractor qualifications Proposed subcontractors shall demonstrate experience appropriate to the scope of work they are performing. Subcontractors responsible for aluminum storefront systems, automatic door operators and electrical work shall be experienced in similar commercial or institutional projects and shall meet all applicable licensing and manufacturer qualification requirements specified in the Contract Documents.
The qualifications will be reviewed by the State of Rhode Island Department of Administration.
Approval is required for final contract award. The State reserves the right and sole discretion to determine equivalent or prior experience and the right to reject any or all bids which fail to demonstrate equivalent prior experience. Failure to respond with relevant information to the stated requirements of this Document may disqualify the Bidder from further consideration as a bidder on this project.
SECTION C: CONSTRUCTION TIME
Start of Construction: November 1, 2026
Substantial Completion: April 1, 2027
Final Completion: June 1, 2027
SECTION D: ALLOWANCES
No Allowances
SECTION E: LIQUIDATED DAMAGES
$ 500 per day
SECTION F: ALTERNATES
N/A
SECTION G: UNIT PRICE
N/A
| SECTION A. BACKGROUND |
| SECTION B: SCOPE OF WORK AND REQUIREMENTS |
| SECTION C: CONSTRUCTION TIME |
| SECTION D: ALLOWANCES |
| SECTION E: LIQUIDATED DAMAGES |
| SECTION F: ALTERNATES |
| SECTION G: UNIT PRICE |