The file's text, extracted by GovTribe without its formatting.
Instructions
| INSTRUCTIONS |
| General |
| - Most tabs will contain cells for Non-Recurring Costs (NRC) and Monthly Recurring Charges (MRC). |
| - Follow the instructions for each tab. *If Contractor is not filling out Tabs within this document a similar document that provides a breakdown of cost must be supplied with RFP submission package.* The Summary tab, as provided here, is MANDATORY regardless of how the breakdown is shown. |
| - Save as an Excel file and give it a unique name, using the following format: "RFP 29393_Proposer’s Corporate Name_Lot 1 Cost Proposal". |
| - Print the entire workbook (not just the worksheets) to verify content of each tab. |
| - Include the saved Excel file when submitting the RFP response package. |
| Summary Tab - REQUIRED |
| - This tab is required and, if using the optional worksheet tabs, contains the totals from the Emergency Services IP Network (ESInet), Next Generation Core Services (NGCS), Network Operations Center/Security Operations Center (NOC/SOC),GIS, PSAP Connection Location , Backup PSAP Connection Location, and Add-On Services tabs. |
| - If preferred, you may free form your responses on the Summary Tab and provide the breakdown of costs separately in a format of your choosing. |
- Enter Organization name and Date in the designated cells. This information automatically populates the other tabs.
- All other cells are locked.
| ESInet Tab |
| - Change the free form "Contractor Input" labels as needed and enter the pricing information for Emergency Services IP Network (hardware, software, training, maintenance, etc.). |
| NGCS Tab |
| - Enter the non-recurring cost (NRC) and monthly recurring charges (MRC) for each NGCS element. |
| - Change the free form "Contractor Input" labels as needed and enter the pricing information for Next Generation Core Services (hardware, software, training, maintenance, etc.). |
| NOC-SOC Tab |
| - Change the free form "Contractor Input" labels as needed and enter the pricing information for the Network Operations Center/Security Operations Center services (hardware, software, training, maintenance, etc.). |
| Geographic Information System (GIS) Tab |
| - Enter the non-recurring cost (NRC) and monthly recurring charges (MRC) for each GIS element. |
| - Change the free form "Contractor Input" labels as needed and enter the pricing information for GIS Services/Elements (hardware, software, training, maintenance, etc.). |
| PSAP Connection Location Tab |
| - Enter the Bandwidth Options speed, non-recurring cost (NRC) and monthly recurring charges (MRC). Note: default values are examples. |
- At the "Replace this text with Bandwidth Option (1-5)" cell, enter the appropriate bandwidth option from the previous step.
- Enter the NRC and MRC costs (hardware, software, etc.) for each PSAP as needed.
- Change the free form "Contractor Input" labels as needed and enter the pricing information for each PSAP.
| Backup PSAP Connection Location Tab |
| NOTE: These costs are not included in the Project Totals on the Summary Tab |
- Enter the Bandwidth Options speed, non-recurring cost (NRC) and monthly recurring charges (MRC). Note: default values are examples.
- At the "Replace this text with Bandwidth Option (1-5)" cell, enter the appropriate bandwidth option from the previous step.
- Enter the NRC and MRC costs (hardware, software, etc.) for each PSAP as needed.
- Change the free form "Contractor Input" labels as needed and enter the pricing information for each PSAP.
| Optional Services Tab |
| As described in the scope of work (RFP Section 2.2.1) and Appendix G - System Requirements, DHSES reserves the right to request Optional Products and Services and/or changes to existing documentation and network designs as necessary to support and maintain proper oversite of the statewide NG911 network. This Optional Services Tab must include the pricing of additional connections and associated costs to the system other than the main two connection points offered per county; this price shall incorporate the price per location that is added to the system. Other optional items listed within the RFP and Appendix G are also listed here. |
Optional Renewal Years are the cost of the years that the State of New York would have the option of extending the contract for after the completion of the base contract of 10 Years has completed.
Summary
| Organization Name: |
| Date (MM/DD/YYYY): |
| Emergency Service IP Network (ESInet) & Next Generation Core Services (NGCS) | Base Years | | | | | | | | | | | | | | | | | | | | Optional Renewal Years | | | | | |
| Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| ESInet | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| NGCS | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| NOC/SOC | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| GIS | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| PSAP Endpoints | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
Backup PSAP Connection Location Totals $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Additional Allowances Totals $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
| Project Totals | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 7 | Year 8 | Year 9 | Year 11 | Year 12 | Year 13 |
| Yearly Totals (NRC+MRC) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Base Year Cost 1st Year | $ - |
| Base Year Cost 2nd Year(Y1 to Y2 NRC+MRC) | $ - |
| Base Year Cost 3rd Year (Y1 to Y3 NRC+MRC) | $ - |
| Base Year Cost 4th Year (Y1 to Y4 NRC+MRC) | $ - |
| Base Year Cost 5th Year (Y1 to Y5 NRC+MRC) | $ - |
| Base Year Cost 6th Year (Y1 to Y6 NRC+MRC) | $ - |
| Base Year Cost 7th Year (Y1 to Y7 NRC+MRC) | $ - |
| Base Year Cost 8th Year (Y1 to Y8 NRC+MRC) | $ - |
| Base Year Cost 9th Year (Y1 to Y9 NRC+MRC) | $ - |
| Base Year Cost 10th Year (Y1 to Y10 NRC+MRC) COST PROPOSAL TOTAL | $ - |
| Total Optional Year Costs | $ - |
| Total Base & Optional Year Costs | $ - |
¹ Monthly Recurring Charges (MRC) from other tabs have been annualized on this Summary tab
ESInet
| Organization Name: | 0 |
| Date (MM/DD/YYYY): | 12/31/99 |
| Emergency Service Internet Protocol Network (ESInet) | Base Years | | | | | | | | | | | | | | | | | | | | Optional Renewal Years | | | | | |
| Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| ESInet Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Total (NRC &MRC) | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | |
¹ Enter monthly recurring charges (annualized MRC will appear on Summary tab)
NGCS
| Organization Name: | 0 |
| Date (MM/DD/YYYY): | 12/31/99 |
| Next Generation Core Services (NGCS) | Base Years | | | | | | | | | | | | | | | | | | | | Optional Renewal Years | | | | | |
| Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| Legacy Network Gateway (LNG) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Legacy PSAP Gateway (LPG) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Border Control Function (BCF) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Emergency Services Routing Proxy (ESRP) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Policy Routing Function (PRF) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Emergency Call Routing Function (ECRF) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Location Validation Function (LVF) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Spatial Interface (SI) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Location Database (LDB) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Discrepancy Reporting | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Event Logging | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Network Time Protocol (NTP) and Time Source | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Message Session Relay Protocol (MSRP) Text Integration | | | | | | | | | | | | | | | | | | | | | | | | | | |
| NG911 Applications and Alarm Integration | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Additional Data by Reference (ADR)/3rd Party LIS | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| NGCS Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Total (NRC &MRC) | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | | $ - | |
¹ Enter monthly recurring charges (annualized MRC will appear on Summary tab)
NOC-SOC
| Organization Name: | 0 |
| Date (MM/DD/YYYY): | 12/31/99 |
| Network Operations Center/Security Operations Center (NOC/SOC) | Base Years | | | | | | | | | | | | | | | | | | | | Optional Renewal Years | | | | | |
| Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| NOC/SOC Total | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Total (NRC &MRC) | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | |
¹ Enter monthly recurring charges (annualized MRC will appear on Summary tab)
GIS
| Organization Name: | 0 |
| Date (MM/DD/YYYY): | 12/31/99 |
| Geographic Information System | Base Years | | | | | | | | | | | | | | | | | | | | Optional Renewal Years | | | | | |
| Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g. Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g. Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g Licensing | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g. Logging | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g. 24/7 Support | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| (GIS) Total | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Total (NRC &MRC) | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | | $0 | |
¹ Enter monthly recurring charges (annualized MRC will appear on Summary tab)
PSAP Connection Location
| Organization Name: | 0 |
| Date (MM/DD/YYYY): | 12/31/99 |
| Bandwidth Speed | Speed (MBPS) | NRC | MRC | Additional Comments |
| Bandwidth Option 1 Speed (Mbps): | | | | |
| Bandwidth Option 2 Speed (Mbps): | | | | |
| Bandwidth Option 3 Speed (Mbps): | | | | |
| Bandwidth Option 4 Speed (Mbps): | | | | |
| Bandwidth Option 5 Speed (Mbps): | | | | |
| Albany County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Allegany County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Broome County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Cattaraugus County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Cayuga County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Chautauqua County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Chemung County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Chenango County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Clinton County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Columbia County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Cortland County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Delaware County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Dutchess County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Erie County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Essex County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Franklin County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fulton County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Genesee County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Greene County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hamilton County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Herkimer County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Jefferson County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Lewis County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Livingston County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Madison County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monroe County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Montgomery County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Nassau County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| New York City | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Niagara County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Oneida County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Onondaga County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ontario County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
| NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ | NRC | MRC¹ |
| e.g., Hardware | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Software | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Licenses | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Entrance Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Facility Routing Diversity | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Training | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Replace With Bandwidth Option (1-5) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| e.g., Contractor Input | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PSAP Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Orange County | Base Years | | | | | | | | | | | | | | Optional Years | | | | | | Optional Renewal Years | | | | | |
| PSAP Connection Location | Year 1 | | Year 2 | | Year 3 | | Year 4 | | Year 5 | | Year 6 | | Year 7 | | Year 8 | | Year 9 | | Year 10 | | Year 11 | | Year 12 | | Year 13 | |
This is the start of the file's text. The full file is on GovTribe.