RFB936000-01 Addendum 1.pdf
PDF 5 MB Posted
- Attached to
- IPBS Fire Alarm Replacement
- Solicitation number
- RFB936000-01
- Issued by
- Muscatine County, Iowa
About this file
This document is Addendum 1 for Request for Bid (RFB) 936000-01 issued by the Iowa Department of Administrative Services (DAS) for the Iowa PBS (Public Broadcasting Service) Fire Alarm Replacement project located at 6450 Corporate Drive in Johnston, Iowa. The addendum modifies the original bid documents, changing the bid due date to March 7, 2024 at 2 PM, and providing updates to specifications and drawings. The project involves replacing the fire alarm system with two primary alternates: Alternate 01 involves reusing existing speaker strobe and notification devices, while Alternate 02 involves installing new speaker strobe and notification devices. The project includes unit prices for adding or reducing addressable smoke and duct smoke detectors, with a target substantial completion date of September 5, 2024.
The bid package covers all labor, materials, equipment, and services required to complete the fire alarm system replacement, including demolition of existing systems and installation of new components. Bidders must submit their proposals through the IMPACS Electronic Procurement System and provide a bid security of 5% of the total bid amount. The project will require on-site supervision, daily logs, and coordination with Iowa PBS staff, who will handle the relocation of furniture and equipment during the construction process. Work hours are restricted to 7:00 AM to 5:00 PM Monday through Thursday, with no noise-producing work permitted during filming times, typically on Fridays. Background checks will be required for personnel needing badges, and all construction workers must adhere to strict site rules, including no smoking, drugs, or alcohol on the premises.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB936000-01 Project Manual.pdf | ||
| Request for Substitution Form.html | HTML file | |
| Life Safety and Code Summary (G001).html | HTML file | |
| Fire Alarm Demo and New - Mezzanine (ED103).html | HTML file | |
| Fire Detection & Alarm Plans - West (E101).html | HTML file | |
| RFB936000-01 - Notice to Bidders.pdf | ||
| Fire Alarm Demolition - East (ED102).html | HTML file | |
| ConsensusDocs 802 Agreement Form (Sample).html | HTML file | |
| Fire Detection & Alarm Plans - East (E102).html | HTML file | |
| 1206330-event.pdf | ||
| RFB936000-01 - Bid Form.pdf | ||
| RFB936000-01 Drawings.pdf | ||
| Bidding Documents via Rapid Reproductions.html | HTML file | |
| Electrical General Notes and Symbols (E000).html | HTML file | |
| Fire Alarm Demolition - West (ED101).html | HTML file | |
| Form 22 - Confidentiality Request.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1 for RFB936000-01
Project Name: DOE IPBS JOH 6450 Fire Alarm Replacement
RFB #: 936000-01
DAS Project #: 9360.00
Date: 02/21/2024
BID DUE DATE CHANGED TO MARCH 7, 2024 @ 2PM
Questions/Substitution requests can be submitted to construction.procurement@iowa.gov until
February 27, 2024 @ 12 PM.
1. See attached Pre-bid Meeting Minutes from the Pre-Bid Walkthrough on February 13, 2024 @
2:30 pm and Attendee List.
2. SPECIFICATIONS
A. Section 00 4116 – Bid Form
a. MODIFY descriptions for Alternate 01 and Alternate 02.
B. Section 01 1200 – Contract Summary
a. MODIFY descriptions for Alternate 01 and Alternate 02.
C. Section 284600 – Digital, Addressable Fire Alarm System
a. CLARIFY system type shall be Horn strobe for Basis of Design and Speaker
Strobe for Alternate #1 and #2.
3. DRAWINGS
A. Drawing E000 – Electrical Geneal Notes & Symbols
a. MODIFY descriptions for Alternate #1 and #2.
b. ADD Speaker strobe symbol to Legend.
c. Refer to attached full size sheet E000.
B. Drawing ED101 – Fire Alarm Demolition - West
a. MODIFY existing horn strobe devices to speaker strobe to match existing conditions.
b. MODIFY keynotes to match existing conditions and new alternates.
c. Refer to attached full size sheet ED101.
C. Drawing ED102 – Fire Alarm Demolition - East
a. MODIFY existing horn strobe devices to speaker strobe to match existing conditions.
b. MODIFY keynotes to match existing conditions and new alternates.
c. Refer to attached full size sheet ED102.
D. Drawing ED103 – Fire Alarm Demo & New - Mezzanine
a. MODIFY existing horn strobe devices to speaker strobe to match existing conditions.
b. MODIFY keynotes to match existing conditions and new alternates.
c. Refer to attached full size sheet ED103.
mailto:construction.procurement@iowa.gov
E. Drawing E101 – Fire Detection & Alarm Plans - West
a. MODIFY general noes and keynotes to match existing conditions and new alternates.
b. Refer to attached full size sheet E101.
F. Drawing E102 – Fire Detection & Alarm Plans - West
a. MODIFY general noes and keynotes to match existing conditions and new alternates.
b. Refer to attached full size sheet E102.
G. Drawing E103 – Fire Detection & Alarm Plans – West Alternate #1 & #2
a. ADD sheet to show locations for a speaker strobe system. Device locations to be used for both alternates.
b. Refer to attached full size sheet E103.
H. Drawing E104 – Fire Detection & Alarm Plans – West Alternate #1 & #2
a. ADD sheet to show locations for a speaker strobe system. Device locations to be used for both alternates.
b. Refer to attached full size sheet E104.
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9360.00 DOE IPBS JOH 6450 Fire Alarm Replacement
6450 Corporate Drive Johnston, Iowa 50131
RFB Pre-Bid Minutes: Meeting #1
Meeting Date Feb 13, 2024 Meeting Time 2:30 PM - 3:30 PM Central Time (US & Canada)
Meeting Location IPBS
Overview Meeting to allow prospective bidders to visit the site, when possible, and learn more about the project.
Notes
Attachments Attendee List.pdf, IPBS Zone Map.pdf
Scheduled Attendees
Name Company Phone Number Email Attendance
Mike Downey Iowa PBS michael.downey@iowapbs.org Present
Jamie Dye Iowa PBS P: (515) 725-9829 james.dye@iowapbs.org Present
Michelle Wendel Iowa PBS P: (515) 725-9828 michelle.wendel@iowapbs.org Present
Eric Heynen KCL Engineering P: (515) 724-7938 eheynen@kclengineering.com Present
Adam Douglas McGough Construction adam.douglas@mcgough.com Present
Leilani Hammel McGough Construction P: (515) 344-8980 leilani.hammel@mcgough.com Present
Brandon Adams State of Iowa - Department of Administrative Services brandon.adams@iowa.gov Present
Jennifer Kleene State of Iowa - Department of Administrative Services
P: (515) 725-0454 jennifer.kleene@iowa.gov For Distribution Only
Introduction
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description DAS - Owner's Representative
• Brandon Adams
McGough Construction - CM
• Adam Douglas
• Leilani Hammel
Iowa PBS
• Michelle Wendel
• Jamie Dye
• Mike Downey
KCL
State of Iowa - Department of Administrative Services Page 1 of 4 Printed On: Feb 20, 2024 02:00 PM CST https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HPMSJ0ZJTG267SMAA7AAF6F4?sig=df11b2a356d8f8436ed3434ac11b3940a0c27e519c39b5edd134710db0c6b9c3 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HP2PVTDVCGY5E3J4KMZZFKH7?sig=9513c4956d15c400264b75e42f89d48c084eac37ccbf8fa7e661abddb3efc085
• Eric Heynen
Official Documented Meeting Minutes See attached Attendee List.
Project Overview
2.1 1 Project Description Open
Description
• Base bid: Fire Alarm Replacement - All work on the contract documents complete, include plans and specifications.
• Alternates:
o Alternate 01: Replacement of Existing Conductors - Provide a complete replacement of the existing conductors.
o Alternate 02: Reuse Existing Notification - Reuse existing notification devices. Existing devices will remain intact and be reconnected to the new system.
• Unit prices:
o Unit 01: Smoke Detection - Provide price to add/reduce an addressable smoke detector o Unit 02: Duct Smoke Detection - Provide price to add/reduce an addressable duct smoke detector.
*Full Descriptions can be found in 01 1200 Contract Summary.*
2.2 1 Project Schedule Open
Description
• Contract(s) Issued: 3/1/24
• Submittals: March 2024
• Construction: June 18, 2024-Sept 5, 2024
• Closeout: September 2024
A pull-plan session will be held with the successful bid package contractors to finalize the construction schedule.
State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving and day after Thanksgiving, Christmas Day
2.3 1 Site Rules Open
Description
• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.
• Contractors shall provide daily logs for each day they are on site.
• Construction progress meeting will be established once construction starts.
• It is of the utmost importance to show respect and courtesy to all staff at all times.
• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.
• No smoking, vaping or smokeless tobacco use onsite.
• Temporary facilities - Not needed.
• Background checks will be needed for anyone who needs a badge, likely just foremen.
Meeting #1 - RFB Pre-Bid Project: 9360.00 DOE IPBS JOH 6450 Fire Alarm Replacement
State of Iowa - Department of Administrative Services Page 2 of 4 Printed On: Feb 20, 2024 02:00 PM CST
• Work hours: 7:00am - 5:00pm Monday through Thursday. No noise producing work is permitted during filming times, typically Fridays.
• View Specification 01 1200 - Contract Summary for more information.
RFB Overview
3.1 1 Bid Submission Open
Description
• Bids are due Thursday, February 29 at 2pm.
• The Bid shall be submitted to the Issuing Officer through the IMPACS Electronic Procurement System.
o Link and information is in the project manual o Contractors will need to register prior to bidding o Bidders will need to register regardless of whether it has already done business with the State of Iowa.
o Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
• Bid Opening will be held via conference call on Thursday, February 29 at 3pm.
• Contractor shall reference section 00 0116 for the bid submittal checklist o Bid Proposal Information o Non Discrimination Clause Information o Contractor Targeted Small Business Enterprise Pre-Bid Contract Information o Bid Security – 5% of total Bid amount
• Apparent low bidder will be required to submit subcontractor/supplier list 48hrs after the bid opening
Bid due date will be changed to March 7 @ 2pm with bid opening March 7 @ 3pm.
3.2 1 Bid Schedule Open
Description
• Questions/Substitutions Due in Writing to Construction.Procurement@iowa.gov: February 20 by 12pm.
• Addendum will be issued during the week of 2/19.
• Bids Due: Feb. 29, 2024 @ 2pm.
• Tentative NOI Issued: March 01, 2024
3.3 1 Administrative Details Open
Description
• Contractors will sign a modified ConsensusDocs 802. Example in the project manual.
• Project-specific Certificate of Insurance must be provided prior to contract execution. Follow example in the project manual and limits in the 802.
• Project-specific P&P bonds must be provided prior to contract execution.
• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours of the bid.
• DAS will provide tax exempt certificates upon request.
• Procore will be used for all project management, at no cost to the trade contractor.
State of Iowa - Department of Administrative Services Page 3 of 4 Printed On: Feb 20, 2024 02:00 PM CST mailto:Construction.Procurement@iowa.gov:
o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign
• Contractor Schedule of Values shall be broken out as specified in the project manual.
o SOV must contain a closeout line item for at least 1% of the total contract value.
o This line item can only be invoiced once the certificate of final completion has been signed by all parties.
• The contractor will be responsible for submitting plans to the Fire Marshal for review and approval.
3.4 1 Pre-Bid Site Visits Open
Description Review IPBS Zone Map.
Official Documented Meeting Minutes
• Pink zones need to be back working by the end of each day and green zones are going to be dependent on IPBS' schedule but can remain down until the end of the week and just need to be back up and running over the weekend.
o The building is not required to have smoke detection but is important that the highlighted areas have them working as noted.
o The white areas are more occupied space/office space. There will still be pull stations and other notifiers that will be working.
Questions
4.1 1 Questions Open
Description Submit all questions in writing to construction.procurement@iowa.gov.
Official Documented Meeting Minutes
• Discussion items:
o If any drywall or ceiling are disturbed, it is the contractor's responsibility to bring that back to existing conditions.
o The ceiling tile are 20" x 60" so contractors need to be careful to not damage the tiles.
o There are several mag holds throughout the building that will need to be tied into the system to override the mag hold if the fire alarm goes off.
o More smoke detection is required in the lobby to be up to code, there is a hard lid ceiling with a couple access panels.
These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.
Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.
State of Iowa - Department of Administrative Services Page 4 of 4 Printed On: Feb 20, 2024 02:00 PM CST mailto:construction.procurement@iowa.gov
PROJECT 9360.00 BID FORM 00 4116 - 1
SECTION 00 4116
BID FORM
The Bid Form must be submitted online through the State�s IMPACS Electronic Procurement System.
RFB #936000-01
BID FORM for CONSTRUCTION CONTRACT for
Iowa PBS 6450 Corporate Drive, Johnston, IA 50131
Project 9360.00
Iowa Department of Administrative Services Hoover State Office Building, Level 3 1305 East Walnut Street Des Moines, Iowa 50319-0105
The following information is to be completed and submitted with your bid.
1. Bid Form - Completed and Signed (to be uploaded with bid submission)
2. Non Discrimination Clause Information
3. Contractor Targeted Small Business Enterprise Pre-Bid Contract Information
4. Bid Security � 5% of total Bid amount (to be uploaded with bid submission)
Authorized Representative:
The undersigned Bidder, in response to your Request for Bid for construction of the above project, having examined the Drawings, Specifications, and other Bidding Documents dated February, 01, 2024 and Addenda issued and acknowledged below as received and being familiar with all the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment and supplies to perform all work to construct the project in strict accordance with the proposed Contract Documents, within the time and at the prices stated below. Prices are to cover all expenses incurred in performing the work required under the proposed Contract Documents, of which this bid is a part.
Bidder acknowledges receipt of the following Addenda which are a part of the Bidding Documents and for which any effect on cost of the Work is included in the bid amounts indicated:
Number ________ ________ ________ ________ ________
Dated ________ ________ ________ ________ ________
Note that the State of Iowa is exempt from State and Local sales and use taxes (including local option and school option) for this project. Taxes on construction materials shall NOT be included in the bid amounts.
PROJECT 9360.00 BID FORM 00 4116 - 2
Amounts shall be indicated in both words and figures. In case of discrepancy, the amount indicated in words shall govern.
BID PACKAGES:
BP 01
Description: All material, labor and equipment associated with all work shown on the contract documents complete including the plans and specifications.
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum of:
Dollars
ALTERNATES:
ALT 01
Description: (DEDUCT) Reuse existing speaker strobe and strobe notification devices. Existing devices are on a Siemens system and are Edwards Est Product. Existing conductors are noted to be 14/4 for the speaker strobes.
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum of:
Dollars
ALT 02
Description: (ADD) Install new speaker strobe and strobe notification devise with new system. Existing devices to be removed. Existing conductors are noted to be 14/4 for the speaker strobes.
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum of:
Dollars
UNIT PRICES:
UNIT 01
Description: (ADD/DEDUCT) Provide price to add/reduce an addressable smoke detector. Assume 30 feet of conductors, wall penetration, and mounting hardware per device.
PROJECT 9360.00 BID FORM 00 4116 - 3
Dollars
UNIT 02
Description: (ADD/DEDUCT) Provide price to add/reduce an addressable duct smoke detector. Assume 50 feet of conductors, test tube, mounting hardware, and shut down relay to mechanical unit per device.
Dollars
Bidder hereby certifies that:
1. This bid is genuine and is not made in the interest of or on behalf of any undisclosed person, firm or corporation;
2. Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding;
and Bidder has not sought by collusion to obtain any advantage over any other bidder or over the Owner.
3. Bidder hereby certifies that the Bidder is registered with the Iowa Labor Commissioner as a Contractor as required by Chapter 91C, Code of Iowa.
4. Bidder agrees to comply with all Federal and State Affirmative Action/Equal Employment Opportunity requirements concerning fair employment and will not discriminate between or among them by reason of race, color, religion, sex, national origin or physical handicap.
5. All construction under this Contract shall conform to the requirements of the Iowa State Building Code.
6. Bidder agrees that this bid shall remain valid and shall not be withdrawn for a period of thirty (30) calendar days after the date for receipt of bids.
7. Bidder agrees that if written notice of acceptance of this bid is mailed, emailed, or delivered to the undersigned within thirty (30) days after the date in which bids are due, or at any time thereafter before it is withdrawn, the undersigned will sign and return the Contract Agreement, prepared in accord with the Bidding Documents and this bid as accepted; and will also provide proof of insurance coverage and required surety bonds.
8. Bidder understands that the Owner reserves the right to reject any and all bids, and to waive irregularities or informalities and enter into a contract for the work, as the Owner deems to be in the best interest of the State.
9. Bidder understands that the Owner reserves the right to accept any, or no, Alternate Bid, if requested, and that the Alternate Bids may be considered in any order or combination, and the low Bidder shall be determined on the basis of the sum of the base bid and any Alternate(s) accepted.
Subcontractors:
The Trade Contractor must identify all Subcontractors and Suppliers within 48 hours of the published date and time for which bids must be submitted, in accordance with Iowa Code Section 8A311, as amended by House File 646 in 2011. Subcontractors and suppliers may not be changed without the approval of the Owner. Requests for changing a Subcontractor or supplier must identify the reason for the proposed change, the name of the new Subcontractor or supplier, and the change in the subcontractor or supplier price as a result of the change. Any reduction in subcontractor or supplier price as a result of the change, if the change is approved by the Owner, shall be deducted from the Trade Contract Price via a deductive Change Order. Any such changes, if approved by the Owner, which result in an increase in the Trade
PROJECT 9360.00 BID FORM 00 4116 - 4
Contract Price shall be borne by the Trade Contractor.
Enforcement of Reciprocal Resident Bidder Preference, per Iowa Code 73A.21.
All bidders shall either check the box next to �Resident Bidder� or check the box next to
�Nonresident Bidder� and by doing so and signing thereafter certifies and attests to the same. All information requested must be provided. Seek out the advice of an attorney if you have questions.
�Resident Bidder� means a person or entity authorized to transact business in of the State of Iowa and having a place of business for transacting business within the State of Iowa at which it is conducting and has conducted business for at least three years prior to the date of the first advertisement for the public improvement. Note, however, that if a nonresident bidder�s state or foreign country has a more stringent definition of a resident bidder, the more stringent definition is applicable as to bidders from that state or foreign country.
Resident Bidder
Name of Resident Bidder: ___________________________
By: _____________________________________ Authorized Agent and Signatory of Resident Bidder
OR:
Nonresident Bidder
Name of Nonresident Bidder: ___________________________
Name of State or Foreign Country of Nonresident Bidder: ___________________________
Particularly identify and describe any preference, labor preference, or any other type of preferential treatment, in effect in the nonresident bidder�s state or foreign country at the time of this bid:
NOTICE: Nonresident Bidders domiciled in a state or country with a resident labor force preference shall make and keep, for a period of not less than three years, accurate records of all workers employed on the public improvement. The records shall include each worker�s name, address, telephone number when available, social security number, trade classification, and the starting ending time of employment.
By: ________________________________________ Authorized Agent and Signatory of Nonresident Bidder
Bid Form shall be signed by an officer of the company with authority to bind in a contract.
Notice of acceptance of this bid, or request for additional information by the Department of Administrative Services, may be addressed to the undersigned at the address set forth below:
Legal Name of Firm: ____________________________________________________________
Date: _________________________________________________
Signature of Bidder: ____________________________________________________
PROJECT 9360.00 BID FORM 00 4116 - 5
Title: ______________________________________________________
Typed Name of Signatory: _____________________________________________________
Email: _______________________________________
Business Address:
Telephone Number: ____________________ Fax Number: ____________________
Federal Tax Identification Number: ____________________
Iowa Contractor Registration Number: _________________________
Bidder Safety Manager Name:_______________________________
For an out-of-state Bidder, Bidder certifies that the Resident Preference given by the State or
Foreign Country of Bidder�s residence, _________________________, is _______ %.
END OF SECTION
PROJECT 9360.00 CONTRACT SUMMARY 01 1200 - 1
SECTION 01 1200
CONTRACT SUMMARY
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Project Information B. Project Summary C. Bid Scope Summary D. Work Hour Restrictions E. Access to Site F. Coordination with Occupants G. Rules for Construction Workers H. Bid Package Instructions
1.02 PROJECT INFORMATION
A. Facility Name/Location: Iowa PBS, 6450 Corporate Dr, Johnston, IA 50131 B. DAS Project #: 9360.00 C. Owner: State of Iowa, Department of Administrative Services, Hoover State Office Building, Level 3, 1305 East Walnut Street, Des Moines, IA 50319 D. Owner�s Representative: Brandon Adams, Iowa Department of Administrative Services, 109 SE
13th Street, Des Moines, IA 50319 E. Construction Manager: Adam Douglas, McGough Construction, 217 E. 2nd St, Suite 120, Des
Moines, IA 50309
1.03 PROJECT SUMMARY
A. The project includes replacing the fire alarm system at Iowa PBS.
B. Target date to provide substantial completion is September 05, 2024.
1.04 BID SCOPE SUMMARY
A. Scope Applicable to All Bid Packages:
1. The Contractor�s Work includes all labor, supervision, materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractor�s Work shall be performed in accordance with the Drawings, Specification Divisions 00 and 01, and Specification sections applicable to each Contractor�s scope.
2. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything so stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement.
3. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place.
4. Provide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task
PROJECT 9360.00 CONTRACT SUMMARY 01 1200 - 2
lighting for work, etc. as determined necessary by Contractor. Coordinate location of trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager.
5. Contractor shall provide all equipment and tools for Contractor�s own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner�s operations, and at the discretion of the Construction Manager.
6. All turf, landscaping, and subgrade disturbances caused by equipment traffic or other activities related to the Contractor�s scope shall be repaired or restored to proper conditions by the Contractor.
7. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractor�s Scope of work.
8. Contractor shall maintain an accurate set of As-Built Drawings throughout the duration of the project and submit to the Construction Manager at the completion of the project.
Contractor to show accurate wire paths and device addresses.
1.05 WORK HOUR RESTRICTIONS
A. Work hours are from 7:00 AM to 5:00 PM, Monday through Thursday unless arrangements are made in advance.
B. No noise producing work is permitted during filming times, typically Fridays.
C. Iowa PBS will notify contractors/project teams of any unpeated filming at least 24 hours before it occurs. Contractor shall stay in communication with Owner and Construction Manager on work activities since the building is occupied and in use.
1.06 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to areas noted on Drawings.
B. Provide access to and from site as required by law and Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permission of Owner and permit if required.
C. Facility will be occupied at all times during duration of work. Contractor personnel shall conduct themselves in an agreeable manner at all times. Failure to do so may result in removal from the work site.
1.07 OWNER OCCUPANCY
A. Owner intends to occupy the building throughout the course of construction.
B. Cooperate with Owner to minimize conflict and to facilitate Owner�s operations.
C. Schedule the Work to accommodate Owner occupancy.
1.08 RULES FOR CONSTRUCTION WORKERS
A. The staff of the State of Iowa has a responsibility to protect the public by providing a secure environment. All work site rules must be followed to the letter, at all times.
B. All construction workers must have a background check completed prior to entering the campus to perform work.
C. Hot Work Permit Processes and Fire Watch, when necessary, will be adhered to for this project.
D. All State properties are tobacco free. No smoking will be permitted or tolerated on campus unless in designated areas.
E. You are permitted access only to the work site and no other area of the institution.
F. No drugs, alcohol, or firearms are allowed on the work site.
PROJECT 9360.00 CONTRACT SUMMARY 01 1200 - 3
G. Do not leave money, drugs, alcohol, or firearms in your personal vehicle.
H. Company and personal vehicles are to be parked and locked in designated or authorized area of the work.
I. Secure all tools at the end of the day.
J. Maintain control of all tools, supplies, and debris at all times during the work.
K. Never leave keys in any vehicle. If a security officer finds keys in a vehicle, they are under orders to turn them in to a security supervisor.
L. Do not give anything to residents or take anything from residents; if they offer, inform your supervisor.
M. Secure all tools at the end of each day. Never leave tools unattended. All tools shall be checked in at the beginning of the day and checked out at the end of the day. If security officers find loose tools, they are under orders to turn them in to their supervisor.
N. All delivery vehicles must go directly to the job site. Extra time should be anticipated for all deliveries. Provide 24-hour notice to the facility of deliveries.
O. During an emergency, follow the instructions of the security staff.
P. Contractor shall wear clothing of a different color, pattern, fashion, etc. as to distinguish themselves from inmates.
1.09 BID PACKAGE INSTRUCTIONS
A. Bid Package #01 � Fire Alarm Replacement: Trade Contractor shall include all of the following, but not limited to, as part of the contract:
1. All work on the contract documents complete; material and labor including all freight, unloading and installation for a complete scope.
2. Includes specifications: All of Divisions 00, 01, 26, and 28.
B. Alternate #01 � Reuse Existing Speaker Strobe System Trade Contractor shall include all of the following, but not limited to, as part of the contract:
1. Reuse existing speaker strobe and strobe notification devices. Existing devices are on a
Siemens system and are Edwards Est product. Reconnect existing devices to the new system. Existing conductors are noted to be 14/4 for the speaker strobes. Conductors can be reused if feasible with new system configuration. Remove or tag abandoned cables per NEC 760. Refer to sheets ED103, E103, and E104 for more information.
2. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
3. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
4. Execute accepted alternates under the same conditions as other work of the Contract.
C. Alternate #02 � Replacement of Notification Devices: Trade Contractor shall include all of the following, but not limited to, as part of the contract:
1. Install new speaker strobe and strobe notification devices with new system. Existing devices to be removed. Existing conductors are noted to be 14/4 for the speaker strobes.
Conductors can be reused if feasible with new system configuration. Remove or tag abandoned cables per NEW 760. Refer to sheets ED103, E103, and E104 for more information.
2. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
3. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
4. Execute accepted alternates under the same conditions as other work of the Contract.
PROJECT 9360.00 CONTRACT SUMMARY 01 1200 - 4
D. Unit Price #01 � Smoke Detection: Trade Contractor shall include all of the following, but not limited to, as part of the contract:
1. Provide price to add/reduce an addressable smoke detector. Assume 30 feet of conductors, wall penetration, and mounting hardware per device.
2. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.
3. Owner reserves the right to reject Contractor�s measurements of work in place that involves use of established unit prices and to have this work measured, at the Owner�s expense, by an independent surveyor acceptable to the Contractor.
E. Unit Price #02 � Duct Smoke Detection: Trade Contractor shall include all of the following, but not limited to, as part of the contract:
1. Provide price to add/reduce an addressable duct smoke detector. Assume 50 feet of conductors, test tube, mounting hardware, and shut down relay to mechanical unit per device
2. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.
3. Owner reserves the right to reject Contractor�s measurements of work in place that involves use of established unit prices and to have this work measured, at the Owner�s expense, by an independent surveyor acceptable to the Contractor.
F. Work Performed by Owner: Iowa PBS will perform the following work items:
1. Relocate all moveable furniture, fixtures and equipment (FF&E), including window treatments; and personal materials from each sequenced work area prior to demolition and construction activities and after new construction is completed.
PART 2 - PRODUCTS � NOT USED
PART 3 - EXECUTION � NOT USED
END OF SECTION
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that i am a duly licensed Professional Engineer under the laws of the State of Iowa
(signature)
License Number :
Pages or sheets covered by this seal:
(date)
My license renewal date is December 31, E N
G N
E E
R I
AOFESSION
S E
D
PR
AI O W
L
IC
E N
L
ERIC HEYNEN, P.E.
ERIC
HEYNEN
E. Sheets
P24706P24706
SHEET LIST
G001 LIFE SAFETY AND CODE SUMMARY
E000 ELECTRICAL GENERAL NOTES & SYMBOLS
ED101 FIRE ALARM DEMOLITION - WEST
ED102 FIRE ALARM DEMOLITION - EAST
ED103 FIRE ALARM DEMO AND NEW - MEZZANINE
E101 FIRE DETECTION & ALARM PLANS - WEST
E102 FIRE DETECTION & ALARM PLANS - EAST
E103 FIRE DETECTION & ALARM PLANS - WEST ALTERNATE #1 & #2
E104 FIRE DETECTION & ALARM PLANS - EAST ALTERNATE #1 & #2
OWNER
IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES
109 SE 13TH STREET
DES MOINES, IA 50319
OWNER PROJECT NUMBER: 9360.00
CONSTRUCTION MANAGER
ADAM DOUGLAS - PROJECT EXECUTIVE
MCGOUGH
217 E 2ND STREET, SUITE 120
DES MOINES, IOWA 50309
ENGINEER
ERIC HEYNEN, PE
KCL ENGINEERING
eheynen@kclengineering.com 515-300-8092
ENGINEER PROJECT NUMBER: 23249
2/20/2024 1:04:29 PM
CONSTRUCTION DOCUMENTS
2/1/2024
STATE OF IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES
9360.00 IOWA PBS FIRE ALARM REPLACEMENT
VICINITY MAP:
6450 CORPORATE DRIVE
JOHNSTON, IOWA 50131
M E
R L
E H
A Y
R O
A D
NW 62ND AVE
6450 CORPORATE DR
CONDUIT SLEEVE
EQUIPMENT IDENTIFICATION TAG. REFER TO EQUIPMENT CONNECTION SCHEDULE
GENERAL SYMBOLS
KEYNOTE#
XXX
X
JUNCTION BOX, CEILING OR FLOOR MOUNTED.
JUNCTION BOX, WALL MOUNTED, ELEVATION AS NOTED.
J
J
POWER SYMBOLS
DUPLEX RECEPTACLE, TAMPER-RESISTANT, WALL MOUNT +18", OR AS NOTED
EQUIPMENT CONNECTION, WALL MOUNT +18", OR AS NOTED, REFER TO ELECTRICAL
EQUIPMENT CONNECTION SCHEDULE FOR CONNECTION TYPE
PANELBOARD - SURFACE MOUNTED
**NOTE: ALL SYMBOLS MAY NOT APPLY TO THIS PROJECT**
1. PROVIDE ELECTRICAL INSTALLATION IN ACCORDANCE WITH ALL STATE CODES.
2. THE CURRENT ADOPTED EDITION OF THE ELECTRICAL CODE IS THE STANDARD FOR THE
ELECTRICAL INSTALLATION. VERIFY WITH STATE OFFICIALS WHEN PERMITS ARE OBTAINED.
NOTIFY DESIGN TEAM OF ANY DISCREPANCIES BETWEEN THE PROJECT MANUAL OR
DRAWINGS AND THE GOVERNING CODE.
3. INSTALLATION SHALL FOLLOW REQUIREMENTS OF THE ADAAG –AMERICANS WITH
DISABILITIES ACT.
4. REFER TO PROJECT MANUAL AND PROJECT CODE REVIEW SHEET FOR LIST OF APPLICABLE
CODES.
CODE NOTES - ELECTRICAL
1. PROVIDE NEW FULLY FUNCTIONAL AND CODE COMPLIANT FIRE ALARM SYSTEM.
2. THE STATE FIRE MARSHAL HAS APPROVED THE USE OF DETECTION ON A ROOM-BY-ROOM
BASIS. DETECTION IS SHOWN IN SPACES THAT THE OWNER WOULD LIKE DETECTION WITHIN
THE SPACE. BIDS AND DESIGN SHALL INCLUDE COVERAGE OF ALL THE SPACES SHOWN IN
THE CURRENT DESIGN.
GENERAL PROJECT INTENT
DEMOLITION AND RENOVATION NOTES - ELECTRICAL
1. ELECTRICAL DEMOLITION DRAWINGS SHOWING EXISTING CONDITIONS HAVE BEEN PREPARED
BASED ON FIELD OBSERVATION AND ORIGINAL DRAWINGS. FIELD VERIFY EXISTING
CONDITIONS BEFORE WORK BEGINS. ADDITIONAL COMPONENTS MAY EXIST WHICH ARE NOT
SHOWN. BECOME FAMILIAR WITH EXISTING ELECTRICAL SYSTEM WHICH WILL BE AFFECTED
BY THE DEMOLITION WORK.
2. PROVIDE EQUIPMENT, LABOR, AND MATERIALS TO REMOVE ELECTRICAL FACILITIES AND
CLEAR THE AREA TO RECEIVE THE NEW WORK PROVIDED UNDER THIS CONTRACT.
3. IN OCCUPIED AREAS BEYOND THE DEMOLITION SCOPE, KEEP EXISTING SYSTEMS NOT
AFFECTED BY PROJECT SCOPE OPERATIONAL THROUGH THE DURATION OF THE PROJECT.
OBTAIN PERMISSION FROM OWNER'S REPRESENTATIVE TO SHUT OFF SERVICES OR SYSTEMS
WHICH MAY AFFECT OTHER AREAS BEYOND THE LIMITS OF THE DEMOLITION AREA. INFORM
OWNER’S REPRESENTATIVE OF THE REASON FOR AND DURATION OF THE SHUTDOWN AND
ENSURE THAT THE SHUTDOWN IS MADE WITH AS LITTLE INCONVENIENCE TO OTHER AREAS
AS POSSIBLE.
4. INSTALL NEW CONDUCTORS FOR NEW DEVICES UNLESS SPECIFICALLY NOTED OTHERWISE.
RETAIN EXISTING CONDUITS IN GOOD CONDITION WHERE APPROVED BY ENGINEER OR AS
INDICATED.
5. KEEP EXISTING SYSTEMS OPERATIONAL DURING ALL PHASES OF CONSTRUCTION. DO NOT
CUT EXISTING TELECOMMUNICATION WIRING, CABLES OR CONDUIT. CONTRACTORS WHO CUT
IN-SERVICE CABLES ARE RESPONSIBLE FOR ALL DOWNTIME AND COSTS TO REPAIR.
6. INSTALL BLANK COVER PLATES OVER OPENING AT REMOVED DEVICE LOCATIONS. THIS
INCLUDES BUT IS NOT LIMITED TO, CLOCKS, RECEPTACLES, SWITCHES, JUNCTION BOXES,
ETC.
7. PROVIDE CUTTING AND PATCHING OF EXISTING MATERIALS AS REQUIRED FOR THE PROPER
COMPLETION OF THE DEMOLITION WORK AND THE INSTALLATION OF THE NEW WORK.
8. MAINTAIN FULL FUNCTIONAL AND AESTHETIC INTEGRITY OF DEVICES IDENTIFIED TO BE
REMOVED AND RELOCATED, AND HANDLE WITH APPROPRIATE CARE TO ALLOW FOR
REINSTALLATION. REPLACE DEVICES DAMAGED DURING DEMOLITION WITH NEW AT
CONTRACTOR’S EXPENSE.
9. EQUIPMENT AND SYSTEM THAT ARE REMOVED REMAIN THE PROPERTY OF THE OWNER
UNLESS OTHERWISE NOTED. DISPOSE OF ALL MATERIALS NOT SALVAGED BY THE OWNER.
10. REMOVE AND REINSTALL CEILING TILES REQUIRED FOR THE WORK BEING DONE UNDER THIS
CONTRACT. REPLACE CEILING TILES DAMAGED DURING CONSTRUCTION TO MATCH EXISTING.
1. BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO BID.
2. INCREASE CONDUCTOR SIZES ON 20A 120V-1 PHASE CIRCUITS EXCEEDING 100 FEET TO
CENTER OF LOAD TO ACCOUNT FOR VOLTAGE DROP.
3. PROVIDE A DEDICATED GREEN INSULATED GROUND CONDUCTOR TO ALL DEVICES. DO
NOT USE CONDUIT SYSTEM AS THE ONLY EQUIPMENT GROUNDING METHOD.
4. CONTRACTOR IS RESPONSIBLE FOR OPENINGS IN WALLS, FLOORS, AND CEILINGS THAT
ARE REQUIRED TO COMPLETE THEIR SCOPE OF WORK. SEAL PENETRATIONS IN
ACCORDANCE WITH THE RATING OF THE AFFECTED ASSEMBLY. REFER TO OCCUPANCY
PLAN FOR RATED WALLS, FLOORS, AND CEILINGS.
INSTALLATION NOTES - ELECTRICAL
ELECTRICAL ABBREVIATIONS
A DEVICE MOUNTED +8" ABOVE
COUNTER TOP (VERIFY LOCATION)
AFF ABOVE FINISHED FLOOR
ATS AUTOMATIC TRANSFER SWITCH
C CEILING
CB CIRCUIT BREAKER
CT CURRENT TRANSFORMER
E EXISTING ITEM TO REMAIN
EC ELECTRICAL CONTRACTOR
EM EMERGENCY LIGHT FIXTURE
ER NEW LOCATION OF EXISTING ITEM
F ROUGH IN FOR FUTURE DEVICE
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FSD FIRE SMOKE DAMPER
G GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
KVA KILO-VOLT-AMPERES
KW KILOWATTS
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION PANEL
MLO MAIN LUGS ONLY
N NEW DEVICE IN EXISTING LOCATION
NIC NOT IN CONTRACT
NM NONMETALLIC
NTS NOT TO SCALE
OC ON CENTER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED,
OWNER INSTALLED
R EXISTING ITEM TO BE REMOVED
RR EXISTING ITEM TO BE REMOVED AND
RELOCATED
RN EXISTING ITEM TO BE REMOVED AND
REPLACED WITH NEW
SCCR SHORT CIRCUIT CURRENT RATING
T TAMPER PROOF DEVICE
TCC TEMPERATURE CONTROL CONTRACTOR
TV TELEVISION
TYP TYPICAL
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLTS
VA VOLT-AMPERES
W WEATHERPROOF DEVICE
WR WEATHER RESISTANT DEVICE
+24" INDICATES MOUNTING HEIGHT CENTER
LINE OF DEVICE TO FINISHED FLOOR
MANUAL FIRE ALARM PULL STATION
FIRE DETECTION AND ALARM SYMBOLS
SMOKE DETECTOR
SMOKE DETECTOR WITH 520Hz SOUNDER BASE
DUCT SMOKE DETECTOR
CARBON MONOXIDE DETECTOR
HEAT DETECTOR
WALL MOUNTED COMBINATION HORN WITH STROBE
CEILING MOUNTED STROBE
SPEAKER
ADDRESSABLE INPUT MODULE; FS - SPRINKLER WATER FLOW SWITCH,
TS - TAMPER SWITCH, PIV - POST INDICATOR VALVE
MAGNETIC DOOR HOLD
FIRE ALARM CONTROL PANEL + EMERGENCY COMMUNICATIONS PANEL
COMBINATION FIRE/SMOKE DAMPER
S
S
AIM
ADDRESSABLE OUTPUT MODULE; SD - FAN SHUT DOWN RELAY, AM - AUDIO MUTEAOM
S
SB
H HORN
S
FSD
S
F
FAA
FACP
XX
XX
COMBINATION CARBON MONOXIDE / SMOKE DETECTORS
FIRE ALARM ANNUNCIATOR PANEL
WALL MOUNTED STROBE
CEILING MOUNTED COMBINATION HORN WITH STROBE
C
WALL MOUNTED WEATHERPROOF COMBINATION HORN WITH STROBE
W
WALL MOUNTED COMBINATION SPEAKER WITH STROBE
CEILING MOUNTED COMBINATION SPEAKER WITH STROBE
C
COMMUNICATIONS - TELECOM SYSTEMS:
O
FO
I
COPPER HORIZONTAL CABLING, EXTENDED PHONE LINES
ROUGH-IN, PATHWAYS AND SLEEVES
SAFETY - FIRE DETECTION AND ALARM:
ROUGH-IN, PATHWAYS AND SLEEVES
INITIATING FIELD DEVICES (SMOKE, MANUAL PULL, MONITOR MODULES)
NOTIFICATION APPLIANCES (HORNS, STROBES, SPEAKERS)
MISCELLANEOUS DEVICES (RELAYS, TEST STATION, ANNUNCIATOR)
TECHNOLOGY RESPONSIBILITY MATRIX
PROVISION RESPONSIBILITIES DEFINED
OFOI
OFCI
CFCI
CFOI
OWNER FURNISHED & OWNER INSTALLED
OWNER FURNISHED & CONTRACTOR INSTALLED
CONTRACTOR FURNISHED & CONTRACTOR INSTALLED
CONTRACTOR FURNISHED & OWNER INSTALLED
GENERAL NOTE:
A. MATRIX IS NOT INTENDED TO BE EXHAUSTIVE TO COVER ALL MATERIALS NECESSARY FOR
SCOPE AND SHOULD ONLY BE USED TO QUICKLY IDENTIFY SYSTEMS AND RELATED
INFRASTRUCTURE INSIDE AND OUTSIDE THE BID OF THIS PROJECT. ANY ITEMS FURNISHED
OR INSTALLED BY THE BIDDING CONTRACTOR SHALL COVER ALL REQUIRED APPURTENANCES
NECESSARY FOR A COMPLETE SYSTEM. THIS SHALL INCLUDE BUT NOT BE LIMITED TO,
EQUIPMENT, ACCESSORIES, TERMINATIONS, TERMINATION COMPONENTS, ALL FINAL
CORDAGE CONNECTIVITY, SOFTWARE, PROGRAMMING, AND THE LABOR TO INSTALL.
O
FC
I
C
FC
I
C
FO
I
1. EXISTING FIRE DETECTION AND ALARM SYSTEM MUST REMAIN OPERATIONAL UNTIL
NEW FIRE ALARM PANEL IS FUNCTIONAL. COORDINATE EXISTING ZONES IN USE AND
PHASE REPLACEMENT OF SYSTEM TO MINIMIZE DOWNTIME.
2. METHODICALLY, AND IN CLOSE COORDINATION WITH THE OWNER, ROUTE NEW FIELD
WIRING TO ANTICIPATED DEVICE LOCATIONS. TAKE NO MORE THAN ONE EXISTING
SIGNAL LINE CIRCUIT OFFLINE AT ANY ONE TIME TO ENSURE A GRACEFUL MIGRATION
OCCURS FROM THE EXISTING SYSTEM TO THE NEW.
3. BIDDING CONTRACTOR IS ENCOURAGED TO RE-USE EXISTING PATHWAYS AND BOXES
WHERE IT IS APPROPRIATE. PROVIDE NEW PENETRATIONS AND SLEEVES WHERE
NECESSARY FOR DEVICE INSTALLATION. REFER TO PLAN SHEETS FOR NEW DEVICE
LOCATIONS AND WHERE EXISTING LOCATIONS CAN BE REUSED.
4. INTERFACE NEW DEVICES WITH NEW AND/OR EXISTING MECHANICAL EQUIPMENT FOR
FAN SHUT DOWN, SMOKE DAMPER AND COMBINATION FIRE/SMOKE DAMPER
PURPOSES.
5. NEW FIRE ALARM DEVICES FOR NOTIFICATION OR DETECTION SHALL BE INSTALLED IN
THE MIDDLE OF CEILING TILES. EXISTING TILE SIZE IS APPROXIMATELY 20" X 60".
INSTALL APPROPRIATE BRACKETS SO DEVICES ARE SUPPORTED FROM THE GRID OR
STRUCTURE ABOVE. TILES CANNOT BE USED FOR SUPPORT.
6. FIRE ALARM ITEMS AND DEVICES ARE SHOWN IN SUGGESTED LOCATIONS. FINAL
LAYOUTS, LOCATIONS, AND QUANTITIES SHALL BE IN ACCORDANCE WITH APPLICABLE
CODES, MANUFACTURER’S RECOMMENDATIONS, AND EQUIPMENT LISTINGS.
COORDINATE LOCATIONS WITH LIGHTING AND AIR HANDLING SYSTEMS.
7. ALL FIRE ALARM CIRCUITRY IN EXPOSED CEILING SPACES SHALL BE IN ¾” CONDUIT PER
SPECIFICATIONS. EXPOSED CABLING SHALL NOT BE ACCEPTED.
8. ALL CONCEALED, ACCESSIBLE CEILING TILE LOCATIONS SHALL BE ALLOWED TO HAVE
OPEN AIR CABLING INSTALLED. PROVIDE J-HOOKS, BRIDLE RINGS AND ASSOCIATED
CABLE SUPPORTS TO KEEP INFRASTRUCTURE MANAGED AND OFF OF THE CEILING TILE.
9. ELECTRICAL CONTRACTOR SHALL PROVIDE FIRESTOPPING AT ALL PENETRATIONS PER
SPECIFICATION.
10. DEVICES SHALL BE WHITE UNLESS OTHERWISE NOTED.
FIRE DETECTION & ALARM NOTES
1. REUSE EXISTING SPEAKER STROBE AND STROBE NOTIFICATION DEVICES. EXISTING
DEVICES ARE ON A SIEMENS SYSTEM AND ARE EDWARDS EST PRODUCT. RECONNECTED
EXISTING DEVICES TO THE NEW SYSTEM. EXISTING CONDUCTORS ARE NOTED TO BE 14/4
FOR THE SPEAKER STROBES. CONDUCTORS CAN BE REUSED IF FEASIBLE WITH NEW
SYSTEM CONFIGURATION. REMOVE OR TAG ABANDONED CABLES PER NEC 760. REFER
TO SHEETS ED103, E103, AND E104 FOR MORE INFORMATION.
2. INSTALL NEW SPEAKER STROBE AND STROBE NOTIFICATION DEVICES WITH NEW
SYSTEM. EXISTING DEVICES TO BE REMOVED. EXISTING CONDUCTORS ARE NOTED TO BE
14/4 FOR THE SPEAKER STROBES. CONDUCTORS CAN BE REUSED IF FEASIBLE WITH NEW
SYSTEM CONFIGURATION. REMOVE OR TAG ABANDONED CABLES PER NEC 760.REFER TO
SHEETS ED103, E103, AND E104 FOR MORE INFORMATION.
ALTERNATES
MAGNETIC LOCKML
ACCESS CONTROL SYMBOLS
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th Street West Des Moines, Iowa 50265 515.724.7938
/2
/2
:0 :3
P
M
E000
CONSTRUCTION
DOCUMENTS
2/1/2024
9360.00
S T
A T
E O
F I
O W
A
D A
S
IP
B S
F
IR
E A
L A
R M
R E
P L
A C
E M
E N
T C
O R
P O
R A
T E
D R
IV
E
J O
H N
S T
O N
IO
W A
ELECTRICAL GENERAL
NOTES & SYMBOLS
# Revision Date
1 ADDENDUM #1 02/20/2024
F A
A
S S
F
F
C
C
S
S
S
S
F
S S S
S
S S
SS
SS
S S S
S
S SS
S
S
S S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
F
S
FAA
S
ML
M L
ML
ML
ML
ML
1. DEMOLITION DRAWINGS PRESENT LAYOUT OF EXISTING
CONDITIONS AND MAJOR ITEMS. THEY ARE NOT TO BE
CONSTRUED AS COMPLETE IN REPRESENTATION OF
ACCESSORIES AND INCIDENTALS TO BE REMOVED, REPLACED,
OR REWORKED. NOR SHOULD ACCESSIBILITY BE INFERRED.
THE CONTRACTOR IS RESPONSIBLE TO FAMILIARIZE
THEMSELVES WITH THE BUILDING AND EXISTING CONDITIONS,
PRIOR TO THE SUBMITTING OF A BID FOR THIS PROJECT.
2. REMOVE ELECTRICAL FACILITIES AND CLEAR THE AREA TO
RECEIVE THE NEW WORK TO BE PROVIDED UNDER THIS
CONTRACT.
3. THIS ELECTRICAL DEMOLITION DRAWING SHOWING EXISTING
CONDITIONS HAS BEEN PREPARED BASED ON FIELD
OBSERVATION. ADDITIONAL COMPONENTS MAY EXIST WHICH
DO NOT SHOW, AND SUCH ITEMS SHALL BE REMOVED TO
MATCH SIMILAR ITEMS WHICH DO SHOW. CONTRACTOR SHALL
VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING
CONDITIONS.
4. ABBREVIATIONS:
E - EXISTING ITEM TO REMAIN
ER - NEW LOCATION OF EXISTING ITEM
N - NEW ITEM IN EXISTING LOCATION
R - EXISTING ITEM TO BE REMOVED, PATCH AND/OR
COVER
RN - REPLACE EXISTING WITH NEW
RR - EXISTING ITEM TO BE REMOVED AND RELOCATED
ELECTRICAL DEMOLITION NOTES
ADMINISTRATION
COMMUNICATIONS
OFFICE
OFFICE
OFFICE1114
OFFICE
OFFICE
BOARDROOM
PRODUCTION
EDUCATION
VIDEO TAPE LIBRARY
NETWORK VIDEO CENTER
TECH EQUIP. CENTER
NETWORK CONTROL
CENTER
AVID 5
FINAL CUT 4
EDIT SERVER
AVID 6
AVID 1
AVID 2
LUNCH ROOM
VENDING
1155A
VEST.
TECHNICAL SHOP
STUDIO 2
CC "B"
AUDIO PROD.
VIDEO CONTROL 1
AUDIO CONTROL 1
CONFERENCE ROOM
FINAL CUT 1
FINAL CUT 2
FINAL CUT 3
OFFICE
SOUTH CONF. ROOM
1126A
MEETING ROOM
GRAPHICS & DESIGN
MENS
WOMEN
CONF. ROOM
VEST.
1138A
FINAL CUT 5
AVID 4
AVID 3
CC "A"
CORRIDOR
MAIN LOBBY
VEST.
CORRIDOR
RN
RN
RN RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN RN RN
RN
RN
RN
RN
R
RN
RN RN
RNRN
RNRN
RN RN RN
RN
RN
R
RN
RN RN
RN
RN
RN RN
RN
RN
RN RN
RN
RN
RN
RN RN
RN
RN
RN
RNRN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RNRN
RN
RN
RN
RN
RN
RN
RN
RN
RN
MOTION GRAPHICS
DARK RM.
M A
T C
H L
IN
E
M A
T C
H L
IN
E
RN
RN
RN
E E
E
E
RN
RN
INSTALL NEW SMOKE DETECTOR IN SATELITE BUILDING.
REUSE EXISTING CONDUIT AND CONDUCTORS TO BUILDING.
REMOVE EXISTING HEAT DETECTOR IN TOWER.
REUSE EXISTING CONDUIT AND CONDUCTORS TO BUILDING.
RN
RN
3 3
3 3
E
E
E
E
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th Street West Des Moines, Iowa 50265 515.724.7938
/2
/2
:0 :3
P
M
ED101
CONSTRUCTION
DOCUMENTS
2/1/2024
9360.00
S T
A T
E O
F I
O W
A
D A
S
IP
B S
F
IR
E A
L A
R M
R E
P L
A C
E M
E N
T C
O R
P O
R A
T E
D R
IV
E
J O
H N
S T
O N
IO
W A
FIRE ALARM
DEMOLITION - WEST
1/8" = 1'-0"
FIRE ALARM DEMO FLOOR PLAN - WEST
KEYNOTES
1 REMOVE EXISTING DEVICE IN ROOM. PREPARE WIRNG FOR
REUSE AND EXTENSION TO NEW DEVICE LOCATIONS IN
ROOM. INSTALL BLANK COVER PLATE OVER EXISTING
DEVICE LOCATION.
2 BASE BID TO REMOVE NOTIFICATION DEVICES AND
REPLACE WITH NEW. ALTERNATE #1 INCLUDES REUSING
EXISTING SPEAKER STROBE NOTIFICATION DEVICES CAN BE
REUSED AS A PART OF ALTERNATE #1. EXISTING DEVICES
APPEAR TO BE EDWARDS EST SPEAKER STROBE
PRODUCTS WITH 14/4 WIRING. SEE DESCRIPTION OF
ALTERNATE ON SHEET E000 FOR MORE INFORMATION.
3 BASE BID TO REMOVE NOTIFICATION DEVICES AND
REPLACE WITH NEW. ALTERNATE #1 INCLUDES REUSING
EXISTING NOTIFICATION DEVICES. EXISTING DEVICES
APPEAR TO BE EDWARDS EST. SEE DESCRIPTION OF
ALTERNATE ON SHEET E000 FOR MORE INFORMATION.
# Revision Date
1 ADDENDUM #1 02/20/2024
C P
FAA
S S
SS
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S
S
F
F
S S
SS
S
S S
S
S
SS
SS
S
S
S
S
SSS
S
F
F
AIM
FS
AIM
TS
S
SS
N A
C
M L
M L
M L
ML
M L
ML
ML
1. DEMOLITION DRAWINGS PRESENT LAYOUT OF EXISTING
CONDITIONS AND MAJOR ITEMS. THEY ARE NOT TO BE
CONSTRUED AS COMPLETE IN REPRESENTATION OF
ACCESSORIES AND INCIDENTALS TO BE REMOVED, REPLACED,
OR REWORKED. NOR SHOULD ACCESSIBILITY BE INFERRED.
THE CONTRACTOR IS RESPONSIBLE TO FAMILIARIZE
THEMSELVES WITH THE BUILDING AND EXISTING CONDITIONS,
PRIOR TO THE SUBMITTING OF A BID FOR THIS PROJECT.
2. REMOVE ELECTRICAL FACILITIES AND CLEAR THE AREA TO
RECEIVE THE NEW WORK TO BE PROVIDED UNDER THIS
CONTRACT.
3. THIS ELECTRICAL DEMOLITION DRAWING SHOWING EXISTING
CONDITIONS HAS BEEN PREPARED BASED ON FIELD
OBSERVATION. ADDITIONAL COMPONENTS MAY EXIST WHICH
DO NOT SHOW, AND SUCH ITEMS SHALL BE REMOVED TO
MATCH SIMILAR ITEMS WHICH DO SHOW. CONTRACTOR SHALL
VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING
CONDITIONS.
4. ABBREVIATIONS:
E - EXISTING ITEM TO REMAIN
ER - NEW LOCATION OF EXISTING ITEM
N - NEW ITEM IN EXISTING LOCATION
R - EXISTING ITEM TO BE REMOVED, PATCH AND/OR
COVER
RN - REPLACE EXISTING WITH NEW
RR - EXISTING ITEM TO BE REMOVED AND RELOCATED
ELECTRICAL DEMOLITION NOTES
STORAGE ROOM
WOMENS
MENS
ELEC. RM.
MECH RM.
CORRIDOR
EFP
1169A
FIBER
GENERAL SERVICES
1170A
COMP. ROOM
TECHNICAL STORAGE
PRODUCTION SHOP
DESIGN
STUDIO 1
GREEN ROOM
OFFICE
OFFICE
OFFICE
COAT CLOSET
MENS
WOMEN
MAYTAG LOBBY
VEST
STUDIO 3
MAYTAG AUDITORIUM
SERVING
VIDEO ROOM
AUDIO ROOM
VEST.
DRESSING
DRESSING
DRESS.1196
MENS
WOMEN
DRESS.
RECEIVING
JAN
CORRIDOR
ENGINEERING
CLOSET
UPS RM.
RN
RN
R
RN
RN RN
RNRN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN RN RN RN
RN
RN
RN RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RNRN
RNRN
RN
RN
RN
RN
RN
RNRNRN
RN
RN RN
RNRN
RN
RN RN
RN
RN
RN
RN
M A
T C
H L
IN
E
M A
T C
H L
IN
E
RN
RN
RN
E
E
RN
RN
E
E
RNRN
R
REMOVE EXISTING FIRE
ALARM FDC BELL AND
PREPARE AREA FOR
NEW HORN/STROBE
E
E
EEE
E
E
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C.
This is the start of the file's text. The full file is on GovTribe.