rfb_13199_for_info_only_20-SDG&E_transmission_TL_6926_permanent_UG_electric_relocation_jack_and_bore_asbuilt.pdf

PDF 250 KB Posted

Attached to
RFB - COLE GRADE ROAD IMPROVEMENTS PHASE 1
Solicitation number
BPM013199
Issued by
California

About this file

This is an As-Built documentation file for an electric transmission line relocation project conducted by SDG&E (San Diego Gas & Electric). The project involved permanent underground electric relocation work utilizing jack and bore construction methodology for transmission line 6926. The documentation details specific construction activities completed during the project, including casing installation and abandonment procedures at station 164+78, where a casing was advanced 126 feet before being grouted with an 8-sack sand mix, with surrounding voids also filled to ensure structural integrity.

The file provides technical specifications for pit backfill procedures, which were completed using a 2-sack slurry mix containing a 2% calcium chloride admixture for both the sending and receiving pits. This documentation serves as a record of completed work scope items and construction methodologies employed during the permanent underground electric relocation jack and bore operation, confirming adherence to the project specifications and construction standards for SDG&E transmission infrastructure.

View the file

Other files

File Type Posted
rfb_13199_for_info_only_10-groundwater_resources_investigation_report.pdf PDF
rfb_13199_for_info_only_7-hydraulic_analysis_for_cole_grade_road.pdf PDF
rfb_13199_for_info_only_9-groundwater_dewatering_study.pdf PDF
rfb_13199_for_info_only_1-structures_record_drawings.pdf PDF
rfb_13199_project_plans.pdf PDF
rfb_13199_for_info_only_16-mediacom_temporary_pole_relocation_plans.pdf PDF
rfb_13199_utility_plans_VCMWD_waterline.pdf PDF
rfb_13199_for_info_only_6-geotechnical_design_report_keys_creek.pdf PDF
rfb_13199_for_info_only_11-addendum_to_foundation_report.pdf PDF
rfb_13199_for_info_only_8-additional_hydraulic_analyses_for_cole_grade_road.pdf PDF
rfb_13199_for_info_only_12-geotechnical_data_report.pdf PDF
rfb_13199_utility_plans_mediacom_20A.pdf PDF
rfb_13199_for_info_only_18-SDG&E_transmission_TL_683_permanent_OH_pole_relocation.pdf PDF
rfb_13199_utility_plans_SDG&E_transmission_TL6926.pdf PDF
rfb_13199_for_info_only_2-RWQCB_draft_NOI_memo.pdf PDF
plan_holder_list_c89a142d-666e-4a85-b2f5-f31b1efa0b37.pdf PDF
rfb_13199_for_info_only_14-final_dewatering_mitigation_plan.pdf PDF
rfb_13199_contract_document.pdf PDF
rfb_13199_for_info_only_5-foundation_report_keyes_creek.pdf PDF
rfb_13199_for_info_only_17-SDG&E_transmission_TL_6926_permanent_UG_electric_relocation.pdf PDF
rfb_13199_utility_plans_AT&T_20A.pdf PDF
rfb_13199_utility_plans_SDG&E_20A.pdf PDF
rfb_13199_for_info_only_13-draft_geotechnical_report.pdf PDF
rfb_13199_for_info_only_3-geotechnical_evaluation.pdf PDF
rfb_13199_for_info_only_4-supplemental_geotechnical_evaluation.pdf PDF
rfb_13199_for_info_only_15-AT&T_temporary_pole_relocation_plans.pdf PDF
rfb_13199_for_info_only_19-SDG&E_distribution_temporary_H and UG_relocations_plans.pdf PDF
rfb_13199_for_info_only_roadway_cross_sections.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Casing advanced and abandoned after 126' at approximate

STA 164+78

Casing was grouted with 8-sack sand mix and voids around casing was also filled

Sending/receiving pits were backfilled with 2-sack slurry mix with a 2% calcium chloride admixture

Sending/receiving pits were backfilled with 2-sack slurry mix with a 2% calcium chloride admixture