This is an addendum to a geotechnical foundation report prepared by Ninyo & Moore for the County of San Diego Department of Public Works, dated March 14, 2022, for the Keys Creek Tributary Crossing project on Cole Grade Road in Valley Center, California. The addendum provides supplemental pile foundation recommendations for a proposed bridge structure that will be supported on deep foundation systems consisting of cast-in-drilled-hole (CIDH) concrete piles, cast-in-steel-shell (CISS) piles, or driven steel H-piles. The services include geotechnical reconnaissance conducted on February 17, 2022, review of the original 2015 foundation report, supplemental geotechnical analyses for 3-foot and 4-foot diameter CIDH pile foundations with increased rock embedment depths, analyses for CISS and driven steel H-pile alternatives, and evaluation of both axial and lateral load capacities for all pile types.
The addendum presents detailed axial and lateral pile capacity data for CIDH and CISS piles with 36-inch and 48-inch diameters and rock embedment depths ranging from 5 to 20 feet, as well as for HP14 x 102 driven steel H-piles with 5-foot rock embedment. Axial capacities were evaluated using the AllPile computer program based on soil properties including consideration of liquefaction downdrag forces during design seismic events. Lateral load capacities were generally evaluated for 1/2-inch deflections at the pile head under both free-head and fixed-head conditions, with specific deflection limits applied for short pile configurations. The document includes soil parameter tables for both static and seismic conditions at north and south abutment locations, comprehensive summary tables of design loads and nominal resistances for each pile type and embedment depth combination, pile spacing reduction factors for group configurations, and detailed lateral analysis graphs showing deflection, moment, and shear force relationships with depth.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5710 Ruffin Road | San Diego, California 92123 | p. 858.576.1000 | www.ninyoandmoore.com
March 14, 2022 Project No. 108611020
Mr. E. David Gasaway County of San Diego Department of Public Works 5252 Kearny Villa Way San Diego, California 92123
Subject: Addendum to Foundation Report Supplemental Pile Foundation Recommendations Keys Creek Tributary Crossing Cole Grade Road, Valley Center, California Oracle Project No. 1003046
References: CivilTech Software, 2017, LiquefyPro (Version 5.9c), A Computer Program for Liquefaction and Settlement Analysis.
Kennedy, M.P., Tan, S.S., Bovard, K.R., Alvarez, R.M., Watson, M.J., and Gutierrez, C.I., 2007, Geologic Map of the Oceanside 30’ x 60’ Quadrangle, CGS Regional Map No. 2, California, Scale 1:100,000.
Ninyo & Moore, 2015, Foundation Report, Keys Creek Tributary Crossing, Cole Grade Road, Valley Center, California, Oracle Project No. 1003046, Ninyo & Moore Project No. 106898010: dated May 8.
Dear Mr. Gasaway:
In accordance with your authorization dated January 28, 2022, we have prepared this addendum providing supplemental pile foundation recommendations for the Keys Creek Tributary Crossing project in Valley Center, California. We understand that the proposed bridge structure for the project is to be supported on deep foundation systems that may consist of cast-in-drilled-hole (CIDH) concrete piles, cast-in-steel-shell (CISS) piles, or driven steel H-piles. The purpose of this addendum was to provide supplemental recommendations for the design of pile foundations to be used on the project. The findings and recommendations in this addendum are considered supplemental, and the findings, conclusions, and recommendations presented in the referenced geotechnical report (Ninyo & Moore, 2015) remain valid and applicable.
http://www.ninyoandmoore.com/
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 2
SCOPE OF SERVICES
The services for this addendum have included the following:
• Performing a geotechnical reconnaissance of the site to observe the existing conditions for comparison to the site conditions documented during the initial evaluation for the referenced foundation report.
• Reviewing the referenced foundation report (Ninyo & Moore, 2015) and providing updated recommendations for current standards/criteria, as appropriate.
• Performing supplemental geotechnical analyses for the capacities of 3-foot diameter CIDH pile foundations with increased depths to those presented in the referenced foundation report (Ninyo & Moore, 2015), including an evaluation of lateral capacities.
• Performing geotechnical analyses for the capacities of 4-foot diameter CIDH pile foundations, including an evaluation of lateral capacities.
• Performing geotechnical analyses for the capacities of CISS pile foundations, including an evaluation of lateral capacities.
• Performing geotechnical analyses for the capacities of drive steel H-pile foundations, including an evaluation of lateral capacities.
• Issuing this draft addendum letter presenting our supplemental recommendations for the requested pile foundation alternatives.
GEOTECHNICAL RECONNAISSANCE
On February 17, 2022, a representative of Ninyo & Moore performed a geotechnical reconnaissance of the proposed bridge location. The purpose of our reconnaissance was to observe current conditions at the site and to evaluate whether or not significant changes have occurred at the site since the issuance of our foundation report (Ninyo & Moore, 2015). Based on our geotechnical reconnaissance, we conclude that the site conditions are generally consistent with those observed during preparation of our foundation report.
SUPPLEMENTAL PILE ANALYSIS
As noted, we understand that the new bridge structure may be supported on CIDH, CISS, or driven steel H-pile foundations that will be rock-socketed within competent granitic rock at the bridge abutment locations. The previous referenced report (Ninyo & Moore, 2015) provided pile capacities for CIDH foundation with diameters of 16, 24, and 36 inches along with granitic rock embedment depths of 5 and 10 feet. Based on correspondence with the County of San Diego, we understand that further analysis of CIDH piles with greater diameters and deeper rock embedment depths along with CISS and driven steel H-piles have been requested. Accordingly, we have prepared this
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 3 addendum presenting axial and lateral pile capacities for CIDH and CISS piles with diameters of
36 inches and 48 inches along with rock embedment depths of 5 to 20 feet. We are also presenting axial and lateral pile capacities for driven steel H-piles consisting of HP14 x 102 steel members embedded 5 feet into granitic rock.
Axial Capacities The capacities were evaluated using the computer program AllPile (CivilTech, 2017) based on the CIDH/CISS diameters, an HP14 x 102 steel member, and the soil properties, described below. The pile capacities calculated for each pile type are based on both end-bearing and frictional capacity assuming the pile is socketed within the Cole Grade Tonalite (Kennedy et al, 2007). The calculated pile capacities include the downdrag forces due to liquefaction of the alluvium during a design seismic event. The soil layer boundaries and the respective soil properties used in our evaluation of pile capacities under both static and liquefied conditions are summarized in Tables 1 through 4 below.
Table 1 – Pile Analysis Soil Parameters for North Abutment (Static)
Material Depth to
Layer Bottom (feet)
General Soil Type*
Buoyant Unit
Weight (pcf)
Friction Angle
(degrees) Cohesion
(ksf) k
(pci) e50
Fill 9 Silty Sand 115 29 0.12 25 -- Alluvium 14 Silty Sand 110 30 0.14 90 --
Alluvium (Below Groundwater) 25 Silty Sand 47.6 30 0.14 20 --
Alluvium (Below Groundwater) 35 Silty Sand 47.6 30 0.14 60 --
Granitic Rock -- Coarse-Grained Igneous Rock 62.6 42 0.14 1,100 0.002
Notes:
* - Sand (Reese) options should be used for Silty Sand layers in Allpile program.
ksf = kips per square foot pcf = pound per cubic foot pci = pounds per cubic inch
Table 2 – Pile Analysis Soil Parameters for North Abutment (Seismic)
Material Depth to
Layer Bottom (feet)
General Soil Type*
Buoyant Unit
Weight (pcf)
Friction Angle
(degrees) Cohesion
(ksf) k
(pci) e50
Fill 9 Silty Sand 115 29 0.12 25 -- Alluvium 14 Silty Sand 110 30 0.14 90 --
Alluvium (Below Groundwater) 25 Soft Clay 47.6 0 0.14 0.1 0.05
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 4
Table 2 – Pile Analysis Soil Parameters for North Abutment (Seismic)
Depth to
Layer Bottom (feet)
General Soil Type*
Buoyant Unit
Weight (pcf)
Friction Angle
(degrees) Cohesion
(ksf) k
(pci) e50
Alluvium (Below Groundwater) 35 Soft Clay 47.6 0 0.14 0.1 0.05
Granitic Rock -- Coarse-Grained Igneous Rock 62.6 42 0.14 1,100 0.002
Notes:
* - Sand (Reese) options should be used for Silty Sand layers in Allpile program.
ksf = kips per square foot
Table 3 – Pile Analysis Soil Parameters for South Abutment (Static)
Depth to
Layer Bottom (feet)
General Soil Type*
Buoyant Unit
Weight (pcf)
Friction Angle
(degrees) Cohesion
(ksf) k
(pci) e50
Fill 9 Silty Sand 115 29 0.12 25 -- Alluvium 14 Silty Sand 110 30 0.14 90 --
Alluvium (Below Groundwater) 22 Silty Sand 47.6 30 0.14 20 --
Alluvium (Below Groundwater) 30 Silty Sand 47.6 30 0.14 60 --
Granitic Rock -- Coarse-Grained Igneous Rock 62.6 42 0.14 1,100 0.002
Notes:
* - Sand (Reese) options should be used for Silty Sand layers in Allpile program.
ksf = kips per square foot
Table 4 – Pile Analysis Soil Parameters for South Abutment (Seismic)
Depth to
Layer Bottom (feet)
General Soil Type*
Buoyant Unit
Weight (pcf)
Friction Angle
(degrees) Cohesion
(ksf) k
(pci) e50
Fill 9 Silty Sand 115 29 0.12 25 -- Alluvium 14 Silty Sand 110 30 0.14 90 --
Alluvium (Below Groundwater) 22 Soft Clay 47.6 0 0.14 0.1 0.05
Alluvium (Below Groundwater) 30 Soft Clay 47.6 0 0.14 0.1 0.05
Granitic Rock -- Coarse-Grained Igneous Rock 62.6 42 0.14 1,100 0.002
Notes:
* - Sand (Reese) options should be used for Silty Sand layers in Allpile program.
ksf = kips per square foot
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 5
Several of the granular layers of alluvium located below the groundwater are expected to liquefy to a depth of approximately 30 to 35 feet below the surface should the design seismic event occur, at the south and north abutments, respectively. The calculated pile capacities include the downdrag forces of the alluvium due to liquefaction during the design seismic event. The pile tip should be embedded in granitic bedrock. The pile design loads and recommended lengths were analyzed using the computer program AllPile (CivilTech, 2009). Tables 5 through 9 present the recommended pile tip elevations, design loads, and nominal resistances for the 36-in and 48-inch diameter CIDH and CISS piles assuming rock embedment depths of 5 to 20 feet and driven steel
H-piles with a rock embedment of 5 feet.
Table 5 – Summary of Axial Load Capacities for Single CIDH Pile (36-inch Diameter)
Location Rock
Embedment (feet)
Design Load (kips)
Nominal Resistance Elevation
Compression (kips)
Tension (kips)
Cutoff Elevation
(feet)
Design Tip
Elevation (feet)
Specified Tip
Elevation (feet)
Abutment 1 (North) 5 200 400 200 N/A 1,394 1,394
Abutment 1 (North) 10 350 700 220 N/A 1,389 1,389
Abutment 1 (North) 15 500 1,000 240 N/A 1,384 1,384
Abutment 2 (South) 5 200 400 200 N/A 1,399 1,399
Abutment 2 (South) 10 350 700 220 N/A 1,394 1,394
Abutment 2 (South) 15 500 1,000 240 N/A 1,389 1,389
Abutment 2 (South) 20 650 1,300 260 N/A 1,384 1,384
Note:
CIDH = Cast-in-drilled-hole concrete cast in place pile
Table 6 – Summary of Axial Load Capacities for Single CIDH Pile (48-inch Diameter)
Location Rock
Embedment (feet)
Design Load (kips)
Nominal Resistance Elevation
Compression (kips)
Tension (kips)
Cutoff Elevation
(feet)
Design Tip
Elevation (feet)
Specified Tip
Elevation (feet)
Abutment 1 (North) 5 340 680 230 N/A 1,394 1,394
Abutment 1 (North) 10 595 1,190 260 N/A 1,389 1,389
Abutment 1 (North) 15 850 1,700 290 N/A 1,384 1,384
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 6
Table 6 – Summary of Axial Load Capacities for Single CIDH Pile (48-inch Diameter)
Rock
Embedment (feet)
Design Load (kips)
Nominal Resistance Elevation
Compression (kips)
Tension (kips)
Cutoff Elevation
(feet)
Design Tip
Elevation (feet)
Specified Tip
Elevation (feet)
Abutment 2 (South) 5 340 680 230 N/A 1,399 1,399
Abutment 2 (South) 10 595 1,190 260 N/A 1,394 1,394
Abutment 2 (South) 15 850 1,700 290 N/A 1,389 1,389
Abutment 2 (South) 20 1,105 2,210 320 N/A 1,384 1,384
Table 7 – Summary of Axial Load Capacities for Single CISS Pile (36-inch Diameter)
Rock
Embedment (feet)
Design Load (kips)
Nominal Resistance Elevation
Compression (kips)
Tension (kips)
Cutoff Elevation
(feet)
Design Tip
Elevation (feet)
Specified Tip
Elevation (feet)
Abutment 1 (North) 5 200 400 160 N/A 1,394 1,394
Abutment 1 (North) 10 270 540 200 N/A 1,389 1,389
Abutment 1 (North) 15 340 680 230 N/A 1,384 1,384
Abutment 2 (South) 5 200 400 135 N/A 1,399 1,399
Abutment 2 (South) 10 270 540 160 N/A 1,394 1,394
Abutment 2 (South) 15 340 680 200 N/A 1,389 1,389
Abutment 2 (South) 20 400 800 230 N/A 1,384 1,384
CISS = Cast-in-steel-shell pile
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 7
Table 8 – Summary of Axial Load Capacities for Single CISS Pile (48-inch Diameter)
Rock
Embedme nt
(feet)
Design Load (kips)
Nominal Resistance Elevation
Compression (kips)
Tension (kips)
Cutoff Elevation
(feet)
Design Tip
Elevation (feet)
Specified Tip
Elevation (feet)
Abutment 1 (North) 5 340 680 200 N/A 1,394 1,394
Abutment 1 (North) 10 460 920 220 N/A 1,389 1,389
Abutment 1 (North) 15 580 1,160 240 N/A 1,384 1,384
Abutment 2 (South) 5 340 680 180 N/A 1,399 1,399
Abutment 2 (South) 10 460 920 200 N/A 1,394 1,394
Abutment 2 (South) 15 580 1,160 220 N/A 1,389 1,389
Abutment 2 (South) 20 700 1,400 240 N/A 1,384 1,384
Table 9 – Summary of Axial Load Capacities for Single Driven H-Pile (HP14 x 102)
Rock
Embedme nt
(feet)
Design Load (kips)
Nominal Resistance Elevation
Compression (kips)
Tension (kips)
Cutoff Elevation
(feet)
Design Tip
Elevation (feet)
Specified Tip
Elevation (feet)
Abutment 1 (North) 5 80 160 80 N/A 1,394 1,394
Abutment 2 (South) 5 70 140 70 N/A 1,399 1,399
Note:
CISS = Cast-in-steel-shell pile
Although the allowable axial loads for the driven steel H-piles may be increased by 2 kips per additional foot of embedment into the underlying rock materials (below the 5 feet indicated in
Table 9), we anticipate that driving refusal would be encountered at embedment depths beyond
5 feet into the underlying rock. Caltrans standards should be followed for driven piles. We anticipate that high tensile stresses will be generated in the piles during driving where the piles penetrate through the alluvium and extend into the underlying bedrock. The tensile stress may be high enough to damage the pile and may produce damaging vibrations. Therefore, pre-drilling should be implemented with an auger having a diameter 2 inches smaller than the width of the pile.
The depth of the pre-drilled hole can be extended up to the total depth of the pile. Due to the difficult driving conditions, the contractor should anticipate using driving tips or cutting shoes.
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 8
A pile spacing of three pile diameters on center or more should be used. For pile spacings less than three diameters, the reductions to axial load capacities presented in Table 10 should be used.
Table 10 – Preliminary Axial Load Reduction Factors
Center-To-Center Pile Spacing (Diameters)
Group Efficiency (Ratio of Axial Resistance of Pile in a Group to a Single Pile)
2D 0.8
2.5D 0.98 3D or more 1.0
Lateral Load Capacities Lateral load capacities for the CIDH, CISS, and driven steel H-piles were generally evaluated for
1/2-inch deflections at the pile head assuming free-head and fixed-head conditions. For certain cases, a 1/4-inch deflection at the pile head was assumed due to the “short pile” condition. The lateral pile capacity estimates presented in Tables 11 through 20 are based on the soil properties presented in Tables 1 and 3 for the static condition. Plots of the variation of the piles’ lateral deflection, shear, and bending moment with depth are presented in Attachment A.
Table 11 – Lateral Capacity for 36-Inch Diameter CIDH, North Abutment Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 40 40
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 41 109
Maximum Positive Moment (Kips-feet) 256.7 209.2
Maximum Negative Moment (Kips-feet) -19.6 -727.5
Depth to Maximum Positive Moment (feet) 10.1 13.7
Depth to Maximum Negative Moment (feet) 30.3 0
Depth to Zero Deflection (feet) 14.9 21.4
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 10 foot embedment into Granitic Rock] (Feet) 45 45
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 42 109
Maximum Positive Moment (Kips-feet) 266.7 209.2
Maximum Negative Moment (Kips-feet) -20.7 -729.2
Depth to Maximum Positive Moment (feet) 10.0 13.6
Depth to Maximum Negative Moment (feet) 30.0 0
Depth to Zero Deflection (feet) 14.5 21.4
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 9
Table 11 – Lateral Capacity for 36-Inch Diameter CIDH, North Abutment Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 15 foot embedment into Granitic Rock] (Feet) 50 50
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 42 109
Maximum Positive Moment (Kips-feet) 270.0 210.8
Maximum Negative Moment (Kips-feet) -21.4 -730.8
Depth to Maximum Positive Moment (feet) 9.6 13.6
Depth to Maximum Negative Moment (feet) 30.3 0
Depth to Zero Deflection (feet) 14.6 21.2
Table 12 – Lateral Capacity for 36-Inch Diameter CIDH, South Abutment
Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 35 35
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 42 109
Maximum Positive Moment (Kips-feet) 263.3 210
Maximum Negative Moment (Kips-feet) -13.3 -727.5
Depth to Maximum Positive Moment (feet) 9.9 13.8
Depth to Maximum Negative Moment (feet) 29.3 0
Depth to Zero Deflection (feet) 14.8 21.6
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 10 foot embedment into Granitic Rock] (Feet) 40 40
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 42 109
Maximum Positive Moment (Kips-feet) 266.7 210.8
Maximum Negative Moment (Kips-feet) -21.2 -729.2
Depth to Maximum Positive Moment (feet) 10.1 13.7
Depth to Maximum Negative Moment (feet) 30.7 0
Depth to Zero Deflection (feet) 14.9 21.4
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 10
Table 12 – Lateral Capacity for 36-Inch Diameter CIDH, South Abutment
Length of Pile [Including 15 foot embedment into Granitic Rock] (Feet) 45 45
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 42 109
Maximum Positive Moment (Kips-feet) 270.8 210.8
Maximum Negative Moment (Kips-feet) -22.2 -730.8
Depth to Maximum Positive Moment (feet) 10.0 13.6
Depth to Maximum Negative Moment (feet) 30.5 0
Depth to Zero Deflection (feet) 15.0 21.4
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 20 foot embedment into Granitic Rock] (Feet) 50 50
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 42 109
Maximum Positive Moment (Kips-feet) 275.0 212.5
Maximum Negative Moment (Kips-feet) -22.0 -732.5
Depth to Maximum Positive Moment (feet) 10.1 13.6
Depth to Maximum Negative Moment (feet) 30.3 0
Depth to Zero Deflection (feet) 14.6 21.7
Table 13 – Lateral Capacity for 48-Inch Diameter CIDH, North Abutment
Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 40 40
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 74 184
Maximum Positive Moment (Kips-feet) 580 389.2
Maximum Negative Moment (Kips-feet) -11.9 -1,508.3
Depth to Maximum Positive Moment (feet) 11.3 17.8
Depth to Maximum Negative Moment (feet) 35.6 0
Depth to Zero Deflection (feet) 18.2 27.1
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 10 foot embedment into Granitic Rock] (Feet) 45 45
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 74 185
Maximum Positive Moment (Kips-feet) 584.2 391.7
Maximum Negative Moment (Kips-feet) -36.8 -1,516.7
Depth to Maximum Positive Moment (feet) 11.4 17.7
Depth to Maximum Negative Moment (feet) 36.4 0
Depth to Zero Deflection (feet) 18.2 27.3
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 11
Table 13 – Lateral Capacity for 48-Inch Diameter CIDH, North Abutment
Length of Pile [Including 15 foot embedment into Granitic Rock] (Feet) 50 50
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 74 185
Maximum Positive Moment (Kips-feet) 590.8 393.3
Maximum Negative Moment (Kips-feet) -43.5 -1,516.7
Depth to Maximum Positive Moment (feet) 11.1 17.7
Depth to Maximum Negative Moment (feet) 36.9 0
Depth to Zero Deflection (feet) 18.2 27.3
Table 14 – Lateral Capacity for 48-Inch Diameter CIDH, South Abutment
Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 35 35
Deflection at top of pile (Inches) 1/2 1/4*
Lateral Capacity (Kips) 95 130
Maximum Positive Moment (Kips-feet) 788.3 240
Maximum Negative Moment (Kips-feet) N/A -1,183.3
Depth to Maximum Positive Moment (feet) 12 18.7
Depth to Maximum Negative Moment (feet) N/A 0
Depth to Zero Deflection (feet) 22.6 26.9
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 10 foot embedment into Granitic Rock] (Feet) 40 40
Deflection at top of pile (Inches) 1/2 1/4*
Lateral Capacity (Kips) 98 136
Maximum Positive Moment (Kips-feet) 833.3 314.2
Maximum Negative Moment (Kips-feet) N/A -1,233.3
Depth to Maximum Positive Moment (feet) 12.1 21
Depth to Maximum Negative Moment (feet) N/A 0
Depth to Zero Deflection (feet) 23.0 28.7
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 15 foot embedment into Granitic Rock] (Feet) 45 45
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 98 239
Maximum Positive Moment (Kips-feet) 833.3 633.3
Maximum Negative Moment (Kips-feet) -10.6 -2,258.3
Depth to Maximum Positive Moment (feet) 11.8 22.7
Depth to Maximum Negative Moment (feet) 40.5 0
Depth to Zero Deflection (feet) 22.7 30.0
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 12
Table 14 – Lateral Capacity for 48-Inch Diameter CIDH, South Abutment
Length of Pile [Including 20 foot embedment into Granitic Rock] (Feet) 50 50
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 98 239
Maximum Positive Moment (Kips-feet) 841.7 642.5
Maximum Negative Moment (Kips-feet) -37.6 -2,258.3
Depth to Maximum Positive Moment (feet) 11.6 22.7
Depth to Maximum Negative Moment (feet) 41.4 0
Depth to Zero Deflection (feet) 22.7 30.3
Notes:
CIDH = Cast-in-drilled-hole concrete cast in place pile
* Fixed head condition was capped at 1/4-inch, due to the “short pile” nature of this configuration. This limit was used because loads resulting in pile head deflections greater than 1/4-inch began to indicate lateral movement of the pile tip.
Table 15 – Lateral Capacity for 36-Inch Diameter CISS, North Abutment
Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 40 40
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 73 178
Maximum Positive Moment (Kips-feet) 557.5 394.2
Maximum Negative Moment (Kips-feet) -0.7 -1,541.7
Depth to Maximum Positive Moment (feet) 11.7 19.8
Depth to Maximum Negative Moment (feet) 38.4 0
Depth to Zero Deflection (feet) 21.4 28.7
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 10 foot embedment into Granitic Rock] (Feet) 45 45
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 73 180
Maximum Positive Moment (Kips-feet) 560 415.8
Maximum Negative Moment (Kips-feet) -16.8 -1,566.7
Depth to Maximum Positive Moment (feet) 11.8 20.5
Depth to Maximum Negative Moment (feet) 38.6 0
Depth to Zero Deflection (feet) 21.8 28.6
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 13
Table 15 – Lateral Capacity for 36-Inch Diameter CISS, North Abutment
Length of Pile [Including 15 foot embedment into Granitic Rock] (Feet) 50 50
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 73 180
Maximum Positive Moment (Kips-feet) 563.3 415.0
Maximum Negative Moment (Kips-feet) -32.8 -1,566.7
Depth to Maximum Positive Moment (feet) 11.6 20.2
Depth to Maximum Negative Moment (feet) 39.9 0
Depth to Zero Deflection (feet) 21.7 28.8
Table 16 – Lateral Capacity for 36-Inch Diameter CISS, South Abutment
Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 35 35
Deflection at top of pile (Inches) 1/2 1/4*
Lateral Capacity (Kips) 73 97
Maximum Positive Moment (Kips-feet) 553.3 195
Maximum Negative Moment (Kips-feet) N/A -825
Depth to Maximum Positive Moment (feet) 11.7 18.7
Depth to Maximum Negative Moment (feet) N/A 0
Depth to Zero Deflection (feet) 21.9 26.2
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 10 foot embedment into Granitic Rock] (Feet) 40 40
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 73 180
Maximum Positive Moment (Kips-feet) 560.8 417.5
Maximum Negative Moment (Kips-feet) -1.2 -1,566.7
Depth to Maximum Positive Moment (feet) 11.7 20.6
Depth to Maximum Negative Moment (feet) 38 0
Depth to Zero Deflection (feet) 21.8 27.5
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 15 foot embedment into Granitic Rock] (Feet) 45 45
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 73 180
Maximum Positive Moment (Kips-feet) 563.3 439.2
Maximum Negative Moment (Kips-feet) -18.1 -1,566.7
Depth to Maximum Positive Moment (feet) 11.8 20.9
Depth to Maximum Negative Moment (feet) 38.6 0
Depth to Zero Deflection (feet) 21.8 28.2
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 14
Table 16 – Lateral Capacity for 36-Inch Diameter CISS, South Abutment
Length of Pile [Including 20 foot embedment into Granitic Rock] (Feet) 50 50
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 73 180
Maximum Positive Moment (Kips-feet) 566.7 441.7
Maximum Negative Moment (Kips-feet) -31.6 -1,575.0
Depth to Maximum Positive Moment (feet) 11.6 21.2
Depth to Maximum Negative Moment (feet) 39.4 0
Depth to Zero Deflection (feet) 21.7 28.3
Notes:
CISS = Cast-in-steel-shell pile
* Fixed head condition was capped at 1/4-inch, due to the “short pile” nature of this configuration. This limit was used because loads resulting in pile head deflections greater than 1/4-inch began to indicate lateral movement of the pile tip.
Table 17 – Lateral Capacity for 48-Inch Diameter CISS, North Abutment
Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 40 40
Deflection at top of pile (Inches) 1/2 1/4*
Lateral Capacity (Kips) 120 163
Maximum Positive Moment (Kips-feet) 1,066.7 323.3
Maximum Negative Moment (Kips-feet) N/A -1,691.7
Depth to Maximum Positive Moment (feet) 12.5 23.4
Depth to Maximum Negative Moment (feet) N/A 0
Depth to Zero Deflection (feet) 26.7 30.7
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 10 foot embedment into Granitic Rock] (Feet) 45 45
Deflection at top of pile (Inches) 1/2 1/4*
Lateral Capacity (Kips) 124 170
Maximum Positive Moment (Kips-feet) 1,125 436.7
Maximum Negative Moment (Kips-feet) N/A -1,741.7
Depth to Maximum Positive Moment (feet) 12.7 25.0
Depth to Maximum Negative Moment (feet) N/A 0
Depth to Zero Deflection (feet) 26.8 32.7
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 15
Table 17 – Lateral Capacity for 48-Inch Diameter CISS, North Abutment
Length of Pile [Including 15 foot embedment into Granitic Rock] (Feet) 50 50
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 125 297
Maximum Positive Moment (Kips-feet) 1,141.7 891.7
Maximum Negative Moment (Kips-feet) -2.3 -3,191.7
Depth to Maximum Positive Moment (feet) 12.6 25.8
Depth to Maximum Negative Moment (feet) 47.5 0
Depth to Zero Deflection (feet) 26.8 33.8
Notes:
CISS = Cast-in-steel-shell pile
* Fixed head condition was capped at 1/4-inch, due to the “short pile” nature of this configuration. This limit was used because loads resulting in pile head deflections greater than 1/4-inch began to indicate lateral movement of the pile tip.
Table 18 – Lateral Capacity for 48-Inch Diameter CISS, South Abutment
Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 35 35
Deflection at top of pile (Inches) 1/2 1/4*
Lateral Capacity (Kips) 120 158
Maximum Positive Moment (Kips-feet) 1,008.3 219.2
Maximum Negative Moment (Kips-feet) N/A -1,683.3
Depth to Maximum Positive Moment (feet) 11.7 22.3
Depth to Maximum Negative Moment (feet) N/A 0
Depth to Zero Deflection (feet) 24.0 27.6
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 10 foot embedment into Granitic Rock] (Feet) 40 40
Deflection at top of pile (Inches) 1/2 1/4*
Lateral Capacity (Kips) 120 166
Maximum Positive Moment (Kips-feet) 1,066.7 378.3
Maximum Negative Moment (Kips-feet) N/A -1,725
Depth to Maximum Positive Moment (feet) 12.5 23.0
Depth to Maximum Negative Moment (feet) N/A 0
Depth to Zero Deflection (feet) 25.5 29.9
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 16
Table 18 – Lateral Capacity for 48-Inch Diameter CISS, South Abutment
Length of Pile [Including 15 foot embedment into Granitic Rock] (Feet) 45 45
Deflection at top of pile (Inches) 1/2 1/4*
Lateral Capacity (Kips) 120 173
Maximum Positive Moment (Kips-feet) 1,100 485.0
Maximum Negative Moment (Kips-feet) N/A -1,783.3
Depth to Maximum Positive Moment (feet) 12.7 24.1
Depth to Maximum Negative Moment (feet) N/A 0
Depth to Zero Deflection (feet) 26.4 31.8
Boundary Condition at the Top of the Pile Free-head Fixed-head Length of Pile [Including 20 foot embedment into Granitic Rock] (Feet) 50 50
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 120 305
Maximum Positive Moment (Kips-feet) 1,108.3 966.7
Maximum Negative Moment (Kips-feet) -4.4 -3,291.7
Depth to Maximum Positive Moment (feet) 12.6 25.3
Depth to Maximum Negative Moment (feet) 47.0 0
Depth to Zero Deflection (feet) 26.3 33.3
Notes:
CISS = Cast-in-steel-shell pile
* Fixed head condition was capped at 1/4-inch, due to the “short pile” nature of this configuration. This limit was used because loads resulting in pile head deflections greater than 1/4-inch began to indicate lateral movement of the pile tip.
Table 19 – Lateral Capacity for Driven Steel H-pile (HP14 x 102), North Abutment
Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 40 40
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 20 55
Maximum Positive Moment (Kips-feet) 95.0 103.3
Maximum Negative Moment (Kips-feet) -6.4 -301.7
Depth to Maximum Positive Moment (feet) 7.7 11.3
Depth to Maximum Negative Moment (feet) 25.9 0
Depth to Zero Deflection (feet) 12.3 14.7
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 17
Table 20 – Lateral Capacity for Driven Steel H-pile (HP14 x 102), South Abutment
Length of Pile [Including 5 foot embedment into Granitic Rock] (Feet) 35 35
Deflection at top of pile (Inches) 1/2 1/2
Lateral Capacity (Kips) 20 55
Maximum Positive Moment (Kips-feet) 94.2 104.2
Maximum Negative Moment (Kips-feet) -7.2 -300.8
Depth to Maximum Positive Moment (feet) 7.4 11.3
Depth to Maximum Negative Moment (feet) 24.4 0
Depth to Zero Deflection (feet) 12.3 14.7
Based on our analysis, increasing the embedment depth of the driven steel H-piles beyond 5 feet into the rock does not increase the lateral load capacities.
For lateral loading, piles in a group may be considered to act individually when the center-to-center spacing is greater than 4D (where, D is the diameter of the pile) in the direction normal to loading and greater than 8D in the direction parallel to loading. The following table presents the lateral load group reduction factors (also known as P-multipliers or Pm) to be applied for various pile spacing for in-line loading.
Table 21 – Preliminary Lateral Load Reduction Factors
Center-To-Center Pile Spacing for In- Line Loading (Diameters)
Group Efficiency (Ratio of Lateral Resistance of Pile in a Group to a Single Pile)
Row 1 Row 2 Row 3 and Higher 2D 0.60 0.35 0.25 3D 0.75 0.55 0.40 5D 1.00 0.85 0.70 7D 1.00 1.00 0.90
Note:
Based on California Amendments to AASHTO LRFD Bridge Design Specifications, 8th Edition, September 2017
If the loading direction for a single row of piles is perpendicular to the row, a Pm of less than 1.00 should only be used if the pile spacing is 4D or less. A Pm of 0.80, 0.90 and 1.00 should be used for pile spacing of 2.5D, 3D and 4D, respectively. Where the perpendicular spacing of laterally loaded piles is less than 4D, the in-line Pm reduction factors should be multiplied together.
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 18
LIMITATIONS
The geotechnical services described in this addendum have been conducted in general accordance with current practice and the standard of care exercised by geotechnical consultants performing similar tasks in the project area. No warranty, expressed or implied, is made regarding the conclusions, recommendations, and opinions presented in this addendum. Our conclusions and recommendations are based on an analysis of the observed site conditions and the references listed. If actual conditions differ from those described in this addendum, our office should be notified and additional recommendations, if warranted, can be provided upon request. Please note that our scope of services for this project did not include an evaluation of any potential environmental hazards at the site.
We appreciate the opportunity to be of service.
Respectfully submitted, NINYO & MOORE
William R. Morrison, PE, GE Senior Engineer
Jeffrey T. Kent, PE, GE Principal Engineer
WRM/JTK/gg
Attachment: Attachment A – Lateral Pile Analysis Graphs
Ninyo & Moore | Cole Grade Road, Valley Center, California | 108611020 | March 14, 2022 1
ATTACHMENT A
Lateral Pile Analysis Graphs
Depth (Zp) from Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=2.69E-4 Top yt=4.88E-1 Max. yt=4.88E-1 Top St=-4.04E-3
0-0.50 +0.50 yt=0 at 15.1-ft
St=0 at 20.6-ft
Top Moment=0.0 Max. Moment=256.7
0-500 +500
Top Shear=41.0 Max. Shear=41.0
0-50 +50 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=82448
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=82448
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=82448
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Cole Grade Road - Keys Creek North Abutment 36-inch CIDH in Rock 5 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=1.19E-3 Top yt=4.98E-1 Max. yt=4.98E-1 Top St=5.72E-18
0-0.50 +0.50 yt=0 at 22.1-ft
St=0 at 26.8-ft
Top Moment=-727.5 Max. Moment=727.5
0-1000 +1000
Top Shear=109.0 Max. Shear=109.0
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=82448
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=82448
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=82448
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=8.93E-9 Top yt=5.02E-1 Max. yt=5.02E-1 Top St=-4.18E-3
0-1.00 +1.00 yt=0 at 14.9-ft
St=0 at 20.6-ft
Top Moment=0.0 Max. Moment=266.7
0-500 +500
Top Shear=42.0 Max. Shear=42.2
0-50 +50 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=82448
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=82448
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=82448
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
36-inch CIDH in Rock 10 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-1.66E-5 Top yt=4.97E-1 Max. yt=4.97E-1 Top St=5.09E-18
0-0.50 +0.50 yt=0 at 22.0-ft
St=0 at 26.7-ft
Top Moment=-729.2 Max. Moment=729.2
0-1000 +1000
Top Shear=109.0 Max. Shear=109.0
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=82448
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=82448
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=82448
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-2.11E-19 Top yt=5.08E-1 Max. yt=5.08E-1 Top St=-4.23E-3
0-1.00 +1.00 yt=0 at 14.9-ft
St=0 at 20.5-ft
Top Moment=0.0 Max. Moment=270.0
0-500 +500
Top Shear=42.0 Max. Shear=42.4
0-50 +50 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=82448
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=82448
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=82448
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
36-inch CIDH in Rock 15 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=1.76E-18 Top yt=4.98E-1 Max. yt=4.98E-1 Top St=9.16E-18
0-0.50 +0.50 yt=0 at 21.9-ft
St=0 at 26.6-ft
Top Moment=-730.8 Max. Moment=730.8
0-1000 +1000
Top Shear=109.0 Max. Shear=109.0
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=82448
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=82448
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=82448
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=82448
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=1.05E-3 Top yt=4.98E-1 Max. yt=4.98E-1 Top St=-3.06E-3
0-0.50 +0.50 yt=0 at 22.4-ft
St=0 at 28.7-ft
Top Moment=0.0 Max. Moment=557.5
0-1000 +1000
Top Shear=73.0 Max. Shear=73.0
0-100 +100 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=16406
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=16406
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=16406
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
36-inch CISS in Rock 5 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-3.07E-2 Top yt=4.97E-1 Max. yt=4.97E-1 Top St=-1.14E-17
0-0.50 +0.50 yt=0 at 29.5-ft
Top Moment=-1541.7 Max. Moment=1541.7
0-2000 +2000
Top Shear=178.0 Max. Shear=178.0
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=16406
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=16406
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=16406
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=2.2E-3 Top yt=4.97E-1 Max. yt=4.97E-1 Top St=-3.06E-3
0-0.50 +0.50 yt=0 at 22.4-ft
St=0 at 28.6-ft
Top Moment=0.0 Max. Moment=560.0
0-1000 +1000
Top Shear=73.0 Max. Shear=73.0
0-100 +100 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=16406
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=16406
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=16406
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
36-inch CISS in Rock 10 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-7.78E-5 Top yt=4.98E-1 Max. yt=4.98E-1 Top St=5.09E-18
0-0.50 +0.50 yt=0 at 29.9-ft St=0 at 0.5-ft
Top Moment=-1566.7 Max. Moment=1566.7
0-2000 +2000
Top Shear=180.0 Max. Shear=181.0
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=16406
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=16406
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=16406
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=2.08E-4 Top yt=4.98E-1 Max. yt=4.98E-1 Top St=-3.08E-3
0-0.50 +0.50 yt=0 at 22.4-ft
St=0 at 28.5-ft
Top Moment=0.0 Max. Moment=563.3
0-1000 +1000
Top Shear=73.0 Max. Shear=73.1
0-100 +100 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=16406
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=16406
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=16406
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
36-inch CISS in Rock 15 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=1.55E-3 Top yt=4.99E-1 Max. yt=4.99E-1 Top St=0E+0
0-0.50 +0.50 yt=0 at 30.1-ft
St=0 at 35.9-ft
Top Moment=-1566.7 Max. Moment=1566.7
0-2000 +2000
Top Shear=180.0 Max. Shear=180.4
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=16406
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=16406
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=16406
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=16406
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=3.33E-3 Top yt=4.93E-1 Max. yt=4.93E-1 Top St=-3.38E-3
0-0.50 +0.50 yt=0 at 18.7-ft
St=0 at 25.1-ft
Top Moment=0.0 Max. Moment=580.0
0-1000 +1000
Top Shear=74.0 Max. Shear=74.2
0-100 +100 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=260576
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=260576
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=260576
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
48-inch CIDH in Rock 5 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-7.03E-3 Top yt=4.99E-1 Max. yt=4.99E-1 Top St=0E+0
0-0.50 +0.50 yt=0 at 28.3-ft St=0 at 0.4-ft
Top Moment=-1508.3 Max. Moment=1508.3
0-2000 +2000
Top Shear=184.0 Max. Shear=184.8
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=260576
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=260576
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=260576
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=1.46E-3 Top yt=4.91E-1 Max. yt=4.91E-1 Top St=-3.39E-3
0-0.50 +0.50 yt=0 at 18.7-ft
St=0 at 25.0-ft
Top Moment=0.0 Max. Moment=584.2
0-1000 +1000
Top Shear=74.0 Max. Shear=74.5
0-100 +100 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=260576
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=260576
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=260576
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
48-inch CIDH in Rock 10 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=1.42E-3 Top yt=5E-1 Max. yt=5E-1 Top St=5.09E-18
0-0.50 +0.50 yt=0 at 28.2-ft
St=0 at 33.5-ft
Top Moment=-1516.7 Max. Moment=1516.7
0-2000 +2000
Top Shear=185.0 Max. Shear=185.0
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=260576
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=260576
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=260576
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-3.7E-5 Top yt=4.95E-1 Max. yt=4.95E-1 Top St=-3.42E-3
0-0.50 +0.50 yt=0 at 18.6-ft
St=0 at 25.0-ft
Top Moment=0.0 Max. Moment=590.8
0-1000 +1000
Top Shear=74.0 Max. Shear=74.9
0-100 +100 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=260576
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=260576
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=260576
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
48-inch CIDH in Rock 1 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=3.45E-4 Top yt=5E-1 Max. yt=5E-1 Top St=-4.58E-18
0-0.50 +0.50 yt=0 at 28.4-ft
St=0 at 33.5-ft
Top Moment=-1516.7 Max. Moment=1516.7
0-2000 +2000
Top Shear=185.0 Max. Shear=185.8
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=3000 I'-in4=260576
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=3000 I'-in4=260576
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=3000 I'-in4=260576
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=3000 I'-in4=260576
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
48-inch CIDH in Rock 1 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-5.03E-2 Top yt=4.99E-1 Max. yt=4.99E-1 Top St=-2.43E-3
0-0.50 +0.50 yt=0 at 27.4-ft
Top Moment=0.0 Max. Moment=1066.7
0-2000 +2000
Top Shear=120.0 Max. Shear=120.0
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=51852
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=51852
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=51852
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=51852
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=51852
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
48-inch CISS in Rock 5 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-4.2E-2 Top yt=2.5E-1 Max. yt=2.5E-1 Top St=0E+0
0-0.50 +0.50 yt=0 at 31.4-ft
Top Moment=-1691.7 Max. Moment=1691.7
0-2000 +2000
Top Shear=163.0 Max. Shear=164.1
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=51852
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=51852
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=51852
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=51852
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=51852
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-1.46E-2 Top yt=4.97E-1 Max. yt=4.97E-1 Top St=-2.48E-3
0-0.50 +0.50 yt=0 at 28.0-ft
St=0 at 38.2-ft
Top Moment=0.0 Max. Moment=1125.0
0-2000 +2000
Top Shear=124.0 Max. Shear=124.3
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=51852
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=51852
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=51852
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=51852
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=51852
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=1, Kbc=1 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
48-inch CISS in Rock 10 Feet (108611020)
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=-1.94E-2 Top yt=2.49E-1 Max. yt=2.49E-1 Top St=0E+0
0-0.50 +0.50 yt=0 at 34.3-ft
Top Moment=-1741.7 Max. Moment=1741.7
0-2000 +2000
Top Shear=170.0 Max. Shear=170.0
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3 e50 %
115.0 29.0 0.12 25.0 Fill
E -kp/i2=29000 I'-in4=51852
110.0 30.0 0.14 90.0 Alluvium
E -kp/i2=29000 I'-in4=51852
47.6 30.0 0.14 20.0 Alluvium
E -kp/i2=29000 I'-in4=51852
47.6 30.0 0.14 60.0 Alluvium
E -kp/i2=29000 I'-in4=51852
62.6 42.0 0.14 1100 0.002 Coarse-grained igneous rocks
E -kp/i2=29000 I'-in4=51852
DEFLECTION, yt -in MOMENT -kp-f SHEAR -kp
Single Pile, Khead=5, Kbc=2 PILE DEFLECTION & FORCE vs DEPTH
ALL-PILE CivilTech Software www.civiltech.com Licensed to
CivilTech Software
Pile Top-ft
Depth (Zp) from Pile Top-ft
0 0
10 10
20 20
30 30
40 40
50 50
60 60
Tip yt=1.08E-3 Top yt=5E-1 Max. yt=5E-1 Top St=-2.5E-3
0-0.50 +0.50 yt=0 at 28.0-ft
St=0 at 35.4-ft
Top Moment=0.0 Max. Moment=1141.7
0-2000 +2000
Top Shear=125.0 Max. Shear=125.4
0-200 +200 -lb/f3 C-kp/f2 k-lb/i3…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .