rfb_13199_for_info_only_18-SDG&E_transmission_TL_683_permanent_OH_pole_relocation.pdf
PDF 9 MB Posted
- Attached to
- RFB - COLE GRADE ROAD IMPROVEMENTS PHASE 1
- Solicitation number
- BPM013199
- Issued by
- California
About this file
This document is a technical engineering drawing and project specification issued by San Diego Gas & Electric (SDG&E) for the Cole Grade Road Relocation Project on Transmission Line 683 (TL683). The project involves the permanent relocation of overhead transmission poles and associated infrastructure to accommodate customer road improvements. The scope of work includes the installation of new transmission structures, transfer of existing 69kV, 12kV, and communications conductors, removal of existing poles, and installation of new foundations. Key structures involved are identified by location numbers 1 through 12, with primary new structures at locations 2, 3, and 4 (structures Z113302, Z518441, and Z518440), ranging from 84 to 90 feet in length. The project requires survey staking, conductor stringing per specified tensions, and coordination with an applicant designer for distribution (C908) and third-party communications infrastructure (CIP) transfers referenced under Job Notification #3-405334. The document was issued for construction on May 5, 2023, with revisions issued June 16 and June 23, 2023.
The project specifications detail precise engineering requirements including pole embedment depths ranging from 5.5 to 17.5 feet, concrete backfill specifications with 3000 PSI concrete, and conductor stringing tables with tension calculations at varying temperatures from 40°F to 100°F. Conductor specifications include 636.0 kcmil 24/7 Rook ACSS/AW transmission cable with design tensions of 4,000 lbs and ruling spans of 368 to 451 feet. Height above grade measurements are provided for each structure location with coordinates in State Plane California Zone VI (NAD 83, EPOCH 2010). The project involves structural modifications to accommodate additional customer grading post-construction, requiring corrocote extensions and ground sleeve adjustments on certain poles. No dampers are required for this transmission line segment, and all work is subject to SDG&E's transmission engineering and design standards documented through drawing number 2016-0001-A-5113-683.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5100 PROJECT SPECIFIC DRAWINGS
N
REV
WORK ORDER/
BUDGET
DWN CHECKED APPV'D DATE
00 2952902/21130 JHA/JJS SMB CPD 5/5/2023
Location
Number Structure Number Stake Description
X Easting
(ft)
Y Northing
(ft)
Z Elevation
(ft)
Center of Pole to
Anchor (ft)
Depth of
Anchor (ft)
2 Z113302 LOC 2_Z113302_STRUCT C/L 6325180.51 2043106.51 1465.83 - -
2 Z113302 LOC 2_Z113302_LO 25'_V-NOTCH 6325163.88 2043125.18 1463.39 - -
2 Z113302 LOC 2_Z113302_RO 25' 6325197.14 2043087.85 1463.60 - -
3 Z518441 LOC 3_Z518441_STRUCT C/L 6325210.47 2043275.61 1466.61 - -
3 Z518441 LOC 3_Z518441_LO 25' 6325185.59 2043277.97 1464.61 - -
3 Z518441 LOC 3_Z518441_RO 25' 6325235.36 2043273.24 1469.72 - -
4 Z518440 LOC 4_Z518440_STRUCT C/L 6325214.90 2043585.29 1472.07 - -
4 Z518440 LOC 4_Z518440_LO 25' 6325189.90 2043585.54 1473.88 - -
4 Z518440 LOC 4_Z518440_RO 25' 6325239.90 2043585.03 1477.14 - -
Horizontal Datum & EPOCH:
NAD 83 Zone VI, 2011
Vertical Datum:
NAVD88
Unit of Measure:
U.S. Survey Foot
SAN DIEGO GAS AND ELECTRIC
TRANSMISSION ENGINEERING
STAKING TABLE
Cole Grade Road Relocation Project
TL683
CHANGE
ISSUED FOR CONSTRUCTION
STAKING REQUIREMENTS:
1. AT EACH STUCTURE CENTER, DRIVE A 60D NAIL OR 1" SQUARE WOODEN STAKE WITH TACK AT EACH STUCTURE CENTER. DRIVE A LATH ADJACENT TO
THE NAIL AND MARK THE LATH WITH THE DESIGNATED STAKE DESCRIPTION. FLAG THE LATH WITH BRIGHT SURVEY FLAGGING OR FLOURESCENT PAINT.
IF NECESSARY USE FLOURESCENT PAINT TO IDENTIFY THE CENTER NAIL AND STRUCTURE NUMBER.
2. AT EACH STRUCTURE LOCATION, DRIVE A REFERENCE 60D NAIL AND GUARD LATH RIGHT AND LEFT OF THE CENTER NAIL ON THE STRUCTURE BISECTOR. IF
NOT DESIGNATED, RIGHT AND LEFT OFFSET DISTANCE SHALL BE 25' FROM STRUCTURE CENTER. MARK THE DESIGNATED STAKE DESCRIPTION ON THE
STAKE OR LATH. OFFSET STAKE LATH SHALL BE A DIFFERENT COLOR THAN STRUCTURE CENTER LATH. SPECIFY OFFSET DISTANCE, IF DIFFERENT THAN 25'.
3. IF NOT DESIGNATED, THE V-NOTCH LINE SHALL BE BASED ON THE MAIN CIRCUIT. THE V-NOTCH LINE IS APPLICABLE FOR CONCRETE FOUNDATION, ANCHOR BOLT TEMPLATE AND STEEL POLE BASE PLATE.
4. REMOVE ALL PREVIOUS STRUCTURE STAKES.
5. STAKE DESCRIPTION SHALL BE NOTED EXACTLY AS SHOWN IN THE STAKE DESCRIPTIONS FIELD OF THIS TABLE.
Drawing No. 2016-0001-A-5112-001 of 1
399.7 ft 171.7 ft 309.7 ft 475.3 ft 311.4 ft
01 21130 2952902 MJB JJS CPD 6/23/2023
00 21130 2952902 JJS/JHA SMB CPD 5/5/2023
REV BUDGET CONST.ORDER CHANGE DRAWN CHECKED APPROVED DATE SCALE: NONE
LINE ANGLE 0.00° -76.50° -9.23° -0.47° -0.34°
LOCATION NUMBER 1 2 3 4 5
STATION (ft) 04+91.0 08+90.7 10+62.4 13+72.2 18+47.5
STRUCTURE NUMBER [Z113303] Z113302 Z518441 Z518440 [Z518439]
STRUCTURE FAMILY SW-WEATH FDN-GALV SW-WEATH SW-WEATH SW-WEATH
STRUCTURE LENGTH (ft)/ CLASS 80'-H3 84'-EP 90'-H7M 85'-H3 70'-H3
STRUCTURE CONFIGURATION Y-EXP ZPI-EXP-HD ZPI-EXP-HD
STRUCTURE DESIGNATION DB-TAN ENG-TERM DE DB-TAN DB-TAN DB-TAN
ASSEMBLY DRAWING 2016-0001-A.5610.01 STD 19037HDSW-636 STD 19037HDSW-636
STRUCTURE DRAWING STD 17231-636 STD 13205SW-636 STD 13205SW-636
STEEL POLE (SP#) SP-2807 - -
GROUNDING DRAWING STD 21130 STD 21120 STD 21120
EMBEDDED DEPTH - 5.5 ft 17.5 ft 11.5 ft -
INSTALL TRANSMISSION
NEW STRUCTURE OFFSET (ft) EXISTING SURVEY TO STAKE SURVEY TO STAKE SURVEY TO STAKE EXISTING
69kV: TRANSFER 3 X (1)-636 KCMIL ACSS/AW FROM
EXISTING [Z518441] AND MAINTAIN EXISTING TENSIONS.
EMBEDMENT SHOWN FOR GRADE AT TIME OF
CONSTRUCTION. STRUCTURE WILL REQUIRE ADDITIONAL
3.5 FEET OF CORROCOTE TO ACCOMMODATE ADDITIONAL
GRADING BY CUSTOMER AFTER CONSTRUCTION. GROUND
SLEEVE AND GROUND NUTS ABOVE GRADE SHOULD BE
EXTENDED AND SHIFTED UP THE POLE AN EQUIVALENT
AMOUNT AS WELL.
BACKFILL PER STD 21120. PRIOR TO INSTALLING POLE,
PLACE 12" LAYER OF CRUSHED ROCK. BACKFILL WITH 3000
PSI CONCRETE
EXISTING, 69KV: REPLACE EXISTING LINE GUARDS AND
UNCLIP, BALANCE TENSIONS AND RECLIP.
69kV: TRANSFER 3 X (1)-636 KCMIL ACSS/AW FROM
EXISTING [Z518440] AND MAINTAIN EXISTING TENSIONS.
EMBEDMENT SHOWN FOR GRADE AT TIME OF
CONSTRUCTION. STRUCTURE WILL REQUIRE ADDITIONAL
6 FEET OF CORROCOTE TO ACCOMMODATE ADDITIONAL
GRADING BY CUSTOMER AFTER CONSTRUCTION. GROUND
SLEEVE AND GROUND NUTS ABOVE GRADE SHOULD BE
EXTENDED AND SHIFTED UP THE POLE AN EQUIVALENT
AMOUNT AS WELL.
BACKFILL PER STD 21120. PRIOR TO INSTALLING POLE,
PLACE 12" LAYER OF CRUSHED ROCK. BACKFILL WITH 3000
PSI CONCRETE
69kV: TRANSFER 3 X (1)-636 KCMIL ACSS/AW FROM
EXISTING [Z113302] AND MAINTAIN EXISTING TENSIONS.
INSTALL DRILLED PIER FOUNDATION PER DWG 2016-001-
A.5730.01
EXISTING, 69KV: REPLACE EXISTING LINE GUARDS AND
UNCLIP, BALANCE TENSIONS AND RECLIP.
DISTRIBUTION GUYING
INSTALL DISTRIBUTION C908 DISTRIBUTION TRANSFERS DONE IN APPLICANT
DESIGNER PACKAGE. SEE JOB NOTIFICATION # 3-405334.
C908 DISTRIBUTION TRANSFERS DONE IN APPLICANT
DESIGNER PACKAGE. SEE JOB NOTIFICATION # 3-405334.
C908 DISTRIBUTION TRANSFERS DONE IN APPLICANT
DESIGNER PACKAGE. SEE JOB NOTIFICATION # 3-405334.
C908 DISTRIBUTION TRANSFERS DONE IN APPLICANT
DESIGNER PACKAGE. SEE JOB NOTIFICATION # 3-405334.
TRANSMISSION GUYING
INSTALL COMMUNICATIONS CIP SCOPE IN APPLICANT DESIGNER PACKAGE. SEE JOB
NOTIFICATION # 3-405334.
CIP SCOPE IN APPLICANT DESIGNER PACKAGE. SEE JOB
NOTIFICATION # 3-405334.
REMOVALS
TRANSFERS
75'-1 STEEL POLE80'-H3 STEEL POLE
SPAN GUYS TO P295592
60'-1 STEEL POLE
SPAN GUYS TO P295595
STRUCTURE DATA
TL683
SHEET 1 OF 3
AHEAD SPAN LENGTH
SAN DIEGO GAS & ELECTRIC
TL683
COLE GRADE ROAD
RELOCATION PROJECT
TRANSMISSION ENGINEERING & DESIGN
2016-0001-A-5113-683
ISSUED FOR CONSTRUCTION
ADDED BACKFILL DESCRIPTION AND NOTED DRILLED PIER LOCATIONS
6/16/2023 2:47 PM
01 21130 2952902 MJB JJS CPD 6/23/2023
00 21130 2952902 JJS/JHA SMB CPD 5/5/2023
REV BUDGET CONST.ORDER CHANGE DRAWN CHECKED APPROVED DATE SCALE: NONE
STRUCTURE DATA
TL683
SHEET 2 OF 3
AHEAD SPAN LENGTH
SAN DIEGO GAS & ELECTRIC
TL683
COLE GRADE ROAD
RELOCATION PROJECT
TRANSMISSION ENGINEERING & DESIGN
2016-0001-A-5113-683
50'-1 STEEL POLE AFTER NEW TRANSMISSION WORK
COMPLETED (TO BE INSTALLED BY APPLICANT DESIGNER)
HEAD GUYS AND HARDWARE
ISSUED FOR CONSTRUCTION
ADDED BACKFILL DESCRIPTION AND NOTED DRILLED PIER LOCATIONS
REMOVALS
TRANSFERS
55'-H4 STEEL POLE AFTER NEW TRANSMISSION WORK
COMPLETED (TO BE INSTALLED BY APPLICANT DESIGNER)
HEAD GUYS, DOWN GUYS, AND HARDWARE
50'-H2 STEEL POLE AFTER NEW TRANSMISSION WORK
COMPLETED (TO BE INSTALLED BY APPLICANT DESIGNER)
HEAD GUYS AND HARDWARE
INSTALL COMMUNICATIONS CIP SCOPE IN APPLICANT DESIGNER PACKAGE. SEE JOB
NOTIFICATION # 3-405334.
CIP SCOPE IN APPLICANT DESIGNER PACKAGE. SEE JOB
NOTIFICATION # 3-405334.
DISTRIBUTION GUYING
INSTALL DISTRIBUTION C908 DISTRIBUTION TRANSFERS DONE IN APPLICANT
DESIGNER PACKAGE. SEE JOB NOTIFICATION # 3-405334.
C908 DISTRIBUTION TRANSFERS DONE IN APPLICANT
DESIGNER PACKAGE. SEE JOB NOTIFICATION # 3-405334.
TRANSMISSION GUYING
NEW STRUCTURE OFFSET (ft) EXISTING EXISTING
[RFS] [RFS] [RFS]
EMBEDDED DEPTH - -
INSTALL TRANSMISSION
STEEL POLE (SP#)
GROUNDING DRAWING
ASSEMBLY DRAWING
STRUCTURE DRAWING
STRUCTURE CONFIGURATION [RFS] [RFS] [RFS]
STRUCTURE DESIGNATION [RFS] [RFS] [RFS]
STRUCTURE FAMILY [RFS] SW-WEATH [RFS] SW-WEATH [RFS]
STRUCTURE LENGTH (ft)/ CLASS 60'-H4 50'-1
LINE ANGLE
LOCATION NUMBER 6 7 8 9 10
STATION (ft)
STRUCTURE NUMBER [P295592] [P295594] [P295595] [P295596] [P295597]
6/16/2023 11:56 AM
01 21130 2952902 MJB JJS CPD 6/23/2023
00 21130 2952902 JJS/JHA SMB CPD 5/5/2023
REV BUDGET CONST.ORDER DRAWN CHECKED APPROVED DATE SCALE: NONE
LINE ANGLE
LOCATION NUMBER 11 12 - - -
STATION (ft)
STRUCTURE NUMBER [Z207016] [P294981]
STRUCTURE FAMILY [RFS] SW-WEATH
STRUCTURE LENGTH (ft)/ CLASS 50'-1
STRUCTURE CONFIGURATION [RFS]
STRUCTURE DESIGNATION [RFS]
ASSEMBLY DRAWING
STRUCTURE DRAWING
STEEL POLE (SP#)
GROUNDING DRAWING
EMBEDDED DEPTH -
INSTALL TRANSMISSION
NEW STRUCTURE OFFSET (ft) EXISTING
[RFS]
DISTRIBUTION GUYING
INSTALL DISTRIBUTION C908 DISTRIBUTION REMOVALS AND TRANSFERS DONE IN
APPLICANT DESIGNER PACKAGE. SEE JOB NOTIFICATION #
3-405334.
TRANSMISSION GUYING
INSTALL COMMUNICATIONS CIP SCOPE IN APPLICANT DESIGNER PACKAGE. SEE JOB
NOTIFICATION # 3-405334.
2016-0001-A-5113-683
REMOVALS
TRANSFERS
25' STEEL POLE
ADDED BACKFILL DESCRIPTION AND NOTED DRILLED PIER LOCATIONS STRUCTURE DATA
ISSUED FOR CONSTRUCTION TL683
CHANGE SHEET 3 OF 3
AHEAD SPAN LENGTH - - - -
SAN DIEGO GAS & ELECTRIC
TL683
COLE GRADE ROAD
RELOCATION PROJECT
TRANSMISSION ENGINEERING & DESIGN
6/16/2023 11:56 AM
PLS-CADD DRAWING
[Z113303]
B
C
Z113302
A
B
C
Z518441
A
B
C
Z518440
A
B
C
[Z518439]
A
B
C
ORDER
CONST
BUDGET REVISION DESCRIPTION APPV DWN CHKD DATE REV
SAN DIEGO GAS & ELECTRIC
TRANSMISSION ENGINEERING
DRAWING NUMBER
NOT DRAWN TO SCALE
PHASING DIAGRAM
TL683
CUSTOMER RELOCATION PROJECT
TL683 COLE GRADE ROAD
Z113303 TO Z518439
2016-0001-A-5115-001 OF 1
21130 2952902 ISSUED FOR CONSTRUCTION JHA/JJS SMB CPD 5/5/23
A
NOTES:
1. ALL VIEWS ARE LOOKING AHEAD ON LINE.
2. 69KV PHASE SYMBOLS A, B, & C ARE REPRESENTATIVE ONLY.
MAINTAIN EXISTING PHASING.
3. CONTRACTOR TO VERIFY PHASING.
LOOKING EAST LOOKING NORTH LOOKING NORTH LOOKING NORTH LOOKING NORTH
DESIGN
TENSION
(LBS)
NO. COND
PER PHASE
NO. COND
PER
CIRCUIT
TIELINE
DESIGN
TENSION
(LBS)
(GO95 LT)
NO. COND
PER PHASE
NO. COND
PER
CIRCUIT
TIELINE
4000 1 3 2 TL683
4000 1 3 2 TL683
NO. COND
PER PHASE
NO. COND
PER
CIRCUIT
DISTANCE
(FT)
TIELINE
00 21130 2952902 JJS/JHA SMB CPD 5/5/2023
REV BUDGET CONST ORDER DRAWN CHECKED APPV’D DATE 2016-0001-A-5116-683-001 OF 1
CONDUCTOR DATA
STRING NEW
REMARKSCONDUCTOR STRINGING TABLE
FROM
LOCATION # STRUCTURE
TO
LOCATION # STRUCTURE
[Z113305] Z113302
TRANSFER EXISTING
CONDUCTOR STRINGING TABLE
FROM
LOCATION # STRUCTURE
TO
LOCATION # STRUCTURE
REMARKS
REPLACE EXISTING LINE GUARDS AND UNCLIP, BALANCE
TENSION AND RECLIP AT [Z113303] AND [Z518439].
5117-001636.0 kcmil 24/7 Rook/ACSS/AW2
Z113302
REMARKS
CHANGE
ISSUED FOR CONSTRUCTION
CONDUCTOR DATA
* SEE STRINGING TABLE FOR STRINGING TENSIONS
TL683
COLE GRADE ROAD
RELOCATION PROJECT
SAN DIEGO GAS AND ELECTRIC
TRANSMISSION ENGINEERING AND DESIGN
TL683
CONDUCTOR
REMOVE EXISTING
FROM
LOCATION # STRUCTURE
TO
LOCATION # STRUCTURE
636.0 kcmil 24/7 Rook/ACSS/AW2 [Z518438]5117-002
00 21130 2952902 JJS/JHA SMB CPD 5/5/2023
REV BUDGET CONST ORDER DRAWN CHECKED APPV’D DATE
LOCATION
FROM
TO 2
DRAWING NUMBER 002
[Z113305]
STRUCTURE #
TRANSFER EXISTING 636 (ROOK ACSS AW2) Z113302
2016-0001-A-5117-683-001
COLE GRADE ROAD RELOCATION PROJECT
TL683
SAN DIEGO GAS AND ELECTRIC
TRANSMISSION ENGINEERING
STRINGING TABLE
NOTE: EXISTING CONDUCTOR TO BE TRANSFERRED TO MATCH EXISTING TENSIONS. STRINGING CHARTS PROVIDED FOR REFERENCE ONLY.
Section #1 from structure #[Z113305] to structure #Z113302, start set #1 '69kV', end set #1 'CKT'
Cable 'C:\Users\jstevens\OneDrive - POWER Engineers, Inc\Cole Grade Road\AD Updates 20230406\Design Exist TIN\03 - Cables\ROOK_ACSS_AW2_GCC.graphsag.wir', Ruling span (ft)
451.464
Sagging data: User specified unstressed cable length in each span
Weather case for final after creep 60 DegF, Equivalent to 6.5 (deg F) temperature increase
Weather cases for final after load:
'GO95 Light'
'Known Local Wind Light 65' (controlling case), Equivalent to 19.2 (deg F) temperature increase
Results below for condition 'Creep FE'
Calculations done using actual span lengths and vertical projections
+ Span From + + Span To + Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Left Span
Str. Set Ph. Str. Set Ph. Length Span Span Span Span Span Span Span Span Span Span Span Span Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Number Projection
40 F 45 F 50 F 55 F 60 F 65 F 70 F 75 F 80 F 85 F 90 F 95 F 100 F
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
[Z113305] 1 1[Z113303] 1 1 491.0 7.02 7.15 7.28 7.41 7.61 7.77 8.01 8.22 8.45 8.68 8.90 9.13 9.35 [Z113305] 30.19
[Z113305] 1 2[Z113303] 1 2 491.1 7.03 7.15 7.28 7.42 7.61 7.77 8.01 8.23 8.45 8.68 8.91 9.13 9.35 [Z113305] 30.56
[Z113305] 1 3[Z113303] 1 3 491.0 7.02 7.15 7.28 7.41 7.61 7.77 8.01 8.22 8.45 8.68 8.90 9.13 9.35 [Z113305] 30.25
[Z113303] 1 1 Z113302 1 1 399.3 4.64 4.73 4.83 4.94 5.10 5.25 5.44 5.63 5.83 6.03 6.22 6.42 6.61 [Z113303] 17.84
[Z113303] 1 2 Z113302 1 2 399.0 4.63 4.72 4.82 4.93 5.09 5.24 5.43 5.63 5.82 6.02 6.21 6.41 6.60 [Z113303] 13.25
[Z113303] 1 3 Z113302 1 3 398.8 4.62 4.72 4.82 4.92 5.09 5.23 5.42 5.62 5.82 6.01 6.21 6.40 6.59 [Z113303] 8.76
+ Span From + + Span To + Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Str. Set Ph. Str. Set Ph. Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
40 F 45 F 50 F 55 F 60 F 65 F 70 F 75 F 80 F 85 F 90 F 95 F 100 F
(lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs)
[Z113305] 1 1[Z113303] 1 1 3360 3301 3243 3182 3100 3037 2945 2869 2792 2719 2650 2585 2524
[Z113305] 1 2[Z113303] 1 2 3360 3301 3243 3183 3100 3038 2946 2870 2792 2719 2650 2586 2525
[Z113305] 1 3[Z113303] 1 3 3360 3301 3243 3183 3100 3038 2946 2870 2792 2719 2650 2586 2524
[Z113303] 1 1 Z113302 1 1 3384 3315 3248 3178 3077 2992 2885 2785 2691 2603 2521 2445 2374
[Z113303] 1 2 Z113302 1 2 3384 3315 3248 3178 3076 2991 2884 2784 2690 2602 2520 2444 2373
[Z113303] 1 3 Z113302 1 3 3384 3316 3249 3178 3076 2991 2884 2784 2690 2602 2520 2444 2373
OF
00 21130 2952902 JJS/JHA SMB CPD 5/5/2023
REV BUDGET CONST ORDER DRAWN CHECKED APPV’D DATE
LOCATION
FROM 2
TO
DRAWING NUMBER 002
STRINGING TABLE TRANSFER EXISTING 636 (ROOK ACSS AW2) [Z518438]
2016-0001-A-5117-683-002
STRUCTURE #
TL683 Z113302
SAN DIEGO GAS AND ELECTRIC
TRANSMISSION ENGINEERING
COLE GRADE ROAD RELOCATION PROJECT
NOTE: EXISTING CONDUCTOR TO BE TRANSFERRED TO MATCH EXISTING TENSIONS. STRINGING CHARTS PROVIDED FOR REFERENCE ONLY.
Section #11 from structure #Z113302 to structure #[Z518438], start set #11 'CKT', end set #1 '69kV'
Cable 'C:\Users\jstevens\OneDrive - POWER Engineers, Inc\Cole Grade Road\AD Updates 20230406\Design Exist TIN\03 - Cables\ROOK_ACSS_AW2_GCC.graphsag.wir', Ruling span (ft)
368.412
Sagging data: User specified unstressed cable length in each span
Weather case for final after creep 60 DegF, Equivalent to 6.5 (deg F) temperature increase
Weather cases for final after load:
'GO95 Light'
'Known Local Wind Light 65' (controlling case), Equivalent to 16.3 (deg F) temperature increase
Results below for condition 'Creep FE'
Calculations done using actual span lengths and vertical projections
+ Span From + + Span To + Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Left Span
Str. Set Ph. Str. Set Ph. Length Span Span Span Span Span Span Span Span Span Span Span Span Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Number Projection
40 F 45 F 50 F 55 F 60 F 65 F 70 F 75 F 80 F 85 F 90 F 95 F 100 F
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
Z113302 11 1 Z518441 1 1 171.5 0.85 0.87 0.90 0.92 0.96 1.02 1.09 1.18 1.27 1.36 1.44 1.54 1.57 Z113302 -3.93
Z113302 11 2 Z518441 1 2 171.3 0.84 0.87 0.89 0.92 0.96 1.01 1.08 1.17 1.26 1.36 1.43 1.53 1.56 Z113302 -3.93
Z113302 11 3 Z518441 1 3 171.1 0.84 0.87 0.89 0.92 0.96 1.01 1.09 1.17 1.26 1.36 1.43 1.53 1.56 Z113302 -3.93
Z518441 1 1 Z518440 1 1 310.2 2.73 2.79 2.86 2.93 3.03 3.16 3.30 3.47 3.64 3.81 3.98 4.14 4.32 Z518441 6.46
Z518441 1 2 Z518440 1 2 310.2 2.72 2.79 2.86 2.93 3.03 3.15 3.30 3.47 3.63 3.80 3.97 4.14 4.31 Z518441 6.46
Z518441 1 3 Z518440 1 3 310.2 2.72 2.79 2.86 2.93 3.03 3.15 3.30 3.47 3.63 3.80 3.97 4.14 4.31 Z518441 6.46
Z518440 1 1[Z518439] 1 1 475.1 6.57 6.69 6.81 6.94 7.12 7.29 7.50 7.72 7.94 8.16 8.38 8.60 8.82 Z518440 13.42
Z518440 1 2[Z518439] 1 2 475.3 6.57 6.69 6.81 6.95 7.12 7.29 7.50 7.72 7.94 8.16 8.39 8.60 8.82 Z518440 17.71
Z518440 1 3[Z518439] 1 3 475.2 6.57 6.69 6.81 6.94 7.12 7.29 7.50 7.72 7.94 8.16 8.38 8.60 8.82 Z518440 22.43
[Z518439] 1 1[Z518438] 1 1 311.8 2.76 2.82 2.89 2.97 3.07 3.19 3.34 3.50 3.67 3.84 4.02 4.18 4.36 [Z518439] 18.51
[Z518439] 1 2[Z518438] 1 2 311.5 2.75 2.82 2.89 2.96 3.06 3.18 3.33 3.50 3.67 3.84 4.01 4.17 4.35 [Z518439] 18.65
[Z518439] 1 3[Z518438] 1 3 311.4 2.75 2.82 2.88 2.96 3.06 3.18 3.33 3.49 3.66 3.83 4.00 4.17 4.34 [Z518439] 18.53
+ Span From + + Span To + Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Str. Set Ph. Str. Set Ph. Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
40 F 45 F 50 F 55 F 60 F 65 F 70 F 75 F 80 F 85 F 90 F 95 F 100 F
(lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs) (lbs)
Z113302 11 1 Z518441 1 1 3509 3415 3322 3224 3094 2923 2727 2529 2348 2182 2069 1935 1896
Z113302 11 2 Z518441 1 2 3516 3421 3328 3231 3102 2935 2738 2539 2357 2190 2075 1938 1899
Z113302 11 3 Z518441 1 3 3510 3416 3323 3225 3095 2925 2728 2530 2348 2182 2069 1935 1896
Z518441 1 1 Z518440 1 1 3450 3369 3289 3206 3099 2979 2846 2710 2585 2470 2364 2270 2178
Z518441 1 2 Z518440 1 2 3452 3371 3292 3208 3101 2982 2849 2713 2587 2472 2366 2272 2180
Z518441 1 3 Z518440 1 3 3452 3371 3292 3209 3102 2983 2849 2713 2588 2473 2367 2272 2180
Z518440 1 1[Z518439] 1 1 3360 3300 3240 3178 3100 3026 2941 2859 2778 2703 2632 2565 2502
Z518440 1 2[Z518439] 1 2 3362 3301 3242 3180 3101 3028 2943 2861 2780 2704 2633 2566 2503
Z518440 1 3[Z518439] 1 3 3362 3301 3242 3180 3102 3029 2943 2861 2780 2705 2633 2566 2503
[Z518439] 1 1[Z518438] 1 1 3448 3367 3288 3205 3099 2982 2849 2713 2588 2474 2368 2274 2182
[Z518439] 1 2[Z518438] 1 2 3451 3370 3291 3208 3102 2985 2852 2716 2591 2476 2370 2276 2184
[Z518439] 1 3[Z518438] 1 3 3451 3370 3291 3208 3102 2986 2853 2717 2591 2476 2370 2276 2184
OF
REV
WORK ORDER/
BUDGET
DWN CHECKED APPV'D DATE
2952902/
21130
JJS/JHA SMB CPD 5/5/2023
WIRE SIZE
STOCK # N/A STOCKBRIDGE DAMPER
X1 X2 X1 X2
NO DAMPERS REQUIRED
Back Span
Length (ft)
Ahead Span
Length (ft)
VOLTAGE LEVEL DAMPER SCHEDULE
Back Span (in) Ahead Span (in)Location
Number
Structure
Number Figure #
Tangent
Figure 1
Deadend
Figure 2
NOTES: NO DAMPERS REQUIRED.636.0 kcmil 24/7 ROOK/ACSS/AW2
CHANGE
ISSUED FOR CONSTRUCTION
SAN DIEGO GAS AND ELECTRIC
TRANSMISSION ENGINEERING
DAMPER SCHEDULE
COLE GRADE ROAD
RELOCATION PROJECT
TL683
Drawing No. 2016-0001-A-5118-683-001 of 001
-2
P
I -7
'0
P I -9
'4
Z
P
P
P
Z
E
P
F D
N -G
A L V
S
T D
-6
H
M
W -W
E A
H
D
S
W -6
-W E
A
D
S
W -6
-W E
A
D
S
W -6
-W E
A
D
S
W -6
491 116
115 172, 139 310, 125
475, 94
400, 244, 68
[Z113305]
[P36211]
[P296012]
[P294981]
Z113302
Z518441
Z518440
[Z518439]
[Z518438]
[P614527]
[P616912]
[Z113303]
[P295596]
[P295599]
[P614936]
[P295598]
[P719303]
[P295597]
[P295595]
[Z207016]
P I 1
.6
-9 °1
'4
SAN DIEGO GAS & ELECTRIC
TRANSMISSION ENGINEERING
SCALE IS FROM 24X36 ORIGINAL
PLAN & PROFILE
REVISION DESCRIPTION BUDGET REV WORK ORDER
DRN CHKD DATE APPV
CONDUCTOR DISPLAYED CONDITIONS
TL683
CUSTOMER RELOCATION PROJECT
TL683 COLE GRADE ROAD
Z113303 TO Z518439
PROFILE
69KV
12KV 3RD PARTY CIP
15' LEFT SIDE PROFILE
15' RIGHT SIDE PROFILE
32' 69KV GROUND CLEARANCE LINE
EX. 69KV 270°F MAX SAG
EX. 12KV 167°F MAX SAG
EX. COMM 130°F MAX SAG
NOTES:
1. WIRES TRANSFERRED AT EXISTING TENSIONS.
2. ALL CONDUCTORS SHOWN AT MAXIMUM SAG. 20' CIP GROUND CLEARANCE LINE
PLAN
ALIGNMENT
EX. SEC 130°F MAX SAG
SECONDARY
H
IL
L D A L E R
C O
L E G
R A D E
TRANSFER EXISTING
69KV: 636 ROOK
ACSS/AW
RS=453`
TRANSFER EXISTING 69KV:
636 ROOK ACSS/AW
RS=368`
2016-0001-A-5120-001 OF 2
AD TO TRANSFER (SEE NOTE 2)
12KV: 636 ROOK
ACSR/AW
AD TO TRANSFER (SEE NOTE 2)
CIP: 1" TELEPHONE
9` MIN
9` MIN
9` MIN
9` MIN
21130 2952902 ISSUED FOR CONSTRUCTION JHA/JJS SMB CPD 5/5/23
NOTES:
1. TRANSMISSION WIRES TRANSFERRED AT EXISTING TENSIONS.
2. C908 DISTRIBUTION AND CIP TRANSFERS DONE IN APPLICANT
DESIGNER (AD) PACKAGE. SEE JOB NOTIFICATION # 3-405334.
3. ALL CONDUCTORS SHOWN AT MAXIMUM SAG.
VERT. SCALE
HORIZ. SCALE
30.0 FT.
150.0 FT.
1750 [ P
P
172, 139
310, 125
[P296012] [P294981]
Z113302
Z518441
Z518440
[P616912]
[P295594]
[P295596]
[P295598]
[P295597]
[P295592]
[P295595]
[Z207016]
SAN DIEGO GAS & ELECTRIC
TRANSMISSION ENGINEERING
SCALE IS FROM 24X36 ORIGINAL
PLAN & PROFILE
REVISION DESCRIPTION BUDGET REV WORK ORDER
DRN CHKD DATE APPV
CONDUCTOR DISPLAYED CONDITIONS
TL683
CUSTOMER RELOCATION PROJECT
TL683 COLE GRADE ROAD
Z113303 TO Z518439
PROFILE
69KV
12KV 3RD PARTY CIP
15' LEFT SIDE PROFILE
15' RIGHT SIDE PROFILE
32' 69KV GROUND CLEARANCE LINE
EX. 69KV 270°F MAX SAG
EX. 12KV 167°F MAX SAG
EX. COMM 130°F MAX SAG
NOTES:
1. WIRES TRANSFERRED AT EXISTING TENSIONS.
2. ALL CONDUCTORS SHOWN AT MAXIMUM SAG. 20' CIP GROUND CLEARANCE LINE
PLAN
ALIGNMENT
EX. SEC 130°F MAX SAG
SECONDARY
C O
L E G
R A D
E
2016-0001-A-5120-002 OF 2
AD TO TRANSFER (SEE NOTE 2)
12KV: 636 ROOK
ACSR/AW
AD TO TRANSFER (SEE NOTE 2)
CIP: 0.5" 50 PAIR
AD TO TRANSFER (SEE NOTE 2)
SEC: #2 AWG TRIPLEX SSC CONCH
AD TO TRANSFER (SEE NOTE 2)
CIP: 0.5" 50 PAIR
E P
F
N
-G A
L V
D
-6
H M
-W
E A
D
S
W -6
21130 2952902 ISSUED FOR CONSTRUCTION JHA/JJS SMB CPD 5/5/23
NOTES:
1. TRANSMISSION WIRES TRANSFERRED AT EXISTING TENSIONS.
2. C908 DISTRIBUTION AND CIP TRANSFERS DONE IN APPLICANT
DESIGNER (AD) PACKAGE. SEE JOB NOTIFICATION # 3-405334.
3. ALL CONDUCTORS SHOWN AT MAXIMUM SAG.
VERT. SCALE
HORIZ. SCALE
30.0 FT.
150.0 FT.
Revision
Date:
Location
Number
(Note 1)
Tieline/Section
SDG&E
Facility Str #
Existing
HAG (ft)
New
HAG (ft)
Embed
(ft)
New %
HAG
New HAG ∆
Height (ft) Transmission
Distribution
(YES or Blank) Communications
Structure
Length (ft) &
Class (Note 3)
Foundation
Type (Note 2)
Removal
Length (ft) &
Class (Note 3)
Stringing
Site
(Y/N)
X Easting (ft)
(Note 4)
Y Northing (ft)
(Note 4)
1 TL683/C908 [Z113303] 68.0 - - - -
EXISTING, REPLACE EXISTING LINE GUARDS AND UNCLIP, BALANCE TENSIONS
AND RECLIP
YES - 80'-H3 SW-WEATH N/A N 6324780.87 2043101.86
2 TL683/C908 Z113302 70.0 78.5 5.5 12 8.5
SET NEW POLE 10.0' NORTHWEST, SURVEY TO STAKE, 69kV: TRANSFER 6 X (1)-
636 KCMIL ACSS/AW
YES (1) CIP WIRE TO P295594 AND Z113303 84'-EP FDN-GALV
80'-H3 STEEL
POLE
N 6325180.511 2043106.51
3 TL683/C908 Z518441 56.0 72.5 17.5 29 16.5
SET NEW POLE 44' SOUTHWEST, SURVEY TO STAKE, 69kV: TRANSFER 3 X (1)-636
KCMIL ACSS/AW
YES
(1) #2 AWG TRIPLEX SEC TO P295596
(2) CIP WIRES TO P295596
90'-H7M SW-WEATH 60'-1 STEEL POLE N 6325210.47 2043275.61
4 TL683 Z518440 60.5 73.5 11.5 21 13.0
SET NEW POLE 18.5' WEST, SURVEY TO STAKE, 69kV: TRANSFER 3 X (1)-636 KCMIL
ACSS/AW
- - 85'-H3 SW-WEATH 75'-1 STEEL POLE N 6325214.90 2043585.29
5 TL683 [Z518439] 60.5 - - - -
EXISTING, REPLACE EXISTING LINE GUARDS AND UNCLIP, BALANCE TENSIONS
AND RECLIP
- - 70'-H3 SW-WEATH N/A N 6325217.78 2044060.59
6 TL683/C908 [P295592] 43.0 - - - - REMOVE STRUCTURE, HEAD GUYS, DOWN GUYS AND HARDWARE - - - [RFS]
55'-H4 STEEL
POLE
(Note 5) N
6325331.369 (Note 5)
2042881.357 (Note 5)
7 C908 [P295594] 47.5 - - - - - YES (1) CIP WIRE TO Z113302 55'-H4 SW-WEATH
N/A
(Note 5) N 6325319.085
(Note 5)
2043101.090 (Note 5)
8 TL683/C908 [P295595] 43.0 - - - - REMOVE STRUCTURE, HEAD GUYS AND HARDWARE - - - [RFS]
50'-H2 STEEL
POLE
(Note 5) N
6325317.032 (Note 5)
2043309.097 (Note 5)
9 C908 [P295596] 43.0 - - - - - YES
(1) #2 AWG TRIPLEX SEC TO Z518441
(2) CIP WIRES TO Z518441
50'-1 SW-WEATH
N/A (Note 5) N
6325315.527 (Note 5)
2043343.575 (Note 5)
10 TL683/C908 [P295597] 43.0 - - - - REMOVE STRUCTURE, HEAD GUY AND HARDWARE - - - [RFS]
50'-1 STEEL
POLE
(Note 5) N
6325307.689 (Note 5)
2043568.353 (Note 5)
11 TL683 [Z207016] 20.0 - - - - REMOVE STRUCTURE, HEAD GUY AND HARDWARE - - - [RFS] 25' STEEL POLE N 6325284.48 2043582.50
12 C908 [P294981] 39.0 - - - - - YES (1) CIP WIRE TO Z113302 50'-1 SW-WEATH
N/A
(Note 5) N 6325065.768
(Note 5)
2043099.592 (Note 5)
Total
Averages
(Note 6)
62.2 74.8 21
TL683 HAG TABLE Cole Grade Road Relocation Project
5/5/2023
Structure Coordinates (GO95 State Plane CA VI)
(EPOCH 2010)
Glossary of Abbreviations RFS -Remove from service CIP -3rd Party Communications HAG -Height Above Grade TAN -Tangent DE -Dead End EP -Engineered/Custom Pole
FDN -Foundation (Note 2) PIER -Concrete Pier Foundation MPL -Micropile Foundation SW -Direct Embed Steel Pole DB -Direct Embedment
WETH -Weathering Steel GALV -Galvanized
Notes
(1) Location Number and Foundation Type are subject to change until design is Final.
(2) Unless otherwise stated, top of foundations (FDN, MPL, PIER) are embeded approximately one foot.
(3) Length of structure includes foundation reveal or the overall length if direct embed.
(4) Units are in Survey Feet unless otherwise indicated.
(5) Structures to be installed by Applicant Designer.
(6) Total Averages only account for structures within replacement scope of work (Z113302, Z518441 and Z518440).
5/5/2023 2016-0001-A-5122 1 of 1
File details come from the government source that posted it. Updated .