Revised_Bid_Form_-_Event_4226.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Bid-PW Bloomington Ave/Minnehaha Pkwy HSIP
Solicitation number
0000004226
Issued by
Hennepin County, Minnesota

About this file

This is a revised bid form for the City of Minneapolis Public Works Department's Bloomington Avenue/Minnehaha Parkway Highway Safety Improvement Program (HSIP) project. The project encompasses approximately 130 line items including construction surveying, mobilization, clearing and grubbing, removal of existing pavement and infrastructure, excavation, aggregate base and concrete pavement installation, sewer and water utility pipe installation, drainage structure construction, concrete walk and curb-and-gutter work, bicycle racks, traffic control systems, tree protection, sodding, and pavement markings. Quantities vary significantly across line items, ranging from single units for some items to thousands of units for others, such as 19,435 square feet for 4-inch concrete walk and 5,034 square yards for pavement removal. Sealed bids are due October 21, 2026 at 2:00 PM CDT, with a pre-bid meeting scheduled for October 1, 2026 at 10:00 AM via Microsoft Teams. Bids must be submitted to the City of Minneapolis Procurement Office at 505 Fourth Avenue South, Room 310, Minneapolis, Minnesota 55415.

Bidders must complete the bid form in Excel format with all unit prices entered in the designated column; the spreadsheet will auto-calculate the total bid amount, and failure to complete all unit prices will result in a non-responsive bid. All bids exceeding $50,000 require submission of a Responsible Contractor Verification and Certification of Compliance Form, a completed non-collusion affidavit, and a bid deposit of at least 5 percent of the total bid amount. A Disadvantaged Business Enterprise (DBE) goal of 8.3 percent applies, with all DBE firms required to be certified through the Minnesota Unified Certification Program by the proposal due date, and apparent low bidders must submit required DBE documentation within five business days following bid opening. Prevailing wage and civil rights compliance requirements under Minneapolis Code of Ordinances Title 7 apply, with construction workforce aspirational goals of 20 percent female participation and 32 percent minority participation. If awarded, contractors must secure Performance and Payment Bonds. Questions should be directed to Duane Hansen at 612-673-2197 or duane.hansen@minneapolismn.gov.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Revised Bid Form
Event 4226- Bloomington Ave/Minnehaha Pkwy HSIP
Supplier Name: _____________________________________________
A Valid bid response shall include the following:
The Bid Form must be filled out in Excel and attached to your bid response. “Total Bid Amount” on Event Line Amount equals the "Total Bid Amount" on your Bid Form. No handwritten prices will be accepted. The spreadsheet will auto-calculate the Total Bid Amount.
Enter your pricing in the Unit Price column. In the event of a mathematical error, the unit price shall govern.
All unit prices must be filled out, if all unit prices are not filled out your bid will be considered Non responsive.
Please enter your company name above.
Item No.Item DescriptionUnitQuantityUnit PriceTotal Price
2011.601CONSTRUCTION SURVEYINGLUMP SUM1$ - 0
2021.501MOBILIZATIONLUMP SUM1$ - 0
2041.610TRAINEESHOUR475$ 1.00$ 475.00Unit price locked - Trainees
2101.502CLEARINGEACH2$ - 0
2101.502GRUBBINGEACH2$ - 0
2104.502REMOVE MANHOLEEACH11$ - 0
2104.502REMOVE CATCH BASINEACH17$ - 0
2104.502REMOVE HYDRANTEACH4$ - 0
2104.502REMOVE SIGNEACH24$ - 0
2104.502REMOVE BICYCLE RACKEACH10$ - 0
2104.502SALVAGE SIGNEACH2$ - 0
2104.502SALVAGE SIGN PANELEACH6$ - 0
2104.503SAWING CONCRETE PAVEMENTLIN FT835$ - 0
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT245$ - 0
2104.503REMOVE WATER MAINLIN FT34$ - 0
2104.503REMOVE SEWER PIPE (STORM)LIN FT680$ - 0
2104.503REMOVE CURB & GUTTERLIN FT2601$ - 0
2104.504REMOVE CONCRETE WALKSQ YD1572$ - 0
2104.504REMOVE PAVEMENTSQ YD5034$ - 0
2104.504REMOVE CONCRETE DRIVEWAY PAVEMENTSQ YD45$ - 0
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD1370$ - 0
2104.518REMOVE BITUMINOUS WALKSQ FT522$ - 0
2106.507EXCAVATION - COMMONCU YD2551$ - 0
2106.507COMMON EMBANKMENT (CV)CU YD145$ - 0
2211.507AGGREGATE BASE (LV) CLASS 5CU YD1578$ - 0
2301.503INTEGRANT CURB DESIGN B6LIN FT260$ - 0
2301.504CONCRETE PAVEMENT 10.0"SQ YD873$ - 0
2301.602DRILL & GROUT REINF BAR (EPOXY COATED)EACH212$ - 0
2360.509TYPE SP 12.5 WEARING COURSE MIX (5;L)TON1164$ - 0
2360.509TYPE SP 12.5 NON WEAR COURSE MIX (4;L)TON1045$ - 0
2501.602BULKHEAD CULVERTEACH4$ - 0
2503.50312" PVC PIPE SEWERLIN FT264$ - 0
2503.50315" PVC PIPE SEWERLIN FT215$ - 0
2503.50315" RC PIPE SEWER CLASS VLIN FT133$ - 0
2503.602CONNECT TO EXISTING STORM SEWEREACH5$ - 0
2504.602CONNECT TO EXISTING WATER MAINEACH4$ - 0
2504.602INSTALL HYDRANTEACH4$ - 0
2504.6026" VALVE BOXEACH4$ - 0
2504.602WATER UTILITY HOLEEACH8$ - 0
2504.6036" WATERMAIN DUCTILE IRON CL 52LIN FT32$ - 0
2506.502CONST DRAINAGE STRUCTURE DESIGN NEACH9$ - 0
2506.502CASTING ASSEMBLYEACH19$ - 0
2506.502ADJUST FRAME & RING CASTINGEACH14$ - 0
2506.503CONST DRAINAGE STRUCTURE DES 48-4020LIN FT32.9$ - 0
2506.503CONST DRAINAGE STRUCTURE DES 60-4020LIN FT12.8$ - 0
2506.503CONST DRAINAGE STRUCTURE DES 72-4020LIN FT4.6$ - 0
2506.602CONNECT INTO EXISTING DRAINAGE STRUCTUREEACH1$ - 0
2521.5184" CONCRETE WALKSQ FT19435$ - 0
2521.602DRILL & GROUT REINF BAR (EPOXY COATED)EACH1210$ - 0
2521.6184" CONCRETE WALK SPECIALSQ FT1190$ - 0
2521.6186" CONCRETE WALK SPECIALSQ FT168$ - 0
2521.618CONCRETE CURB RAMP WALKSQ FT5641$ - 0
2531.503CONCRETE CURB & GUTTER DESIGN B612 (MOD)LIN FT795$ - 0
2531.5048" CONCRETE DRIVEWAY PAVEMENTSQ YD35$ - 0
2531.603LINEAR TACTILE STRIPSLIN FT250$ - 0
2531.603CONCRETE CURB & GUTTERLIN FT2095$ - 0
2531.603CONCRETE CURB DESIGN VLIN FT50$ - 0
2531.618TRUNCATED DOMESSQ FT784$ - 0
2540.602BICYCLE RACKEACH10$ - 0
2563.601TRAFFIC CONTROLLUMP SUM1$ - 0
2563.601ALTERNATE PEDESTRIAN ROUTELUMP SUM1$ - 0
2564.502INSTALL SIGN PANELEACH2$ - 0
2564.502INSTALL SIGNEACH6$ - 0
2564.502DELINEATOR / MARKEREACH13$ - 0
2564.518SIGNSQ FT80$ - 0
2564.518SIGN PANELSQ FT1.5$ - 0
2564.602SIGN COLLAREACH24$ - 0
2565.501TRAFFIC CONTROL INTERCONNECTLUMP SUM1$ - 0
2565.516TRAFFIC CONTROL SIGNAL SYSTEM ASYSTEM1$ - 0
2565.516TRAFFIC CONTROL SIGNAL SYSTEM BSYSTEM1$ - 0
2565.516TRAFFIC CONTROL SIGNAL SYSTEM CSYSTEM1$ - 0
2565.516TRAFFIC CONTROL SIGNAL SYSTEM DSYSTEM1$ - 0
2571.602TREE PROTECTIONEACH32$ - 0
2573.502STORM DRAIN INLET PROTECTIONEACH32$ - 0
2575.504SODDING TYPE SALT TOLERANTSQ YD1026$ - 0
2582.5034" SOLID LINE MULTI COMPLIN FT162$ - 0
2582.5036" SOLID LINE MULTI COMPLIN FT51$ - 0
2582.5038" SOLID LINE MULTI COMPLIN FT9$ - 0
2582.5034" BROKEN LINE MULTI COMPLIN FT183$ - 0
2582.50324" SOLID LINE PREF TAPE GR INLIN FT249$ - 0
2582.518PAVT MSSG PREF THERMO GR INSQ FT18$ - 0
2582.518CROSSWALK PREF THERMO GR INSQ FT2090$ - 0
2582.618PAVEMENT MARKING SPECIAL 2SQ FT172$ - 0
2582.618PAVEMENT MARKING SPECIAL 3SQ FT112$ - 0
2582.618PAVEMENT MARKING SPECIAL 4SQ FT12$ - 0

Total Bid Amount. Please enter this amount on line 1 on the eSupplier Portal $ 475.00