Reference Check Past Performance Questionnaire.pdf
PDF 311 KB Posted
- Attached to
- Master Agreement AZ|CTR065678
- Contract number
- CTR065678
- Issued by
- Arizona
About this file
This document is a Past Performance Questionnaire for a Request for Proposal (RFP) #BPM004287 by the Arizona Department of Environmental Quality (ADEQ) for a "Lead Service Line Consultant Services" project. The reference check was completed by Michael Miyahira, Engineering Section Supervisor from the Hawaii Department of Health Safe Drinking Water Branch, evaluating the performance of the contractor TruePani Inc.
The questionnaire reveals that TruePani Inc. performed two rounds of WIIN 2107 grant Lead Testing in Schools projects. The reference check indicates the contractor met service needs, completed the project within the agreed-upon time and budget, and received exceptional ratings across multiple performance metrics. Specifically, the contractor scored a perfect 6 out of 6 for quality of deliverables, problem-solving responsiveness, willingness to re-contract, and overall job performance. No inaccuracies were found in their work, and no performance complaints were filed by external stakeholders.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1 Rev.12-18-2018
REQUEST FOR PROPOSAL (RFP) # BPM004287
ADEQ Project: “Lead Service Line Consultant Services”
Past Performance Questionnaire Contractor: TruePani Inc.
Please email the completed Past Performance Questionnaire to Forbin.Merrilyn@azdeq.gov
Reference Check provided by
Name ____Michael Miyahira, P.E.____________________________________________________
Title______Engineering Section Supervisor ____________________________________________
Agency/Company______Hawaii Department of Health Safe Drinking Water Branch__________
Email Address_________michael.miyahira@doh.hawaii.gov______________________________
Phone Number ________808-586-4258_______________________________________________ _
1. Has the Contractor listed above provided Lead Service Line Identification and Inventory services for your agency/company? Yes☐ No☒
i) If yes, how would you rate the quality of work performed by this Contractor on your project?
Please provide a rating from 0 to 6:
ii) If not, please sign and return the Form to the email address above Responses provided below for two rounds of WIIN 2107 grant Lead Testing in Schools projects in which they performed exceptionally
2. Did the Contractor and their employee(s) meet your agency /company’s requested service needs and work plan? Yes☒ No☐
i) If not, please provide the details below:
3. Was the project performed by this Contractor completed within the agreed-upon time?
Yes☒ No☐
i) If no, please provide details below:
Please provide a rating from 0 to 6:
4. Was the project completed within budget? Yes☒ No☐
i) If not, please provide details on how the supplier communicated and managed the cost overrun.
mailto:Forbin.Merrilyn@azdeq.gov
Page | 2 Rev.12-18-2018
5. Please describe the quality of deliverables submitted:
Please provide a rating from 0 to 6: 6
6. Was there any finding of inaccuracies in the data provided by the Contractor? Yes☐ No☒
If yes please provide details below
7. Did any of your external stakeholders file a performance or conduct report against the contractor or any of their staff? Yes☐ No☒
ii) If yes, please provide details below
8. Was the Contractor’s staff responsive to solving any problems that may have occurred on your project?
Please provide a rating from 0 to 6: 6
9. Would you be willing to contract with this Contractor again? Yes☒ No☐
i) If yes, please provide a rating from 0 to 6: 6
10. How would you rate the Contractor’s overall job performance?
Unsatisfactory☐ Marginal☐ Satisfactory☐ Very Good☐ Exceptional☒
To the Arizona Department of Environmental Quality: The undersigned has certified all information contained in the Past Performance Questionnaire is current and factual.
Name: __Michael Miyahira____________
Title: _Hawaii DOH SDWB Engineering Sup
Signature: ____________________________
Date: October 14, 2022
File details come from the government source that posted it. Updated .