This is an attachment to a Request for Proposal issued by the County of Sacramento for the Rio Cosumnes Correctional Center (RCCC) Campus Electrification Plan, coordinated through the Department of General Services, Facility Planning and Management, and the Sacramento County Sheriff Organization. The site plan document identifies I-3 occupancy buildings at the RCCC campus that contain aging natural gas HVAC equipment requiring replacement through electrification alternatives. The plan delineates specific buildings and facilities in scope for the electrification project, distinguishing them from non-I-3 occupancy buildings that already have code-compliant HVAC systems. The RFP (No. 2025-PURB RFP-0054) was released on November 20, 2025, with a proposal response deadline of January 8, 2026, at 2:00 p.m. A non-mandatory pre-proposal meeting is scheduled for December 9, 2025, at 9:00 a.m. The selected consultant must deliver a 50% draft report, 95% draft report, and final report with cost estimates, site plans, and implementation recommendations within six months of contract issuance. The project requires compliance with Chapter 11 of the 2022 California Mechanical Code for I-3 occupancies and coordination with SMUD utility services, specifically connecting to a 69kV substation north of campus via a proposed 12kV utility yard.
The contract will be executed on a lump-sum basis with payments aligned to deliverable milestones. Proposing consultants must provide estimated hours per labor level and hourly rate sheets for potential additional scope during the design stage, with all travel costs included in the lump-sum compensation. Evaluation criteria assess team qualifications (25 points), relevant experience (30 points), proposal quality (15 points), cost (20 points), timeline availability (5 points), and reference quality (5 points). The project is funded by Sacramento County. All consultants must complete a security background investigation and view the Prison Rape Elimination Act (PREA) Compliance Training Video prior to facility entry. Successful vendors must maintain comprehensive insurance coverage and comply with Sacramento County administrative and legal requirements as outlined in the sample county agreement attachment.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
30303030 moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Rectangle moyherr Rectangle moyherr Rectangle moyherr Text Box moyherr Text Box ATTACHMENT D - RCCC CAMPUS SITE PLAN - I3 BUILDINGS WITH AGING NATURAL GAS HVAC EQUIPMENT moyherr Rectangle moyherr Text Box
COLOR LEGEND
moyherr Text Box
I3 OCCPANCY WITH AGING NATURAL GAS HVAC EQUIPMENT
NON I3 OCCUPANCY
BUILDING WITH AN EXISTING CODE COMPLIANT HVAC PLAN
moyherr Rectangle moyherr Rectangle moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon moyherr Polygon
File details come from the government source that posted it. Updated .