Q and A No. 12-16.pdf
PDF 66 KB Posted
- Attached to
- Containerized Housing Units Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document contains questions and answers regarding Solicitation # FA301620Q00320001 for Containerized Housing Units at Joint Base San Antonio Lackland, Texas. The solicitation seeks proposals to install ten 8' x 40' containerized housing units to serve as temporary office space. Questions addressed technical specifications such as electrical requirements, flooring expectations, and minimum ceiling height. Contractors are responsible for any gravel base needed and existing flooring in the containers does not require removal. Proposals are due by April 20, 2020 and the standard interior finishes seen in past proposals include fiberglass reinforced panels and vinyl tile or roll flooring.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A No. 17-22.pdf | ||
| Q and A No. 8-11.pdf | ||
| Q and A No. 5-7.pdf | ||
| Q and A No. 4 (updated).pdf | ||
| Q and A No. 1-3.pdf | ||
| Q and A No. 4.pdf | ||
| Questions And Answers Sheet.docx | DOCX document | |
| Attachment 2 - Layout Specification 6 April 2020.pdf | ||
| Attachment 1 - Statement of Objectives - Addendum 1 (6 April 2020).pdf | ||
| Solicitation Amendment FA301620Q00320001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
502 CONS/JBKAE Solicitation # FA301620Q00320001 JBSA Lackland, TX Containerized Housing Units
QUESTIONS & ANSWERS
Cut-off date for contractor questions is: 12:00 PM CST, 13 April 2020.
Questions
Question 12: Please provide the link for JBSA-Lackland Air Force Base Design Standards, Architectural Compatibility Plan, and the Installation Facilities Standards (IFS). Narrowing search for the requirement for long term installation of temporary buildings and electrical codes.
Government Response: https://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/jbsa-lackland-ifs
Question 13: Who is financially responsible for “some gravel base may need to be placed to accommodate the configuration?
Government Response: The contractor that is selected. From our CE expert… 16 cubic yards per container X 2700lbs per ton= 20.5 tons per container X 10 CHUs=~205 Tons of type II sub-base. It might be safe to order 10% more.
Question 14: What is the distance from the designated electrical panel for the remaining two containers?
Government Response: Answered in Question 3 response: approximately 60’-70’ for each…120’- 140’ total.
Question 15: Does the government require existing flooring of Conex removed? Does the government have an expectation of flooring?
Government Response: The single-use CONEX existing flooring does not need to be removed. The SOO leaves it up to the contractor to propose interior finishes. Of the submissions, the government will select the one that is technically accurate and best price. The standard we have seen on the majority of CONEX offices is Fiberglass Reinforced Panels (FRP) and 12’ or 16’ vinyl tile flooring laid over a leveling sub-floor. Other solution have include roll vinyl flooring.
Question 16: Does the government have a minimum ceiling height?
Government Response: The height of an 8’ X 40’ CONEX is 8’5”…with insulation and a light fixture, fire alarm, the ceiling should be approximately 7’10” to 8’.
https://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/jbsa-lackland-ifs https://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/jbsa-lackland-ifs