This document is a PSB 25-1 Checklist for a contract involving the Tri-State Tollway (I-94/I-294) Plaza Improvements, Phase II Engineering Services. The prime contractor is SINGH & ASSOCIATES, INC., with the project identified as SI251-71. The checklist is likely part of an Illinois Department of Transportation (IDOT) procurement process, evaluating the responsiveness and responsibility of the proposed engineering services team.
The contract has specific Disadvantaged Business Enterprise (DBE) and Veteran-Owned Small Business (VOSB) participation goals, with a DBE goal of 77% and a Veteran goal of 3%. The prime contractor, Singh, is slated to perform 62% of the work, with additional participation from American (4%), Vaughn (5%), and GSG (6%) firms. Key personnel include Carl Gutowski (Project Manager), Brian Doubek (Project Engineer), Vytas Pelegrinias (Roadway Designer), Rashesh Patel (Electrical Designer), and Andrew Walton (QC/QA), all of whom are Illinois Licensed Professional Engineers. The project involves highways (freeways), electrical engineering, and surveying services, with the prime firm being prequalified in these special service categories.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSB 25-1 Checklist
PSB 25-1
Item 07: I-25-2006 Tri-State Tollway (I-94/I-294), Plaza Improvements, Phase II Engineering Services
SI251- 71
Prime Firm or Team Name:
SINGH & ASSOC., INC.
E-mail:
Required Items
Responsiveness/Responsible Yes, No or N/A Notes Statement of Interest Disclosures (Prime or TM-for each firm) Vendor Disclosure (Formerly Forms A) - (V.24.1) or IPG Active Registered Vendor Disclosure (Formerly Forms B) - (V23.1)
Exhibit F - VOSB - Utilization Plan and Letter of Intent
Firms and %
Exhibit H – DBE - Utilization Plan and Letter of Intent
Firms and %
Cure for Evaluation Yes, No or N/A Notes MUST total 100% Prime %
DBE %
Non-DBE %
SOI Team Grid - Accuracy
VOSB %
Self-Performance 40% (Prime or TM) Exhibit A - Key Personnel PSB # verify resumes are attached
List Key Personnel
Project Manager (IL Licensed Professional Engineer) Project Engineer (IL Licensed Professional Engineer) Roadway Designer (IL Licensed Professional Engineer) Electrical Designer (IL Licensed Professional Engineer) QC/QA (IL Licensed Professional Engineer) IDOT Prequalified Prime or TM - Make comment if not prequalified. Attach prequalified/not prequalified report in eBuilder Highways (Freeways) Prime Special Services (Electrical Engineering) Prime or Subconsultant
Special Services (Surveying) Prime or Subconsultant
Exhibit C _ WL file Prime or TM (each member)
Submitted?
Must be present for Evaluation Yes, No or N/A Notes
Y/N % D/M/WBE Firm? DBE DBE Goal 77.00 VOSB/SDVOSB Firm? VOSB Veteran Goal 3.00
Prime not VOSB
Carl Gutowski
Brian Doubek
Vytas Pelegrimas
Rashesh Patel Andrew Walton
Innldr 3% No U-Plan submitted
Singh 62%, American 4%, Vaughn 5%, GSG 6%, no uplan submitted
Board of Election (date s/be prior to PSB due date) Prime or (Prime or TM-for each firm)
Submitted?
Exhibit D – Availability of Key Project Personnel
Submitted?
DBE DBE Firm:Exhibit E - Partnering for Growth (Mentor Protege)
VOSB VOSB Firm:
Firm's Commitment Signature Submitted?
Terms and Conditions Submitted?
N/A
File details come from the government source that posted it. Updated .