2008 Item 9 Voting Tally.pdf

PDF 224 KB Posted

Attached to
Open Market Construction-Related Professional Services IL|25-557THA-ENGCO-P-85516
Contract number
25-557THA-ENGCO-P-85516
Issued by
Illinois

About this file

The document is a Consultant Selection Committee report from the Illinois Tollway, dated April 30, 2025, specifically for PSB 25-1, Item 9 I-25-2008 regarding engineering services for Plaza Improvements in Phase II at the Reagan Memorial Tollway (I-88) and Veterans Memorial Tollway (I-355). The selection process involved 12 engineering and consulting firms, with some designated as Disadvantaged Business Enterprises (DBE) and Participating 4 Groups (P4G), and utilized a multi-round voting process for firm selection.

Through a silent round voting process, the committee narrowed down the potential firms, with THE RODERICK GROUP, Gasperec Elberts Consulting, LLC/Innleadair LLC, and EPSTEIN, A. & SONS INTERN., INC. emerging as the top three recommended firms across three voting rounds. The selection considered various factors including DBE status, firm nominations, and multiple voting rounds. Firms like Atlas Technical Consultants LLC, B.L.A., INC. DBA BOLLINGER, LACH, Bravo Company Engineering, and others were evaluated, with the final selection focusing on engineering and consulting services for the specified tollway plaza improvement project.

View the file

Other files

File Type Posted
2008_PSB25-1_THE RODERICK GROUP_03142025 - ITEM 9 CHECKLIST.pdf PDF
I-25-2008 Notice of Award.pdf PDF
IPG Active Registered Vendor Disclosure - Formerly Forms B v.23.1~33.docx DOCX document
25.1_VOSB Goal Facilitation.pdf PDF
EM_SPO_DP_2008-CiorbaGroupInc_07312025.pdf PDF
NOA-4764-GlobetrottersEngineering-2_Signed.pdf PDF
Vendor Disclosure - Formerly Forms A-v.24.1.docx DOCX document
NOA-4764-GlobetrottersEngineering-1_Signed.pdf PDF
NOA-4988-WBK Engineering-2_Signed.pdf PDF
2008_FDS_Packet.pdf PDF
2008_Roderick_GS-DD_Packet_07222025.pdf PDF
NOA-2012-ThomasEngineering-1_Signed.pdf PDF
EM_CEI_MB_2008-CiorbaGroupInc_07312025.pdf PDF
PSB 25-1 AddendumNo3 03062025.pdf PDF
2006_Singh_GS-DD_Packet_07212025.pdf PDF
2006_FDS_Packet.pdf PDF
PSB 25-1_Final~1.pdf PDF
2006 Item 7 Voting Tally.pdf PDF
NOA-2011-Lakeshore-3_Signed.pdf PDF
PSB-25-1 Item 7 Singh Checklist.pdf PDF
NOA-2011-Lakeshore-1_Signed.pdf PDF
PSB 25-1 AddendumNo2 02212025.pdf PDF
I-25-2006 Notice of Award.pdf PDF
PJF_I-25-2006 Item7~1.pdf PDF
NOA-4988-WBK Engineering-1_Signed.pdf PDF
PSB 25-1_AddendumNo1-02182025.pdf PDF
NOA-2011-Lakeshore-2_Signed.pdf PDF
PJF_I-25-2008 Item9~1.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Selection Date: April 30, 2025

PSB 25-1

Item 9 I-25-2008 Reagan Memorial Tollway (I-88) and Veterans Memorial Tollway (I-355), Plaza Improvements; Phase II Engineering Services

Round Voting (Silent) Number Firm DBE P4G Nominated Firms Round 1 Round 2 Round 3

1 Atlas Technical Consultants LLC No No SE3, LLC 5 3 EPSTEIN, A. & SONS INTERN., INC. 1

B.L.A., INC. DBA BOLLINGER, LACH

No Yes Gasperec Elberts Consulting, LLC/Innleadair

LLC 5 5

THE RODERICK GROUP

Bravo Company Engineering

No No

THE RODERICK GROUP

5 6 Gasperec Elberts Consulting, LLC/Innleadair LLC 2

4 CHIN, R. M. & ASSOC., INC. Yes No EPSTEIN, A. & SONS INTERN., INC. 6 5 CIORBA GROUP, INC. No No 6 EPSTEIN, A. & SONS INTERN., INC. No Yes

Gasperec Elberts Consulting, LLC/Innleadair LLC

Yes/Yes No/Yes

GSG Material Testing, Inc. dba the HOH Group, Inc. Yes No

9 MILHOUSE ENG. & CONSTRUCTION, INC. Yes Yes 10 SE3, LLC Yes No 11 SINGH & ASSOC., INC. Yes No Firms Round 1 Round 2 Round 3 12 THE RODERICK GROUP Yes No 1 THE RODERICK GROUP 4

Gasperec Elberts Consulting, LLC/Innleadair LLC 2

EPSTEIN, A. & SONS INTERN., INC.

Consultant Selection Committee

Suggested Firms Nomination

Round

Top 3 Voting Summary

Illinois Tollway

Round 2

File details come from the government source that posted it. Updated .