Progressive Design-Build Agreement TEMPLATE_20251017.docx

DOCX document 213 KB Posted

Attached to
WRWWTF Electrical Building Progressive Design-Build
Solicitation number
RFP 720 WUD 26-014R 2
Issued by
Palm Beach County, Florida

About this file

Summary

This is a Progressive Design-Build Agreement template for Palm Beach County, Florida, establishing the contractual framework for design and construction services related to the WRWWTF Electrical Building project (WUD Project No. XX-XXX). The agreement implements a phased delivery approach consisting of Phase 1 (design, pricing, and preliminary services) and Phase 2 (completion of design, procurement, construction, start-up, testing, commissioning, and warranty services). Phase 1 services must be completed to a specified level of design completion or defined deliverables to establish the Contract Price for Phase 2 on an open-book basis. The County retains the right to accept the Design-Builder's Phase 2 Contract Price, negotiate modifications to scope and price, reject the proposal and cancel the project, proceed with an alternative Design-Builder, or exercise an off-ramp option allowing the County to contract directly with Design-Builder's design subconsultants for continued services. Phase 1 services commence within ten days of the Notice to Proceed, with Phase 2 services following within ten days of the Phase 2 Notice to Proceed. The Design-Builder must conduct performance tests to demonstrate that Facility Performance Criteria are met at Substantial Completion.

Compensation for Phase 1 Services is provided on a time-and-materials basis plus out-of-pocket expenses subject to a not-to-exceed amount, with monthly invoicing and payment within thirty days of County approval, in compliance with Florida's Local Government Prompt Payment Act. Phase 2 compensation will be established as a Guaranteed Maximum Price (GMP) during Phase 1 negotiations, with the agreement to be amended upon mutual acceptance. The GMP includes separate Design-Builder and Owner contingencies for unanticipated costs, with any savings remaining with the County. Liquidated damages are assessed at specified daily rates for delays in achieving Substantial Completion and Final Completion dates. The Design-Builder must comply with Palm Beach County's Equal Business Opportunity (EBO) Ordinance, including specified Small Business Enterprise (SBE) participation percentages. The Design-Builder shall provide a Public Construction Bond prior to Phase 1 commencement and a Form of Guarantee prior to Phase 2 commencement. The Design-Builder is required to register as a vendor with Palm Beach County's Vendor Self Service system, maintain all necessary licenses and authorizations, comply with E-Verify employment eligibility verification, and adhere to the County's nondiscrimination and criminal history records check requirements.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NAME

PROGRESSIVE DESIGN-BUILD AGREEMENT (WUD PROJECT NO. XX-XXX)

THIS AGREEMENT, made and entered into this _______ day of _________, 202X (“Effective Date”) by and between Palm Beach County, Florida, a political subdivision of the state of Florida, hereinafter referred to as the “County” or “Owner”, and [Design-Builder Name], a [State Name] Corporation authorized to do business in the State of Florida, hereinafter referred to as “Design-Builder”, whose Federal I.D. is [Design-Builder Federal I.D.].

WITNESSETH

WHEREAS, the County recently solicited proposals for design-build services in relation to the Project Name Design-Build project (WUD Project No XX-XXX) (“Project”); and

WHEREAS, Design-Builder submitted a proposal to design and construct the Project and was selected to receive the award of the Project;

WHEREAS, Owner and Design-Builder commit at all times to cooperate fully with each other, and proceed on the basis of trust and good faith to permit each party to realize the benefits afforded under this Agreement; and

WHEREAS, County and Design-Builder wish to enter into this Agreement to set forth the terms, conditions, and requirements of Design-Builder’s design and construction services in completing the Project.

NOW THEREFORE, In consideration of the mutual covenants and obligations contained herein, County and Design-Builder now agree as follows:

Article 1.0Scope of Work for Phase 1 and Phase 2 Services
1.1Phased Delivery. County and Design-Builder will implement the Project on a phased basis.
1.2Phase 1 Services. County has selected Design-Builder on the basis of Design-Builder’s proposal for the performance of design, pricing, and other services for the Project during Phase 1. Design-Builder shall perform such services to the level of completion required for Design-Builder and County to establish the Contract Price for Phase 2, as set forth in Section 1.3 below. The Contract Price for Phase 2 shall be developed during Phase 1 on an “Open-Book” basis. Design-Builder’s Compensation for Phase 1 Services is set forth in Section 1, Phase 1, of Attachment B, Compensation. The level of completion required for Phase 1 Services is defined in Section 1 of Attachment A, Scope of Design-Builder’s Services (either as a percentage of design completion or by defined deliverables).
1.3Phase 2 Services. Design-Builder’s Phase 2 services shall consist of the completion of design services for the Project, the procurement of all materials and equipment for the Project, the performance of construction services for the Project, the start-up, testing, and commissioning of the Project, and the provision of warranty services, all as further described in Attachment A, Scope of Design-Builder’s Services. Upon receipt of Design-Builder’s proposed Contract Price for Phase 2, County may (a) accept the Contract Price and issue a Notice to Proceed with Phase 2 services, or (b) enter into a negotiation with Design-Builder on the scope and Contract Price, and, if required, on the schedule, for Phase 2 services to achieve a mutually acceptable basis on which to proceed, or (c) reject Design-Builder’s proposal for Phase 2 and either (i) cancel the Project, (ii) proceed with another Design-Builder, or (iii) exercise the “off-ramp” final design provisions of Section 1.4, Off-Ramp. The Contract Price for Phase 2 Services will be as set forth in Section 2, Phase 2, of Attachment B, Compensation, when mutually agreed between the parties, and this Agreement shall be amended to add the agreed-upon Contract Price for Phase 2 Services in Attachment B, Compensation. Once the parties have agreed upon the Contract Price and County has issued a Notice to Proceed with Phase 2, Design-Builder shall perform the Phase 2 services, all as further described in Attachment A, Scope of Design-Builder’s Services, as it may be revised.
1.4Off-Ramp
1.4.1The parties acknowledge that County’s ability to successfully complete the Project may be significantly impacted if County elects to terminate Design-Builder’s services at the end of Phase 1, rather than proceeding to Phase 2 under Section 1.3 (“Phase 2 Services”) and certain design subconsultants are not available to continue working on the Project. Consequently, Design-Builder hereby agrees that if County terminates Design-Builder for any reason, County shall have the right to contract directly with such design subconsultants for design-related services on this Project, and Design-Builder shall take such steps as are reasonably necessary to enable County to implement such relationship. Design-Builder shall provide in any design subconsultancy agreements that County shall have the right to negotiate directly with such design subconsultants for the continuation of their services with respect to the Project, and that any provisions with respect to copyright or the ownership of instruments of service confirm such right of County.
1.4.2If the parties are unable to reach an agreement on Design-Builder’s proposed Contract Price for Phase 2 under Section 1.3 within the time limit for acceptance specified in the Proposal, as may be extended by the mutual agreement of the parties, then the proposed Contract Price shall be deemed withdrawn and of no effect. In such event, County and Design-Builder shall meet and confer as to how the Project will proceed, with County having the following options:
.1County may declare Phase 1 Services completed and authorize Design-Builder to continue to advance the final design of the Project as an extension of Phase 1 or as an Additional Service, as applicable; or
.2County may terminate the relationship with Design-Builder and proceed to exercise its available options to perform the final design and construction with parties other than Design-Builder.
1.4.3If County fails to exercise either of its options under Section 1.4.2 in a reasonable period of time,

Design-Builder may give written notice to County that it considers this Agreement completed. If County fails to exercise either of the options under Section 1.4.2 within ten (10) days of receipt of Design-Builder’s notice, then this Agreement shall be deemed completed.

1.4.4If County terminates the relationship with Design-Builder under Section 1.4.2.2, or if this Agreement is deemed completed under Section 1.4.3, then Design-Builder shall have no further liability or obligations to County under this Agreement
1.5Completion. Once Design-Builder has received a Notice to Proceed with Phase 2, Design-Builder shall perform all design and construction services, and provide all material, equipment, tools, labor, manuals, start-up, commissioning and testing services for the Project necessary to complete the Work described in and reasonably inferable from the Contract Documents, including Section 2 of Attachment A (Scope of Design-Builder’s Services). A requirement of Substantial Completion of the Work is that Design-Builder shall conduct performance tests to demonstrate that the Facility Performance Criteria have been met.
Article 2.0Contract Documents
2.1Contract Documents. The Contract Documents are comprised of the following:

2.1.1

The Design-Build Criteria set forth as Attachment H to this Agreement;

2.1.2

All written modifications, amendments and change orders to this Agreement issued in accordance with Attachment D, General Conditions;

2.1.3

2.1.4

Written Special Conditions, if any, to the General Conditions;

Written Supplementary Conditions, if any, to the General Conditions;

2.1.5

The General Conditions set forth as Attachment D to this Agreement;

2.1.6

This Agreement, excluding all exhibits and attachments;

2.1.7

Technical Specifications and Drawings

2.1.8

The following other documents attached hereto:

· Attachment A – Scope of Design-Builder’s Services

· Attachment B – Compensation

· Attachment C – Schedule

· Attachment E – Public Construction Bond

· Attachment F – Form of Guarantee

· Attachment G – OEBO Schedule 1 and Schedule 2

· Attachment I – Engineering and Construction Hourly Labor Rates

· Attachment J – Pricing Guidance

· Attachment K – Miscellaneous Documents / Forms

Article 3.0
Interpretation and Intent
3.1Contract Documents. The Contract Documents are intended to permit the parties to complete the Work and all obligations required by the Contract Documents within the Contract Time(s) for the Phase 1 Compensation and the agreed Contract Price for Phase 2 Services. The Contract Documents are intended to be complementary and interpreted in harmony so as to avoid conflict, with words and phrases interpreted in a manner consistent with construction and design industry standards. In the event of any inconsistency, conflict, or ambiguity between or among the Contract Documents, the Contract Documents shall take precedence in the order in which they are listed in Section 2.1 hereof. In case of discrepancy among technical specifications, drawings, and plans, the most restrictive requirements shall govern. Detailed plans shall have precedence over general plans. In the event that any conflicts cannot be resolved by reference to this Governing Order of Contract Documents provision, then County shall resolve the conflict in any manner which is acceptable to County and which comports with the overall intent of the Contract Documents.
3.2Meanings. Terms, words and phrases used in the Contract Documents, including this Agreement, shall have the meanings given them in Attachment D, - General Conditions.
3.3Entire Agreement. The Contract Documents form the entire agreement between County and Design-Builder and by incorporation herein are as fully binding on the parties as if repeated herein in their entirety. No oral representations or other agreements have been made by the parties except as specifically stated in the Contract Documents.
Article 4.0Ownership of Work Product
4.1County’s Limited License upon Payment in Full. Upon County’s payment in full for the Work performed in Phase 1 under the Contract Documents, Design-Builder shall be deemed to have conveyed to County all drawings, Specifications and other documents and electronic data furnished by the Design-Builder to County under this Agreement (the “Work Product”) developed by Design-Builder for County’s use in the design, construction, occupancy and maintenance of the Project. Design-Builder shall require a similar provision conveying to County their respective Phase 1 design Work Product from each of Design-Builder’s design subconsultants. The conveyance of such Work Product shall not include any patent, trade secret, or other intellectual property owned by Design-Builder or its respective subconsultants prior to undertaking the Work hereunder, but Design-Builder and its subconsultants shall grant County a nonexclusive license to use such intellectual property included in the Work Product for County’s design, construction, occupation, operation, maintenance and repair of the Project, but not for use on any other project or facility without Design-Builder’s (or its subconsultant’s) express written consent. Design-Builder shall include provisions in each of its subconsultants agreements reflecting the conveyance and license provided above.
4.2County’s Limited License upon County’s Termination for Convenience or Design-Builder’s Election to Terminate. If (i) County terminates the Project for its convenience as set forth in GC 62 or GC 63; (ii) Design-Builder elects to terminate this Agreement in accordance with GC 64; or (iii) County elects the “off ramp” option provided in Section 1.4 of this Agreement, Design-Builder shall, upon County’s payment in full of the amounts due Design-Builder under the Contract Documents, be deemed to have granted County a limited license to use the Work Product to complete the Project and subsequently use and occupy the Project, conditioned on the following:
4.2.1Use of the Work Product is at County’s sole risk without liability or legal exposure to Design-Builder or anyone working for or through Design-Builder, including Design Consultants of any tier (collectively the “Released Parties”).
4.2.2If County elects the “off ramp” option provided in Section 1.4 of this Agreement and retains any of the Design-Builder’s design subconsultants, then the risk, liability and legal exposure with respect to Work Product shall be as set forth in the agreement or agreements between County and such design subconsultant or subconsultants.
4.3County’s Limited License upon Design-Builder’s Default. If this Agreement is terminated due to Design-Builder’s default pursuant to GC 62 and (i) it is determined that Design-Builder was in default, and (ii) County has fully satisfied all of its obligations under the Contract Documents, then Design-Builder shall grant County a limited license to use the Work Product in connection with County’s completion, use and occupancy of the Project. This limited license is conditioned on County’s express understanding that its use of the Work Product is at County’s sole risk and without liability or legal exposure to any Released Party.
4.4County’s Release for Use of Work Product. County recognizes that in the event of an early termination of the Work, whether for convenience or for cause, Design-Builder will not have the opportunity to finish or to finalize its Work Product. Therefore, if County uses the Work product under Sections 4.3 or 4.4 in whole or in part, County releases the Released Parties from any and all claims, damages, liabilities, losses and expenses, including attorneys’ fees, arising out of or resulting from County’s use of the Work product.
Article 5.0Contract Time
5.1Dates of Commencement.
5.1.1Design-Builder’s Phase 1 Services shall commence within ten (10) days of Design-Builder’s receipt of County’s Phase 1 Notice to Proceed unless the parties mutually agree otherwise in writing. Design-Builder shall complete the Phase 1 Services in accordance with Attachment C, Schedule and Attachment H, Design Build Criteria.
5.1.2The Phase 2 Services shall commence on the date within ten (10) days of Design-Builder’s receipt of County’s Phase 2 Notice to Proceed (“Date of Commencement”) unless the parties mutually agree otherwise in writing.
5.2Substantial Completion and Final Completion
5.2.1Substantial Completion of the Work shall be achieved in accordance with Attachment C, Schedule, Attachment H, Design Build Criteria, and Attachment D, General Conditions.
5.2.2Interim milestones and/or Substantial Completion of identified portions of the Work shall be achieved in accordance with Attachment C, Schedule (“Scheduled Substantial Completion Date”), Attachment H, Design Build Criteria, and Attachment D, General Conditions.
5.2.3Final Completion of the Work or identified portions of the Work shall be achieved Services in accordance with Attachment C, Schedule (“Scheduled Final Completion Date”),Attachment H, Design Build Criteria, and Attachment D, General Conditions.
5.2.4All of the dates set forth in this Article 5.0 shall be subject to adjustment in accordance with the General Conditions.
5.3Time is of the Essence. County and Design-Builder mutually agree that time is of the essence with respect to the dates and times set forth in the Contract Documents. County agrees to provide all site access, materials, information, data, and approvals required under the Contract Documents in a timely manner, as required for Design-Builder to achieve the interim milestones of the Schedule and the Scheduled Substantial Completion Date and Scheduled Final Completion Date.
5.4Liquidated Damages. Design-Builder understands that if Substantial Completion is not achieved by the Scheduled Substantial Completion Date (as it may be extended hereunder), County will suffer damages which are difficult to determine and accurately specify. Design-Builder agrees that if Substantial Completion is not achieved in accordance with Attachment C, Schedule and Attachment H, Design Build Criteria, Design-Builder shall pay County $X,X00.00 as liquidated damages for each calendar day that Substantial Completion extends beyond the Scheduled Substantial Completion Date. Design-Builder agrees that if Final Completion is not achieved by the Scheduled Final Completion Date, Design-Builder shall pay County $X,X00.00 as liquidated damages for each day that Final Completion extends beyond the Scheduled Final Completion Date. The liquidated damages provided herein shall be in lieu of all liability for any and all extra costs, losses, expenses, claims, penalties and any other damages, whether special or consequential, and of whatsoever nature incurred by County which are occasioned by any delay in achieving Substantial Completion or Final Completion.
Article 6.0Compensation and Contract Price
6.1Phase 1 Compensation. For the Phase 1 Services, County shall pay Design-Builder compensation in accordance with Section 1, Phase 1, of Attachment B, Compensation.
6.2Phase 2 Contract Price. For the Phase 2 Services, County shall pay Design-Builder in accordance with Section 2, Phase 2, of Attachment B, Compensation, an agreed Contract Price, subject to adjustments made in accordance with the General Conditions and Article 7.

Article 7.0 Guaranteed Maximum Price [This Article 7 acts as a placeholder and will be completed as part of the amendment to add the GMP for Phase 2 Services].

7.1 Design-Builder guarantees that it shall not exceed the GMP of ______ Dollars ($ ). Documents used as a basis for the GMP shall be identified in the Contract Price Amendment to this Agreement. Design-Builder does not guarantee any specific line item provided as part of the GMP, and has the sole discretion to apply payment due to overruns in one line item to savings due to underruns in any other line item. Design-Builder agrees, however, that it will be responsible for paying all costs of completing the Work which exceed the GMP, as adjusted in accordance with the Contract Documents.

7.2 Contingency.

7..2.1 Design-Builder Contingency. The GMP includes a Design-Builder Contingency in the amount of (to be established at time of GMP) Dollars ($ ) which is available for Design-Builder’s exclusive use for unanticipated costs it has incurred that are not the basis for a Change Order under the Contract Documents. By way of example, and not as a limitation, such costs may include: (a) trade buy-out differentials; (b) overtime or acceleration ordered by the Owner; (c) escalation of materials; (d) omissions, however caused; (e) Subcontractor defaults; or (f) those events under Article 11.10 and Section 82 of the General Conditions of Contract that result in an extension of the Contract Time but do not result in an increase in the Contract Price. The Design-Builder Contingency is not available to Owner for any reason, including changes in scope or any other item which would enable Design-Builder to increase the GMP under the Contract Documents. Design-Builder shall provide Owner notice of all anticipated charges against the Contingency, and shall provide Owner as part of the monthly status report required by amended to add the agreed-upon Contract Price for Phase 2 Services of the General Conditions of Contract an accounting of the Design-Builder Contingency, including all reasonably foreseen uses or potential uses of the Design Builder Contingency. Design-Builder agrees that with respect to any expenditure from the Design Builder Contingency relating to a Subcontractor default or an event for which insurance or bond may provide reimbursement, Design-Builder will in good faith exercise reasonable steps to obtain performance from the Subcontractor and/or recovery from any surety or insurance company. Design-Builder agrees that if Design-Builder is subsequently reimbursed for said costs, then said recovery will be credited back to the Contingency.

7.2.2 Owner Contingency. The GMP includes an Owner Contingency in the amount of (to be established at time of GMP ) Dollars ($ ) which is available for Owner’s exclusive use for unanticipated costs that are not the basis for a Change Order under the Contract Documents. By way of example, and not as a limitation, such costs may include: (a) specific Owner allowances, (b) Owner request(s) to accelerate, and (c) reasonable scope gaps as adjudicated reasonable by the Owner. The Owner Contingency is not available to Design-Builder for any reason without prior approval by the Owner. The Design-Builder will be required to furnish documentation justifying the use of the Owner Contingency and provide documentation evidencing proposed expenditures to be charged to the Owner Contingency prior to approval and the release of funds by the Owner. Proper Documentation for use of the Owner Contingency shall be determined by the Owner. Owner shall provide Design-Builder notice of all anticipated charges against the Owner Contingency.

7.3 Savings.

7.3.1 If the sum of the actual Cost of the Work and Design-Builder’s Fee is less than the GMP, as such GMP may have been adjusted over the course of the Project, the difference (“Savings”) shall remain with the County.

Article 8.0Procedure for Payment
8.1Payment for Phase 1 Services
8.1.1County shall compensate Design-Builder for professional services on a computation of time charges plus “out-of-pocket” expenses, not-to exceed amount pursuant to Attachment B, Compensation, to this Agreement. County shall compensate Design-Builder for construction services in accordance with GC- 54. County shall compensate the Design-Builder monthly for Phase 1 Services performed under the Agreement on the following basis:
A.The total amount to be paid by the County under this Agreement for all Phase 1 Services and materials including, if applicable, "out of pocket" expenses (specified in paragraph C below) shall not exceed a total contract amount of __________dollars ($). The Design-Builder shall notify the County's representative in writing when 90% of the "not to exceed amount" has been reached. The Design-Builder will bill the County on a monthly basis, or as otherwise provided, at the amounts set forth in Attachment B for Phase 1 Services rendered toward the completion of the Scope of Work. The cost of work, fee and profit shall be in accordance with the Pricing Guidance set forth in Attachment J. Where incremental billings for partially completed items are permitted, the total billings shall not exceed the estimated percentage of completion as of the billing date.

B. Invoices received from the Design-Builder for Phase 1 Services pursuant to Attachment B, Compensation to this Agreement will be reviewed and approved by the County's representative, to verify that services have been rendered in conformity with the Agreement. Approved invoices will then be sent to the Finance Department for payment. Invoices will normally be paid within thirty (30) days following the County representative's approval, but no later than required under Florida’s Local Government Prompt Payment Act, Section 218.70 et seq., Florida Statutes.

C. "Out-of-pocket" expenses will be reimbursed up to an amount not to exceed __________dollars ($ ), and in accordance with the list of the types and amounts of expenditures eligible for reimbursement as set forth in Attachment B, Compensation. All requests for payment of "out-of-pocket" expenses eligible for reimbursement under the terms of this Agreement shall include copies of paid receipts, invoices, or other documentation acceptable to the Palm Beach County Finance Department. Such documentation shall be sufficient to establish that the expense was actually incurred and necessary in the performance of the Phase 1 Services described in this Agreement. Any travel, per diem, mileage, meals, or lodging expenses which may be reimbursable under the terms of this Agreement will be paid in accordance with the rates and conditions set forth in Section 112.06l, Florida Statutes.

D. Payments made for construction services performed in the execution of Phase 1 Services shall be made in accordance with the applicable provisions of Florida Statute 218.70 et seq, the Local Government Prompt Payment Act and GC 54.

E. Final Invoice: In order for both parties herein to close their books and records, the Design-Builder will clearly state "final invoice" on the Design-Builder’s final/last billing to the County for Phase 1 Services. This shall constitute Design-Builder’s certification that all Phase 1 services have been properly performed and all charges and costs have been invoiced to County. Any other charges for Phase 1 Services not properly included on this final invoice are waived by the Design-Builder.

F. In order to do business with Palm Beach County, Design-Builder is required to create a Vendor Registration Account OR activate an existing Vendor Registration Account through the Purchasing Department’s Vendor Self Service (VSS) system, which can be accessed at https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService. If Design-Builder intends to use sub-consultants, Design-Builder must also ensure that all sub-consultants are registered as consultants in VSS. All sub-consultant agreements must include a contractual provision requiring that the sub-consultant register in VSS. County will not finalize a contract award until the County has verified that the Design-Builder and all of its sub-consultants are registered in VSS.

8.2Progress Payments for Phase 2 Services
Payment for Phase 2 Services shall be in accordance with GC 54 or as otherwise agreed to by the Parties in the amendment to add the GMP for Phase 2 Services.
Article 9.0Indemnity, Insurance and Bonds
9.1Indemnity. The indemnification provisions set forth in GC 37 are applicable during the Term of this Agreement, and shall survive the termination or expiration of this Agreement.
9.2Insurance.Insurance obligations shall be as set forth in GC 18 are applicable during the Term of this Agreement.
9.3Bonds and Other Performance Security. Prior to the Notice to Proceed for Phase 1 and Phase 2 Services, Design-Builder shall provide the Public Construction Bond attached hereto as Attachment E, Public Construction Bond. Prior to the Notice to Proceed for Phase 2, Design-Builder shall provide the Form of Guarantee attached here to as Attachment F, Form of Guarantee.

Article 10.0 Subcontracting The County reserves the right to accept the use of a subcontractor or to reject the selection of a particular subcontractor and to inspect all facilities of any subcontractors in order to make a determination as to the capability of the subcontractor to perform properly under this Agreement. The Design-Builder is encouraged to seek additional small business enterprises for participation in subcontracting opportunities. If the Design-Builder uses any subcontractors on this project the following provisions of this Article shall apply:

If a subcontractor fails to perform or make progress, as required by this Agreement, and it is necessary to replace the subcontractor to complete the work in a timely fashion, the Design-Builder shall promptly do so, subject to acceptance of the new subcontractor by the County.

It is the policy of the Board of County Commissioners of Palm Beach County, Florida (the Board) that all segments of its business population including, but not limited to, small and local owned businesses, have an equitable opportunity to participate in the County’s procurement process, prime contract and subcontract opportunities. In pursuance of that policy, the Board adopted an Equal Business Opportunity (EBO) Ordinance which is codified in Sections 2-80.20 through 2 80.30 (as may be amended) of the Palm Beach County Code. The EBO Ordinance sets forth the County’s requirements for the EBO program, and is incorporated herein and made part of this Contract. Non-compliance with the EBO Ordinance must be corrected within fifteen (15) days of notice of non-compliance. Failure to comply with the EBO Ordinance may result in any of the following penalties:

• Suspension of Agreement;

· Withholding of funds;

•Termination of the Agreement based upon a material breach of contract pertaining to the EBO Program compliance;
•Suspension or debarment of Design-Builder from eligibility for providing goods or services to the County for a period not to exceed three (3) years; and
•Liquidated damages equal to the difference in dollar value of small business enterprise (SBE) participation as committed to in the Agreement, and the dollar value of SBE participation as actually achieved.

For Phase 1 Services, the Design-Builder must adhere to the Affirmative Procurement Initiatives (APIs) set forth in the Notice of Advertisement, and the specifications set forth in Design-Builder’s response, which are both incorporated herein by reference. Failure to comply with this Article 10.0 is a material breach of this Agreement. Design-Builder agrees to meet the following SBE percentages: xx.xx% SBE. (NOTE: If Design-Builder has agreed to provide an API percentage that is higher than what was required by the Goal Setting Committee, then you must state what the Design-Builder has agreed to on the API page.)

The APIs for Phase 2 Services shall be set by the Goal Setting Committee prior to the advertisement and bidding of such services by the Design-Builder, and the provisions of this Article 10.0 shall apply to the Phase 2 Services. If the Design-Builder is unable to achieve the goals during the advertisement and bidding for Phase 2, a waiver shall be submitted as part of the GMP. The amended APIs, as determined by the County, for Phase 2 shall be included in the Phase 2 amendment.

i. Design-Builder shall report all subcontractor payment information on EBO forms 3a and 4, or as otherwise required by EBO, and, when the EBO portal is available, input subcontractor payment information directly into the County’s contract management system.

Design-Builder shall pay subcontractors undisputed amounts within ten (10) days after County pays the Design-Builder. In the event of a disputed invoice, the Design-Builder shall send the subcontractor(s) and County a written notice of the dispute within five (5) days after receipt of the subject invoice.

ii. Design-Builder must notify the Office of EBO of changes in S/M/WBE utilization and obtain prior approval for any substitutions.

The Design-Builder agrees to pay its subconsultants in compliance with the Florida Prompt Payment Act. In the event Design-Builder fails to comply with payments(s) to its subconsultants in accordance with the Florida Prompt Payment Act, Design-Builder shall be subject to any and all penalties and sanctions available under the terms of the EBO Program, its contract with the County, or any other applicable law.

The Office of EBO has the right to review Design-Builder’s records and interview Subcontractors.

Article 11.0Other Provisions
11.1Truth-In-Negotiation Certificate

Signature of this Agreement by the Design-Builder shall also act as the execution of a truth-in-negotiation certificate certifying that the wage rates, over-head charges, and other costs used to determine the compensation provided for in this Agreement are accurate, complete and current as of the date of the Agreement and no higher than those charged the Design-Builder's most favored customer for the same or substantially similar service.

The said rates and costs shall be adjusted to exclude any significant sums should the County determine that the rates and costs were increased due to inaccurate, incomplete or noncurrent wage rates or due to inaccurate representations of fees paid to outside consultants. The County shall exercise its rights under this Article 11.1 within three (3) years following final payment.

11.2 Personnel

The Design-Builder represents that it has, or will secure at its own expense, all necessary personnel required to perform the services under this Agreement. Such personnel shall not be employees of or have any contractual relationship with the County.

All of the services required herein under shall be performed by the Design-Builder or under its supervision, and all personnel engaged in performing the services shall be fully qualified and, if required, authorized or permitted under state and local law to perform such services.

Any changes or substitutions in the Design-Builder's key personnel, as may be listed in Exhibit "A", must be made known to the County's representative and written approval must be granted by the County's representative before said change or substitution can become effective.

The Design-Builder warrants that all services shall be performed by skilled and competent personnel to the highest professional standards in the field.

All of the Design-Builder’s personnel (and all Subcontractors), while on County premises, will comply with all County requirements governing conduct, safety and security.

11.3 Federal and State Tax

The County is exempt from payment of Florida State Sales and Use Taxes. The County will sign an exemption certificate submitted by the Design-Builder. The Design-Builder shall not be exempted from paying sales tax to its suppliers for materials used to fulfill contractual obligations with the County, nor is the Design-Builder authorized to use the County's Tax Exemption Number in securing such materials.

The Design-Builder shall be responsible for payment of its own and its share of its employees' payroll, payroll taxes, and benefits with respect to the performance of the Work.

11.4 Availability of Funds

The County's performance and obligation to pay under this Agreement for subsequent fiscal years are contingent upon annual appropriations for its purpose by the Board of County Commissioners.

11.5Reserved
11.6Reserved.
11.7Reserved
11.8Law and Venue; Remedies; No Third Party Beneficiaries
This Agreement shall be governed by the laws of the State of Florida. Any legal action necessary to enforce the Agreement will be held in a court of competent jurisdiction located in Palm Beach County, Florida. No remedy herein conferred upon any party is intended to be exclusive of any other remedy, and each and every such remedy shall be cumulative and shall be in addition to every other remedy given hereunder or now or hereafter existing at law or in equity, by statute or otherwise. No single or partial exercise by any party of any right, power, or remedy hereunder shall preclude any other or further exercise thereof.

No provision of this Agreement is intended to, or shall be construed to, create any third party beneficiary or to provide any rights to any person or entity not a party to this Agreement, including but not limited to any citizen or employees of the County and/or Design-Builder.

THE PARTIES HEREBY WAIVE ANY RIGHTS EITHER OF THEM MAY HAVE TO A JURY TRIAL IN ANY LITIGATION ARISING OUT OF OR RELATED TO THIS AGREEMENT AND AGREE THAT THEY SHALL NOT ELECT A TRIAL BY JURY. THE PARTIES HERETO HAVE SEPARATELY, KNOWINGLY AND VOLUNTARILY GIVEN THIS WAIVER OF RIGHT TO TRIAL BY JURY WITH THE BENEFIT OF COMPETENT LEGAL COUNSEL.

11.9Conflict of Interest
The Design-Builder represents that it presently has no interest and shall acquire no interest, either direct or indirect, which would conflict in any manner with the performance of services required hereunder, as provided for in Chapter 112, Part III, Florida Statutes, and the Palm Beach County Code of Ethics. The Design-Builder further represents that no person having any such conflict of interest shall be employed for said performance of services.
The Design-Builder shall promptly notify the County's representative, in writing, by certified mail, of all potential conflicts of interest of any prospective business association, interest or other circumstance which may influence or appear to influence the Design-Builder's judgement or quality of services being provided hereunder. Such written notification shall identify the prospective business association, interest or circumstance, the nature of work that the Design-Builder may undertake and request an opinion of the County as to whether the association, interest or circumstance would, in the opinion of the County, constitute a conflict of interest if entered into by the Design-Builder. The County agrees to notify the Design-Builder of its opinion by certified mail within thirty (30) days of receipt of notification by the Design-Builder. If, in the opinion of the County, the prospective business association, interest or circumstance would not constitute a conflict of interest by the Design-Builder, the County shall so state in the notification and the Design-Builder shall, at its option, enter into said association, interest or circumstance and it shall be deemed not in conflict of interest with respect to services provided to the County by the Design-Builder under the terms of this Agreement.
11.10Excusable Delays
The Design-Builder shall not be considered in default by reason of any failure in performance if such failure arises out of causes reasonably beyond the control of the Design-Builder or its subcontractors and without their fault or negligence. Such causes include, but are not limited to, acts of God, Force Majeure, natural or public health emergencies, labor disputes, freight embargoes, and abnormally severe or unusual weather conditions.
Upon the Design-Builder's request, the County shall consider the facts and extent of any failure to perform the Work and, if the Design-Builder's failure to perform was without it or its subcontractors fault or negligence, the Contract Schedule and/or any other affected provision of this Agreement shall be revised accordingly, subject to the County's rights to change, terminate, or stop any or all of the work at any time.
11.11Arrears
The Design-Builder shall not pledge the County's credit or make it a guarantor of payment or surety for any contract, debt, obligation, judgement, lien, or any form of indebtedness. The Design-Builder further warrants and represents that it has no obligation or indebtedness that would impair its ability to fulfill the terms of this Agreement.
11.12Disclosure and Ownership of Documents
The Design-Builder shall deliver to the County's representative for approval and acceptance, and before being eligible for final payment of any amounts due, all documents and materials prepared by and for the County under this Agreement.
To the extent allowed by Chapter 119, Florida Statutes, all written and oral information not in the public domain or not previously known, and all information and data obtained, developed, or supplied by the County or at its expense will be kept confidential by the Design-Builder and will not be disclosed to any other party, directly or indirectly, without the County's prior written consent unless required by a lawful court order. All drawings, maps, sketches, programs, data base, reports and other data developed, or purchased, under this Agreement for or at the County's expense shall be and remain the County's property and may be reproduced and reused at the discretion of the County.
All covenants, agreements, representations and warranties made herein, or otherwise made in writing by any party pursuant hereto, including but not limited to any representations made herein relating to disclosure or ownership of documents, shall survive the execution and delivery of this Agreement and the consummation of the transactions contemplated hereby.
Notwithstanding any other provision in this Agreement, all documents, records, reports and any other materials produced hereunder shall be subject to disclosure, inspection and audit, pursuant to the Palm Beach County Office of the Inspector General, Palm Beach County Code, Sections 2-421 – 2-440, as amended.
11.13Independent Contractor Relationship
The Design-Builder is, and shall be, in the performance of all work services and activities under this Contract, an Independent Contractor, and not an employee, agent, or servant of the County. All persons engaged in any of the work or services performed pursuant to this Contract shall at all times, and in all places, be subject to the Design-Builder's sole direction, supervision, and control. The Design-Builder shall exercise control over the means and manner in which it and its employees perform the work, and in all respects the Design-Builder's relationship and the relationship of its employees to the County shall be that of an Independent Contractor and not as employees or agents of the County.
The Design-Builder does not have the power or authority to bind the County in any promise, agreement or representation.
11.14Contingent Fees
The Design-Builder warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for the Design-Builder to solicit or secure this Contract and that it has not paid or agreed to pay any person, company, corporation, individual, or firm, other than a bona fide employee working solely for the Design-Builder, any fee, commission, percentage, gift, or any other consideration contingent upon or resulting from the award or making of this Contract.
11.15Access and Audits
The Design-Builder shall maintain adequate records to justify all charges, expenses, and costs incurred in estimating and performing the work for at least five (5) years after completion or termination of this Contract. The County shall have access to such books, records, and documents as required in this section for the purpose of inspection or audit during normal business hours, at the Design-Builder's place of business.
Palm Beach County has established the Office of the Inspector General in Palm Beach County Code, Section 2-421 - 2-440, as may be amended. The Inspector General’s authority includes but is not limited to the power to review past, present and proposed County contracts, transactions, accounts and records, to require the production of records, and to audit, investigate, monitor, and inspect the activities of the Design-Builder, its officers, agents, employees, and lobbyists in order to ensure compliance with contract requirements and detect corruption and fraud.
Failure to cooperate with the Inspector General or interfering with or impeding any investigation shall be in violation of Palm Beach County Code, Section 2-421 - 2-440, and punished pursuant to Section 125.69, Florida Statutes, in the same manner as a second degree misdemeanor.
11.16Nondiscrimination
The County is committed to assuring equal opportunity in the award of contracts and complies with all laws prohibiting discrimination. Pursuant to Palm Beach County Resolution R2025-0748, as may be amended, the Design-Builder warrants and represents that throughout the term of the Contract, including any renewals thereof, if applicable, all of its employees are treated equally during employment without regard to race, color, religion, disability, sex, age, national origin, ancestry, marital status, familial status, sexual orientation, or genetic information. Failure to meet this requirement shall be considered default of the Contract.
As a condition of entering into this Contract, the Design-Builder represents and warrants that it will comply with the County’s Commercial Nondiscrimination Policy as described in Resolution R2025-0748, as amended. As part of such compliance, the Design-Builder shall not discriminate on the basis of race, color, national origin, religion, ancestry, sex, age, marital status, familial status, sexual orientation, disability, or genetic information in the solicitation, selection, hiring or commercial treatment of subcontractors, vendors, suppliers, or commercial customers, nor shall the Design-Builder retaliate against any person for reporting instances of such discrimination. The Design-Builder shall provide equal opportunity for subcontractors, vendors and suppliers to participate in all of its public sector and private sector subcontracting and supply opportunities, provided that nothing contained in this clause shall prohibit or limit otherwise lawful efforts to remedy the effects of marketplace discrimination that have occurred or are occurring in the County’s relevant marketplace in Palm Beach County. The Design-Builder understands and agrees that a material violation of this clause shall be considered a material breach of this Contract and may result in termination of this Contract, disqualification or debarment of the company from participating in County contracts, or other sanctions. This clause is not enforceable by or for the benefit of, and creates no obligation to, any third party. Design-Builder shall include this language in its subcontracts.
11.17Authority to Practice
The Design-Builder hereby represents and warrants that it has and will continue to maintain all licenses and approvals required to conduct its business, and that it will at all times conduct its business activities in a reputable manner. Proof of such licenses and approvals shall be submitted to the County's representative upon request.
11.18Severability
If any term or provision of this Contract, or the application thereof to any person or circumstances shall, to any extent, be held invalid or unenforceable, the remainder of this Contract, or the application of such terms or provision, to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected, and every other term and provision of this Contract shall be deemed valid and enforceable to the extent permitted by law.
11.19Public Entity Crimes
As provided in F.S. 287.132-133, by entering into this contract or performing any work in furtherance hereof, the Design-Builder certifies that it, its affiliates, suppliers, subcontractors and consultants who will perform hereunder, have not been placed on the convicted vendor list maintained by the State of Florida Department of Management Services within the 36 months immediately preceding the date hereof. This notice is required by F.S. 287.133(3)(a).
11.20Modifications of Work
The County reserves the right to make changes in Scope of Work, including alterations, reductions therein or additions thereto. Upon receipt by the Design-Builder of the County's notification of a contemplated change, the Design-Builder shall, in writing: (1) provide a detailed estimate for the increase or decrease in cost due to the contemplated change, (2) notify the County of any estimated change in the completion date, and (3) advise the County if the contemplated change shall affect the Design-Builder's ability to meet the completion dates or schedules of this Contract.
If the County so instructs in writing, the Design-Builder shall suspend work on that portion of the Scope of Work affected by a contemplated change, pending the County's decision to proceed with the change.
If the County elects to make the change, the County shall initiate a Contract Amendment and the Design-Builder shall not commence work on any such change until such written amendment is signed by the Design-Builder and approved and executed on behalf of Palm Beach County.
11.21Notice
All notices required in this Contract shall be sent by certified mail, return receipt requested, hand delivery or other delivery service requiring signed acceptance.

If sent to the County, notices shall be addressed to:

Palm Beach County Water Utilities Department c/o Ali Bayat, P.E., PMP 8100 Forest Hill Blvd West Palm Beach, FL 33413 With copy to:

Palm Beach County Attorney’s Office 301 North Olive Ave.

West Palm Beach, Florida 33401

If sent to the Design-Builder, notices shall be addressed to:

[Design Builder Address]

With a copy to:

[Design Builder Address]

Notice shall be effective upon receipt by the individuals designated above.

11.22 Entirety of Contractual Agreement

The County and the Design-Builder agree that the Contract Documents set forth the entire agreement between the parties, and that there are no promises or understandings other than those stated herein. None of the provisions, terms and conditions contained in the Contract Documents may be added to, modified, superseded or otherwise altered, except by written instrument executed by the parties hereto in accordance with Article 10.20 - Modifications of Work.
11.23Criminal History Records Check
The Design-Builder, Design-Builder’s employees, subcontractors of Design-Builder and employees of subcontractors shall comply with Palm Beach County Code, Section 2-371 - 2-377, the Palm Beach County Criminal History Records Check Ordinance (“Ordinance”), for unescorted access to critical facilities (“Critical Facilities”) or criminal justice information facilities (“CJI Facilities”) as identified in Resolutions R2013-1470, R2015-0572, and R2024-0549 as amended. The Design-Builder is solely responsible for the financial, schedule, and/or staffing implications of this Ordinance. Further, the Design-Builder acknowledges that its Contract price includes any and all direct or indirect costs associated with compliance with this Ordinance, except for the applicable FDLE/FBI fees that shall be paid by the County.
This Contract may include sites and/or buildings which have been designated as either “critical facilities” or “criminal justice information facilities” pursuant to the Ordinance and above referenced Resolutions, as amended. County staff representing the County department will contact the Design-Builder(S) and provide specific instructions for meeting the requirements of this Ordinance. Individuals passing the background check will be issued a badge. The Design-Builder shall make every effort to collect the badges of its employees and its subcontractors’ employees upon conclusion of the contract and return them to the County. If the Design-Builder or its subcontractor(s) terminates an employee who has been issued a badge, the Design-Builder must notify the County within two (2) hours. At the time of termination, the Design-Builder shall retrieve the badge and shall return it to the County in a timely manner.