26-014R WRWWTF Electrical Building Design-Build Entity Volume of Work Form.docx
DOCX document 21 KB Posted
- Solicitation number
- RFP 720 WUD 26-014R 2
- Issued by
- Palm Beach County, Florida
About this file
This is a Design-Build Entity Volume of Previous Work Form for the WRWWTF Electrical Building Progressive Design-Build project in Florida. The form requires bidding firms to document their previous Construction Management (CM) contracts awarded or funded by the County over the preceding six years. Firms must list the dollar amounts for each year and provide a total volume of previous work. The form stipulates that only CM contracts actually awarded or funded by the County as of the submittal date are included in the calculation; hard bid awards and CM work for which selection has occurred but contracts have not yet been executed are explicitly excluded from consideration.
The document requires completion and certification by an authorized representative of the proposing firm, including printed name, signature, title, and date. This volume of work documentation serves as a qualification metric for evaluating bidders' experience and capacity to perform the design-build services for the electrical building project. The form does not specify pricing terms, set-asides, funding sources, or contract duration within its content, as it functions solely as a historical work volume reporting mechanism for pre-qualification assessment purposes.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN-BUILD ENTITY
VOLUME OF PREVIOUS WORK FORM
Firm Name:
Date:
Year (list previous 6 years)
Dollar Amount of CM Contracts Awarded or Funded by the County
Year 1: 20__
Year 2: 20__
Year 3: 20__
Year 4: 20__
Year 5: 20__
Year 6: 20__
TOTAL
The Volume of Previous Work calculation shall be based only on CM contracts of the firm awarded or funded by the County as of the submittal date (hard bid awards are not included). CM work for which a firm has been selected but a contract has not yet been awarded shall not be included in the calculation.
PROPOSER (firm name):
PRINT NAME OF AUTHORIZED REPRESENTATIVE:
SIGNATURE OF AUTHORIZED REPRESENTATIVE:
TITLE: DATE: __
File details come from the government source that posted it. Updated .