This is a Frequently Asked Questions (FAQ) document related to the WRWWTF (Water Reclamation Wastewater Treatment Facility) Electrical Building Progressive Design-Build project in Florida. The document addresses inquiries from potential bidders regarding the project scope, procurement process, and technical requirements. Key topics covered in the FAQs include clarifications on project deliverables, design-build methodology, insurance and bonding requirements, and submission procedures. The document serves as a supplementary resource to the main solicitation, providing additional guidance to prospective contractors interested in bidding on this electrical infrastructure project. The FAQs establish important procedural and technical parameters that bidders must understand and comply with when preparing their proposals.
The FAQ document emphasizes specific requirements related to the progressive design-build delivery method, including phasing and milestone requirements, quality assurance standards, and coordination protocols between design and construction phases. Additional details address common questions about insurance coverage, performance bonds, payment terms, and the selection criteria that will be used to evaluate bids. The document reinforces the importance of adherence to Florida regulations and local code requirements applicable to the project. This resource enables potential bidders to clarify ambiguities in the solicitation documents and ensures a more comprehensive understanding of project expectations, thereby facilitating more competitive and compliant bid submissions.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PBCWUD PROJECT NO. 26-014R Frequently Asked Questions (FAQ)-1 Rev. 06-12-2026
Western Region Wastewater Treatment Facility Phase 2 Electrical Building & Resiliency Improvements Progressive Design-Build
PBCWUD Project No. 26-014R
Frequently Asked Questions (FAQ)
Q1 – What changes were made in the RFP compared with the original RFP?
Everything is the same except a PPT of electrical components was added. The PPT was based on a BODR developed earlier for this project.
Q2 –Can I resubmit the same proposal?
The same proposal may be submitted, however please change the project number to
26-014R and re-sign and re-date all required documents.
Q3 – How does SBE percent get calculated?
This project is grant funded so no affirmative procurement initiatives (APIs) are required.
Q4-Will you cancel this RFP again if you receive less than 3 proposals?
Palm Beach County has done extensive outreach to attract potential firms. If the above scenario happens, County will evaluate all proposals and make a decision per the County procurement code.
Q5-Do I need to resubmit plan holder request if I already did it in the original RFP?
Yes. This is a new RFP.
Q6. Can I request the information that was sent out in the original RFP?
Please submit a plan holder request and the documents will be provided.