Plans2_22040.pdf

PDF 6 MB Posted

Attached to
751/22040. BDW; Petobego Dam Removal
Solicitation number
RFQ 171 260000000422 3
Issued by
Michigan

About this file

Summary: Plans Document for Petobego Dam Removal Project

This is a plans document related to the Petobego Dam Removal project (751/22040.BDW) administered by the State of Michigan. The document contains technical plans and specifications for the removal of Petobego Dam, a civil engineering project requiring demolition and site restoration work. The project involves the complete removal of dam infrastructure and associated restoration activities to return the site to a natural state. Specific details regarding project timeline, site visits, bidders' meetings, response dates, and award information would be contained in the associated solicitation documents rather than this plans file, which serves as the technical reference document for prospective bidders.

The plans document establishes the technical requirements, design specifications, and site conditions that bidders must address in their proposals and cost estimates. This document is essential for contractors to understand the scope of demolition work, site conditions, environmental considerations, and restoration requirements necessary to develop accurate bids. The plans serve as the baseline documentation for project execution and ensure all bidders are operating from the same technical understanding of the work involved in the dam removal and site restoration activities.

View the file

Other files

File Type Posted
Plans1_22040.pdf PDF
Addendum_1_22040.pdf PDF
Service Disabled Veteran Owned Business Info Sheet 2025.pdf PDF
Addendum_2_22040.pdf PDF
Specs_22040.pdf PDF
Advertisement_22040.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US

EDGE GRAVEL

ACCESS

BM200

REMOVE DAM AND CONTROL

STRUCTURE. INCLUDING FULL

DEPTH CONCRETE AND

SHEETPILING

CLEAR AND GRADE EMBANKMENT TO

MATCH ADJACENT GROUND.

SALVAGE EXCESS TOPSOIL.

01-004-009-30

TELGENHOF, G & B

01-004-005-00

MI DEPT OF NATURAL

RESOURCES

FLOW

PREVIOUSLY DISTURBED AREA.

AREA TO BE USED FOR SPOIL

DISPOSAL FROM DAM REMOVAL. 01-004-005-00

MI DEPT OF NATURAL

RESOURCES

DELINEATED

WETLAND

BOUNDARY

DELINEATED

WETLAND

BOUNDARY

PARCEL BOUNDARY

EXISTING

PETOBEGO DAM

STRUCTURE

DOWNSTREAM

OHWM EL 594.80

NO. 01 STA 1+08

0+00

0+50

1+00

1+50

2+00

2+50

3+00

3+50

4+00

4+50

5+00

5+50 6+

6+

7+00

7+50

8+00

8+50 8+75

NO. 02 STA 7+86

UPSTREAM

OHWM EL 598.20

EXISTING ACCESS ROAD

APPROXIMATE

STAGING/LAYDOWN AREA

MDOT ROW

33.0'

MDOT ROW

75.0'

100 YR FLOODPLAIN

EL 612.00

0+

1+

2+

3+

4+

5+

6+

7+

8+

8+

HP EL

588.43

HP EL

590.06 HP EL

592.42

HP EL

592.54

HP EL

592.47

HP EL

592.83 HP EL

591.59

HP EL

590.89

EX PROFILE GRADE

HP EL

591.30

HP EL

592.75

HP EL

592.35

TOP OF BANK RIGHT

TOP OF BANK LEFT

N O

. 0

- S

TA

+0

- C

L O

F U

S -3

7' O

F

' S P

A N

X

' R

IS

E C

O N

C B

O X

C U

LV

S

TA

+0

- P

E

TO

B E

G O

P O

N D

N O

. 0

- S

TA

+8

- C

L P

E

TO

B E

G O

D A

M

TO

P O

F D

A M

A B

U

TM

E N

TS

R

T E

L

1.

LT

E

L

1.

EX HEADWALL

EX HEADWALL

DOWNSTREAM

OHWM EL 594.80

100 YR FLOODPLAIN

EL 612.00

UPSTREAM

OHWM EL 598.20

N

0 603015

BENCHMARKS

BM 200 - SET 60D SPIKE, EAST SIDE OF 12" TWIN HEMLOCK.

HEMLOCK IN CENTER OF GRAVEL TURN-AROUND AT DAM.

EL 603.20

SECTION 5, T.28 N. - R.9 W.,

ACME TOWNSHIP,

GRAND TRAVERSE COUNTY, MICHIGAN

TOBECO CREEK

CONTRACTOR TO REMOVE THE FOLLOWING EXISTING ITEMS:

· SHEET PILE.

· CONTROL STRUCTURE W/ WINGWALLS.

· ANY CONCRETE ABUTMENTS OR OTHER BURIED STRUCTURES IN THE AREA OF

EXCAVATION OF THE PROPOSED IMPROVEMENTS. IN SUMMARY, COMPLETE

REMOVAL OF THE EXISTING STRUCTURE.

ALL DEBRIS TO BE HAULED OFFSITE. WHICH INCLUDES BUT NOT LIMITED TO ALL

STEEL, CONCRETE, AND NON-NATURAL MATERIALS AS PART OF THE ORIGINAL DAM

STRUCTURE. COST TO BE INCLUDED IN THE LUMP SUM PRICE BID FOR DEMOLITION.

ALL EXCAVATED NATIVE EARTH MATERIAL IS TO REMAIN ON-SITE. ALL FILL MATERIAL

IS TO BE SCREENED PRIOR TO PLACEMENT IN DESIGNATED AREA APPROVED BY

ENGINEER AND OWNER.

CONTRACTOR MUST SUBMIT WORK PLAN OUTLINING DEMOLITION SEQUENCE AND

WATER CONTROL MEASURES. WORK PLAN MUST BE APPROVED BY ENGINEER

BEFORE WORK MAY START.

CONTRACTOR IS RESPONSIBLE TO SECURE MDOT PERMIT FOR WORKING IN MDOT

ROW FOR STAGING OR LAY DOWN AREA.

DEMOLITION NOTES

LEGEND

- DELINEATED WETLAND BOUNDARY

PROFILE VIEW

SCALE: H: 1" = 100' V: 1" = 10'

EXISTING SITE PLAN

SCALE: 1" = 30'

EXISTING CROSS SECTION

SCALE: 1" = 30'

- CLEARING AND SALVAGING

- PARCEL BOUNDARY

- ORDINARY HIGH WATER (OHWM)

- 100 YR FLOODPLAIN

THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR THIS

SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN ACCORDANCE

WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS DONE. THE ENGINEER

DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY OTHER LOCATION, CONDITION,

DESIGN OR PURPOSE.

BY MARK REVISIONS DATE

DE. BY:

DR. BY:

STDS.

SCALE

DATE

CH. BY:

APP. BY:

SHEET

FILE NO.

OF

PROJECT NO.

SAGINAW OFFICE

230 S. Washington Ave.

Saginaw, MI 48607 Tel. 989-754-4717 Fax. 989-754-4440 www.SpicerGroup.com

PETOBEGO DAM

GRAND TRAVERSE COUNTY, MICHIGAN

EXISTING SITE PLAN

& DEMOLITION PLAN

POC/WTM

CBS

WTM

WTM 132100SG2022

04 13

JULY, 2026

AS SHOWN DR-4344-04

DR

- PREVIOUS DISTURBED AREA

W/ PROPOSED CLEARING AND SALVAGING

NO. 01 - STA 1+08 - US 31

NO WORK

NO. 02 - STA 7+85 - MI DEPT OF NATURAL RESOURCES

REMOVE EXISTING DAM. INSTALL ROCK WEIR

STRUCTURE W/POOL/RIFFLE. SEE SHEET 06 FOR

PLAN AND PROFILE.

NOTES:

1. 100 YR FLOODPLAIN EL 596.30, DOWNSTREAM

OHWM EL 594.80, UPSTREAM OHMW 598.20.

2. 100 YR FLOODPLAIN WAS DETERMINED USING FEMA

FLOODPLAIN ZONE A LAYER AND EXISTING

CONTOUR INFORMATION.

3. OHWM WAS BASED OFF OF WATER SURFACE

ELEVATION COLLECTED ON 10-22-2022

- STAGING/LAYDOWN AREA

CBS ISSUED FOR PERMIT - REV 1 07/08/2026

P:

\P ro j2

2\

SG

Pe to be go D am

R em ov al

R es to ra tio n\ dw g\ D

R -4

4-

_P

P.

dw g, /3 0/

0:

:1

AM

, m ic ha el

.c ou rn ey

8'-0"

2% MAX SLOPE

NOTE: PRIOR TO COMPLETION OF PROJECT, 4" OF TOP SOIL SHALL BE PLACED ON ACCESS ROAD, SEEDED AND MULCHED.

PROTECTIVE ACCESS DRIVE DETAIL

NOT TO SCALE

EX ACCESS DRIVE

INSTALL 6" OF 21AA

STONE PROTECTION

UNDISTURBED

SUBGRADE

EX GRADE

EDGE GRAVEL

ACCESS

BM200

DELINEATED

WETLAND

BOUNDARY

DELINEATED WETLAND

BOUNDARY

100 YR FLOODPLAIN

EL 596.30

EXISTING

PETOBEGO DAM

STRUCTURE

SPOIL LEVELING DEPOSIT AREA.

AREA SHALL BE LEVELED,

SEEDED, AND MULCHED.

DOWNSTREAM OHWM

EL 594.80

US

01-004-009-30

TELGENHOF, G & B

01-004-005-00

MI DEPT OF NATURAL

RESOURCES

01-004-005-00

MI DEPT OF NATURAL

RESOURCES

0+00

0+50

1+00

1+50

2+00

2+50

3+00

3+50

4+00

4+50

5+00

5+50 6+

6+

7+00

7+50

8+00

8+50 8+75

UPSTREAM OHWM

EL 598.20

6" OF 21AA STONE

APPROXIMATELY 68 CYD

(SEE CONSTRUCTION NOTE 3)

6" OF 21AA STONE

APPROXIMATELY 69 CYD

(SEE CONSTRUCTION NOTE 3)

APPROXIMATE LIMITS OF

DISTURBANCE.

MDOT ROW

33.0'

MDOT ROW

75.0'

APPROXIMATE LIMITS OF

DISTURBANCE

100 YR FLOODPLAIN

EL 612.00

N

0 603015

BENCHMARKS

BM 200 - SET 60D SPIKE, EAST SIDE OF 12" TWIN HEMLOCK.

HEMLOCK IN CENTER OF GRAVEL TURN-AROUND AT DAM.

EL 603.20

SECTION 5, T.28 N. - R.9 W.,

ACME TOWNSHIP,

GRAND TRAVERSE COUNTY, MICHIGAN

TOBECO CREEK

LEGEND

- DELINEATED WETLAND BOUNDARY

PROPOSED SITE PLAN

SCALE: 1" = 30'

- APPROXIMATE ACCESS DRIVE PROTECTION

- SPOIL LEVELING DEPOSIT AREA

- PROPOSED STREAM RESTORATION

LIMITS

- PARCEL BOUNDARY

CONSTRUCTION NOTE

1. CONTRACTOR MUST NOTIFY ENGINEER AND MDNR 1 WEEK

PRIOR TO COMMENCING WORK ON-SITE.

2. CONTRACTOR MUST COORDINATE WITH ENGINEER PRIOR TO

ANY WORK TAKING PLACE ON TELGENHOF PROPERTY.

3. SNOW FENCE TO BE INSTALLED TO IDENTIFY LIMITS OF

DISTURBANCE. FENCE TO BE SECURED TO TREES WHERE

POSSIBLE. T-POST MAY BE USED AS DIRECTED BY ENGINEER.

4. ACCESS DRIVE PROTECTION SHALL BE 6" OF 21AA STONE TO

BE PLACED ON TOP OF EXISTING ACCESS DRIVE AS SHOWN

ABOVE. UPON COMPLETION OF THE PROJECT 4" OF TOP SOIL

TO BE PLACED ON TOP OF GRAVEL DRIVE, AND SHALL BE

SEEDED AND MULCHED.

5. CONTRACTOR MUST NOT WORK OUTSIDE OF LIMITS OF

DISTURBANCE SHOWN ON THIS PLAN SET.

6. CONTRACTOR SHALL INSTALL TURBIDITY CURTAIN FOR PARTIAL

WIDTH CONSTRUCTION. INSTALLATION SHALL BE DISCUSSED

DURING PRE CONSTRUCTION FIELD WALK W/ ENGINEER.

PARCEL BOUNDARY

- ORDINARY HIGH WATER (OHWM)

- 100 YR FLOODPLAIN

THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR THIS

SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN ACCORDANCE

WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS DONE. THE ENGINEER

DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY OTHER LOCATION, CONDITION,

DESIGN OR PURPOSE.

BY MARK REVISIONS DATE

DE. BY:

DR. BY:

STDS.

SCALE

DATE

CH. BY:

APP. BY:

SHEET

FILE NO.

OF

PROJECT NO.

SAGINAW OFFICE

230 S. Washington Ave.

Saginaw, MI 48607 Tel. 989-754-4717 Fax. 989-754-4440 www.SpicerGroup.com

PETOBEGO DAM

GRAND TRAVERSE COUNTY, MICHIGAN

PROPOSED SITE PLAN

AND SESC PLAN

POC/WTM

CBS

WTM

WTM 132100SG2022

05 13

JULY, 2026

AS SHOWN DR-4344-05

DR

E6 E8

E6

E8

E9

E8 E9

S53

S61

E21

E1 - SESC MEASURE, PER "DTMB" SOIL EROSION

AND SEDIMENTATION CONTROL GUIDEBOOK

- ROUNDED AGGREGATE-LINED STREAM CHANNEL

- ROCK STRUCTURE

- SNOW FENCE / LIMITS OF

DISTURBANCE

NOTES:

1. 100 YR FLOODPLAIN EL 596.30, DOWNSTREAM

OHWM EL 594.80, UPSTREAM OHMW 598.20.

2. 100 YR FLOODPLAIN WAS DETERMINED USING FEMA

FLOODPLAIN ZONE A LAYER AND EXISTING

CONTOUR INFORMATION.

3. OHWM WAS BASED OFF OF WATER SURFACE

ELEVATION COLLECTED ON 10-22-2022

- STAGING/LAYDOWN AREA

E6

S53

S53

CBS ISSUED FOR PERMIT - REV 1 07/08/2026

TURBIDITY CURTAIN SHALL BE

INSTALLED (SEE CONSTRUCTION

NOTE 6 THIS SHEET)

P:

\P ro j2

2\

SG

Pe to be go D am

R em ov al

R es to ra tio n\ dw g\ D

R -4

4-

-0

6_

PP

.d w g, /3 0/

0:

:0

AM

, m ic ha el

.c ou

EXISTING

PETOBEGO DAM

STRUCTURE

DOWNSTREAM OHWM

EL 594.80

FLOW

01-004-009-30

TELGENHOF, G & B

01-004-005-00

MI DEPT OF NATURAL

RESOURCES

01-004-005-00

MI DEPT OF NATURAL

RESOURCES

TOBECO C

REEK

PROPOSED ROCK STRUCTURE A

CENTER EL 595.50

BANK TIE IN EL 597.00

PROPOSED ROCK STRUCTURE B

CENTER EL 594.50

BANK TIE IN EL 596.00

6+

7+00

7+50

8+00

8+50

UPSTREAM OHWM

EL 598.20

APPROXIMATE LIMITS OF

DISTURBANCE

PROPOSED STREAM CL

CONSTRUCT 4 FT WIDE

LOW FLOW NOTCH WITH

ELEVATION 595.50

CONSTRUCT 4 FT WIDE

LOW FLOW NOTCH WITH

ELEVATION 594.50

EX PROFILE GRADE

TOP OF BANK RIGHT

TOP OF BANK LEFT

6+

7+

8+

8+

HP EL

592.83

HP EL

592.29

HP EL

591.99

HP EL

592.35

N O

. 0

- S

TA

+8

- C

L P

E

TO

B E

G O

D A

M

TO

P O

F D

A M

A B

U

TM

E N

TS

R

T E

L

1.

LT

E

L

1.

HP EL

590.29

BACK POOL

EL = 592.80

BACK POOL

EL = 592.94

BOTTOM POOL

EL = 592.80

BOTTOM POOL

EL = 591.80

ROCK STRUCTURE A

EL = 595.50

ROCK WEIR STRUCTURE

W/POOL/RIFFLE

FL 592.94

UPSTREAM

OHMW EL 598.20

ROCK STRUCTURE B

EL = 594.50

DOWNSTREAM

OHMW EL 594.80

7+

100YR FLOODPLAIN

EL 612.00

N

0 20105

SECTION 05,T.28 N. - R.9 W.,

ACME TOWNSHIP,

GRAND TRAVERSE COUNTY, MICHIGAN

PROPOSED SITE PLAN

SCALE: 1" = 10'

BENCHMARKS

BM 200 - SET 60D SPIKE, EAST SIDE OF 12" TWIN HEMLOCK.

HEMLOCK IN CENTER OF GRAVEL TURN-AROUND AT DAM.

EL 603.20

CONSTRUCTION NOTE

1. SEE SHEET 04 FOR DAM REMOVAL PHASE AND EXISTING

CONDITION CROSS SECTION.

2. DURING EXCAVATION AND FILL TO PROPOSED STREAM BANK

EXISTING MATERIAL IS TO BE USED AS DIRECTED BY ENGINEER.

3. SEE SEEDING SPECIFICATION FOR REQUIRED NATIVE SEED MIX.

LEGEND

PR

O

PE

R

TY

L

IN

E

PROPERTY LINE

- DELINEATED WETLAND BOUNDARY

- ORDINARY HIGH WATER (OHWM)

NOTES:

1. 100 YR FLOODPLAIN EL 596.30, DOWNSTREAM

OHWM EL 594.80, UPSTREAM OHMW 598.20.

2. 100 YR FLOODPLAIN WAS DETERMINED USING FEMA

FLOODPLAIN ZONE A LAYER AND EXISTING

CONTOUR INFORMATION.

3. OHWM WAS BASED OFF OF WATER SURFACE

ELEVATION COLLECTED ON 10-22-2022

- TURBIDITY CURTAIN

THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR THIS

SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN ACCORDANCE

WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS DONE. THE ENGINEER

DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY OTHER LOCATION, CONDITION,

DESIGN OR PURPOSE.

BY MARK REVISIONS DATE

DE. BY:

DR. BY:

STDS.

SCALE

DATE

CH. BY:

APP. BY:

SHEET

FILE NO.

OF

PROJECT NO.

SAGINAW OFFICE

230 S. Washington Ave.

Saginaw, MI 48607 Tel. 989-754-4717 Fax. 989-754-4440 www.SpicerGroup.com

PETOBEGO DAM

GRAND TRAVERSE COUNTY, MICHIGAN

PROPOSED

STREAM RESTORATION

POC/WTM

CBS

WTM

WTM 132100SG2022

06 13

JULY, 2026

AS SHOWN DR-4344-06

DR

OPEN CHANNEL PROFILE VIEW

SCALE: H: 1"=20' V: 1" =10'

- ROUNDED AGGREGATE-LINED STREAM CHANNEL

- ROCK STRUCTURE

CBS ISSUED FOR PERMIT - REV 1 07/08/2026

P:

\P ro j2

2\

SG

Pe to be go D am

R em ov al

R es to ra tio n\ dw g\ D

R -4

4-

-0

6_

PP

.d w g, /3 0/

0:

:4

AM

, m ic ha el

.c ou

7+91

0 10 20 30 40 500-10-20-30-40-50

7+70

0 10 20 30 40 500-10-20-30-40-50

7+49

0 10 20 30 40 500-10-20-30-40-50

8+45

0 10 20 30 40 500-10-20-30-40-50

6+55

0 10 20 30 40 500-10-20-30-40-50

8+11

0 10 20 30 40 500-10-20-30-40-50

SILL EL=591.36

EX FL EL 592.84

EX FL EL 592.15

EX FL EL 591.85

EX GRADE

EX GRADE

EX GRADE

G R

A V

E L

E D

G E

EX FL EL 591.43

EX GRADE

HP

EL 592.83

HP

EL 591.34

HP

EL 591.59

HP

EL 590.89

HP

EL 591.61

HP

EL 590.47

HP

EL 590.29

HP

EL 590.35

EX FL EL 591.01

EX GRADE

TOP WALL EL=597.01

TOP WALL EL=596.54 TOP WALL EL=596.60

TOP WALL EL=596.92

EX FL EL 592.56

EX GRADE

HP

EL 591.47

HP

EL 593.30

C L

TO

B

E C

O C

R E

E K

C L

TO

B

E C

O C

R E

E K

C L

TO

B

E C

O C

R E

E K

C L

TO

B

E C

O C

R E

E K

DOWNSTREAM

OHWM=594.80

DOWNSTREAM

OHWM=594.80

UPSTREAM

OHWM=598.20

UPSTREAM

OHWM=598.20

CUT 27.9 SQ FT

C L

TO

B

E C

O C

R E

E K

C L

TO

B

E C

O C

R E

E K

DOWNSTREAM

OHWM=594.80

UPSTREAM

OHWM=598.20

FILL 12.5 SQ FT

ROUNDED AGGREGATE

30.6 SQ FT

ROCK STRUCTURE

159.1 SQ FT

FILL 45.0 SQ FT

CUT 82.5 SQ FT

STRUCTURE REMOVAL

108.1 SQ FT

APPROXIMATE STRUCTURE

REMOVAL AND NATIVE FILL

105.7 SQ FT

EL 595.50

THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR THIS

SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN ACCORDANCE

WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS DONE. THE ENGINEER

DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY OTHER LOCATION, CONDITION,

DESIGN OR PURPOSE.

BY MARK REVISIONS DATE

DE. BY:

DR. BY:

STDS.

SCALE

DATE

CH. BY:

APP. BY:

SHEET

FILE NO.

OF

PROJECT NO.

SAGINAW OFFICE

230 S. Washington Ave.

Saginaw, MI 48607 Tel. 989-754-4717 Fax. 989-754-4440 www.SpicerGroup.com

PETOBEGO DAM

GRAND TRAVERSE COUNTY, MICHIGAN

STREAM CROSS SECTIONS

STA 2+04 TO STA 8+10

POC/WTM

CBS

WTM

WTM 132100SG2022

07 13

JULY, 2026

1" = 10' DR-4344-07

DR

LEGEND

- CUT

- ROUNDED AGGREGATE LINE STREAM CHANNEL

- ROCK STRUCTURE

NOTES:

1. 100 YR FLOODPLAIN EL 596.30, DOWNSTREAM

OHWM EL 594.80, UPSTREAM OHMW 598.20.

2. 100 YR FLOODPLAIN WAS DETERMINED USING FEMA

FLOODPLAIN ZONE A LAYER AND EXISTING

CONTOUR INFORMATION.

3. OHWM WAS BASED OFF OF WATER SURFACE

ELEVATION COLLECTED ON 10-22-2022

- FILL

- STRUCTURE REMOVAL

- STRUCTURE REMOVAL AND NATIVE FILL

CBS ISSUED FOR PERMIT - REV 1 07/08/2026

P:

\P ro j2

2\

SG

Pe to be go D am

R em ov al

R es to ra tio n\ dw g\ D

R -4

4-

_C

S.

dw g, /3 0/

0:

:2

AM

, m ic ha el

.c ou

A

08B

08C

30°

TY

P

POOL

(ALL SIDE SLOPE 2:1)

POOL

(ALL SIDE SLOPE 2:1)

PROPOSED STREAM CLFLOW

ROUNDED AGGREGATE

12" THICK LINED STREAM CHANNEL

D50 = 1"

EQUAL MIX (BY VOLUME) OF 25% MDOT HEAVY RIPRAP,

25% MDOT PLAIN RIPRAP, 25% MDOT 3"X1" COURSE

AGGREGATE, AND 25% MDOT 21A

RIFFLE

NOT TO SCALE

ROCK DROP STRUCTURE

W/POOL/RIFFLE PLAN VIEW DETAIL

4' (MIN) TIE INTO BANK. (TYP)

(SEE PLAN VIEW ELEVATION)

PROPOSED TOE OF SLOPE

PROPOSED TOE OF SLOPE

A

25'±

(TYP)

3'

(T Y

P

4'±

(TYP)

EXISTING STREAM FLOWLINE

RECESS STONES IN

ROCK WEIR MIN 24"

NOT TO SCALE

PROFILE VIEW

2'

RECESS STONES IN

ROCK WEIR MIN 24"

ROUNDED AGGREGATE

12" THICK LINED STREAM CHANNEL

D50 = 1"

EQUAL MIX (BY VOLUME) OF 25% MDOT HEAVY RIPRAP,

25% MDOT PLAIN RIPRAP, 25% MDOT 3"X1" COURSE

AGGREGATE, AND 25% MDOT 21A

EQUAL MIX (BY VOLUME) OF 25% MDOT HEAVY RIPRAP,

25% MDOT PLAIN RIPRAP, 25% MDOT 3"X1" COURSE

AGGREGATE, AND 25% MDOT 21A

2'± OR MATCH INTO

EXISTING

EXISTING STREAM FLOWLINE

B CROSS SECTION

NOT TO SCALE

1' TO TIE

IN ELEVATION

EROSION CONTROL BLANKET WITH

PROPOSED SEEDING

PROPOSED ROCK STRUCTURE

PROPOSED POOL BOTTOM

10'

SEE PLAN VIEW FOR

TIE IN ELEVATION

4'

CONSTRUCT 4 FT WIDE

LOW FLOW NOTCH. SEE

ELEVATIONS ON SHEET 06

C

2'

10'

24'

ROUNDED AGGREGATE

12" THICK LINED STREAM CHANNEL

D50 = 1"

POOL BOTTOM2'

CROSS SECTION

NOT TO SCALE

EROSION CONTROL BLANKET WITH

PROPOSED SEEDING.

1' 1'

THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR THIS

SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN ACCORDANCE

WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS DONE. THE ENGINEER

DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY OTHER LOCATION, CONDITION,

DESIGN OR PURPOSE.

BY MARK REVISIONS DATE

DE. BY:

DR. BY:

STDS.

SCALE

DATE

CH. BY:

APP. BY:

SHEET

FILE NO.

OF

PROJECT NO.

SAGINAW OFFICE

230 S. Washington Ave.

Saginaw, MI 48607 Tel. 989-754-4717 Fax. 989-754-4440 www.SpicerGroup.com

PETOBEGO DAM

GRAND TRAVERSE COUNTY, MICHIGAN

ROCK STRUCTURE

DETAIL

POC/WTM

CBS

WTM

WTM 132100SG2022

08 13

JULY, 2026

AS SHOWN DR-4344-08

DR

CBS ISSUED FOR PERMIT - REV 1 07/08/2026

P:

\P ro j2

2\

SG

Pe to be go D am

R em ov al

R es to ra tio n\ dw g\ D

R -4

4-

-0

6_

PP

.d w g, /3 0/

0:

:1

AM

, m ic ha el

.c ou

File details come from the government source that posted it. Updated .