This document is a set of design plans for the Petobego Dam removal and stream restoration project in Grand Traverse County, Michigan, prepared by Spicer Group, Inc. for the Michigan Department of Technology, Management and Budget (DTMB) and the Michigan Department of Natural Resources (DNRE) Wildlife Division. The project involves the demolition of an existing dam structure (Dam ID No. 354) located in Section 5, T28N-R09W, Acme Township, and the restoration of Tobeco Creek to its natural channel configuration. Key project components include removal of concrete structures and sheet piling, excavation of accumulated sediment, construction of rock structures and riprap installations, streambed aggregate placement, and comprehensive vegetation stabilization with seeding and mulching. The work encompasses multiple construction phases with specific sequencing requirements, including incremental drawdown of the impoundment, staged embankment clearing and grading on both north and south sides, and installation of temporary turbidity curtain measures during in-stream activities.
The project construction must adhere to strict environmental compliance requirements under Part 91 of the Michigan Soil Erosion and Sedimentation Control Act and Part 31, 301, and 303 regulations. Work is restricted to hours between 7:00 AM and 7:00 PM Monday through Saturday, with no work permitted on Sundays or holidays without authorization. The contractor must provide two weeks' notice prior to construction commencement and coordinate with local stakeholders and adjacent landowners. All equipment operating in the watercourse must be cleaned and use biodegradable hydraulic fluid, with diversion of the channel explicitly prohibited. The contractor is responsible for water control measures, utilities coordination through Miss Dig notification (3 full working days minimum), obtaining all required permits, maintaining traffic and access, dust control, and daily soil erosion and sedimentation control (SESC) measure maintenance. The contractor must maintain all permanent SESC measures for one year following installation, with the Michigan Department of Natural Resources assuming long-term maintenance responsibilities thereafter.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum_1_22040.pdf | ||
| Service Disabled Veteran Owned Business Info Sheet 2025.pdf | ||
| Addendum_2_22040.pdf | ||
| Plans2_22040.pdf | ||
| Specs_22040.pdf | ||
| Advertisement_22040.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B A
TE
S
R O
A D
TOWNLINE ROAD
CARNES ROAD
GAY ROAD
ANGELL ROADM
U
N R
O R
O A
D
US-31
C A
B A
N A
SH
O
R
ES
E
LK
L A
K E
RO
AD
D R
IVE
EL
K
LA
K
E
TR
A
IL
PROJECT LOCATION
EAST ARM GRAND TRAVERSE BAY
ELK LAKE
PETOBEGO POND
PETOBEGO
STATE GAME
AREA
TO
BEC
O C
R
EEK
N
LOCATION MAP
NOT TO SCALE
N
AREA MAP
NOT TO SCALE
GRAND
TRAVERSE
COUNTY
SECTION 5, T28N-R09W,
ACME TOWNSHIP,
GRAND TRAVERSE COUNTY, MICHIGAN
THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR THIS
SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN ACCORDANCE
WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS DONE. THE ENGINEER
DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY OTHER LOCATION, CONDITION,
DESIGN OR PURPOSE.
BY MARK REVISIONS DATE
DE. BY:
DR. BY:
STDS.
SCALE
DATE
CH. BY:
APP. BY:
SHEET
FILE NO.
OF
PROJECT NO.
SAGINAW OFFICE
230 S. Washington Ave.
Saginaw, MI 48607 Tel. 989-754-4717 Fax. 989-754-4440 www.SpicerGroup.com
PETOBEGO DAM
GRAND TRAVERSE COUNTY, MICHIGAN
COVER SHEET
POC/WTM
CBS
WTM
WTM 132100SG2022
01 13
JULY, 2026
NOT TO SCALE DR-4344-01
DR
PETOBEGO DAM - DAM ID NO. 354
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT, AND BUDGET, AND
MICHIGAN DEPARTMENT OF NATURAL RESOURCES
WILDLIFE DIVISION 751/20122. BDW
PLAN INDEX
FILE NO. DESCRIPTION NO.
DR-4344-01 COVER SHEET 01
DR-4344-02 CONTACTS, GENERAL NOTES, LINE TYPE LEGEND 02
DR-4344-03 SOIL EROSION AND SEDIMENTATION CONTROL PLAN 03
DR-4344-04 EXISTING SITE PLAN & DEMOLITION PLAN 04
DR-4344-05 PROPOSED SITE PLAN 05
DR-4344-06 PROPOSED STREAM RESTORATION 06
DR-4344-07 STREAM CROSS SECTIONS - STA 2+04 TO STA 8+10 07
DR-4344-08 ROCK STRUCTURE DETAIL 08
* DR-4344-09 PART 31 IMPACT AREAS - PLAN VIEW 09
* DR-4344-10 PART 31 IMPACT AREAS - CROSS SECTION 10
* DR-4344-11 PART 301 IMPACT AREAS - PLAN VIEW 11
* DR-4344-12 PART 301 IMPACT AREAS - CROSS SECTIONS 12
* DR-4344-13 PART 303 - IMPACT AREAS - PLAN VIEW AND CROSS SECION 13
CBS ISSUED FOR PERMIT - REV 1 07/08/2026
CBS ISSUED FOR BID 07/30/2026
NOTE: * SHEETS NOT INCLUDED IN THIS SET
P:
\P ro j2
2\
SG
Pe to be go D am
R em ov al
R es to ra tio n\ dw g\ D
R -4
4-
-0
3_ C
S_ N
O
TE
S_
SE
SC
.d w g, /3
0/
0:
:3
AM
, m ic ha el .c ou rn ey
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text B
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
PROJECT DATUM
HORIZONTAL: STATE PLANE CENTRAL MI '83 2113
VERTICAL: NORTH AMERICAN VERTICAL DATUM '88
THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR THIS
SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN ACCORDANCE
WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS DONE. THE ENGINEER
DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY OTHER LOCATION, CONDITION,
DESIGN OR PURPOSE.
BY MARK REVISIONS DATE
DE. BY:
DR. BY:
STDS.
SCALE
DATE
CH. BY:
APP. BY:
SHEET
FILE NO.
OF
PROJECT NO.
SAGINAW OFFICE
230 S. Washington Ave.
Saginaw, MI 48607 Tel. 989-754-4717 Fax. 989-754-4440 www.SpicerGroup.com
PETOBEGO DAM
GRAND TRAVERSE COUNTY, MICHIGAN
CONTACTS, GENERAL NOTES,
LINE TYPES LEGEND, AND
SESC MEASURE LEGEND
POC/WTM
CBS
WTM
WTM 132100SG2022
02 13
JULY, 2026
NOT TO SCALE DR-4344-02
DR
PROJECT CONSTRUCTION NOTES:
1. DEMOLITION AND CHANNEL RECONSTRUCTION MAY OCCUR IN THE WET. ANY EQUIPMENT OPERATING IN THE
WATERCOURSE MUST BE THOROUGHLY CLEANED PRIOR TO ARRIVAL ONSITE AND MUST USE
BIODEGRADABLE HYDRAULIC FLUID. CONTRACTOR MUST TAKE MEASURES TO PREVENT DEBRIS FROM
FLOWING DOWNSTREAM.
2. OTHER MEASURES OF WATER CONTROL, INCLUDING SHEETING, COFFERDAMS, PUMPING, AND SAND BAGS MAY BE USED, AS APPROVED BY THE ENGINEER. DIVERSION OF THE CHANNEL WILL NOT BE ALLOWED.
3. ALL COST FOR WATER CONTROL AND/OR WORKING IN THE WET WILL BE INCLUDED IN OTHER PAY ITEMS.
4. CONTRACTOR MUST PROVIDE 2 WEEK NOTICE TO ENGINEER TO ALLOW FOR COORDINATION WITH LOCAL
STAKEHOLDERS AND THE ADJACENT LANDOWNER.
5. NO EXCAVATION SHALL BE PERFORMED WITHOUT INSPECTOR AND OR MDNR REPRESENTATIVE OR ASSIGNED
AGENT.
GENERAL NOTES
NO WORK SHALL BE PERFORMED BEFORE 7:00 AM OR AFTER 7:00 PM MONDAY THROUGH SATURDAY. NO WORK SHALL HAPPEN ON
SUNDAYS OR HOLIDAYS, UNLESS AUTHORIZED BY THE OWNER.
CONTRACTOR SHALL NOTIFY ENGINEER 48 HOURS PRIOR TO START OF CONSTRUCTION, CONSTRUCTION STAKING AND INSPECTION.
CONTRACTOR SHALL MAINTAIN ACCESS FOR MAIL DELIVERY AND GARBAGE PICKUP AT ALL PARCELS. IF THESE SERVICES CANNOT BE PERFORMED, CONTRACTOR IS RESPONSIBLE FOR TAKING THE NECESSARY MEASURES TO CARRY THEM OUT.
COORDINATE DRIVE CLOSURES AND MAIL BOX RELOCATION WITH LANDOWNERS A MINIMUM OF ONE DAY IN ADVANCE.
CONTRACTOR TO PROVIDE DUST CONTROL AND SWEEP ROADS DAILY.
ALL EXCAVATED MATERIAL NOT TO BE REUSED OR DISPOSED OF ON SITE SHALL BE REMOVED FROM SITE. THE CONTRACTOR IS RESPONSIBLE FOR DISPOSING OF MATERIALS ACCORDING TO LOCAL AND STATE REQUIREMENTS.
UNDERGROUND UTILITIES/MISS DIG
FOR PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH PUBLIC ACT 174, 2013, THE CONTRACTOR SHALL DIAL 1-800-482-7171 OR 811 A MINIMUM OF THREE FULL WORKING DAYS, EXCLUDING SATURDAYS, SUNDAYS, AND HOLIDAYS, PRIOR TO BEGINNING EACH EXCAVATION IN AREAS WHERE PUBLIC UTILITIES HAVE NOT BEEN PREVIOUSLY LOCATED. MEMBERS WILL THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING UTILITY OWNERS WHO
MAY NOT BE A PART OF THE "MISS DIG" ALERT SYSTEM.
THE EXISTING UTILITIES ON THESE DRAWINGS HAVE BEEN SHOWN ACCORDING TO THE BEST AVAILABLE INFORMATION.
CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION AND SHALL NOTIFY THE ENGINEER AS TO
WHERE POSSIBLE CONFLICT EXISTS.
ALL CONSTRUCTION UNDER EXISTING UTILITIES, INCLUDING HOUSE SERVICES, SHALL BE COMPLETELY BACKFILLED WITH SAND, IN
12" LAYERS, AND COMPACTED TO NOT LESS THAN 95% OF THE MAXIMUM UNIT WEIGHT.
ANY UTILITIES ENCOUNTERED DURING CONSTRUCTION SHALL BE SUPPORTED, PER THE SPECIFICATIONS OF THE INDIVIDUAL UTILITY
COMPANY CLAIMING OWNERSHIP OF THE UTILITY.
SOIL EROSION AND SEDIMENTATION CONTROL MEASURES
APPROPRIATE SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO EARTH-DISTURBING ACTIVITIES. PLACE TURF ESTABLISHMENT ITEMS AS SOON AS POSSIBLE ON POTENTIAL ERODABLE SLOPES AS DIRECTED BY OWNER.
CRITICAL DITCH GRADES SHALL BE PROTECTED WITH EITHER SOD, SEED/MULCH, OR SEED/MULCH BLANKET AS DIRECTED BY
OWNER.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES ARE IN PLACE AND MAINTAINED UNTIL THE CONTRACT HAS BEEN COMPLETED AND ACCEPTED. MEASURES SHALL ONLY BE PAID FOR ONCE.
ALL CATCHBASINS AND SEDIMENTATION TRAPS/BASINS SHALL BE CLEANED OUT UPON COMPLETION OF THE PROJECT.
CONTRACTOR SHALL CONFORM TO SOIL EROSION AND SEDIMENTATION CONTROL ACT, PART 91 OF ACT 451 OF 1994.
PROPERTY OWNERS
PROPERTY OWNERS' NAMES, WHERE SHOWN, ARE FOR INFORMATION ONLY, AND THEIR ACCURACY IS NOT GUARANTEED.
ADJUSTING MONUMENT BOXES
ALL GOVERNMENT CORNERS ON THIS PROJECT SHALL BE PRESERVED, WHETHER SHOWN OR NOT. IT MAY BE NECESSARY TO PLACE
OR ADJUST MONUMENT BOXES, AS REQUIRED.
TRAFFIC
THE CONTRACTOR SHALL MAINTAIN LOCAL TRAFFIC AT ALL TIMES. SIGNAGE MUST BE IN ACCORDANCE WITH THE MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES AND SHALL BE COORDINATED WITH THE ENGINEER AND GOVERNING ROAD AGENCY.
PERMITS MAY BE REQUIRED.
PERMITS
PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED BY THE
APPROPRIATE AGENCIES.
CONSTRUCTION PROCEDURES SHALL CONFORM TO THE REQUIREMENTS OF THE APPROPRIATE AGENCIES.
GENERAL NOTES CONT.
ALL WORK SHALL BE CONFINED TO THE RIGHT-OF-WAY OR CONSTRUCTION LIMITS SHOWN ON THE PLANS. ANY WORK OUTSIDE OF THESE LIMITS SHALL BE AGREED TO BY THE CONTRACTOR AND THE LANDOWNER IN WRITING.
RESTORE ALL LAWN AREAS PER SPECIFICATIONS AND PLANS.
CONTRACTOR TO RESTORE INCIDENTAL DAMAGES ON THE PROJECT AS DIRECTED BY OWNER AND ENGINEER AT THE
CONTRACTOR'S EXPENSE.
ALL DRAIN SIDE SLOPES SHALL BE 2H:1V OR FLATTER, UNLESS SPECIFIED OTHERWISE.
THE WORDS "RIGHT SIDE" OR "LEFT SIDE" IMPLY TO AS YOUR LOOKING ALONG THE ALIGNMENT FROM STA 0+00.
REMOVE EXISTING FENCES, LANDSCAPING, AND OTHER STRUCTURES IN RIGHT-OF-WAY OR CONSTRUCTION LIMITS
AS-NEEDED FOR CONSTRUCTION. COST TO BE INCLUDED IN SITE CLEARING.
REINSTALLATION OF FENCES MUST BE COORDINATED WITH THE LAND OWNER AT THE LAND OWNER'S EXPENSE, UNLESS
STATED OTHERWISE IN THE PLANS.
ALL SPRINKLER SYSTEMS DAMAGED SHALL BE REPAIRED BY CONTRACTOR. COST TO BE INCLUDED IN AMOUNT BID FOR THE
PAY ITEM BEING INSTALLED, UNLESS OTHERWISE NOTED.
CONTRACTOR TO CLEAR TREES WITHIN THE RIGHT-OF-WAY OR CONSTRUCTION LIMITS AS NECESSARY TO CONSTRUCT PROJECT AND LEVEL SPOILS AS SHOWN IN DETAILS. COORDINATE REMOVALS WITH THE ENGINEER/LANDOWNER.
UTILITIES
UTILITIES LOCATED IN THE ROAD AND DRAIN RIGHTS-OF-WAY WILL BE RELOCATED BY OTHERS, UNLESS OTHERWISE
NOTED ON THE PLANS.
THE COUNTY PUBLIC WORKS / DRAIN COMMISSIONER'S / WATER RESOURCES COMMISSIONER'S MINIMUM CLEARANCE STANDARDS SHALL BE MET WHENEVER RELOCATING EXISTING UTILITIES WITHIN THE DRAIN RIGHT-OF-WAY.
ALL WATER VALVE BOXES SHALL BE ADJUSTED TO FINISHED GRADE. COST SHALL BE INCLUDED IN THE PAY ITEM BEING
INSTALLED.
ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
DEMOLISH EXISTING STRUCTURE(S) AND DISPOSE OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS. COST TO BE INCLUDED WITH THE ITEM BEING INSTALLED AS DIRECTED BY OWNER/ENGINEER.
CONTRACTOR SHALL CONNECT ANY AND ALL FIELD TILE OUTLETS AND OTHER STORM LEADS TO PROPOSED STORM SEWER WITH PREMANUFACTURED TEES, WYES, GASKETS, SEALS, COUPLERS, BOOTS, ETC. PER SPECIFICATIONS.
SOIL EROSION SEDIMENT CONTROL
ALL RIPRAP MATERIAL SHALL BE APPROVED BY THE ENGINEER. OWNER AND ENGINEER RESERVES THE RIGHT TO
REJECT ANY AND ALL RIPRAP.
CONTRACTOR SHALL FINISH GRADE, SEED, FERTILIZE, AND MULCH DAILY ON ALL DISTURBED AREAS AS DESCRIBED IN
THE SPECIFICATIONS.
CONTACTS
MICHIGAN DEPARTMENT OF NATURAL RESOURCES
ATT: BRANDY DYBAS-BERGER
1570 NORTH TOWER BEACH ROAD
PINCONNING, MI 48650
PHONE: (989) 385-0958
OWNER/WILDLIFE
BIOLOGIST
MICHIGAN DEPARTMENT OF TECHNOLOGY,
MANAGEMENT, AND BUDGET
ATT: BRUCE WATKINS
3111 WEST SAINT JOSEPH STREET
LANSING, MI 48917
PHONE: (517) 242-7882
DTMB PROJECT
DIRECTOR
SPICER GROUP, INC
ATT: WARREN MILLER, P.E.
230 SOUTH WASHINGTON AVENUE
SAGINAW, MI 48605
PHONE: (989) 754-4717
PROJECT MANAGER
SPICER GROUP, INC
ATT: NILS LINDWALL, P.E.
16242 BUSINESS PARK DRIVE
TRAVERSE CITY, MI 49686
PHONE: (231) 758-2893
ENGINEER
HYDRAULIC AND DAM SAFETY UNIT
ATT: MICHAEL SIZE
2100 WEST M-32
GAYLORD, MI 48735
PHONE: (989) 619-4295
EGLE
AT&T
ATT: AMY KOLP
955 36TH STREET
GRAND RAPIDS, MI 49508
PHONE: (989) 776-4060
TELEPHONE
LINE TYPE LEGENDABBREVIATIONS
- MAIL BOX
- GUY ANCHOR AND POLE
- LIGHT POLE
- POWER AND TELEPHONE POLE
- TELEPHONE POLE
- POWER POLE
- TELEPHONE PEDESTAL
- WATER VALVE
- GAS VALVE
- FIRE HYDRANT
- CURB CATCHBASIN
- CATCHBASIN
- MANHOLE
PROPOSED SYMBOLS
- BARRIER FREE PARKING
- CATCHBASIN
- WATER VALVE
- FIRE HYDRANT
- MANHOLE
- LIGHT POLES
- SPOT ELEVATION LABELS600.00
LABEL
G = GUTTER
TW = WALK
TC = TOP OF CURB
FS = FINISH SURFACE
- DRAINAGE FLOW
- BREAK IN LINE
- TREE
- BUSH
- PINE
- WETLANDS
- STUMP
- SET 1/2" IRON ROD
- FOUND SURVEY CORNER
- SOIL BORING
- AIR CONDITIONING UNIT
- SATELLITE DISH
- ANTENNA
- RAILROAD SIGNAL
- SPRINKLER
- TRANSFORMER
AC
- WATER METER
- MONITORING WELL
- 1/4 SECTION CORNER
- BENCHMARK
- ELECTRIC MANHOLE
- HAND HOLE
- EXISTING SIGN-1 POST
- EXISTING SIGN-2 POST
SYMBOL LEGEND
EXISTING SYMBOLS
SB#
BC = BACK OF CURB
BM = BENCHMARK
CB = CATCHBASIN
C/C = CENTER TO CENTER
CJ = CONSTRUCTION JOINT
CL = CENTERLINE
CMP = CORRUGATED METAL PIPE
CONC = CONCRETE
CORR = CORRUGATED
CSP = CORRUGATED STEEL PIPE
DI = DUCTILE IRON PIPE
EF = EACH FACE
ELEC = ELECTRIC
EL OR ELEV = ELEVATION
EOM = EDGE OF METAL
EOP = EDGE OF PAVEMENT
EQ/SP = EQUALLY SPACED
ESMT = EASEMENT
EW = EACH WAY
EX OR EXIST = EXISTING
FES = FLARED END SECTION
FF = FINISH FLOOR
FG = FINISH GROUND
FL = FLOW LINE
FS = FINISH SURFACE
FT = FEET
GALV = GALVANIZED
G = GUTTER
GA = GAUGE
HDG = HOT DIP GALVANIZED
HDPE = HIGH DENSITY POLYETHYLENE
HMA = HOT MIX ASPHALT
HOR = HORIZONTAL
HP = HIGH POINT
HYD = HYDRANT
INV = INVERT
LP = LOW POINT
OC = ON CENTER
OH = OVERHEAD
MH = MANHOLE
MIN = MINIMUM
MON = MONUMENT
NFL = NOT FIELD LOCATED
NTS = NOT TO SCALE
PROP = PROPOSED
PVC = POLYVINYL CHLORIDE
RCP = REINFORCED CONCRETE PIPE
ROW = RIGHT OF WAY
SAN = SANITARY
SB = SOIL BORING
SS = STAINLESS STEEL
STA = STATION
STM = STORM
SWR = SEWER
T/B = TOP AND BOTTOM
TC = TOP OF CURB
TOB = TOP OF BANK
TOS = TOE OF SLOPE
TELE = TELEPHONE
TRW = TOP OF RETAINING WALL
TW = TOP OF WALK
UG = UNDERGROUND
UNO = UNLESS NOTED OTHERWISE
VERT = VERTICAL
WM = WATERMAIN
WSEL = WATER SURFACE ELEVATION
- BARRIER FREE PARKING
- CONTROL POINT
- EXISTING ELECTRIC
- EXISTING CURB & GUTTER
- PROPOSED UTILITY
- PROPOSED CURB & GUTTER
- EXISTING WATERMAIN
- EXISTING SANITARY SEWER OR FORCEMAIN
- EXISTING STORM SEWER
- EXISTING TELEPHONE CABLE
- EXISTING GAS MAIN
- EXISTING ROAD CENTERLINE
- FENCE LINE
- OVERHEAD UTILITY
- RAILROAD TRACKS
- STATION LINE
- LIMITS OF RIGHT-OF-WAY
- EASEMENT
- SILT FENCE
- TREE LINE
- EXISTING CONTOURS
- PROPOSED CONTOURS
- REVERSE PAN CURB & GUTTER
1+00
- EXISTING DRAINS (OTHER)
- 100 YEAR FLOODPLAIN
- ORDINARY HIGH WATER MARK
- EXISTING BRINE LINE
E
U - UTILITY MANHOLE
M.W.
- TELEPHONE MANHOLET
- WATER MANHOLEW
- WELL
- EXISTING CABLE
CBS ISSUED FOR PERMIT - REV 1 07/08/2026
P:
\P ro j2
2\
SG
Pe to be go D am
R em ov al
R es to ra tio n\ dw g\ D
R -4
4-
-0
3_ C
S_ N
O
TE
S_
SE
SC
.d w g, /3
0/
0:
:1
AM
, m ic ha el .c ou rn ey
W
GENERAL TIMING & SEQUENCE
ALL PROPOSED CHANNEL EXCAVATION ACTIVES FOR THIS PROJECT MUST ADHERE TO THE
FOLLOWING SEQUENCE. ANY VARIATION WITH WATER CONTROL MEASURES WILL NEED TO BE
PRESENTED TO EGLE.
1. INSTALL SNOW FENCE AS DIRECTED BY ENGINEER OR OWNER TO SET CLEAR BOUNDARY
FOR LIMITS OF DISTURBANCE.
2. NSTALL SESC MEASURES.
3. CLEAR AND STRIP TOPSOIL FROM SPOILS DISPOSAL AREA.
4. PLACE AGGREGATE SURFACING.
5. EXCAVATE ACCUMULATED SEDIMENT FROM IMMEDIATELY BEHIND DAM AND GRADE TO
PROPOSED CROSS SECTION.
6. REMOVE STOPLOGS INCREMENTALLY TO DRAWDOWN IMPOUNDMENT, APPROXIMATELY
0.5-FOOT OR LESS, PER DAY.
7. CLEAR, STRIP TOPSOIL, AND GRADE EMBANKMENT ON NORTH SIDE. CLEAR AND STRIP FOR
NEW ROAD ALIGNMENT.
8. CONTRACTOR MUST PERFORM DAILY RAKING, SEEDING, AND MULCHING DISTURBED AREAS.
9. REMOVE WALLS FROM CONCRETE STRUCTURE. LEAVE CONCRETE SLAB. INSTALL PARTIAL
-WIDTH TURBIDITY CURTAIN AS SHOWN ON SHEET 06, "SHORELINE CONSTRUCTION" DETAIL.
10. PLACE RIPRAP ON EXISTING CONCRETE SLAB TO CREATE TEMPORARY FORD.
11. USING FORD FOR ACCESS, CLEAR, STRIP TOPSOIL, AND GRADE EMBANKMENT ON SOUTH
SIDE.
12. WORKING SOUTH TO NORTH ACROSS STREAM, REMOVE RIPRAP, REMOVE CONCRETE
SLAB,REMOVE EXISTING SHEET PILING, AND GRADE TO PROPOSED CHANNEL CROSS SECTION.
UTILIZE PARTIAL-WIDTH TURBIDITY CURTAIN TO ISOLATE HALF STREAM AT A TIME. SWITCH
SIDES AS APPROPRIATE. REFER TO "SHORELINE CONSTRUCTION" TURBIDITY CURTAIN DETAIL
ON SHEET 06.
13. CONSTRUCT ROCK STRUCTURES, PLACE STREAMBED AGGREGATE, AND RIPRAP.
14. PLACE TOPSOIL, SEED, MULCH, JUTE NET, AND LIVE STAKES.
15. REMOVE SESC MEASURES, AS APPROPRIATE.
On flat areas, slopes, grassed waterways and spillways, diversion ditches and dikes, borrow and stockpile areas, and spoil piles when areas are subject to raindrop impact, and erosive forces from wind or water.
E6
EROSION CONTROL MEASURES
Mulch
E9
Turbidity Curtain
At locations where construction equipment will enter and exit the drain easement and tracking of soil is anticipated.
S53 Stone Construction Access
Within a stream or drain parallel to flow when a slack water area is necessary to isolate earth change activities from a lake or channel.S61
THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR THIS
SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN ACCORDANCE
WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS DONE. THE ENGINEER
DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY OTHER LOCATION, CONDITION,
DESIGN OR PURPOSE.
BY MARK REVISIONS DATE
DE. BY:
DR. BY:
STDS.
SCALE
DATE
CH. BY:
APP. BY:
SHEET
FILE NO.
OF
PROJECT NO.
SAGINAW OFFICE
230 S. Washington Ave.
Saginaw, MI 48607 Tel. 989-754-4717 Fax. 989-754-4440 www.SpicerGroup.com
PETOBEGO DAM
GRAND TRAVERSE COUNTY, MICHIGAN
SOIL EROSION AND
SEDIMENTATION CONTROL PLAN
POC/WTM
CBS
WTM
WTM 132100SG2022
03 13
JULY, 2026
NOT TO SCALE DR-4344-03
DR
GRAND TRAVERSE COUNTY
SOIL
CLASS SOIL COMPOSITION
BcA Blount-Pewamo loams, 0 to 2 percent slopes
BfA Blount loam, Erie-Huron Lake Plain, 0 to 2 percent slopes
Cu Cut and fill land
KnA Kibby fine sandy loam, 0 to 3 percent slopes
Ma Made land
MeA Metamora sandy loam, 0 to 3 percent slopes
Pe Pewamo loam
So Sloan silt loam, wet
CONTINUED MAINTENANCE PROGRAM FOR PERMANENT SESC MEASURES
RESPONSIBLE
PARTY: MICHIGAN STATE DEPARTMENT OF NATURAL RESOURCES
PERMANENT SESC
MEASURE MAINTENANCE PROCEDURE
SEEDING: REPAIR BARE AREAS, APPLYING SUPPLEMENTAL SEED, MULCH, AND WATER AS NEEDED. MOWING CAN BE USED
PERIODICALLY TO DISCOURAGE WEEDS.
RIPRAP: REPAIR AREAS WHERE ROCK HAS BEEN DISPLACED. EXPAND RIPRAP AREA IF NEEDED.
DETAILED SPECIFICATIONS ARE LOCATED IN THE MICHIGAN DTMB'S SOIL EROSION AND SEDIMENTATION
CONTROL GUIDEBOOK.
E8
E12
E21
Permanent Seeding
Mulch Blanket
Riprap
Live Staking Slopes and drain banks, wetland buffer and reservoir drawdown areas. In areas requiring stabilization but with limited access for equipment or when little site disturbance is required.
Along drain banks, shorelines, or where concentrated flows occur. Slows velocity, reduces erosion and sediment load.
When bare soil is exposed, temporarily or permanently, to erosive forces from wind and or water on flat areas, mild slopes, grassed waterways and spillways, diversion ditches and dikes, borrow and stockpile areas, and spoil piles.
Slope stabilizing measures provde an immediate and effective cover over raw erodible slopes affording excellent protection against rain and wind erosion.
1. INSTALL AND MAINTAIN ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES IN
ACCORDANCE WITH THE APPROVED PLAN PRIOR TO COMMENCEMENT OF CONSTRUCTION OR MASS
GRADING. ALL SESC MEASURES MUST BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE
PETOBEGO DAM SESC PLAN AND PROJECT SPECIFICATIONS.
2. SOIL EROSION CONTROL MEASURES MUST BE INSPECTED BY A STATE CERTIFIED INSPECTOR AFFILIATED WITH THE COUNTY PUBLIC WORKS / COUNTY DRAIN COMMISSIONER'S OFFICE PRIOR TO COMMENCEMENT
OF CONSTRUCTION OR MASS GRADING.
3. DAILY INSPECTION AND MAINTENANCE MUST BE MADE TO ENSURE ALL EROSION CONTROL MEASURES ARE FUNCTIONING PROPERLY AND INTACT. NECESSARY REPAIRS MUST BE PERFORMED WITHIN 24 HOURS.
4. ADDITIONAL SOIL EROSION CONTROL MEASURES MUST BE PROVIDED THROUGHOUT CONSTRUCTION ACTIVITY AS NEEDED AND DETERMINED BY THE APA/ENGINEER. THE SOIL EROSION AND SEDIMENTATION CONTROL PLAN IS TO BE AMENDED TO INCLUDE ADDITIONAL EROSION CONTROL MEASURES IMPLEMENTED
ON-SITE.
5. SEDIMENT FROM WORK ON THIS SITE IS TO BE CONTAINED ON THE SITE AND IS NOT TO BE ALLOWED TO COLLECT ON ANY OFF-SITE AREAS OR IN WATERWAYS. WATERWAYS INCLUDE BOTH NATURAL AND
MANMADE OPEN DITCHES, STREAMS, STORM DRAINS, LAKES, PONDS, AND WETLANDS.
6. ALL VISUAL TRACKING INCLUDING MUD, DIRT, AND DEBRIS TRACKED ONTO EXISTING ROADWAYS MUST BE IMMEDIATELY REMOVED NO LESS THAN ON A DAILY BASIS BY SCRAPING AND SWEEPING AND/OR AS
DIRECTED BY THE ENGINEER OR APA.
7. DUST CONTROL MUST BE EXERCISED AT ALL TIMES DURING THE PROJECT AND AS DIRECTED BY THE
ENGINEER OR APA. APPLY DUST SUPPRESSANT TO SURFACES USING A PRESSURE TYPE WATER
DISTRIBUTOR TRUCK EQUIPPED WITH A SPRAY SYSTEM.
8. ALL PERMANENT SOIL EROSION CONTROL MEASURES MUST BE IN PLACE WITHIN 24 HOURS OF FINAL GRADING (GRADE LISTED ON PLANS), THIS INCLUDES ALL VEGETATIVE STABILIZATION. VEGETATIVE STABILIZATION WILL BE ONGOING. TOPSOIL, FERTILIZER, SEED, POLYMER, SILT STOP (OR EQUAL), MULCH AND OR RIPRAP MUST BE IN PLACE BEFORE PROCEEDING TO THE NEXT WORK AREA. ALL TEMPORARY MEASURES SUCH AS SILT FENCE AND INLET PROTECTION BAGS ARE TO BE REMOVED ONCE PERMANENT SESC MEASURES ARE IN PLACE AND VEGETATION IS ESTABLISHED. REMOVAL OF TEMPORARY MEASURES, FOLLOWING ACCEPTANCE OF THE PROJECT IS THE RESPONSIBILITY OF THE CONTRACTOR.
9. PRIOR TO WINTER CONSTRUCTION, ALL EXPOSED SOILS MUST BE STABILIZED WITH A COMBINATION OF SILT STOP 705 POLYMER BLEND, NORTH AMERICAN GREEN EROSION CONTROL BLANKETS, MULCH, OR OTHER APPROVED METHOD IF VEGETATION COULD NOT BE ESTABLISHED DURING THE GROWING SEASON
AS DETERMINED BY THE APA OR ENGINEER.
10. WORK AREAS MUST BE STABILIZED WITH TOPSOIL, SEED, FERTILIZER, AND MULCH WITHIN 24 HOURS FOLLOWING CONSTRUCTION. VEGETATIVE STABILIZATION IS ONGOING THROUGHOUT THE PROJECT.
11. ALL SOIL EROSION CONTROL MEASURES MUST BE INSPECTED DAILY, THE STORM WATER OPERATOR IS TO MAKE A WEEKLY INSPECTION OR INSPECT AFTER EACH RAIN EVENT THAT RESULTED IN A DISCHARGE TO ENSURE PROPER MAINTENANCE OF THE SOIL EROSION CONTROL MEASURES. ANY DEFICIENCIES OR REPAIRS TO SOIL EROSION CONTROL MEASURES MUST BE CORRECTED IMMEDIATELY. INLET PROTECTION MEASURES, DANDY BAG II (OR EQUAL), FLEX STORM (OR EQUAL), MUST BE INSTALLED IN CATCHBASINS BEFORE ANY STORMWATER RUNOFF IS ALLOWED TO ENTER THE TOP OF THE STRUCTURES. THE SILT AND SEDIMENT MUST BE REMOVED FROM INLET PROTECTION MEASURES AS NEEDED TO ENSURE PROPER
FUNCTION OF THE BAGS.
12. THE NEED FOR TEMPORARY MEASURES SUCH AS SILT FENCE AND DANDY BAG II (OR EQUAL), FLEX STORM (OR EQUAL) FOR EXISTING OR NEW CATCHBASINS MUST BE ASSESSED ON A DAILY BASIS. PIPES ARE TO BE CAPPED AT THE END OF EACH WORKDAY. AT NO TIME SHOULD SEDIMENT COLLECT IN A CATCHBASIN OR AN OFF-SITE AREA. TEMPORARY MEASURES MUST BE REMOVED ONCE PERMANENT MEASURES ARE IN
PLACE AND VEGETATION IS ESTABLISHED.
13. IF DEWATERING IS NECESSARY, CONTRACTOR SHALL SUBMIT A DEWATERING PLAN TO THE ENGINEER OR
APA FOR APPROVAL.
14. THE NOTICE OF COVERAGE (IF REQUIRED), SOIL EROSION AND SEDIMENTATION CONTROL PLAN, AND
STORMWATER OPERATOR LOGS MUST BE LOCATED ON SITE AT ALL TIMES.
15. ALL RESTORATION TO OCCUR WITHIN 24 HOURS OF FINAL GRADING.
SOIL EROSION AND
SEDIMENTATION CONTROL NOTES
MAINTENANCE PROGRAM FOR SESC MEASURES
GENERAL MAINTENANCE
· CONTRACTOR SHALL MAINTAIN ALL PERMANENT SESC MEASURES FOR A PERIOD OF 1 YEAR FOLLOWING
THEIR INSTALLATION.
· TEMPORARY SESC MEASURES MUST BE INSTALLED, MAINTAINED, AND REMOVED BY THE CONTRACTOR.
· TEMPORARY MEASURES MUST BE MAINTAINED AND IN PLACE UNTIL AREAS ARE PERMANENTLY STABILIZED.
· PERMANENT MEASURES MUST BE INSTALLED AND MAINTAINED BY THE CONTRACTOR UNTIL FINAL
COMPLETION.
· DAILY MAINTENANCE IS THE CONTRACTOR'S RESPONSIBILITY.
· TEMPORARY SESC MEASURES MUST BE REMOVED AT THE END OF THE PROJECT ONCE PERMANENT
MEASURES ARE ESTABLISHED.
· TEMPORARY SESC MEASURES MUST BE INSTALLED PRIOR TO OR AT THE TIME OF EARTH DISTURBANCE.
· INSPECT WEEKLY AND AFTER EACH RAIN EVENT UNTIL VEGETATION HAS BEEN ESTABLISHED.
· IF NECESSARY, REPAIR AND RE-SEED OR REPLANT ERODED AREAS IMMEDIATELY.
SEEDING AND MULCHING
· SEEDING PRACTICES INCLUDE TOPSOIL (AS DIRECTED BY ENGINEER), SEED, POLYMER, AND MULCH OR
MULCH MATTING (AS DIRECTED BY ENGINEER OR WHERE SHOWN ON PLANS).
· WHERE NECESSARY, APPROPRIATE MULCH MUST BE APPLIED BASED ON SLOPE AND GROWING
CONDITIONS AS APPROVED BY THE PROJECT MANAGER.
· ALL SLOPES AND HIGHLY EROSIVE ARES MUST BE SEEDED, POLYMER APPLIED, AND MULCHED AS NEEDED
WHEN CONSTRUCTION ACTIVITY IS NOT TAKING PLACE.
· SEED AND MULCH IS TO BE INSPECTED DAILY FOLLOWING EACH RAIN EVENT TO DETERMINE IF
CONCENTRATED FLOWS ARE PRESENT.
· IN THE EVENT THAT SEED AND MULCH ARE REMOVED BY EROSIVE RUNOFF, REPAIRS ARE TO BE MADE
IMMEDIATELY.
· ALL AREAS DURING CONSTRUCTION MUST BE PERMANENTLY STABILIZED WITHIN 72 HOURS OF FINAL
GRADE (GRADE LISTED ON PLAN).
SILT FENCE
· SILT FENCE IS THE BE TRENCHED IN NO LESS THAN 6 INCHES BELOW THE GROUND SURFACE.
· INSPECT SILT FENCE DAILY AND IMMEDIATELY FOLLOWING EACH RAINFALL.
· REPAIR WHEN SILT FENCE IS SAGGING OR HAS BEEN REMOVED/TORN DOWN.
· WHEN SILT COLLECTS TO HALF THE HEIGHT OF THE FENCE, ALL SILT IS TO BE REMOVED AND FENCE
REPAIRED.
· REMOVE SILT FENCE WHEN PERMANENT SESC MEASURES ARE IN PLACE AND VEGETATION IS
ESTABLISHED.
· WHERE MULCH BLANKET IS SPECIFIES, USE JUTE OR COIR NETTING OVER STRAW MULCH. DO NOT USE MULCH
BLANKETS WITH POLYMERIC NETTING.
STABILIZED CONSTRUCTION ACCESS
· INSPECT WEEKLY AND AFTER EACH RAINFALL.
· WHEN CONSTRUCTION ACCESS IS NO LONGER EFFECTIVE, SCRAPE THE TOP LAYER AND ADD 2" OF
AGGREGATE.
TURBIDITY CURTAIN
· INSPECT CURTAIN DAILY AND MAKE REQUIRED ADJUSTMENTS TO ENSURE THAT ANCHORS, TIE-DOWNS, OR OTHER MECHANISMS ARE SUFFICIENTLY ISOLATING CONSTRUCTION ACTIVITIES FROM THE WATERBODY.
COMPLIANCE WITH PART 91 OF PA 451
· RESPOND IMMEDIATELY TO STORMWATER OPERATOR AND/OR SOIL EROSION AND SEDIMENTATION CONTROL INSPECTOR'S CONCERNS. MAKE CORRECTIVE MEASURES AS REQUIRED IMMEDIATELY AS DETAILED
BY THE APPROVED APA MANUAL(S).
CBS ISSUED FOR PERMIT - REV 1 07/08/2026
P:
\P ro j2
2\
SG
Pe to be go D am
R em ov al
R es to ra tio n\ dw g\ D
R -4
4-
-0
3_ C
S_ N
O
TE
S_
SE
SC
.d w g, /3
0/
0:
:5
AM
, m ic ha el .c ou rn ey
AutoCAD SHX Text
WHERE USED
AutoCAD SHX Text
KEY
AutoCAD SHX Text
SYMBOL
SESC MEASURE
| Sheets and Views |
| DR-4344-01 |
| Sheets and Views |
| DR-4344-02 |
| Sheets and Views |
| DR-4344-03_SESC |
| Sheets and Views |
| DR-4344-04_PP |
| Sheets and Views |
| DR-4344-05_PP |
| Sheets and Views |
| DR-4344-06_PP |
| Sheets and Views |
| DR-4344-07_CS |
| Sheets and Views |
| DR-4344-08_DETAIL |