About this file
This is a set of engineering plans and drawings prepared by the State of Hawaii Department of Land and Natural Resources (DLNR), Division of Boating and Ocean Recreation, for the Kikiaola Small Boat Harbor Sand Bypassing project located in Kekaha, Kauai, Hawaii (Job No. B95CK77A). The project involves excavating sand from East Beach and Basin borrow areas, placing beach fill material, and implementing best management practices and water quality monitoring at the harbor. The plans consist of 18 sheets prepared by licensed professional engineer Robert A. Walker (License No. 14549-C, expiration 4/30/2028) and include general notes, project control and baseline information, existing conditions surveys (east and west sections), haul route and laydown areas, proposed borrow area plans with detailed cross-sections, proposed beach fill plans with sections, proposed harbor basin dredging as an alternate, and erosion and sediment control details and notes. The plans are dated May 6, 2026, and marked as "For Bidding Purposes Not for Construction," indicating they are preliminary bid documents. Topographic and hydrographic surveys were performed by Integral Consulting, Inc. on February 11-13, 2025, using RTK GPS and total station methodologies, with aerial photography collected on February 12, 2025.
The project establishes specific design parameters including a proposed beach slope of 5H:1V or 6H:1V depending on location, a proposed beach berm crest elevation of 8 feet mean sea level (MSL), proposed dune crest elevation of 15.5 feet MSL with a 3H:1V slope, and minimum beach width of 10 feet. Borrow area excavation is proposed to approximately 0 feet MSL with seaward limits at the existing +2 foot contour, except near the East Breakwater where the limit extends to 0 feet. The harbor basin dredging (identified as Add Alternate No. 1) specifies dredging to elevation -7 feet MSL with dredged material to be stockpiled above mean high high water (MHHW) for drying prior to placement or hauling. The contractor is required to design and furnish temporary bridge measures to prevent loading on the existing irrigation ditch bridge, coordinate hauling operations with the engineer, maintain a minimum 8-foot elevation berm where existing ground is below that level, and implement comprehensive erosion and sediment control measures including filter socks, silt fencing, turbidity curtains, and construction access controls. Updated surveys will be collected prior to final construction to incorporate into the Issued for Construction (IFC) plan set. Vertical datum references NOAA Tide Gauge 1611400 (Nawiliwili) for the 1983-2001 tidal epoch, with horizontal coordinates referenced to NAD83 Hawaii State Plane Zone 4.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAWAII
N
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI, HAWAII
CONSULTANT:REGIONAL MAP
PROJECT
LOCATION
LOCATION MAP
APPROVED:
MEGHAN L. STATTS
ADMINISTRATOR
DIVISION OF BOATING AND OCEAN RECREATION
DEPARTMENT OF LAND AND NATURAL RESOURCES
DATE:_____________
MAUKA
MAKAI
KEKAHA
VICINITY MAP
WAIMEA
SHEET INDE;
SHEET NO. DWG NO. DESCRIPTION
1 COVER, SHEET INDEX, VICINITY MAPS
2 C0 GENERAL NOTES
3 C1 PROJECT CONTROL AND BASELINE
4 D1 EXISTING CONDITIONS - OVERALL
5 D2 EXISTING CONDITIONS - EAST
6 D3 EXISTING CONDITIONS - WEST
7 D4 HAUL ROUTE & LAYDOWN AREA
8 D5 PROPOSED BORROW AREA PLAN
9 D6 BORROW SECTIONS 1
10 D7 BORROW SECTIONS 2
11 D8 BORROW SECTIONS 3
12 D9 PROPOSED BEACH FILL PLAN
13 D10 BEACH FILL SECTIONS 1
14 D11 BEACH FILL SECTIONS 2
15 D12
PROPOSED HARBOR BASIN DREDGING
(ADD ALTERNATE NO. 1)
16 C2 EROSION AND SEDIMENT CONTROL DETAILS
17 C3 EROSION AND SEDIMENT CONTROL NOTES
18 C4 GRADING NOTES
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
STATE OF HAWAII DEPARTMENT OF LAND
AND NATURAL RESOURCES
DIVISION OF BOATING AND OCEAN RECREATION
JOB NO. B95CK77A
PROJECT LOCATION
KAUAI
PROJECT LOCATION
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
GENERAL NOTES
C0
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
-0+220+00 1+00
2+00 3+00
4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+0026+00
0+00
1+00
2+00
3+00 4+00
5+006+007+008+009+0010+0011+0012+0013+00 14+00
15+0015+50
2 3
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
PROJECT CONTROL AND BASELINE
C1
NOTES
1. TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS
PERFORMED BY INTEGRAL CONSULTING, INC. ON
FEBRUARY 11-13, 2025 USING A COMBINATION OF RTK
GPS AND TOTAL STATION METHODOLOGIES.
2. HIGH-RESOLUTION ORTHOMOSAIC BACKGROUND IMAGE
CREATED USING AERIAL PHOTOGRAPHS COLLECTED ON
FEBRUARY 12, 2025 BY INTEGRAL CONSULTING, INC.
3. SATELLITE BACKGROUND IMAGE COURTESY OF MAXAR.
4. VERTICAL DATUM: MSL PER NOAA TIDE GAUGE 1611400
(NAWILIWILI) FOR THE 1983-2001 TIDAL EPOCH.
5. VERTICAL ELEVATIONS IN FEET, REFERENCED TO NGS
BENCHMARK "KIKI 4"
6. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII
STATE PLANE ZONE 4, US SURVEY FEET
7. HORIZONTAL COORDINATES REFERENCED TO NGS
BENCHMARKS "KIKI 2" AND "KIKI 3"
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
LINETYPE LEGEND
BASELINE:
KIKIAOLA
SMALL BOAT HARBOR
PACIFIC OCEAN
BORROW AREA (EAST)
BEACH FILL AREA (WEST)
0A8.A
0A.A, .E.A+A
:A,0EA
Feet 0 350 700
PROJECT BASELINE (TYP.)
BASELINE CONTROL POINTS
NAME EASTING NORTHING ELEVATION (MSL)
KIKI 2 1575382.84 45773.09 4.00
KIKI 3 1575600.08 45767.63 8.49
KIKI 4 1575460.56 45818.60 6.66
BASELINE CONTROL POINTS
POINT
Easting
1573423.19
1573618.14
1574418.30
1574615.04
1574932.32
1575951.09
1576438.10
1578264.76
Northing
46187.52
46226.11
46226.12
46191.58
46043.60
45524.99
45312.36
45088.01
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
1+00
2+00 3+00
4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+0026+00
0+00
1+00
2+00
3+00 4+00
5+006+007+008+009+0010+0011+0012+0013+00 14+00
15+0015+50
-4
-2
-8
-6
-4
-2
-4 -2
0 2 4 681010
-6
-4 -2 0
2 4 6 8101012121414
-6 -4
-2 0 2 4 6
1012121414
-6 -4
-2 024681012
-6
-4 -2
4 6
-4
-20
-2 0 2
-4 -2 10 4
-4-2
2 4
-2
2 4
-8
-6 -4 -2 0 2 4 6
-6 -4
-2
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
EXISTING CONDITIONS - OVERALL
D1
NOTES
1. TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS
PERFORMED BY INTEGRAL CONSULTING, INC. ON
FEBRUARY 11-13, 2025 USING A COMBINATION OF RTK
GPS AND TOTAL STATION METHODOLOGIES.
2. HIGH-RESOLUTION ORTHOMOSAIC BACKGROUND IMAGE
CREATED USING AERIAL PHOTOGRAPHS COLLECTED ON
FEBRUARY 12, 2025 BY INTEGRAL CONSULTING, INC.
3. SATELLITE BACKGROUND IMAGE COURTESY OF MAXAR.
4. TOPOGRAPHIC AND BATHYMETRIC DATA WEST OF
STATION 11+00 WERE OBTAINED FROM VARIOUS
SOURCES AND COMPILED FOR THE PURPOSES OF
THESE BID PLANS. UPDATED TOPOGRAPHIC AND
BATHYMETRIC SURVEY DATA FOR THIS AREA WILL BE
COLLECTED BY THE ENGINEER PRIOR TO
CONSTRUCTION AND INCORPORATED INTO THE FINAL
ISSUED FOR CONSTRUCTION (IFC) PLAN SET.
5. VERTICAL DATUM: MSL PER NOAA TIDE GAUGE 1611400
(NAWILIWILI) FOR THE 1983-2001 TIDAL EPOCH.
6. VERTICAL ELEVATIONS IN FEET, REFERENCED TO NGS
BENCHMARK "KIKI 4"
7. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII
STATE PLANE ZONE 4, US SURVEY FEET
8. HORIZONTAL COORDINATES REFERENCED TO NGS
BENCHMARKS "KIKI 2" AND "KIKI 3"
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
LINETYPE LEGEND
BASELINE:
EXISTING CONTOUR:
MHHW (+1.01 FT MSL):
KIKIAOLA
SMALL BOAT HARBOR
PACIFIC OCEAN
BORROW AREA (EAST)
BEACH FILL AREA (WEST)
0A8.A
0A.A, .E.A+A
:A,0EA
Feet 0 350 700
PROJECT BASELINE (TYP.)
-2
1+00
2+00
3+00
4+00
5+00 6+00
7+00 8+00
9+00 10+00
11+00 12+00
13+00 14+00
15+00 16+00
17+00 18+00
19+00 20+00
21+00 22+00
-4
-2
-2
-4
-2
10 4
-4 -2
-2
8 10
-0 +0
2+
0+ 76 1+
1+
3+
3+
4+
4+
5+
5+
6+
6+
7+
7+
7+
8+
9+
9+
+3
+8
+3
+2
+0
+9
+8
+6
+9
+6
+6
+4
+2
-0 +2
0+
8+
+3
+3
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
EXISTING CONDITIONS - EAST
D2
NOTES
1. TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS
PERFORMED BY INTEGRAL CONSULTING, INC. ON
FEBRUARY 11-13, 2025 USING A COMBINATION OF RTK
GPS AND TOTAL STATION METHODOLOGIES.
2. HIGH-RESOLUTION ORTHOMOSAIC BACKGROUND IMAGE
CREATED USING AERIAL PHOTOGRAPHS COLLECTED
ON FEBRUARY 12, 2025 BY INTEGRAL CONSULTING, INC.
3. SATELLITE BACKGROUND IMAGE COURTESY OF MAXAR.
4. VERTICAL DATUM: MSL PER NOAA TIDE GAUGE 1611400
(NAWILIWILI) FOR THE 1983-2001 TIDAL EPOCH.
5. VERTICAL ELEVATIONS IN FEET, REFERENCED TO NGS
BENCHMARK "KIKI 4"
6. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII
STATE PLANE ZONE 4, US SURVEY FEET
7. HORIZONTAL COORDINATES REFERENCED TO NGS
BENCHMARKS "KIKI 2" AND "KIKI 3"
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
LINETYPE LEGEND
BASELINE:
SECTION LINE:
EXISTING CONTOUR:
MHHW (+1.01 FT MSL):
0A8.A
0A.A, .E.A+A
:A,0EA
Feet 0 150 300
PACIFIC OCEAN
EAST BREAKWATER
0+00
2+00
3+00
4+00
5+00 6+007+008+009+0010+0011+0012+0013+00
14+00
15+0015+50
-4
-2
2 4
-8
-6
-4
-2
-4
-2
6 810
-6
-4
-2
121414
-6
-4
-2
-6
-4
-2
-6
-4 -2
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
EXISTING CONDITIONS - WEST
D3
NOTES
1. TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS PERFORMED BY INTEGRAL
CONSUTLING, INC. ON FEBRUARY 11-13, 2025 USING A COMBINATION OF RTK GPS AND
TOTAL STATION METHODOLOGIES.
2. TOPOGRAPHIC AND BATHYMETRIC DATA WEST OF STATION 11+00 WERE OBTAINED
FROM VARIOUS SOURCES AND COMPILED FOR THE PURPOSES OF THESE BID PLANS.
UPDATED TOPOGRAPHIC AND BATHYMETRIC SURVEY DATA FOR THIS AREA WILL BE
COLLECTED BY THE ENGINEER PRIOR TO CONSTRUCTION AND INCORPORATED INTO
THE FINAL ISSUED FOR CONSTRUCTION (IFC) PLAN SET.
3. HIGH-RESOLUTION ORTHOMOSAIC BACKGROUND IMAGE CREATED USING AERIAL
PHOTOGRAPHS COLLECTED ON FEBRUARY 12, 2025 BY INTEGRAL CONSULTING, INC.
4. SATELLITE BACKGROUND IMAGE COURTESY OF MAXAR.
5. VERTICAL DATUM: MSL PER NOAA TIDE GAUGE 1611400 (NAWILIWILI) FOR THE
1983-2001 TIDAL EPOCH.
6. VERTICAL ELEVATIONS IN FEET, REFERENCED TO NGS BENCHMARK "KIKI 4"
7. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE PLANE ZONE 4, US
SURVEY FEET
8. HORIZONTAL COORDINATES REFERENCED TO NGS BENCHMARKS "KIKI 2" AND "KIKI 3"
9. FOR BASELINE CONTROL COORDINATES, SEE SHEET C1.
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
LINETYPE LEGEND
BASELINE:
EXISTING CONTOUR:
MHHW (+1.01 FT MSL):
0A8.A
0A.A, .E.A+A
:A,0EA
Feet 0 125 250
PACIFIC OCEAN
WEST BREAKWATER
EXIST. SANDBAG REVETMENT
(STA. 11+10 TO 13+80, APPROX.)
EXIST. ROCK REVETMENT
(STA. 13+80 TO 15+50, APPROX.)
-6
-4 -2
-4
-2
-2
-8
-6 -4 -2 0
2 4 6
-6
-4
-2
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
HAUL ROUTE & LAYDOWN AREA
D4
NOTES
1. TOPOGRAPHIC SURVEY PERFORMED BY INTEGRAL CONSULTING INC. ON FEBRUARY 11-13,
2025 AND REPRESENT CONDITIONS AT THAT TIME.
2. VERTICAL DATUM: MEAN SEA LEVEL (MSL) BASED ON NOAA TIDE STATION 1611400,
NAWILIWILI, 1983–2001 TIDAL EPOCH.
3. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE PLANE ZONE 4, US SURVEY FEET.
4. BATHYMETRIC DATA WITHIN THE HARBOR BASIN ARE BASED ON A HYDROGRAPHIC
CONDITION SURVEY CONDUCTED BY THE U.S. ARMY CORPS OF ENGINEERS (USACE)
PORTLAND DISTRICT ON JANUARY 14, 2020 AND REPRESENT CONDITIONS AT THAT TIME.
ORIGINAL USACE SURVEY DATA WERE REFERENCED TO MLLW AND WERE CONVERTED TO
MSL FOR USE IN THESE PLANS. UPDATED BATHYMETRIC SURVEY DATA FOR THE PROPOSED
HARBOR BASIN DREDGING AREA WILL BE COLLECTED BY THE ENGINEER PRIOR TO
CONSTRUCTION AND INCORPORATED INTO THE FINAL ISSUED FOR CONSTRUCTION (IFC)
PLAN SET.
5. HIGH-RESOLUTION ORTHOMOSAIC IMAGE CREATED USING AERIAL PHOTOGRAPHS
COLLECTED ON FEBRUARY 12, 2025 BY INTEGRAL CONSULTING INC. AND REPRESENT
CONDITIONS AT THAT TIME.
6. SATELLITE BACKGROUND IMAGE COURTESY OF MAXAR.
7. CONTRACTOR SHALL VERIFY HAUL ROUTE CONDITIONS, ACCESS CONSTRAINTS, BRIDGE
LOAD LIMITATIONS, AND HARBOR OPERATIONS PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL COORDINATE HAULING OPERATIONS WITH ENGINEER AND SHALL PROVIDE
FLAGGERS, PILOT VEHICLES, SIGNAGE, OR OTHER CONTROLS AS REQUIRED TO MAINTAIN
SAFE PUBLIC AND HARBOR ACCESS.
8. CONTRACTOR SHALL DESIGN, FURNISH, INSTALL, MAINTAIN, AND REMOVE TEMPORARY
BRIDGE SPAN OR APPROVED EQUIVALENT MEASURE TO PREVENT CONSTRUCTION VEHICLE
LOADING ON THE EXISTING BRIDGE OVER THE IRRIGATION DITCH. TEMPORARY ACCESS
MEASURE SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO USE.
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
LINETYPE LEGEND
BASELINE:
SECTION LINE:
EXISTING CONTOUR:
MHHW (+1.01 FT MSL):
KIKIAOLA
SMALL BOAT HARBOR
PACIFIC OCEAN
BORROW AREA (EAST)
BEACH FILL AREA (WEST)
0A8.A
0A.A, .E.A+A
:A,0EA
HAUL ROUTE. PILOT TRUCK OR
FLAGGER TO LEAD HAULERS
THROUGH ACTIVE HARBOR AREA
EXIST. BRIDGE OVER IRRIGATION DITCH.
CONTRACTOR TO CONSTRUCT TEMPORARY
BRIDGE SPAN TO PREVENT LOADING ON
EXIST. BRIDGE
CONTRACTOR WORK,
STORAGE, AND FIELD OFFICE
Feet 0 100 200
WEST BREAKWATER
EAST BREAKWATER
2+00
3+00
4+00
5+00 6+00
7+00 8+00
9+00 10+00
11+00 12+00
13+00 14+00
15+00 16+00
17+00 18+00
19+00 20+00
21+00 22+00
2 4 6 888 88
2 4 6 88
0 2 4 6 88
-4
-2
-2
-4
-2
10 4
-4 -2
-2
8 10
-0 +0
2+
0+ 76 1+
1+
3+
3+
4+
4+
5+
5+
6+
6+
7+
7+
7+
8+
9+
9+
+3
+8
+3
+2
+0
+9
+8
+6
+9
+6
+6
+4
+2
-0 +2
0+
8+
+3
+3
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
PROPOSED BORROW AREA PLAN
D5
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
LINETYPE LEGEND
BASELINE:
SECTION LINE:
EXISTING CONTOUR:
MHHW (+1.01 FT MSL):
PROPOSED BORROW AREA BOUNDARY:
PROPOSED CONTOUR (MAJOR):
PROPOSED CONTOUR (MINOR):
0A8.A
0A.A, .E.A+A
:A,0EA
Feet 0 150 300
PACIFIC OCEAN
EAST BREAKWATER
NOTES
1. TOPOGRAPHIC AND BATHYMETRIC SURVEYS PERFORMED BY
INTEGRAL CONSULTING INC. ON FEBRUARY 11-13, 2025 AND
REPRESENT CONDITIONS AT THAT TIME.
2. VERTICAL DATUM: MEAN SEA LEVEL (MSL) BASED ON NOAA TIDE
STATION 1611400, NAWILIWILI, 1983–2001 TIDAL EPOCH.
3. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE PLANE
ZONE 4, US SURVEY FEET.
4. HIGH-RESOLUTION ORTHOMOSAIC IMAGE CREATED USING AERIAL
PHOTOGRAPHS COLLECTED ON FEBRUARY 12, 2025 BY INTEGRAL
CONSULTING INC. AND REPRESENT CONDITIONS AT THAT TIME.
5. SATELLITE BACKGROUND IMAGE COURTESY OF MAXAR.
6. CONTRACTOR SHALL EXCAVATE ONLY WITHIN THE PROPOSED
BORROW AREA BOUNDARY AND SHALL NOT EXCAVATE BELOW
THE PROPOSED GRADES SHOWN ON THE BORROW SECTIONS,
UNLESS OTHERWISE APPROVED BY THE ENGINEER.
7. FOR BASELINE CONTROL COORDINATES, SEE SHEET C1.
PROJECT BASELINE (TYP.)
-2
0+76
-8
-4
-8
-4
0 20 40 60 80 100 120 140 1600
3+07
-8
-4
-8
-4
0 20 40 60 80 100 1200
5+17
-8
-4
-8
-4
0 20 40 60 80 1000-20
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
BORROW SECTIONS 1
D6
LINETYPE LEGEND
EXISTING SURFACE:
PROPOSED SURFACE:
MHHW (+1.01 FT MSL):
NOTES
1. TOPOGRAPHIC AND BATHYMETRIC SURVEYS PERFORMED BY INTEGRAL
CONSULTING INC. ON FEBRUARY 11-13, 2025 AND REPRESENT CONDITIONS
AT THAT TIME.
2. VERTICAL DATUM: MEAN SEA LEVEL (MSL) BASED ON NOAA TIDE STATION
1611400, NAWILIWILI, 1983–2001 TIDAL EPOCH.
3. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE PLANE ZONE 4,
US SURVEY FEET.
4. X-AXES: DISTANCE FROM BASELINE (FEET)
5. Y-AXES: ELEVATION ABOVE MSL (FEET)
6. WHERE EXISTING GROUND IS BELOW ELEV. +8.0 FT MSL ALONG THE
LANDWARD EDGE OF THE BORROW AREA, CONTRACTOR SHALL CONSTRUCT
A TEMPORARY OR FINISHED BERM TO MAINTAIN A MINIMUM CREST
ELEVATION OF +8.0 FT MSL. MAUKA FACE SHALL BE GRADED AT 3H:1V OR
FLATTER.
7. PROPOSED BEACH SLOPE: 5H:1V
8. PROPOSED BOTTOM OF EXCAVATION: 0FT
9. PROPOSED SEAWARD LIMIT OF DISTURBANCE OF THE BORROW AREA SHALL
BE THE EXISTING +2 FT CONTOUR, EXCEPT WITHIN 200 FT OF THE EAST
BREAKWATER (BETWEEN STA. -0+22 AND STA. 1+10, APPROX.) WHERE THE
SEAWARD LIMIT IS EXTENDED TO THE 0.0 FT CONTOUR.
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
BOTTOM OF
EXCAVATION: 0FT
5:1
BOTTOM OF
EXCAVATION: 0FT
BOTTOM OF
EXCAVATION: 0FT
LIMIT OF DISTURBANCE:
EXIST. 2FT CONTOUR LINE
LIMIT OF DISTURBANCE:
EXIST. 2FT CONTOUR LINE
LIMIT OF DISTURBANCE:
EXIST. 0FT CONTOUR LINE
MHHW
MHHW
MHHW
CONSTRUCT BERM WHERE
NECESSARY TO MAINTAIN
MIN. 8FT BERM ELEVATION
CONSTRUCT BERM WHERE
NECESSARY TO MAINTAIN
MIN. 8FT BERM ELEVATION
5:1
5:1
3:1
Feet 0 24 48
VERTICAL EXAGGERATION: 2X
-0+04
-4
-8 -4
0 20 40 60 80 100 120 140 160 180
0+76
-8 -4
-8 -4
0 20 40 60 80 100 120 140 1600
1+22
-8 -4
-8 -4
0 20 40 60 80 100 120 1400
1+73
-8 -4
-8 -4
0 20 40 60 80 100 1200
3+07
-8 -4
-8 -4
0 20 40 60 80 100 1200
3+49
-8 -4
-8 -4
0 20 40 60 80 100 1200
4+07
-8 -4
-8 -4
0 20 40 60 80 100 1200-20
4+63
-8 -4
-8 -4
0 20 40 60 80 1000-20
5+17
-8 -4
-8 -4
0 20 40 60 80 1000-20
5+67
-8 -4
-8 -4
0 20 40 60 80 100 1200-20
6+08
-8 -4
-8 -4
0 20 40 60 80 100 1200-20
6+56
-8 -4
-8 -4
0 20 40 60 80 100 1200-20
7+13
-8 -4
-8 -4
0 20 40 60 80 100 1200-20
7+41
-8 -4
-8 -4
0 20 40 60 80 100 1200-20
7+98
-8 -4
-8 -4
0 20 40 60 80 100 1200-20
8+52
-8 -4
-8 -4
0 20 40 60 80 1000-20
-0+22
-8 -4
-8 -4
0 20 40 60 80 100 120 140 160 180 200
0+19
-8 -4
-8 -4
0 20 40 60 80 100 120 140 160 180
8+99
-8 -4
-8 -4
0 20 40 60 80 1000-20
2+26
-8 -4
-8 -4
0 20 40 60 80 100 1200
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
BORROW SECTIONS 2
D7
LINETYPE LEGEND
EXISTING SURFACE:
PROPOSED SURFACE:
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
Feet 0 60 120
VERTICAL EXAGGERATION: 2X
NOTES
1. TOPOGRAPHIC AND BATHYMETRIC SURVEYS PERFORMED BY
INTEGRAL CONSULTING INC. ON FEBRUARY 11-13, 2025 AND
REPRESENT CONDITIONS AT THAT TIME.
2. VERTICAL DATUM: MEAN SEA LEVEL (MSL) BASED ON NOAA TIDE
STATION 1611400, NAWILIWILI, 1983–2001 TIDAL EPOCH.
3. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE PLANE
ZONE 4, US SURVEY FEET.
4. X-AXES: DISTANCE FROM BASELINE (FEET)
5. Y-AXES: ELEVATION ABOVE MSL (FEET)
6. WHERE EXISTING GROUND IS BELOW ELEV. +8.0 FT MSL ALONG THE
LANDWARD EDGE OF THE BORROW AREA, CONTRACTOR SHALL
CONSTRUCT A TEMPORARY OR FINISHED BERM TO MAINTAIN A
MINIMUM CREST ELEVATION OF +8.0 FT MSL. MAUKA FACE SHALL BE
GRADED AT 3H:1V OR FLATTER.
7. PROPOSED BEACH SLOPE: 5H:1V
8. PROPOSED BOTTOM OF EXCAVATION: 0FT
9. PROPOSED SEAWARD LIMIT OF DISTURBANCE OF THE BORROW
AREA SHALL BE THE EXISTING +2 FT CONTOUR, EXCEPT WITHIN 200
FT OF THE EAST BREAKWATER (BETWEEN STA. -0+22 AND STA. 1+10,
APPROX.) WHERE THE SEAWARD LIMIT IS EXTENDED TO THE 0.0 FT
CONTOUR.
0 20 40 60 80 100 1200-20 0 20 40 60 80 1000-20
9+45
-8 -4
-8 -4
0 20 40 60 80 1000-20
9+85
-8 -4
-8 -4
0 20 40 60 80 1000-20
10+35
-8 -4
-8 -4
0 20 40 60 800-20-40
10+81
-8 -4
-8 -4
0 20 40 60 800-20-40
13+30
-8 -4
-8 -4
0 20 40 60 80 1000-20
14+23
-8 -4
-8 -4
0 20 40 60 80 1000-20
15+08
-8 -4
-8 -4
0 20 40 60 80 1000-20
15+97
-8 -4
-8 -4
0 20 40 60 80 1000-20
16+80
-8 -4
-8 -4
0 20 40 60 80 1000-20
17+68
-8 -4
-8 -4
0 20 40 60 80 1000-20
18+95
-8 -4
-8 -4
0 20 40 60 80 1000-20
19+65
-8 -4
-8 -4
0 20 40 60 800-20
20+60
-8 -4
-8 -4
0 20 40 60 800-20
21+46
-8 -4
-8 -4
0 20 40 60 800-20
22+21
-8 -4
-8 -4
0 20 40 60 800-20
23+55
-8 -4
-8 -4
0 20 40 60 800-20
24+69
-8 -4
-8 -4
0 20 40 60 800-20
11+36
-8 -4
-8 -4
0 20 40 60 800-20-40
12+36
-8 -4
-8 -4
0 20 40 60 80 1000-20-40
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
BORROW SECTIONS 3
D8
LINETYPE LEGEND
EXISTING SURFACE:
PROPOSED SURFACE:
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
Feet 0 60 120
VERTICAL EXAGGERATION: 2X
NOTES
1. TOPOGRAPHIC AND BATHYMETRIC SURVEYS PERFORMED BY
INTEGRAL CONSULTING INC. ON FEBRUARY 11-13, 2025 AND
REPRESENT CONDITIONS AT THAT TIME.
2. VERTICAL DATUM: MEAN SEA LEVEL (MSL) BASED ON NOAA TIDE
STATION 1611400, NAWILIWILI, 1983–2001 TIDAL EPOCH.
3. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE PLANE
ZONE 4, US SURVEY FEET.
4. X-AXES: DISTANCE FROM BASELINE (FEET)
5. Y-AXES: ELEVATION ABOVE MSL (FEET)
6. WHERE EXISTING GROUND IS BELOW ELEV. +8.0 FT MSL ALONG THE
LANDWARD EDGE OF THE BORROW AREA, CONTRACTOR SHALL
CONSTRUCT A TEMPORARY OR FINISHED BERM TO MAINTAIN A
MINIMUM CREST ELEVATION OF +8.0 FT MSL. MAUKA FACE SHALL BE
GRADED AT 3H:1V OR FLATTER.
7. PROPOSED BEACH SLOPE: 5H:1V
8. PROPOSED BOTTOM OF EXCAVATION: 0FT
9. PROPOSED SEAWARD LIMIT OF DISTURBANCE OF THE BORROW
AREA SHALL BE THE EXISTING +2 FT CONTOUR, EXCEPT WITHIN 200
FT OF THE EAST BREAKWATER (BETWEEN STA. -0+22 AND STA. 1+10,
APPROX.) WHERE THE SEAWARD LIMIT IS EXTENDED TO THE 0.0 FT
CONTOUR.
0+00
2+00
3+00
4+00
5+00 6+007+008+009+0010+0011+0012+0013+00
14+00
15+0015+50
0+
1+
2+
2+
3+
3+ 734+
154+ 845+
6+
7+
7+
8+
8+
9+ 379+
+4
+9
+5
+0
+5
+0
+5
+0
+5
+0
-4
-2
-8
-6
-4
-2
0246810
-4
-2
6 810
-6
-4
-2
121414
-6
-4
-2
-6
-4
-2
-6
-4 -2
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
PROPOSED BEACH FILL PLAN
D9
LINETYPE LEGEND
BASELINE:
SECTION LINE:
EXISTING CONTOUR:
MHHW (+1.01 FT MSL):
PROPOSED FILL AREA BOUNDARY:
PROPOSED GRADE BREAK:
PROPOSED SLOPE LINE:FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
0A8.A
0A.A, .E.A+A
:A,0EA
Feet 0 125 250
PACIFIC OCEAN
WEST BREAKWATER
NOTES
1. TOPOGRAPHIC AND BATHYMETRIC SURVEYS PERFORMED BY INTEGRAL CONSULTING
INC. ON FEBRUARY 11-13, 2025 AND REPRESENT CONDITIONS AT THAT TIME.
2. VERTICAL DATUM: MEAN SEA LEVEL (MSL) BASED ON NOAA TIDE STATION 1611400,
NAWILIWILI, 1983–2001 TIDAL EPOCH.
3. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE PLANE ZONE 4, US SURVEY
FEET.
4. EXISTING TOPOGRAPHIC AND BATHYMETRIC DATA WEST OF STATION 11+00 WERE
OBTAINED FROM VARIOUS SOURCES AND COMPILED FOR THE PURPOSES OF THESE BID
PLANS. UPDATED TOPOGRAPHIC AND BATHYMETRIC SURVEY DATA FOR THIS AREA
WILL BE COLLECTED BY THE ENGINEER PRIOR TO CONSTRUCTION AND INCORPORATED
INTO THE FINAL ISSUED FOR CONSTRUCTION (IFC) PLAN SET.
5. THE OVERALL BEACH FILL TEMPLATE SHOWN HEREIN IS REPRESENTATIVE OF THE
INTENDED DESIGN. FINAL STATION AND OFFSET LOCATIONS FOR KEY BEACH FILL
TEMPLATE FEATURES (E.G., BERM CREST, DUNE TOE, DUNE CREST BREAKPOINTS,
LANDWARD FILL LIMITS) WILL BE DETERMINED BASED ON THE PRE-CONSTRUCTION
SURVEY AND PROVIDED IN THE ISSUED FOR CONSTRUCTION (IFC) PLAN SET.
EXIST. SANDBAG REVETMENT
(STA. 11+10 TO 13+80, APPROX.)
TO BE REMOVED
EXIST. ROCK REVETMENT
(STA. 13+80 TO 15+50, APPROX.)
PROPOSED DUNE CREST
ELEVATION: 15.5FT (TYP.)
PROPOSED BEACH
ELEVATION: 8FT (TYP.)
LIMITS OF FILL
7+64
-12
-8
-4
-12
-8
-4
00-20-40-60-80-100-120-140
10+94
-12
-8
-4
-12
-8
-4
0 200-20-40-60-80-100-120
14+00
-8
-4
-8
-4
00-20-40-60-80-100-120
11+50
-12
-8
-4
-12
-8
-4
00-20-40-60-80-100-120
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
BEACH FILL SECTIONS 1
D10
NOTES:
1. TOPOGRAPHIC AND BATHYMETRIC SURVEYS PERFORMED BY INTEGRAL CONSULTING INC. ON FEBRUARY 11-13, 2025 AND REPRESENT
CONDITIONS AT THAT TIME.
2. VERTICAL DATUM: MEAN SEA LEVEL (MSL) BASED ON NOAA TIDE STATION 1611400, NAWILIWILI, 1983–2001 TIDAL EPOCH.
3. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE PLANE ZONE 4, US SURVEY FEET.
4. X-AXES: DISTANCE FROM BASELINE (FEET)
5. Y-AXES: ELEVATION ABOVE MSL (FEET)
6. PROPOSED BEACH SLOPE: 6H:1V
7. PROPOSED BEACH BERM CREST ELEVATION: 8FT
8. PROPOSED MIN. BEACH WIDTH: 10FT
9. PROPOSED MINIMUM BEACH BERM WIDTH IS 10 FT, MEASURED FROM THE DUNE TOE TO THE BERM CREST UNLESS OTHERWISE SHOWN.
10. PROPOSED DUNE SLOPE: 3H:1V
11. PROPOSED DUNE CREST ELEVATION: 15.5FT
12. PROPOSED MIN. DUNE CREST WIDTH: 5FT
13. THE OVERALL BEACH FILL TEMPLATE SHOWN HEREIN IS REPRESENTATIVE OF THE INTENDED DESIGN. FINAL STATION AND OFFSET
LOCATIONS FOR KEY BEACH FILL TEMPLATE FEATURES (E.G., BERM CREST, DUNE TOE, DUNE CREST BREAKPOINTS, LANDWARD FILL LIMITS) WILL BE DETERMINED BASED ON THE PRE-CONSTRUCTION SURVEY AND PROVIDED IN THE ISSUED FOR CONSTRUCTION (IFC)
PLAN SET.
14. EXISTING SANDBAG REVETMENT (TO BE REMOVED) SPANS APPROXIMATELY FROM STA. 11+10 TO 13+80.
15. EXISTING ROCK REVETMENT (TO REMAIN) SPANS APPROXIMATELY FROM STA. 13+80 TO 15+50.
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
LINETYPE LEGEND
EXISTING SURFACE:
PROPOSED SURFACE:
MHHW (+1.01 FT MSL):
DUNE CREST
ELEVATION: 15.5FT
DUNE CREST
ELEVATION: 15.5FT
BERM CREST
ELEVATION: 8FT
BERM CREST
ELEVATION: 8FT
BERM CREST
ELEVATION: 8FT
6:1
6:1
6:1
3:1
3:1
MHHW
MHHW
MHHW
DUNE CREST
ELEVATION: 15.5FT
BERM CREST
ELEVATION: 8FT
6:1
3:1
MHHW EXIST. SANDBAG REVETMENT
(APPROX.) TO BE REMOVED
3:1 3:1
EXIST. ROCK REVETMENT
(APPROX.)
Feet 0 30 60
0+99
-4
-8 -4
00-20-40-60-80-100-120-140
1+50
-8 -4
-8 -4
00-20-40-60-80-100-120-140
2+19
-8 -4
-8 -4
00-20-40-60-80-100-120-140
2+60
-8 -4
-8 -4
00-20-40-60-80-100-120-140-160
3+28
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120-140-160
3+73
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120-140-160
4+15
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120-140-160
4+84
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120-140-160
5+92
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120-140-160
6+41
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120-140-160
7+16
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120-140
7+64
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120-140
8+21
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120
8+73
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120
9+37
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120
9+85
-8 -4
-8 -4
00-20-40-60-80-100-120
10+47
-12 -8 -4
-12 -8 -4
0 200-20-40-60-80-100-120
10+94
-12 -8 -4
-12 -8 -4
0 200-20-40-60-80-100-120
11+50
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120
12+00
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120
12+50
-12 -8 -4
-12 -8 -4
00-20-40-60-80-100-120
13+00
-8 -4
-8 -4
00-20-40-60-80-100-120
13+50
-8 -4
-8 -4
00-20-40-60-80-100-120
14+00
-8 -4
-8 -4
00-20-40-60-80-100-120
14+50
-8 -4
-8 -4
00-20-40-60-80-100
15+00
-8 -4
-8 -4
00-20-40-60-80
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
BEACH FILL SECTIONS 2
D11
LINETYPE LEGEND
EXISTING SURFACE:
PROPOSED SURFACE:
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
Feet 0 40 80
VERTICAL EXAGGERATION: 2X
NOTES:
1. TOPOGRAPHIC AND BATHYMETRIC SURVEYS PERFORMED BY
INTEGRAL CONSULTING INC. ON FEBRUARY 11-13, 2025 AND
REPRESENT CONDITIONS AT THAT TIME.
2. VERTICAL DATUM: MEAN SEA LEVEL (MSL) BASED ON NOAA
TIDE STATION 1611400, NAWILIWILI, 1983–2001 TIDAL EPOCH.
3. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE
PLANE ZONE 4, US SURVEY FEET.
4. X-AXES: DISTANCE FROM BASELINE (FEET)
5. Y-AXES: ELEVATION ABOVE MSL (FEET)
6. PROPOSED BEACH SLOPE: 6H:1V
7. PROPOSED BEACH BERM CREST ELEVATION: 8FT
8. PROPOSED MIN. BEACH WIDTH: 10FT
9. PROPOSED MINIMUM BEACH BERM WIDTH IS 10 FT,
MEASURED FROM THE DUNE TOE TO THE BERM CREST
UNLESS OTHERWISE SHOWN.
10. PROPOSED DUNE SLOPE: 3H:1V
11. PROPOSED DUNE CREST ELEVATION: 15.5FT
12. PROPOSED MIN. DUNE CREST WIDTH: 5FT
13. THE OVERALL BEACH FILL TEMPLATE SHOWN HEREIN IS
REPRESENTATIVE OF THE INTENDED DESIGN. FINAL STATION
AND OFFSET LOCATIONS FOR KEY BEACH FILL TEMPLATE
FEATURES (E.G., BERM CREST, DUNE TOE, DUNE CREST
BREAKPOINTS, LANDWARD FILL LIMITS) WILL BE DETERMINED
BASED ON THE PRE-CONSTRUCTION SURVEY AND PROVIDED
IN THE ISSUED FOR CONSTRUCTION (IFC) PLAN SET.
14. EXISTING SANDBAG REVETMENT (TO BE REMOVED) SPANS
APPROXIMATELY FROM STA. 11+10 TO 13+80.
15. EXISTING ROCK REVETMENT (TO REMAIN) SPANS
APPROXIMATELY FROM STA. 13+80 TO 15+50.
-4
-8
-6
-4
-2
4 6
-6
-4
-2
0+00
1+00
2+00 2+50
-10
-5
-10
-5
0+00 1+00 2+00 2+50
CHIEF ENGINEER DATE
APPROVED:
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
PROPOSED HARBOR BASIN DREDGING
(ADD ALTERNATE NO. 1)
D12
NOTES
1. TOPOGRAPHIC SURVEY PERFORMED BY INTEGRAL CONSULTING INC. ON FEBRUARY 11-13,
2025 AND REPRESENT CONDITIONS AT THAT TIME.
2. VERTICAL DATUM: MEAN SEA LEVEL (MSL) BASED ON NOAA TIDE STATION 1611400, NAWILIWILI, 1983–2001 TIDAL EPOCH.
3. HORIZONTAL COORDINATE SYSTEM: NAD83, HAWAII STATE PLANE ZONE 4, US SURVEY FEET.
4. BATHYMETRIC DATA WITHIN THE HARBOR BASIN ARE BASED ON A HYDROGRAPHIC CONDITION
SURVEY CONDUCTED BY THE U.S. ARMY CORPS OF ENGINEERS (USACE) PORTLAND DISTRICT
ON JANUARY 14, 2020 AND REPRESENT CONDITIONS AT THAT TIME. ORIGINAL USACE SURVEY
DATA WERE REFERENCED TO MLLW AND WERE CONVERTED TO MSL FOR USE IN THESE
PLANS. UPDATED BATHYMETRIC SURVEY DATA FOR THE PROPOSED HARBOR BASIN
DREDGING AREA WILL BE COLLECTED BY THE ENGINEER PRIOR TO CONSTRUCTION AND
INCORPORATED INTO THE FINAL ISSUED FOR CONSTRUCTION (IFC) PLAN SET.
5. BATHYMETRIC DATA BETWEEN THE LIMITS OF THE 2020 USACE HARBOR BASIN SURVEY AND
ADJACENT SURVEY DATA COLLECTED IN 2025 WERE INTERPOLATED FOR THE PURPOSES OF
THESE BID PLANS.
6. DREDGED MATERIAL SHALL BE TEMPORARILY STOCKPILED AND RETAINED ABOVE MHHW AS
NECESSARY TO ALLOW DRYING PRIOR TO HAULING OR BEACH FILL PLACEMENT.
CONTRACTOR SHALL IMPLEMENT BMPs TO PREVENT TURBID RUNOFF OR SEDIMENT
DISCHARGE TO WATERS.
7. FEDERALLY MAINTAINED ACCESS CHANNEL SHOWN FOR REFERENCE. CONTRACTOR SHALL
NOT OBSTRUCT OR CONDUCT WORK WITHIN THE FEDERAL ACCESS CHANNEL UNLESS
OTHERWISE AUTHORIZED.
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
LINETYPE LEGEND
DREDGE AREA
BASELINE:
SECTION LINE:
EXISTING CONTOUR:
MHHW (+1.01 FT MSL):
FEDERAL ACCESS CHANNEL LIMITS:
KIKIAOLA
SMALL BOAT HARBOR
BORROW AREA (EAST)
0A8.A
0A.A, .E.A+A
:A,0EA
DREDGE TO ELEV.
-7 FEET MSL
ACCESS CHANNEL
(FEDERALLY MAINTAINED)
Feet 0 50 100
STOCKPILE AREA
(ABOVE MHHW)
EAST BREAKWATER
BASIN DREDGING CROSS-SECTION
DREDGE TO -7 FEET
EXISTING GRADE
Feet 0 20 40
1' OVERDREDGE
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
EROSION AND SEDIMENT CONTROL DETAILS
C2
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
FILTER SOCK DETAIL
SILT FENCE DETAIL
CONSTRUCTION INGRESS/EGRESS DETAILS
TURBIDITY CURTAIN DETAIL
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
EROSION AND SEDIMENT CONTROL NOTES
C3
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
E526,21 P5E9E1T,21/ 6ED,0E1T &21T52/ 12TE6�
�. T+E &21T5A&T25 6+A// )2//2: T+E *8,DE/,1E6 ,1 T+E &,T< A1D &281T< 2) .A8A,
6 �58/E6
5E/AT,1* T2 :ATE5 48A/,T<�.
2. 0EA685E6 T2 &21T52/ E526,21 A1D 2T+E5 P2//8TA1T6 6+A// %E ,1 P/A&E %E)25E A1<
EA5T+:25. ,6 ,1,T,ATED.
3. 0,1,0,=E 62,/ &20PA&T,21
A5EA6 :+E5E ),1A/ 6TA%,/,=AT,21 25 ,1),/T5AT,21 P5A&T,&E6 :,// %E ,16TA//ED 6+A// %E P52TE&TED )520 EX&E66,9E &20PA&T,21 D85,1* &216T58&T,21. 9E+,&/E A1D E48,P0E1T 86E 6+A// %E 5E6T5,&TED 25 TE&+1,48E6 T2 &21D,T,21 T+E 62,/6 T2 68PP25T 9E*ETAT,21 6+A// %E ,0P/E0E1TED ,1 T+E A5EA6 T+AT +A9E %EE1 &20PA&TED A1D A5E DE6,*1ATED T2 5E0A,1
9E*ETAT,9E 25 P26T�&216T58&T,21 ,1),/T5AT,21 A5EA6. &/EA5/< 0A5. T+E A5EA6 T2 %E
A92,DED :,T+ )/A*6 25 TE0P25A5< )E1&,1*. :+E5E TE0P25A5< )E1&,1* ,6 86ED� )E1&,1*
086T %E ADE48ATE/< 68PP25TED %< P26T6 A1D 0A,1TA,1ED ,1 A1� 8P5,*+T P26,T,21.
4. PE5,0ETE5 &21T52/6
PE5,0ETE5 &21T52/6 A5E 5E48,5ED D2:1 6/2PE 2) A// D,6T85%ED A5EA6 �2T+E5 T+A1 %2552:
A1D ),// A5EA6�. 0A,1TA,1 D2:16T5EA0 9E*ETATE %8))E5 A5EA
�. 6ED,0E1T %A55,E56 A1D )E1&E6
6ED,0E1T )E1&E6 25 %A55,E56 6+A// %E 86ED D2:16/2PE 2) A// D,6T85%ED A5EA6 �2T+E5
T+A1 %2552: A1D ),// A5EA6�. 81T,/ 6/2PE6 A5E 6TA%,/,=ED A 6ED,0E1T )E1&E 25 %A55,E56 6+A// %E ,16TA//ED AT T+E T2E 2) T+E 6/2PE A1D 21 &21T2856 AT T+E )2//2:,1* 6PA&,1*�
6/2PE ุ 2�� �0 )EET 6PA&,1*
6/2PE ุ 4�� A1D � 2 � �� )EET 6PA&,1*
6/2PE � 4�� 20 )EET 6PA&,1*
�. T5A&.,1* &21T52/ ವ 0,1,0,=E 6ED,0E1T T5A&.�28T 21T2 2))�6,TE 6T5EET6� 2T+E5 PA9ED A,5EA6� A,1D 6,DE:A/.6 )520 9E+,&/E6 EX,T,1* T+E &216T58&T,21 6,TE %< 5E6T5,&T,1* 9E+,&/E T5A)),& T2 P52PE5/< DE6,*1ATED A5EA6 A1D 86,1* ADD,T,21A/ &21T52/6 T2 5E029E 6ED,0E1T )520 9E+,&/E T,5E6
P5,25 T2 EX,T,1* T+E 6,TE.
ವ 9E+,&8/A5 PA5.,1* A1D 029E0E1T6 21 P52-E&T 6,TE6 086T %E &21),1ED T2 PA9ED 685)A&E6 25 P5EDE),1ED PA5.,1* A5EA6 A1D 9E+,&/E PAT+6� :+,&+ 6+A// %E 0A5.ED :,T+ )/A*6 25
%281DA5< )E1&,1*.
ವ A// P2//8TA1T6 A1D 0ATE5,A/6 T+AT A5E D52PPED� :A6+ED� T5A&.ED� 6P,//ED� 25 2T+E5:,6E D,6&+A5*ED )520 A P52-E&T 6,TE T2 2))�6,TE 6T5EET6� 2T+E5 PA9ED A5EA6� 6,DE:A/.6 25 T+E
064 086T %E &/EA1ED 86,1* D5< 0ET+2D6 68&+ A6 6:EEP,1* 25 9A&880,1*
ವ :A6+,1* P2//8TA1T6 A1D 0ATE5,A/6 T+AT A5E D,6&+A5*ED )520 T+E P52-E&T 6,TE T2 T+E 064 ,1T2 D5A,1 ,1/ET6 25 &AT&+ %A6,16 ,6 P52+,%,TED 81/E66 T+E 0ATE5,A/ ,6 6ED,0E1T A1D
T+E ,1/ET6 A5E D,5E&TED T2 A 6ED,0E1T %A6,1 25 6ED,0E1T T5AP.
�. %E6T 0A1A*E0E1T P5A&T,&E6 �%0P6� 6+A// 12T %E 5E029ED 81T,/ ),1A/ 6TA%,/,=AT,21 ,6
&20P/ETE )25 T+AT P+A6E.
8. 5E)E5 T2 &,T< A1D &281T< 2) .A8A, %E6T 0A1A*E0E1T P5A&T,&E6 0A18A/� &216T58&T,21�
)25 025E ,1)250AT,21 21 %0P6.
E526,21 A1D 6ED,0E1T &21T52/ P/A1 6&+ED8/E A1D 5A,1
5E6P216E P/A1�
P52-E&T 6E48E1&E�
�. ,16TA// 6TA%,/,=ED &216T58&T,21 E1T5A1&E� PE5,0ETE5 &21T52/6� ,1/ET P52TE&T,21� A1D TE0P25A5< )E1&,1* )25 P52TE&TED A5EA6� &/EA5,1* A1D *58%%,1* A6 1E&E66A5< )25 T+E
,16TA//AT,21 2) T+E6E %0P6.
2. &/EA5� *58%� A1D *5ADE T+E 6,TE� 5E)E5 T2 T+E 6,TE P/A1. 5E/2&ATE� 5E&216T58&T A1D 0A,1TA,1 %0P6 A6 1EEDED T2 .EEP T+E0 E))E&T,9E AT A// T,0E6. ,1,T,ATE TE0P25A5< 6TA%,/,=AT,21
,00ED,ATE/< 21&E *5AD,1* ,6 &20P/ETED ,1 EA&+ P+A6E.
3. P52&EED :,T+ &216T58&T,21 :,T+ /EA6T P266,%/E D,6T85%A1&E 2) 9E*ETAT,9E A5EA6 A1D
TE0P25A5< 6T58&T85E6.
4. 5E029E 25 D,60A1T/E TE0P25A5< E526,21 &21T52/ 6T58&T85E6 A)TE5 )8// E6TA%/,6+0E1T 2)
PE50A1E1T 9E*ETAT,9E &29E5.
�. P5A&T,&E *22D +286E.EEP,1* 0EA685E6 T+528*+28T T+E D85AT,21 2) &216T58&T,21
�. ,16PE&T,216 :,// %E PE5)250ED :EE./<.
5A,1 5E6P216E P/A1�
�. T+E )2//2:,1* :,// %E PE5)250ED :+E1 +EA9< 5A,16� T52P,&A/ 6T250 25 +855,&A1E ,6 ,00,1E1T
25 ,6 )25E&A6TED ,1 T+E 1EXT 48 +2856�
· TE0P25A5< 686PE16,21 2) A&T,9E *5AD,1*� *58%%,1* A1D T5E1&+,1*.
· ,16PE&T A// PE5,0ETE5 &21T52/6� A1D 0A,1TA,1 A6 1EEDED. 5E,16TA// A1< PE5,0ETE5 &21T52/6
T+AT :E5E 5E029ED D8E T2 A&T,9E :25. ,1 T+E A5EA. ,) A 6E9E5E 6T250 ,6 EXPE&TED�
· &29E5 25 5E/2&ATE 0ATE5,A/ 6T2&.P,/E6 A1D /,48,D 0ATE5,A/ &21TA,1E56 T2 A92,D &21TA&T
:,T+ 5A,1:ATE5.
· P/A&E 6P,// PA16 25 2,/�21/< 6P,// PAD6 81DE5 &216T58&T,21 9E+,&/E6 T2 P5E9E1T 5812)) )520 &21TA&T,1* A1< 6P,//ED PET52/E80 P52D8&T6. P52PE5/< D,6P26E 2) A1< A&&808/ATED
2,/< :ATE5 A)TE5 T+E 5A,1 E9E1T.
· 5E�,16PE&T A)TE5 T+E APP52A&+,1* +EA9< 5A,16� T52P,&A/ 6T250 25 +855,&A1E A1D 5EP/A&E 25
0A,1TA,1 %0P6 A6 1EEDED.
*22D +286E.EEP,1* %0Ps�
�. ,16PE&T %0P6 A1D 6,TE :EE./< 0A,1TA,1 %0P6 A1D 6,TE A6 5E48,5ED T2 E1685E &21T,18ED
PE5)250A1&E.
2. D86T &21T52/ D86T )520 T+E P52-E&T 6,TE 6+A// 12T %E T5A16P25TED 25 D,6&+A5*ED T2 2))6,TE A5EA6. :25. 6+A// %E ,1 &21)250A1&E :,T+ T+E A,5 P2//8T,21 6TA1DA5D6 &21TA,1ED ,1
T+E �+A:A,, AD0,1,6T5AT,9E 58/E6 T,T/E ��� &+APTE5 �0.� A,5 48A/,T< &21T52/.
3. 6T5EET 6:EEP,1* A1D 9A&880,1*. A// P2//8TA1T6 D,6&+A5*ED )520 &216T58&T,21 6,TE T2
2))�6,TE A5EA6 086T %E 6:EPT 25 9A&880ED EA&+ DA< %E)25E /EA9,1* T+E -2% 6,TE.
4. 0ATE5,A/6 DE/,9E5<� 6T25A*E A1D 86E 0A1A*E0E1T. P5E9E1T� 5ED8&E� 25 E/,0,1ATE T+E D,6&+A5*E 2) P2//8TA1T6 )520 0ATE5,A/ DE/,9E5<� 6T25A*E� A1D 86E T2 T+E 6T250 :ATE5 6<6TE0 25 :ATE5&2856E6 %< 0,1,0,=,1* T+E 6T25A*E 2) +A=A5D286 0ATE5,A/6 216,TE� 6T25,1* 0ATE5,A/6 ,1 A DE6,*1ATED A5EA� ,16TA//,1* 6E&21DA5< &21TA,10E1T. &216T58&T,21 0ATE5,A/6� :A6TE� T2X,& A1D +A=A5D286 68%6TA1&E6� 6T2&.P,/E6 A1D 2T+E5 6285&E6 2) P2//8T,21 6+A// 12T %E 6T25ED ,1 %8))E5 A5EA6� 1EA5 A5EA6 2) &21&E1T5ATED )/2:� 25 A5EA6 A%8TT,1* T+E 064� 5E&E,9,1* :ATE56� 25 D5A,1A*E ,0P529E0E1T6 T+AT D,6&+A5*E 2))�6,TE. P5,0A5< A1D
6E&21DA5< &21TA,10E1T &21T52/6 A1D &29E56 6+A// %E ,0P/E0E1TED T2 T+E 0EP.
�. 6P,// P5E9E1T,21 A1D &21T52/. &5EATE A1D ,0P/E0E1T 6P,// P5E9E1T,21 A1D 5E6P216E P/A16 T2 E/,0,1ATE A1D 0,1,0,=E T+E D,6&+A5*E 2) P2//8TA1T6 T2 T+E 064 A1D 5E&E,9,1* :ATE56 )520 /EA.6 A1D 6P,//6 %< 5ED8&,1* T+E &+A1&E )25 6P,//6� A%625%,1*� &21TA,1,1*� A1D &/EA1,1* 8P 6P,//6 A1D P52PE5/< D,6P26,1* 2) 6P,// 0ATE5,A/6. AT A 0,1,080� A// P52-E&T6 6+A// &/EA18P
A// /EA.6 A1D 6P,//6 ,00ED,ATE/<.
�. +A=A5D286 0ATE5,A/6. P5E9E1T 25 5ED8&E T+E D,6&+A5*E 2) P2//8TA1T6 T2 6T250 :ATE5 )520 +A=A5D286 :A6TE T+528*+ P52PE5 0ATE5,A/ 86E A1D :A6TE D,6P26A/. ,1 T+E E9E1T T+AT +A=A5D286 0ATE5,A/6 A5E D,6&+A5*ED T2 T+E 064� T+E P52PE5T< 2:1E5 25 E6&P &225D,1AT25 6+A// ,00ED,ATE/< 12T,)< T+E DEPA5T0E1T 2) )A&,/,T,E6 0A,1TE1A1&E� .A8A, ),5E DEPA5T0E1T� A1D .A8A, P2/,&E DEPA5T0E1T 2) T+E D,6&+A5*E %< TE/EP+21E. A :5,TTE1 5EP25T DE6&5,%,1* T+E P2//8TA1T6 T+AT :E5E D,6&+A5*ED� T+E 5EA6216 )25 T+E D,6&+A5*E� A1D T+E 0EA685E6 T+AT +A9E %EE1 TA.E1 25 :,// %E TA.E1 T2 P5E9E1T A 5E2&&855E1&E 2) T+E D,6&+A5*E 6+A// %E
68%0,TTED T2 T+E D,5E&T25 12 /E66 T+A1 3 DA<6 A)TE5 12T,),&AT,21 %< P+21E.
�. 121+A=A5D286 0ATE5,A/6. ,1 T+E E9E1T T+AT 121+A=A5D286 0ATE5,A/6 A5E D,6&+A5*ED T2 T+E
064� T+E P52PE5T< 2:1E5 25 E6&P &225D,1AT25 6+A// 12T,)< T+E &,T< DEPA5T0E1T 2)
)A&,/,T,E6 0A,1TE1A1&E %< TE/EP+21E 12 /ATE5 T+A1 T+E 1EXT %86,1E66 DA<. A :5,TTE1 5EP25T DE6&5,%,1* T+E P2//8TA1T6 T+AT :E5E D,6&+A5*ED� T+E 5EA6216 )25 T+E D,6&+A5*E� A1D T+E
0EA685E6 T+AT +A9E %EE1 TA.E1 25 :,// %E TA.E1 T2 P5E9E1T A 5E2&&855E1&E 2) T+E
D,6&+A5*E 6+A// %E 68%0,TTED T2 T+E D,5E&T25 12 /E66 T+A1 3 DA<6 A)TE5 12T,),&AT,21 %< P+21E.
8. 9E+,&/E A1D E48,P0E1T &/EA1,1*. E/,0,1ATE A1D 0,1,0,=E T+E D,6&+A5*E 2) P2//8TA1T6 T2
6T250 :ATE5 )520 9E+,&/E A1D E48,P0E1T &/EA1,1* 2PE5AT,216 %< 86,1* 2))�6,TE )A&,/,T,E6 :+E1 )EA6,%/E� :A6+,1* ,1 DE6,*1ATED� &21TA,1ED A5EA6 21/<� A1D E/,0,1AT,1* D,6&+A5*E6 T2 T+E 6T250 D5A,1 6<6TE0 %< E9AP25AT,1* A1D/25 T5EAT,1* :A6+ :ATE5� A6 APP52P5,ATE 25
,1),/T5AT,1* :A6+ :ATE5 )25 EXTE5,25 &/EA1,1* A&T,9,T,E6 T+AT 86E :ATE5 21/<.
�. 9E+,&/E A1D E48,P0E1T )8E/,1*. P5E9E1T )8E/ 6P,//6 A1D /EA.6 %< 86,1* 2))�6,TE )A&,/,T,E6� )8E/,1* 21/< ,1 DE6,*1ATED A5EA6� E1&/26,1* 25 &29E5,1* 6T25ED )8E/� A1D ,0P/E0E1T,1* 6P,// &21T52/6 68&+ A6 6E&21DA5< &21TA,10E1T A1D A&T,9E 0EA685E6 86,1* 6P,// 5E6P216E .,T6.
�0. 9E+,&/E A1D E48,P0E1T 0A,1TE1A1&E. E/,0,1ATE A1D 0,1,0,=E T+E D,6&+A5*E 2) P2//8TA1T6 T2
6T250 :ATE5 )520 9E+,&/E A1D E48,P0E1T 0A,1TE1A1&E 2PE5AT,216 %< 86,1* 2))�6,TE
)A&,/,T,E6 :+E1 )EA6,%/E� PE5)250,1* :25. ,1 DE6,*1ATED A5EA6 21/<� 86,1* 6P,// PAD6 81DE5 9E+,&/E6 A1D E48,P0E1T� &+E&.,1* )25 /EA.6 A1D 6P,//6� A1D &21TA,1,1* A1D &/EA1,1* 8P
6P,//6 ,00ED,ATE/<.
��. 62/,D :A6TE 0A1A*E0E1T. P5E9E1T 25 5ED8&E D,6&+A5*E 2) P2//8TA1T6 T2 T+E /A1D� *5281D:ATE5� A1D ,1 6T250 :ATE5 )520 62/,D :A6TE 25 &216T58&T,21 A1D DE02/,T,21 :A6TE %< P529,D,1* DE6,*1ATED :A6TE &2//E&T,21 A5EA6� &2//E&T 6,TE T5A6+ DA,/<� A1D E1685,1* T+AT &216T58&T,21 :A6TE ,6 &2//E&TED� 5E029ED� A1D D,6P26ED 2) 21/< AT A8T+25,=ED
D,6P26A/ A5EA6.
�2. 6A1,TA5</6EPT,& :A6TE 0A1A*E0E1T. TE0P25A5< A1D P25TA%/E 6A1,TA5< A1D 6EPT,& :A6TE 6<6TE06 6+A// %E 0281TED 25 6TA.ED ,1� :E//�0A,1TA,1ED A1D 6&+ED8/ED )25 5E*8/A5 :A6TE D,6P26A/ A1D 6E59,&,1*. 6285&E6 2) 6A1,TA5< A1D/D5 6EPT,& :A6TE 6+A// 12T %E 6T25ED 1EA5
T+E 064 25 5E&E,9,1* :ATE56.
�3. 6T2&.P,/E 0A1A*E0E1T. 6T2&.P,/E6 6+A// 12T %E /2&ATED ,1 D5A,1A*E :A<6� :,T+,1 �0 )EET )520 A5EA6 2) &21&E1T5ATED )/2:6� A1D A5E 12T A//2:ED ,1 T+E &,T< 5,*+T�2)�:A<. 6ED,0E1T %A55,E56 25 6,/T )E1&E6 6+A// %E 86ED A5281D T+E %A6E 2) A// 6T2&.P,/E6. 6T2&.P,/E6 6+A// 12T EX&EED �� )EET ,1 +E,*+T. 6T2&.P,/E6 086T %E &29E5ED :,T+ P/A6T,& 6+EET,1* D5 A
&20PA5A%/E 0ATE5,A/ ,) T+E< :,// 12T %E A&T,9E/< 86ED :,T+,1 � DA<6.
�4. /,48,D :A6TE 0A1A*E0E1T. /,48,D :A6TE 6+A// %E &21TA,1ED ,1 A &21T52//ED A5EA 68&+ A6 A +2/D,1* P,T� 6ED,0E1T %A6,1� 52//�2)) %,1� 25 P25TA%/E TA1. 2) 68)),&,E1T 92/80E A1D T2 &21TA,1 T+E /,48,D :A6TE6 *E1E5ATED. &21TA,10E1T A5EA6 D5 DE9,&E6 086T %E ,0PE50EA%/E A1D /EA. )5EE A1D 6+28/D 12T %E /2&ATED :+E5E A&&,DE1TA/ 5E/EA6E 2) T+E &21TA,1ED /,48,D
&A1 D,6&+A5*E T2 :ATE5 %2D,E6� &+A11E/6� 25 6T250 D5A,16.
��. &21&5ETE :A6TE 0A1A*E0E1T. P5E9E1T 25 5ED8&E T+E D,6&+A5*E 2) P2//8TA1T6 T2 6T250 :ATE5 )520 &21&5ETE :A6TE %< &21D8&T,1* :A6+28T 2))6,TE 25 PE5)250,1* 216,TE :A6+28T ,1 A DE6,*1ATED A5EA &216T58&TED A1D 0A,1TA,1ED ,1 68)),&,E1T 48A1T,T< A1D 6,=E T2 &21TA,1 A// /,48,D A1D &21&5ETE :A6TE *E1E5ATED %< :A6+28T 2PE5AT,216. P/A6T,& /,1,1* 0ATE5,A/ 6+28/D %E A 0,1,080 2) �0 0,//,0ETE5 P2/<ET+</E1E 6+EET,1* A1D 6+28/D %E )5EE 2) +2/E6� TEA56� 25 2T+E5 DE)E&T6 T+AT &20P520,6E T+E ,0PE50EA%,/,T< 2) T+E 0ATE5,A/. &21TA,10E1T A5EA6 25 DE9,&E6 6+28/D 12T %E /2&ATED :+E5E A&&,DE1TA/ 5E/EA6E 2) T+E &21TA,1ED /,48,D &A1 D,6&+A5*E T2 :ATE5 %2D,E6� &+A11E/6� 25 6T250 D5A,16. :A6+28T )A&,/,T,E6 086T %E &/EA1ED� 25 1E: )A&,/,T,E6 086T %E &216T58&TED A1D 5EAD< )25 86E 21&E T+E :A6+28T ,6 �� PE5&E1T )8//. 21&E &21&5ETE :A6TE6 A5E :A6+ED ,1T2 T+E DE6,*1ATED A5EA A1D A//2:ED T2 +A5DE1� T+E &21&5ETE 6+28/D %E %52.E1 8P� 5E029ED� A1D D,6P26ED 2) A6 62/,D :A6TE6.
��. &21TA0,1ATED 62,/ 0A1A*E0E1T. AT 0,1,080 &21TA,1 &21TA0,1ATED 0ATE5,A/ 62,/ %< 6855281D,1* :,T+ ,0PE50EA%/E /,1ED %E506 25 &29E5 EXP26ED &21TA0,1ATED 0ATE5,A/ :,T+ P/A6T,& 6+EET,1*. &21TA0,1ATED 62,/ 6+28/D %E D,6P26ED 2) P52PE5/< ,1 A&&25DA1&E :,T+ A//
APP/,&A%/E 5E*8/AT,216.
CHECKED:
DRAWN:
DESIGNED:
SCALE: AS NOTED
DATE: 2026-05-06
SUBMITTED:
DRAWING NO.
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
STATE OF HAWAII
RAW/TMC/AJW
KIKIAOLA SMALL BOAT HARBOR
SAND BYPASSING
KEKAHA, KAUAI HAWAII
JOB NO. B95CK77A SHEET NO. SHEETSOF 18
ANSI D 34.00" x 22.00"
TMC
RAW
LICENSED
PROFESSIONAL
ENGINEER
No. 14549-C
RO
BER
T A. WALKER
HAWA II, U.S
.A
This work was prepared by me or under my supervision
EXP. DATE
4/30/2028
GRADING NOTES
C4
FOR BIDDING PURPOSES
NOT FOR CONSTRUCTION
*5AD,1* 12TE6�
�. A// *5AD,1* :25. 6+A// %E D21E ,1 A&&25DA1&E :,T+ &+APTE5 �4� A5T,&/E6 �3� �4�
�� A1D ��� A6 5E/ATED T2 *5AD,1*� 62,/ E526,21 A1D 6ED,0E1T &21T52/ 2) T+E
5E9,6ED 25D,1A1&E6 2) .A8A,� ���0� A6 A0E1DED� A1D 62,/6 5EP25T %< 6+25E/,1E
6&,E1&E E1*,1EE5,1* DATED 0A< 20��.
2. 12 &21T5A&T25 6+A// PE5)250 A1< *5AD,1* 2PE5AT,21 62 A6 T2 &A86E )A//,1*
52&.6� 62,/ 25 DE%5,6 ,1 A1< )250 T2 )A//� 6/,DE 25 )/2: 21T2 AD-2,1,1*
P52PE5T,E6� 6T5EET6 25 1AT85A/ :ATE5&2856E6. 6+28/D 68&+ 9,2/AT,216 2&&85� T+E
&21T5A&T25 0A< %E &,TED A1D T+E &21T5A&T25 6+A// ,00ED,ATE/< 0A.E A// 5E0ED,A/
A&T,216 1E&E66A5<.
3. T+E &21T5A&T25� AT +,6 2:1 EXPE16E� 6+A// .EEP T+E P52-E&T A5EA A1D
6855281D,1* A5EA )5EE )520 D86T 18,6A1&E. T+E :25. 6+A// %E ,1 &21)250A1&E
:,T+ T+E A,5 P2//8T,21 &21T52/ 6TA1DA5D6 &21TA,1ED ,1 T+E +A:A,, AD0,1,6T5AT,9E
58/E6� T,T/E ��� &+APTE5 �0.�� ಯA,5 P2//8T,21 &21T52ಯ.
4. :,T+ EX&EPT,21 2) ,55,*AT,21 /,1E6� T+E 81DE5*5281D P,PE6� &A%/E6 25 D8&T/,1E6 .12:1 T2 EX,6T %< T+E E1*,1EE5 )520 T+,6 6EA5&+ 2) 5E&25D6 A5E ,1D,&ATED 21 T+E P/A16. T+E &21T5A&T25 6+A// 9E5,)< T+E /2&AT,216 A1D DEPT+6 2) T+E )A&,/,T,E6 A1D EXE5&,6E P52PE5 &A5E ,1 EX&A9AT,1* ,1 T+E A5EA. :+E5E9E5 &211E&T,216 2) 1E: 8T,/,T,E6 A5E 6+2:1 21 T+E P/A16� T+E &21T5A&T25 6+A// EXP26E T+E EX,6T,1* /,1E6 AT T+E P52P26ED &211E&T,216 T2 9E5,)< T+E,5 /2&AT,216 A1D DEPT+6
P5,25 T2 EX&A9AT,21 )25 T+E 1E: /,1E6.
�. ADE48ATE P529,6,216 6+A// %E 0ADE T2 P5E9E1T 685)A&E :ATE56 )520 DA0A*,1* T+E
&8T )A&E 2) A1 EX&A9AT,21 25 T+E 6/2PED 685)A&E6 2) A ),//. )85T+E5025E�
ADE48ATE P529,6,216 6+A// %E 0ADE T2 P5E9E1T 6ED,0E1T�/ADE1 5812)) )520
/EA9,1* T+E 6,TE.
�. 12 *5AD,1* :25. 6+A// %E D21E 21 6AT85DA<6� 681DA<6 A1D +2/,DA<6 AT A1< T,0E
:,T+28T P5,25 12T,&E T2 T+E D,5E&T25� D.P.P.� P529,DED 68&+ *5AD,1* :25. ,6 A/62
,1 &21)250A1&E :,T+ T+E &20081,T< 12,6E &21T52/ 6TA1DA5D6 &21TA,1ED ,1 T+E
+A:A,, AD0,1,6T5AT,9E 58/E6� T,T/E ��� &+APTE5 4�� ಯ&20081,T< 12,6E &21T52/�.
�. T+E *E1E5A/ &21T5A&T25/DE9E/2PE5/2:1E5 2) T+E P52-E&T 6+A// %E 5E6P216,%/E
)25 A// *5AD,1* 2PE5AT,216 T2 %E PE5)250ED ,1 &21)250A1&E :,T+ APP/,&A%/E
P529,6,216 2) T+E +A:A,, AD0,1,6T5AT,9E 58/E6� T,T/E ��� &+APTE5 �4� �:ATE5 48A/,T<
6TA1DA5D6�� A1D T,T/E ��� &+APTE5 ��� �:ATE5 P2//8T,21 &21T52/�� A6 :E// A6
&+APTE5 �4 2) T+E 5E9,6ED 25D,1A1&E6 2) .A8A,� A6 A0E1DED. %E6T 0A1A*E0E1T
P5A&T,&E6 6+A// %E E0P/2<ED AT A// T,0E6 D85,1* &216T58&T,21.
8. ,1 A&&25DA1&E :,T+ 6TATE /A:� A// D,6&+A5*E6 5E/ATED T2 P52-E&T &216T58&T,21 25 2PE5AT,216 A5E 5E48,5ED T2 &20P/< :,T+ 6TATE :ATE5 48A/,T< 6TA1DA5D6 �+A:A,, AD0,1,6T5AT,9E 58/E6� &+APTE5 ����4�. %E6T 0A1A*E0E1T P5A&T,&E6 6+A// %E 86ED T2 0,1,0,=E 25 P5E9E1T T+E D,6&+A5*E
2) 6ED,0E1T� DE%5,6� A1D 2T+E5 P2//8TA1T6 T2 6TATE :ATE56. PE50,T &29E5A*E ,6 A9A,/A%/E )520 T+E DEPA5T0E1T 2) +EA/T+� &/EA1 :ATE5 %5A1&+ AT +TTP�//+EA/T+.+A:A,,.*29/&:%. T+E 2:1E5/DE9E/2PE5/&21T5A&T25 ,6 5E6P216,%/E )25 2%TA,1,1* 2T+E5 )EDE5A/� 6TATE� 25 /2&A/
A8T+25,=AT,216 A6 5E48,5ED %< /A:.
�. :+E5E APP/,&A%/E A1D )EA6,%/E T+E 0EA685E6 T2 &21T52/ E526,21 A1D 2T+E5
P2//8TA1T6 6+A// %E ,1 P/A&E %E)25E A1< EA5T+ 029,1* P+A6E 2) T+E *5AD,1* ,6
,1,T,ATED.
�0. TE0P25A5< E526,21 &21T52/6 6+A// 12T %E 5E029ED %E)25E PE50A1E1T E526,21
&21T52/6 A5E ,1�P/A&E A1D E6TA%/,6+ED.
��. ,) T+E *5AD,1* :25. ,192/9E6 &21TA0,1ATED 62,/� T+E1 A// *5AD,1* :25. 6+A// %E
D21E ,1 &21)250A1&E :,T+ APP/,&A%/E 6TATE A1D )EDE5A/ 5E48,5E0E1T6.
�2. P8568A1T T2 &+APTE5 �E� +56� ,1 T+E E9E1T A1< A5T,)A&T6 25 +80A1 5E0A,16 A5E
81&29E5ED D85,1* &216T58&T,21 2PE5AT,216� T+E &21T5A&T25 6+A// ,00ED,ATE/<
686PE1D :25. A1D 12T,)< T+E .A8A, P2/,&E DEPA5T0E1T� T+E 6TATE DEPA5T0E1T
2) /A1D A1D 1AT85A/ 5E6285&E6�+,6T25,& P5E6E59AT,21 D,9,6,21 ���2�80���. ,1 ADD,T,21� )25 121�&,T< P52-E&T6� T+E &21T5A&T25 6+A// ,1)250 T+E &,9,/ E1*,1EE5,1* %5A1&+� D.P.P. ���8�8084�� A1D )25 &,T< P52-E&T6� 12T,)< T+E 5E6P216,%/E &,T< A*E1&<.
�3. A// *5AD,1* A1D &216T58&T,21 :25. 6+A// ,0P/E0E1T 0EA685E6 T2 E1685E T+AT T+E D,6&+A5*E 2) P2//8TA1T6 )520 T+E &216T58&T,21 6,TE :,// %E 5ED8&ED T2 T+E 0AX,080 EXTE1T P5A&T,&A%/E A1D
:,// 12T &A86E 25 &21T5,%8TE T2 A1 EX&EEDA1&E 2) :ATE5 48A/,T< 6TA1DA5D6.
�4. 121�&20P/,A1&E T2 A1< 2) T+E A%29E 5E48,5E0E1T6 6+A// 0EA1 ,00ED,ATE 686PE16,21 2) A// :25.� A1D 5E0ED,A/ :25. 6+A// &200E1&E ,00ED,ATE/<. A// &26T6 ,1&855ED 6+A// %E %,//ED T2 T+E 9,2/AT25. )85T+E5025E� 9,2/AT256 6+A// %E 68%-E&TED T2 AD0,1,6T5AT,9E� &,9,/ A1D/25 &5,0,1A/
PE1A/T,E6.
��. )25 %E1&+ 0A5.� 6EE 6+EET &�.