Pitt Chiller Plant - Drawings - Part VI Electrical.pdf
PDF 28 MB Posted
- Attached to
- Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
- Solicitation number
- 36C24426R0062
About this file
This file contains electrical construction drawings for Part VI of the UD Chiller Capacity Upgrade project at the University of Pittsburgh's University Drive Campus in Pittsburgh, Pennsylvania. The drawings, issued on May 11, 2022, were prepared by the Office of Construction and Facilities Management with project number 646-20-109 and include detailed plans for electrical demolition, lighting, power distribution, conduit routing, and systems across multiple building levels.
The drawing set encompasses electrical demolition plans for the first level, second level, and roof; electrical lighting plans for the first and second levels; electrical power plans for the first and second levels; an electrical conduit plan for the second level; an electrical plan for the roof; and electrical systems plans for the first and second levels. Each drawing is oriented to plan north and actual north, includes standard architectural scales (ranging from 1/8 inch to 3 inches per foot), and is designated with grid references (columns 1-10, rows A-F). These technical drawings serve as construction documents specifying the locations, routing, and installation requirements for all electrical work required as part of the chiller capacity upgrade project at the Pittsburgh Veterans Affairs Medical Center.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Projo ect Number
Building Number
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAV NIA
646-20-109
Projo ect Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAV NIA
646-20-109
Projo ect Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAV NIA
646-20-109
Projo ect Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAV NIA
646-20-109
Projo ect Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
PLAN
NORTH
ACTUAL
NORTH
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
DEMOLITION PLAN - FIRST LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
DEMOLITION PLAN - SECOND LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
DEMOLITION PLAN - ROOF
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
LIGHTING PLAN - FIRST LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
LIGHTING PLAN - SECOND LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
POWER PLAN - FIRST LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
POWER PLAN - SECOND LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
CONDUIT PLAN - SECOND LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
PLAN - ROOF
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
SYSTEMS PLAN - FIRST LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
ELECTRICAL
SYSTEMS PLAN - SECOND LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAVV NIA
646-20-109
Projo ect Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAV NIA
646-20-109
Projo ect Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAV NIA
646-20-109
Projo ect Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAVV NIA
646-20-109
Projo ect Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAV NIA
646-20-109
Projo ect Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Projo ect Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Offff ice of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVAV NIA
646-20-109
Projo ect Director