This document set comprises structural engineering construction drawings for a U.S. Department of Veterans Affairs facility project, prepared by Miller Remick LLC, a professional engineering firm based in Cherry Hill, New Jersey. The drawings are stamped as controlled documents not to be used without the engineer's seal and signature.

The structural drawings include comprehensive demolition plans for first, second, and roof levels showing selective removal of existing concrete slabs, masonry walls, steel framing, and other building elements. Foundation plans detail column locations and footing types, including concrete pad footings and spread footings at varying elevations. Framing plans for first and second levels specify new concrete slab construction on grade with concrete composite metal deck systems, while roof-level framing includes new steel grating platforms and cooling tower support structures. Additional drawings provide structural details for concrete and steel construction, including typical footing details, column base details, beam-to-beam connections, moment connections at columns, wall reinforcement patterns, equipment pad construction, and site-specific details for exterior equipment foundations and anchor installations. The drawings reference schedules for footing types, beam reactions, and connection specifications. All structural work incorporates standard industry practices with specifications for materials such as galvanized steel components, reinforced concrete construction, and specific bolt and weld requirements noted throughout the detail sheets.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

DEMOLITION PLAN

FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

DEMOLITION PLAN

SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

DEMOLITION PLAN

ROOF LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FOUNDATION PLAN

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

ROOF LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

ROOF DUNNAGE

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

STRUCTURAL

FRAMING PLAN

TOP OF COOLING TOWER PLATFORM

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

STRUCTURAL

BRACE FRAME ELEVATIONS

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

File details come from the government source that posted it. Updated .