Pitt Chiller Plant - Drawings - Part II Structural.pdf
PDF 2 MB Posted
- Attached to
- Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
- Solicitation number
- 36C24426R0062
About this file
This document set comprises structural engineering construction drawings for a U.S. Department of Veterans Affairs facility project, prepared by Miller Remick LLC, a professional engineering firm based in Cherry Hill, New Jersey. The drawings are stamped as controlled documents not to be used without the engineer's seal and signature.
The structural drawings include comprehensive demolition plans for first, second, and roof levels showing selective removal of existing concrete slabs, masonry walls, steel framing, and other building elements. Foundation plans detail column locations and footing types, including concrete pad footings and spread footings at varying elevations. Framing plans for first and second levels specify new concrete slab construction on grade with concrete composite metal deck systems, while roof-level framing includes new steel grating platforms and cooling tower support structures. Additional drawings provide structural details for concrete and steel construction, including typical footing details, column base details, beam-to-beam connections, moment connections at columns, wall reinforcement patterns, equipment pad construction, and site-specific details for exterior equipment foundations and anchor installations. The drawings reference schedules for footing types, beam reactions, and connection specifications. All structural work incorporates standard industry practices with specifications for materials such as galvanized steel components, reinforced concrete construction, and specific bolt and weld requirements noted throughout the detail sheets.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
DEMOLITION PLAN
FIRST LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
DEMOLITION PLAN
SECOND LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
DEMOLITION PLAN
ROOF LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FOUNDATION PLAN
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
FIRST LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
SECOND LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
ROOF LEVEL
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
ROOF DUNNAGE
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
PLAN
NORTH
ACTUAL
NORTH
STRUCTURAL
FRAMING PLAN
TOP OF COOLING TOWER PLATFORM
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
6" 6"
6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
STRUCTURAL
BRACE FRAME ELEVATIONS
UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D