Pitt Chiller Plant - Drawings - Part IV Plumbing.pdf
PDF 1 MB Posted
- Attached to
- Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
- Solicitation number
- 36C24426R0062
About this file
This document consists of engineering plumbing design plans and specifications prepared for the U.S. Department of Veterans Affairs by Miller Remick LLC, a professional engineering firm located in Cherry Hill, New Jersey. The drawings detail mechanical, electrical, plumbing, and structural engineering for a facility upgrade project.
The plans include plumbing abbreviations, notes, and symbols on the title sheet; first-level plumbing layouts showing fixture locations, water distribution lines, and drainage systems; second-level plumbing plans depicting chiller plants, mechanical systems, and extended distribution networks; and detailed technical specifications for trapeze pipe supports, floor drains, pipe hangers, emergency shower installations, and sub-meter connections. The Office of Construction and Facilities Management for the Department of Veterans Affairs is identified as the approving authority. LaBella Associates PC of Rochester, New York served as the project design consultant in conjunction with Miller Remick LLC. The drawings are marked as not for reproduction without the professional engineer's seal and signature, and include standard notations requiring compliance with all applicable codes and the inclusion of architectural information from the original drawings. These are construction bid documents intended to support facility contracting and renovation work.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
PLAN
NORTH
ACTUAL
NORTH
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
PLAN
NORTH
ACTUAL
NORTH
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
File details come from the government source that posted it. Updated .