Pitt Chiller Plant - Drawings - Part III AE.pdf

PDF 2 MB Posted

Attached to
Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
Solicitation number
36C24426R0062
Issued by

About this file

This is a set of architectural construction drawings for a chiller replacement project at the VA Pittsburgh Healthcare System facility. The drawings document a comprehensive renovation involving the removal of existing building elements and installation of new mechanical, structural, and architectural systems across multiple levels of the building.

The project includes demolition work on the first and second floors and roof level, with detailed removal specifications for concrete walls, structural steel, mechanical equipment, ductwork, piping, roofing systems, and interior partitions. Construction work encompasses new concrete slabs on metal decks, structural steel installation, new mechanical equipment pads, coil door installations with sealed thresholds, louver openings, and roof system modifications. The drawings specify finish details including sealed concrete, paint specifications (Sherwin-Williams), new floor finishes, wall treatments, and building envelope improvements with insulation and weatherproofing. The project involves coordination with multiple trades (structural, mechanical, plumbing, HVAC, and electrical), with cross-references to separate structural, mechanical, electrical, and plumbing drawing sets. General notes emphasize contractor responsibility for field verification of existing conditions, dust and debris control, water-tight building maintenance during construction, compliance with all applicable codes, and coordination with existing site utilities. The work is designated for the U.S. Department of Veterans Affairs Office of Construction and Facilities Management, prepared by LaBella Associates Consulting Engineers and Architects (SDVOSB-certified), with the project identified as MR Project 12, LO Chiller Capacity and Control System Upgrade.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM STAFF0507

CONSTRUCTION BID

DOCUMENTS

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JD, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM WM

2 1 /4"

3'

- 7

1/ 2"

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM JH, WM

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM WM

File details come from the government source that posted it. Updated .