6-APIS_198204_VC_NPS_SUSTAINABILITY_CHECKLIST.pdf
PDF 200 KB Posted
- Attached to
- Replace Visitor Center to Correct Serious Safety Deficiencies to Enhance Visitor Experience
- Solicitation number
- P17PS01828
About this file
Sustainability Checklist
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fund Source: Gross Project Construction Cost:
Predesign Begin Date:
FY of Const. Funding
Park:
State: Region:
Type of Building
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
SS Prereq 1 Construction Activity Pollution
Prevention Y N/A
SWPPP to be specified along with an erosion control drawing showing BMP strategies to control sediment.
Y N/A
SWPPP to be specified along with an erosion control drawing showing BMP strategies to control sediment.
Y N/A
SWPPP to be specified along with an erosion control drawing showing BMP strategies to control sediment.
Y N/A
SWPPP to be specified along with an erosion control drawing showing BMP strategies to control sediment.
SS Credit 1 Site Selection NA 0 Public Parkland NA 0 Public Parkland NA 0 Public Parkland NA 0 Public Parkland
SS Credit 2 Development Density &
Community Connectivity N 0 Site Remoteness Factor N 0 Site Remoteness Factor N 0 Site Remoteness Factor N 0 Site Remoteness Factor
SS Credit 3 Brownfield Redevelopment Y 1
Soil contaminated previously developed site. Remediation is part of the Project.
Y 1
Soil contaminated previously developed site. Remediation is part of the Project.
Y 1
Soil contaminated previously developed site. Remediation is part of the Project.
Y 1
Soil contaminated previously developed site. Remediation is part of the Project.
SS Credit 4.1 Alternative Transportation, Public Transportation Access N 0
No public buses stop at Little
Sand Bay.
N 0
No public buses stop at Little
Sand Bay.
N 0
No public buses stop at Little
Sand Bay.
N 0
No public buses stop at Little
Sand Bay.
Project Type New Building
Description:
Park/PMIS: APIS/ 198204
Gold (60 to 79)
This project would remove and replace the Little Sand Bay Visitor Center. This structure was inspected in 2012 by National Park Service Public Health Service Consultant and Bayfield
County Health Department and found to be uninhabitable in its then current state. It was contaminated by mold and rodent urine/feces and soil below the facility is contaminated with fuel. Because of these safety concerns, the Visitor Center was temporarily closed, impacting
60% of the park’s visitors. 2015
0%
57 Missed Prereq.
Gross Non Building (i.e. Site) Cost:
86% 3%
If Renovation, Exist. Bldg. CRV
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development
$1,160,239
SFS Architecture APIS
$596,630
Missed Prereq.
Silver (50 to 59)
Gross Building Construction Cost:
58 61 61
LEED Certification Level Not Certified/Missing Prereq. Silver (50 to 59) Gold (60 to 79)
Construction
86%% Federal Regulations Achieved
Sustainable Sites (SS) Maximum LEED NC 2009 Credits: 26
Construction Documents
89%
Architect/Engineer Firm:
MidwestDate: July 17, 2017 WI
New
NPS Project Sustainability Checklist
Building and Non-Building Projects (For New Construction or Renovation) LEED 2009 Edition
Project Title: Replace the LSB Visitor Center Line Item $1,756,869
Not Certified/Missing Prereq.
Total LEED-NC Credits
1,650Building Size (Square Feet)
89%
Form E 62 (8/2/13) 1
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
SS Credit 4.2
Alternative Transportation, Bicycle Storage & Changing
Rooms
N 0
No public shower facilities within limits and not reasonable to assume significant bike use due to remote nature of park
N 0
No public shower facilities within limits and not reasonable to assume significant bike use due to remote nature of park
N 0
No public shower facilities within limits and not reasonable to assume significant bike use due to remote nature of park
N 0
No public shower facilities within limits and not reasonable to assume significant bike use due to remote nature of park
SS Credit 4.3
Alternative Transportation, Low-Emitting & Fuel-Efficient
Vehicles
Y 3
Will provide 5% of parking for low-emitting/ fuel efficient vehicles.
Y 3
Will provide 5% of parking for low-emitting/ fuel efficient vehicles.
Y 3
Will provide 5% of parking for low-emitting/ fuel efficient vehicles.
Y 3
Will provide 5% of parking for low-emitting/ fuel efficient vehicles.
SS Credit 4.4 Alternative Transportation, Parking Capacity Y 2
Option 3: provide no new parking. The project will not increase the number of parking spaces over that which already exists.
Y 2
Option 3: provide no new parking. The project will not increase the number of parking spaces over that which already exists.
Y 2
Option 3: provide no new parking. The project will not increase the number of parking spaces over that which already exists.
Y 2
Option 3: provide no new parking. The project will not increase the number of parking spaces over that which already exists.
SS Credit 5.1 Site Development, Protect or
Restore Habitat N 0
Not reasonable to pursue due to the extensive nature of remediation on the site.
N 0
Not reasonable to pursue due to the extensive nature of remediation on the site.
N 0
Not reasonable to pursue due to the extensive nature of remediation on the site.
N 0
Not reasonable to pursue due to the extensive nature of remediation on the site.
SS Credit 5.2 Site Development, Maximize
Open Space Y 1
Case 2: Provide open space equal or greater than building footprint.
Y 1
Case 2: Provide open space equal or greater than building footprint.
Y 1
Case 2: Provide open space equal or greater than building footprint.
Y 1
Case 2: Provide open space equal or greater than building footprint.
SS Credit 6.1 Stormwater Design, Quantity
Control (See EISA Section 438) N 0
Not reasonable to pursue due to the Site Program.
N 0
Not reasonable to pursue due to the Site Program.
N 0
Not reasonable to pursue due to the Site Program.
N 0
Not reasonable to pursue due to the Site Program.
SS Credit 6.2 Stormwater Design, Quality Control
(See EISA Section 438) N 0
Not reasonable to pursue due to the Site Program.
N 0
Not reasonable to pursue due to the Site Program.
N 0
Not reasonable to pursue due to the Site Program.
N 0
Not reasonable to pursue due to the Site Program.
EISA 2007,
Section 438 Protect Hydrology Y N/A
To the extent possible, the pre
Visitor Center hydrology will be maintained including temperature, rate, volume and duration.
To the extent possible, the pre
Visitor Center hydrology will be maintained including temperature, rate, volume and duration.
Y N/A
To the extent possible, the pre
Visitor Center hydrology will be maintained including temperature, rate, volume and duration.
Y N/A
To the extent possible, the pre
Visitor Center hydrology will be maintained including temperature, rate, volume and duration.
SS Credit 7.1 Heat Island Effect, Non-Roof Y 1
Utilize open grid paver systems and hardscape materials with an SRI of at least 29.
Y 1
Utilize open grid paver systems and hardscape materials with an SRI of at least 29.
Y 1
Utilize open grid paver systems and hardscape materials with an SRI of at least 29.
Y 1 Utilize hardscape materials with an SRI of at least 29.
SS Credit 7.2 Heat Island Effect, Roof Y 1
Utilize roofing materials with
SRI values below the listed criteria.
Y 1
Utilize roofing materials with
SRI values below the listed criteria.
Y 1
Utilize roofing materials with
SRI values below the listed criteria.
Y 1
Utilize roofing materials with
SRI values below the listed criteria.
SS Credit 8 Light Pollution Reduction Y 1 Use occupancy sensors on all light fixtures.
Y 1
Use occupancy sensors on all light fixtures.
Y 1
Use occupancy sensors on all light fixtures.
Y 1
Use occupancy sensors on all light fixtures.
2006 NPS Mgmt
Policies (Para.
4.9)
Soundscape Preservation Y N/A
No exterior noise producing equipment louder than ambient noise levels or screened.
Y N/A
No exterior noise producing equipment louder than ambient noise levels or screened.
Y N/A
No exterior noise producing equipment louder than ambient noise levels or screened.
Y N/A
No exterior noise producing equipment louder than ambient noise levels or screened.
2006 NPS Mgmt
Policies (Para.
4.10)
Dark Sky Preservation Y N/A
All outdoor fixtures to be lowest light level possible for needs. All to be full cut-off luminaires.
Y N/A
All outdoor fixtures to be lowest light level possible for needs. All to be full cut-off luminaires.
Y N/A
All outdoor fixtures to be lowest light level possible for needs. All to be full cut-off luminaires.
Y N/A
All outdoor fixtures to be lowest light level possible for needs. All to be full cut-off luminaires.
Form E 62 (8/2/13) 2 credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
Missed
Prereq.
10 10 10 10
Missed
Prereq.
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
WE Prereq 1
Water Use Reduction, 20%
Reduction (see Guiding Principle III -
Protect and Conserve Water)
Y N/A
1.28 GPF toilet, low water lavs
in building.
Y N/A
1.28 GPF toilet, low water lavs
in building.
Y N/A
1.28 GPF toilet, low water lavs
in building.
Y N/A
1.28 GPF toilet, low water lavs
in building.
WE Credit 1
Water Efficient Landscaping, Reduce by 50% (see Guiding
Principle III - Protect and Conserve
Water)
Y 2 Use water-efficient vegetation.
No permanent irrigation.
Y 2Use water-efficient vegetation. No permanent irrigation.Y 2Use water-efficient vegetation. No permanent irrigationY 2Use water-efficient vegetation. No permanent irrigation
WE Credit 1
(cont'd)
Water Efficient Landscaping, No Potable Use or No
Irrigation
Y 2 No permanent irrigation. Y 2 No permanent irrigation. Y 2 No permanent irrigation. N 0
WE Credit 2 Innovative Wastewater
Technologies Y 2
1.28 GPF toilet., no water
toilets.
N 2
1.28 GPF toilet., no water
toilets. Requires 50% reduction in waste water
N 2
1.28 GPF toilet., no water
toilets. Requires 50% reduction in waste water
N 2
1.28 GPF toilet., no water
toilets. Requires 50% reduction in waste water
NPS Policy Water Metering Y N/A
Water meter to be provided and assumed inside the building due to extreme weather conditions
Y N/A
Water meter to be provided and assumed inside the building due to extreme weather conditions
Y N/A
Water meter to be provided and assumed inside the building due to extreme weather conditions
Y N/A
Water meter to be provided and assumed inside the building due to extreme weather conditions
EPACT 2005,
Section 109
Water Used for Energy
Conservation Y N/A Y N/A Y N/A Y N/A
WE Credit 3 Water Use Reduction (30%, 35%, 40%) N 0
Not enough water usage in the building to justify pursuit.
N 0
Not enough water usage in the building to justify pursuit.
N 0
Not enough water usage in the building to justify pursuit.
N 0
Not enough water usage in the building to justify pursuit.
Missed
Prereq.
6 6 6 4
Missed
Prereq.
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
EA Prereq 1
Fundamental Commissioning of the
Building Energy Systems * (see
Guiding Principle I - Employ
Integrated Design Principles)
Y N/A
Commissioning for HVAC, light, daylighting, hot water.
Building envelope, blower door testing
Y N/A
Commissioning for HVAC, light, daylighting, hot water.
Building envelope, blower door testing
Y N/A
Commissioning for HVAC, light, daylighting, hot water.
Building envelope, blower door testing
Y N/A
Commissioning for HVAC, light, daylighting, hot water.
Building envelope, blower door testing
Schematic Design Design Development
LEED-NC Subtotal
Energy & Atmosphere (EA)
Maximum LEED NC 2009 Credits: 35
Sustainability Features
PMIS Submission Predesign Construction Documents Construction
LEED-NC Subtotal
Water Efficiency (WE)
Maximum LEED NC 2009 Credits: 10
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Documents Construction
Form E 62 (8/2/13) 3 credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
EA Prereq 2
Minimum Energy Performance (see
Guiding Principle II Optimize Energy
Performance)
Y N/A Whole building energy simulation Y N/A
Whole building energy simulation Y N/A
Whole building energy simulation Y N/A
Whole building energy simulation
EA Prereq 3
Fundamental Refrigerant
Management (see Guiding Principle
V - Reduce Environmental Impact of Materials)
Y N/A Y N/A Y N/A Y N/A
EA Credit 1
Optimize Energy Performance:**
(Federal Regulations require 30% for New Construction and 20% for
Existing Building Renovation. Note that this automatically equates to
10 Points for New Construction and
7 Points for Existing Building
Renovation.) (see Guiding Principle
II - Optimize Energy Performance)
Y 10 Utilizing High Efficiency Split
System.
Y 13
Utilizing High Efficiency Split
System with Propane fuel source.
Y 13
Utilizing High Efficiency Split
System with Propane fuel source.
Y 13
Utilizing High Efficiency Split
System with Propane fuel source.
EISA 2007,
Section 433
Reduce Fossil Fuel Derived
Energy
NA N/A NA N/A
Using propane as heat source.
NA N/A
Using propane as heat source.
NA N/A
Using propane as heat source.
EO 13963
Procure Environmentally sustainable electronic products (Predominantly relates to purchases of desktop/laptop computer and peripherals)
Y N/A All new computer equipment to be compliant Y N/A
All new computer equipment to be compliant Y N/A
All new computer equipment to be compliant Y N/A
All new computer equipment to be compliant
CFR Title 10, Part
436.4
Procure Energy Star or FEMP designated products Y N/A Will use energy star of FEMP Y N/A Will use energy star of FEMP Y N/A Will use energy star of FEMP Y N/A Will use energy star of FEMP
EPACT 2005,
Section 104
Premium Efficiency Electric
Motors Y N/A
Building design to minimize need for electric motors, but will be premium efficiency if over 10hp
Y N/A
Building design to minimize need for electric motors, but will be premium efficiency if over 10hp
Y N/A
Building design to minimize need for electric motors, but will be premium efficiency if over 10hp
Y N/A
Building design to minimize need for electric motors, but will be premium efficiency if over 10hp
EISA 2007,
Section 523
On-Site Renewable Energy***
Solar Thermal for Hot Water
(Choose NA if proven not life cycle cost effective)
NA N/A
Will determine appropriate solar-thermal technology during design process.
NA N/A
Will not pursue solar-thermal technology due to high initial cost and long payback.
NA N/A
Will not pursue solar-thermal technology due to high initial cost and long payback.
NA N/A
Will not pursue solar-thermal technology due to high initial cost and long payback.
EA Credit 2 On-Site Renewable Energy***
1%-13% Renewable Energy N 0
Will be further evaluated during the design process.
N 0
Will be further evaluated during the design process.
N 0
No On-site Renewable Energy will be used.
Y 1
Purchased Shares in Solar
Garden.
EA Credit 3
Enhanced Commissioning (required for projects with building size >
5,000 sf) (see Guiding Principle I -
Employ Integrated Design
Principles)
NA 0
Enhanced Commissioning will be evaluated during the design process.
NA 0
Enhanced Commissioning will be evaluated during the design process.
N 0
Enhanced Commissioning will be provided due to the relatively small scale of the project.
N 0
Enhanced Commissioning will be not provided due to the relatively small scale of the project.
Form E 62 (8/2/13) 4 credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
EA Credit 4
Enhanced Refrigerant Management
(see Guiding Principle V - Reduce
Environmental Impact of Materials)
Y 2 Will Comply. Refrigerants will not be used.
Y 2
Will Comply. Refrigerants will not be used.
Y 2
Will Comply. Refrigerants will not be used.
Y 2
Will Comply. Refrigerants will not be used.
EA Credit 5
Measurement & Verification
(see Guiding Principle II -
Optimize Energy
Performance)
Y 3 Will develop M&V plan during design Y 3
Will develop M&V plan during design Y 3
Will develop M&V plan during design
NA 0
MOU Guiding
Principles & EO
13693
Measurement & Verification (see
Guiding Principle II - Optimize
Energy Performance)
Y 3 Will develop M&V plan during design Y 3
Will develop M&V plan during design Y 3
Will develop M&V plan during design Y 3
Will develop M&V plan during design
EA Credit 6 Green Power N 0 No green power purchases N 0 N 0 No green power purchases Y 2 Green power purchase will be utilized.
Missed
Prereq.
18 21 21 21
Missed
Prereq.
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
MR Prereq 1 Storage & Collection of
Recyclables Y N/A Will provide recycling Y N/A Will provide recycling Y N/A Will provide recycling Y N/A Will provide recycling
MR Credit 1.1 Building Reuse, Maintain
Existing Walls, Floors & Roof N 0
Existing building is to be demolished as part of this
Project.
N 0
Existing building is to be demolished as part of this
Project.
N 0
Existing building is to be demolished as part of this
Project.
N 0
Existing building is to be demolished as part of this
Project.
MR Credit 1.2
Building Reuse, Maintain
Interior Nonstructural
Elements
N 0
Existing building is to be demolished as part of this
Project.
N 0
Existing building is to be demolished as part of this
Project.
N 0
Existing building is to be demolished as part of this
Project.
N 0
Existing building is to be demolished as part of this
Project.
MR Credit 2
Construction Waste Management, Divert 50% from Disposal (see
Guiding Principle V - Reduce
Environmental Impact of Materials)
Y 1 Waste mgmt plan will be part of construction contract.
Y 1
Waste mgmt plan will be part of construction contract.
Y 1
Waste mgmt plan will be part of construction contract.
Y 1
Waste mgmt plan will be part of construction contract.
MR Credit 2
(cont'd)
Construction Waste
Management, Divert 75% from Disposal
Y 1
Reduce use of materials that traditionally create waste during construction such as wood, gyp board: encourage factory or shop assembled components to reduce field fabrication that encourages waste.
Y 1
Reduce use of materials that traditionally create waste during construction such as wood, gyp board: encourage factory or shop assembled components to reduce field fabrication that encourages waste.
Y 1
Reduce use of materials that traditionally create waste during construction such as wood, gyp board: encourage factory or shop assembled components to reduce field fabrication that encourages waste.
Y 1
Reduce use of materials that traditionally create waste during construction such as wood, gyp board: encourage factory or shop assembled components to reduce field fabrication that encourages waste.
Predesign Schematic Design Design Development Construction Documents
LEED-NC Subtotal
Materials & Resources (MR) Maximum LEED NC 2009 Credits: 14
Sustainability Features
PMIS Submission Construction
Form E 62 (8/2/13) 5 credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
MR Credit 3 Materials Reuse N 0
No materials from existing building has been identified as suitable material for reuse.
N 0
No materials from existing building has been identified as suitable material for reuse.
N 0
No materials from existing building has been identified as suitable material for reuse.
N 0
No materials from existing building has been identified as suitable material for reuse.
MR Credit 4
Recycled Content, 10% (post-consumer + ½ pre-consumer). Use
EPA's CPG for designated products to use)
Y 1
Use fly-ash in concrete, re-use old concrete foundations as aggregate, old asphalt in new, recycled content carpet
Y 1
Use fly-ash in concrete, re-use old concrete foundations as aggregate, old asphalt in new, recycled content carpet
Y 1
Use fly-ash in concrete, re-use old concrete foundations as aggregate, old asphalt in new, recycled content carpet
Y 1 Use fly-ash in concrete
MR Credit 4 Recycled Content, 20% (post-consumer + ½ pre-consumer) Y 1 Explore ways to increase Y 1 Explore ways to increase Y 1 Explore ways to increase Y 1 Explore ways to increase
MR Credit 5
Regional Materials, Extracted, Processed &
Manufactured Regionally
Y 1 Will use regionally obtained concrete, wood, and plants Y 1
Will use regionally obtained concrete, wood, and plants Y 1
Will use regionally obtained concrete, wood, and plants Y 1
Will use regionally obtained concrete, wood, and plants
EO13693 Biopreferred Products Y N/A Form-release, carpet, sealants Y N/A Form-release, carpet, sealants Y N/A Form-release, carpet, sealants Y N/A Form-release, carpet, sealants
MR Credit 6 Rapidly Renewable Materials Y 1
Linoleum, soy form release agent. May not be feasible due to small quantities.
Y 1
Linoleum, soy form release agent. May not be feasible due to small quantities.
Y 1
Linoleum, soy form release agent. May not be feasible due to small quantities.
N 0
Linoleum, soy form release agent. May not be feasible due to small quantities.
MR Credit 7
Certified Wood (see Guiding
Principle V - Reduce Environmental
Impact of Materials) - Note: LEED requires FSC certification, but for compliance with federal requirements any of the following certifications are sufficient: Forest
Stewardship Council (FSC), Sustainable Forestry Initiative (SFI), American Tree Farm System (ATFS), or Programme for the Endorsement of Forest Certification (PEFC)
Y 1
Use Certified Wood products.
Reduce use of wood to finish materials only
Y 1
Use Certified Wood products.
Reduce use of wood to finish materials only
Y 1
Use Certified Wood products.
Reduce use of wood to finish materials only
Y 1
Use Certified Wood products.
Reduce use of wood to finish materials only
Missed
Prereq.
7 7 7 6
Missed
Prereq.
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
EQ Prereq 1
Minimum IAQ Performance (See
Guiding Principle IV, Enhance
Indoor Environmental Quality)
Y N/A CASE 2: natural ventilation:
meet ASHRAE 62 Y N/A
CASE 2: natural ventilation:
meet ASHRAE 62 Y N/A
CASE 2: natural ventilation:
meet ASHRAE 62 Y N/A
CASE 2: natural ventilation:
meet ASHRAE 62
Schematic Design Design Development Construction Documents Construction PMIS Submission Predesign
LEED-NC Subtotal
Indoor Environmental Quality (EQ)
Maximum LEED NC 2009 Credits: 15
Sustainability Features
Form E 62 (8/2/13) 6 credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
EQ Prereq 2 Environmental Tobacco
Smoke (ETS) Control Y N/A Smoke free building Y N/A Smoke free building Y N/A Smoke free building Y N/A Smoke free building
EQ Credit 1 Outdoor Air Delivery
Monitoring Y 1
OA Airflow Station for non-densely occupied spaces.
Y 1
OA Airflow Station for non-densely occupied spaces.
Y 1
OA Airflow Station for non-densely occupied spaces.
Y 1
OA Airflow Station for non-densely occupied spaces.
EQ Credit 2 Increased Ventilation N 0 Difficult to achieve due to longer cold season.
N 0
Difficult to achieve due to longer cold season.
N 0
Difficult to achieve due to longer cold season.
N 0
Difficult to achieve due to longer cold season.
EQ Credit 3.1
Construction IAQ Management
Plan, During Construction (See
Guiding Principle IV, Enhance
Indoor Environmental Quality)
Y 1
IAQ mgmt plan, use filters during construction, change upon occupancy
Y 1
IAQ mgmt plan, use filters during construction, change upon occupancy
Y 1
IAQ mgmt plan, use filters during construction, change upon occupancy
Y 1
IAQ mgmt plan, use filters during construction, change upon occupancy
EQ Credit 3.2
Construction IAQ Management
Plan, Before Occupancy (See
Guiding Principle IV, Enhance
Indoor Environmental Quality)
Y 1 Test air prior to occupancy, flush if needed.
Y 1
Test air prior to occupancy, flush if needed.
Y 1
Test air prior to occupancy, flush if needed.
Y 1
Test air prior to occupancy, flush if needed.
EQ Credit 4.1
Low-Emitting Materials, Adhesives
& Sealants (See Guiding Principle
IV, Enhance Indoor Environmental
Quality)
Y 1
Use low VOC materials.
Avoid glues and sealants as much as possible
Y 1
Use low VOC materials.
Avoid glues and sealants as much as possible
Y 1
Use low VOC materials.
Avoid glues and sealants as much as possible
Y 1
Use low VOC materials.
Avoid glues and sealants as much as possible
EQ Credit 4.2
Low-Emitting Materials, Paints &
Coatings (See Guiding Principle IV, Enhance Indoor Environmental
Quality)
Y 1
Minimize use of paints and coatings. Low VOC oil finishes for wood.
Y 1
Minimize use of paints and coatings. Low VOC oil finishes for wood.
Y 1
Minimize use of paints and coatings. Low VOC oil finishes for wood.
Y 1
Minimize use of paints and coatings. Low VOC oil finishes for wood.
EQ Credit 4.3
Low-Emitting Materials, Flooring
Materials (See Guiding Principle IV, Enhance Indoor Environmental
Quality)
Y 1 Use mostly finished concrete floors.
Y 1
Use mostly finished concrete floors.
Y 1
Use mostly finished concrete floors.
Y 1
Use mostly finished concrete floors.
EQ Credit 4.4
Low-Emitting Materials, Composite Wood & Agrifiber
Products
Y 1
Use low emitting wood and agrifiber in interior applications.
Y 1
Use low emitting wood and agrifiber in interior applications.
Y 1
Use low emitting wood and agrifiber in interior applications.
Y 1
Use low emitting wood and agrifiber in interior applications.
EQ Credit 5 Indoor Chemical & Pollutant
Source Control Y 1
Provide permanent shoe tracking grills at entrances, exhaust at copy areas, exhaust at janitor closet, high level filtration.
Y 1
Provide permanent shoe tracking grills at entrances, exhaust at copy areas, exhaust at janitor closet, high level filtration.
Y 1
Provide permanent shoe tracking grills at entrances, exhaust at copy areas, exhaust at janitor closet, high level filtration.
Y 1
Provide permanent shoe tracking grills at entrances, exhaust at copy areas, exhaust at janitor closet, high level filtration.
MOU Guiding
Principles & EO
13423
Moisture Control Y N/A Ventilate building well. Y N/A Ventilate building well. Y N/A Ventilate building well. Y N/A Ventilate building well.
EQ Credit 6.1
Controllability of Systems, Lighting
(See Guiding Principle IV, Enhance
Indoor Environmental Quality)
Y 1 Will Comply Y 1 Will Comply Y 1 Will Comply Y 1 Will Comply
Form E 62 (8/2/13) 7 credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
EQ Credit 6.2 Controllability of Systems, Thermal Comfort Y 1
Operable venting and windows and thermostat zone controls
Y 1
Operable venting and windows and thermostat zone controls
Y 1
Operable venting and windows and thermostat zone controls
N 0
EQ Credit 7.1
Thermal Comfort, Design (See
Guiding Principle IV, Enhance
Indoor Environmental Quality)
Y 1 Meet ASHRAE 55 Y 1 Meet ASHRAE 55 Y 1 Meet ASHRAE 55 Y 1 Meet ASHRAE 55
EQ Credit 7.2 Thermal Comfort, Verification Y 1 Conduct post-occupancy surveys as required Y 1
Conduct post-occupancy surveys as required Y 1
Conduct post-occupancy surveys as required Y 1
Conduct post-occupancy surveys as required
EQ Credit 8.1
Daylight & Views, Daylight 75% of
Spaces (See Guiding Principle IV, Enhance Indoor Environmental
Quality)
Y 1 Will Comply Y 1 Will Comply Y 1 Will Comply Y 1 Will Comply
EQ Credit 8.2 Daylight & Views, Views for
90% of Spaces N 0
Will be further evaluated during Schematic Design.
N 0
Will be further evaluated during Schematic Design.
N 0
Will be further evaluated during Schematic Design.
N 0
Unable to meet this requirement
Missed
Prereq.
13 13 13 12
Missed
Prereq.
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
ID Credit 1.1 Public Education Displays Y 1
Incorporate sustainable features display panels as part of building story.
Y 1
Incorporate sustainable features display panels as part of building story
Y 1
Incorporate sustainable features display panels as part of building story
Y 1
Incorporate sustainable features display panels as part of building story
ID Credit 1.2 Innovation in Design: Provide
Specific Title N 0 N 0 N 0 N 0
ID Credit 1.3 Innovation in Design: Provide
Specific Title N 0 N 0 N 0 N 0
ID Credit 1.4 Innovation in Design: Provide
Specific Title N 0 N 0 N 0 N 0
ID Credit 1.5 Innovation in Design: Provide
Specific Title N 0 N 0 N 0 N 0
ID Credit 2
LEED
Accredited
Professional Y 1
Design firm has LEED accredited professional Y 1
Design firm has LEED accredited professional Y 1
Design firm has LEED accredited professional Y 1
Design firm has LEED accredited professional
0 2 2 2 2 0
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
RP Credit 1.1 WEc1 (50%) Y 1 Y 1 No permanent irrigation. Y 1 No permanent irrigation. Y 1 No permanent irrigation. Y 1 No permanent irrigation.
RP Credit 1.2 EQc7.1 Y 1 Y 1 Meet ASHRAE 55 Y 1 Meet ASHRAE 55 Y 1 Meet ASHRAE 55 Y 1 Meet ASHRAE 55
Sustainability Features
PMIS Submission
LEED-NC Subtotal
Schematic Design
Design Development Construction Documents
Regional Priority (RP)
Maximum LEED NC 2009 Credits: 4
Design Development
PMIS Submission Predesign
Innovation & Design Process (ID)
Maximum LEED NC 2009 Credits: 6
Sustainability Features
Construction
Construction Documents Construction Predesign
Schematic Design
LEED-NC Subtotal
Form E 62 (8/2/13) 8 credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points
Concisely explain how credit/requirement is met at this milestone:
Sustainability Features
PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
RP Credit 1.3 Regional Priority Credit:
Region Defined N 0 N 0 N 0 N 0
RP Credit 1.4 Regional Priority Credit:
Region Defined N 0 N 0 N 0 N 0
2 2 2 2 2 0
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points
Concisely explain how credit/requirement is met at this milestone:
MOU Guiding
Principles & EO
13423 (pg. 3)
Complete Integrated Design
Narrative During Predesign
Only
N/A N/A Y N/A Y N/A N/A Y N/A N/A N/A N/A N/A N/A
LEED Certification Rating System
Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ points
For more information on LEED Certification and credits, visit www.usgbc.org
Fulfillment of Guiding Principles for HPSB completes 18 LEED NC credits and 6 prerequisites.
The federal requirement (from EISA 2007) that relates to these LEED-NC credits is "Where life cycle cost effective, design systems to provide not less than 30 percent of the hot water demand through the installation and use of solar hot water heaters." The LEED credits for this item stipulates a percentage of total energy consumption to be provided by on site renewable sources. In some cases meeting the federal requirement will also meet the LEED requirement for these credits.
For new buildings of 5,000 GSF or more and major renovations to buildings greter than or equal to 5,000 GSF, contract with an independent Commissioning Authority and comply with ASHRAE 0-2005, "The Commissioning Process". For smaller projects, comply with the requirements of LEED NC 2009, EA Prerequisite 1, "Fundamental
Commissioning of the Building Energy Systems" (which allows the commissioning authority to be an employee of the design firm).
For new building projects of 5,000 GSF or more, perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential) to show performance at least 30% better (20% for major renovations) than a code compliant similar building. If it can be shown that meeting the 30% performance standard for new construction (or 20% for major renovations) is not life cycle cost effective (over 40 years - not 25 years per a recent regulatory change) then the project must incorporate the maximum energy savings that can be shown to be life cycle cost effective. For new building projects with a lower net construction value, an alternative method is to meet or exceed the minimum requirements prescribed by the ASHRAE Advanced Energy Design Guide (a much simpler prescriptive method for achieving the target) appropriate for the project's building. For buildings without an appropriate Advanced Energy Design Guide perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007
(or IECC 2006 for residential).
Schematic Design Design Development Construction Documents
LEED-NC Subtotal
Construction
Non-LEED-NC Federal Requirements Maximum LEED NC 2009 Credits: 26
Sustainability Features
PMIS Submission Predesign
Form E 62 (8/2/13) 9
File details come from the government source that posted it. Updated .