3-APIS_198204_VC_SUPPLEMENTAL_SPECIFICATIONS.pdf

PDF 29 MB Posted

Attached to
Replace Visitor Center to Correct Serious Safety Deficiencies to Enhance Visitor Experience
Solicitation number
P17PS01828
Issued by

About this file

Supplemental Specifications

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

sfs archi tec ture inc | 2100 centra l sui te #31 kansas c i ty missouri 64108 www.sfsarch.com

Project:

REPLACE VISITOR CENTER TO

CORRECT SERIOUS SAFETY

DEFICIENCIES AND ENHANCE VISITOR

EXPERIENCE AND PROVIDE SHELTER

TO PROTECT HISTORIC FISHING TUG

‘TWILITE’

For the National Park Service

Park Code: APIS

PMIS: 198204 & 227081

SUPPLEMENTAL DOCUMENTS

Final Construction Documents Issued on: JUNE 19, 2017

APIS – 198204 023126 - 1

EXISTING HAZARDOUS MATERIAL INFORMATION

DOCUMENT 023126 - EXISTING HAZARDOUS MATERIAL INFORMATION

1.1 EXISTING HAZARDOUS MATERIAL INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting

Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are part of the Contract Documents.

B. An existing hazardous (building) materials assessment/ survey for Project, prepared by Terracon

Consultants, Inc, dated July 28th, 2015, is available for viewing as appended to this Document.

C. An existing hazardous material (soil) mitigation plan for Project, prepared by Terracon

Consultants, Inc, dated November 22nd, 2016 is available for viewing as appended to this

Document.

D. Related Requirements:

1. Document 003132 "Geotechnical Data" for reports and soil-boring data from geotechnical investigations that are made available to bidders.

2. Section 024116 "Structure Demolition"" for notification requirements if materials suspected of containing hazardous materials are encountered.

3. Document 311000 “Site Clearing”

4. Document 312000 “Earth Moving”

END OF DOCUMENT 023126

APIS – 198204 023132 - 1

GEOTECHNICAL DATA

DOCUMENT 023132 - GEOTECHNICAL DATA

1.1 GEOTECHNICAL DATA

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions.

This Document and its attachments are not part of the Contract Documents.

B. Soil-boring data for Project, obtained by Terracon Consultants, Inc, dated August 29th, 2016 is available for viewing as appended to this Document.

C. A geotechnical investigation report for Project, prepared by Terracon Consultants, Inc, dated August 29th, 2016 is available for viewing as appended to this Document.

D. Related Requirements:

1. Document 003126 "Existing Hazardous Material Information" for hazardous materials reports that are made available to bidders.

END OF DOCUMENT 023132

Hazardous Material Assessment/Survey Little Sand Bay Visitor Center (LSB VC)

32660 Little Sand Bay Road Bayfield, Wisconsin

July 28, 2015

Terracon Project No. 58157036

Prepared for:

SFS Architecture

Kansas City, Missouri

Prepared by:

Terracon Consultants, Inc.

Franklin, Wisconsin

Terracon Consul tants, Inc . 9856 South 57th Street Frankl in , Wisconsin 53132 P 414-423-0255 F 414-423-0566 terracon.com

July 28, 2015

SFS Architecture 1150 Grand Boulevard Kansas City, Missouri 64106

Attention: Kwame Smith Phone: (816) 474-1397 Email: KSmith@sfsarch.com

Re: Hazardous Material Assessment/Survey Little Sand Bay Visitor Center (LSB VC) 32660 Little Sand Bay Road Bayfield, Wisconsin 54814 Terracon Project No. 58157036

Dear Mr. Smith:

Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above-referenced site to SFS Architecture. The purpose of this report is to present the findings of a Hazardous Material Assessment/Survey performed on July 10, 2015. This survey was conducted in general accordance with our cost proposal emailed to Mr. Kerry Newman on May 29, 2015 and our work plan dated June 30, 2015. We understand that this survey was requested due to planned demolition of the above-referenced building. In addition, per your July 9, 2015 voicemail request, Terracon developed and implemented a limited plan for sampling lead in soil samples collected from around the building on July 11, 2015.

Terracon appreciates the opportunity to provide this service to SFS Architecture. If you have any questions regarding this report please contact the undersigned at 414-423-0255.

Sincerely, Terracon Consultants, Inc.

Elizabeth M Newbold Frank M. Reiber Licensed Asbestos Inspector Senior Project Industrial Hygienist for

Responsive Resourceful Reliable

TABLE OF CONTENTS

EXECUTIVE SUMMARY .......................................................................................................................... i

1.0 INTRODUCTION

1.1 Reliance

2.0 BUILDING DESCRIPTION

3.0 FIELD ACTIVITIES

3.1 Visual Assessment

3.2 Physical Assessment

3.3 Sample Collection

3.4 Sample Analysis

4.0 REGULATORY OVERVIEW

5.0 HAZARDOUS BUILDING MATERIALS

5.1 PCBs

5.2 Mercury

5.3 CFC

5.4 Lead Based Paint

5.5 Batteries

5.6 Radioactive Sources

5.7 Mold

5.8 Biohazards

5.9 Lead Soil Sampling

5.0 FINDINGS AND RECOMMENDATIONS

6.0 LIMITATIONS/GENERAL COMMENTS

APPENDIX A IDENTIFIED ASBESTOS CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)

ASSUMED ASBESTOS CONTAINING MATERIALS BY HA

APPENDIX B ASBESTOS SURVEY SAMPLE LOCATION SUMMARY

APPENDIX C ASBESTOS ANALYTICAL LABORATORY DATA

APPENDIX D SOIL ANALYTICAL LABORATORY DATA

APPENDIX E PHOTO LOG

APPENDIX F LICENSES AND CERTIFICATIONS

Responsive Resourceful Reliable i

EXECUTIVE SUMMARY

Terracon Consultants, Inc. (Terracon) conducted an asbestos survey at the building located at 32660 Little Sandy Bay Road, Bayfield, Wisconsin. We understand this asbestos survey was requested due to the planned demolition of the on-site building. The purpose of this survey was to sample and identify suspect asbestos-containing materials (ACM) and provide information regarding the identity, location, condition and approximate quantities of ACM in interior and exterior building components. The survey was performed on July 10, 2015 by a State of Wisconsin certified asbestos inspector in general accordance with our work plan dated June 30, 2015, and the sampling protocols established in United State Environmental Protection Agency (USEPA) 40 Code of Federal Regulations (CFR) Part 763 Subpart E 763, known as the Asbestos Hazard Emergency Response Act, (AHERA). Terracon collected 110 bulk samples from homogeneous areas of suspect ACM.

The following asbestos containing materials were identified as a result of laboratory analysis or assumed to be asbestos containing:

Material Description Material Location Estimated Quantity

RACM, CAT I,

CAT II Non-friable

Black insulation paper Chimney flue (2nd floor kitchen) 50 Sq. Ft. RACM Black Mastic under 9”x9” floor tiles

2nd Floor bathroom 25 Sq. Ft. CAT I

Window Pane Glazing 2nd Floor Windows 100 Linear Ft. CAT II Wall patch – tar-like South wall of basement black patching around pipe 2 Cu. Ft. CAT II

Mortar Patch on Chimney Flue Basement Chimney 4 Cu. Ft. CAT II Electrical Wiring Insulation (observed in Attic) black/white (assumed)

Throughout attic (possible other areas of building)

Unknown CAT II

Electrical components/ fixtures and junction boxes (assumed)

Unknown Unknown

The above-listed friable ACM (RACM) and Category II ACM must be removed prior to any activities (renovation and/or demolition) that may disturb the materials in accordance with applicable federal, state and local regulations. Category I non-friable ACM that is damaged or could be damaged to the extent that it could be crumbled, pulverized or reduced to powder when dry, making it friable, must also be removed prior to any activities (renovation and/or demolition) that may disturb this material in accordance with applicable federal, state and local regulations.

A summary of the classification, condition and approximate quantity of identified ACM is presented in Appendix A. The summary of sample locations is presented in Appendix B.

Laboratory analytical reports are included in Appendix C.

HAZARDOUS MATERIAL ASSESSMENT/SURVEY

LSB VC Bayfield, Wisconsin July 28, 2015 Terracon Project No. 58157036

Reliable Responsive Resourceful ii

Terracon can provide the Client with a proposal for developing asbestos abatement specifications (project design) and for performing abatement oversight and air monitoring upon request.

The hazardous building materials identified during the hazardous material survey should be removed intact if possible, segregated, packaged, and recycled/disposed in accordance with applicable state and federal regulations prior to demolition of the building.

The presence of elevated concentrations of lead in the soil should be reported to the WDNR.

Terracon can assist with reporting to the WDNR. If they require, Terracon is experienced with conducting investigations and remediations in accordance with NR 700 series, Wisconsin Administrative Code (WAC). If desired, soil and/or groundwater sampling can be performed in conjunction with drilling performed for geotechnical purposes as a cost-saving measure.

Responsive Resourceful Reliable i

Little Sand Bay Visitor Center (LSB VC)

32660 Little Sand Bay Road, Bayfield, Wisconsin Terracon Project No. 58157036

July 28, 2015

1.0 INTRODUCTION

Terracon Consultants, Inc. (Terracon) conducted a pre-demolition asbestos survey and hazardous building materials assessment of the building located at 32660 Little Sand Bay Road, Bayfield, Wisconsin. The survey was conducted on July 10, 2015 by a Wisconsin-certified asbestos inspector in general accordance with our cost proposal emailed to Mr. Kerry Newman on May 29, 2015 and our work plan dated June 30, 2015. In addition, per your July 9, 2015 voicemail request, Terracon developed and implemented a limited plan for sampling lead in soil samples collected from around the building on July 11, 2015.

The interior and exterior building components were surveyed, and homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented.

Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids or in other concealed areas.

Suspect ACM samples were collected in general accordance with the sampling protocols outlined in United States Environmental Protection Agency (USEPA) 40 Code of Federal Regulations (CFR) Part 763 Subpart E 763, known as the Asbestos Hazard Emergency Response Act (AHERA). Samples were delivered to an accredited laboratory for analysis by Polarized Light Microscopy (PLM). In addition, in accordance with the work plan, five blind duplicate samples were submitted for analysis.

We understand this asbestos survey was requested due to the planned demolition of the LSB VC building to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP).

In conjunction with the asbestos survey, a visual assessment was performed to identify and quantify other hazardous materials, including lead, mold, fluorescent light tubes, mercury, and bio-hazards. Where observed, these items were documented and quantified.

1.1 Reliance

This report is for the exclusive use of SFS Architecture for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and SFS Architecture. Reliance on this report by SFS Architecture and all

July 28, 2015 Terracon Project No. 58157036

Responsive Resourceful Reliable 2 authorized parties will be subject to the terms, conditions, and limitations stated in the proposal, this report and Terracon’s Agreement for Services. The limitations of liability defined in Terracon’s Agreement for Services is the aggregate limit of Terracon’s liability to SFS Architecture.

2.0 BUILDING DESCRIPTION

The subject building is an approximately 3,834-square-feet two-story building with partial basement and crawlspace. The building was reportedly constructed around 1940, with significant renovations since that time. The basement walls are a combination of stone/mortar and block wall. The building is wood framed and wood siding. Interior areas of the building are finished with drywall, carpet, wood flooring, ceramic floor tiles, and ceiling tiles. The main floor serves as the visitor center and ranger office. The second floor appears to have been originally designed as living quarters that are no longer in use. The area is used for storage. The roof is divided into two sections; the north side was recently replaced with a new asphalt composite shingle roofing and the south side is a flat roof covered with a membrane-type roofing system.

3.0 FIELD ACTIVITIES

The survey was conducted by Elizabeth M Newbold, a Wisconsin-licensed asbestos inspector (License No. AII-184404). A copy of Elizabeth M Newbold’s asbestos inspector license is included in Appendix E. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763 Subpart E 763.86, AHERA. A summary of survey activities is provided below.

3.1 Visual Assessment

Survey activities were initiated with visual observation of the interior and exterior of the building to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application. Interior assessment was conducted in visually accessible areas of the building proposed for demolition.

Terracon did not conduct destructive investigation of doors in the building to determine if the doors were insulated with suspect ACM. However, the doors appeared to be wood. Terracon observed older electrical fixtures, junction boxes, and fiber-coated wiring. These were assumed to be asbestos-containing as they were live and could not be sampled.

3.2 Physical Assessment

A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be

July 28, 2015 Terracon Project No. 58157036

Responsive Resourceful Reliable 3 crumbled, pulverized or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.

3.3 Sample Collection

Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release.

Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.

The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.

Terracon collected 110 bulk samples from 36 homogeneous areas of suspect ACM. A summary of suspect ACM samples collected during the survey is included as Appendix B.

3.4 Sample Analysis

Bulk samples were submitted under chain of custody to Steve Moody Micro Systems (SMMS) of Farmers Branch, Texas for analysis by polarized light microscopy with dispersion staining techniques per USEPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. Steve Moody Micro Systems (SMMS) is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP) Accreditation No. 102056-0.

4.0 REGULATORY OVERVIEW

The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).

The asbestos NESHAP regulation classifies ACM as either RACM, Category I non-friable ACM or Category II non-friable ACM. RACM includes all friable ACM, along with Category I and Category II non-friable ACM that has become friable, will be or has been subjected to sanding, grinding, cutting or abrading, or ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder in the course of renovation or demolition activity.

July 28, 2015 Terracon Project No. 58157036

Responsive Resourceful Reliable 4

Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, resilient floor covering mastics and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials other than Category I non-friable ACM that contain more than 1% asbestos. Category II non-friable ACM generally includes but is not limited to cementitious material such as: cement pipes, cement siding, cement panels, glazing, mortar, and grouts.

The OSHA standards 29 CFR 1910.1001 and 29 CFR 1926.1101, regulate employee exposure to asbestos. The OSHA standards require that employee exposure to airborne asbestos fibers be maintained at or below 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight hour time weighted average (TWA), and not exceed 1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30 minute time period known as an excursion limit (EL). The TWA and EL are known as OSHA’s permissible exposure limits (PELs). The OSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work. Building owners are required to maintain buildings and equipment in a safe operating condition, including the repair, removal, encapsulation or enclosure of damaged ACMs.

5.0 HAZARDOUS BUILDING MATERIALS

In accordance with the work plan, a visual assessment was performed to identify and quantify other hazardous materials, including: lead, mold, fluorescent light tubes, mercury, and bio-hazards. Materials such as mercury, chlorofluorocarbons (CFCs), radioactive sources, batteries, polychlorinated biphenyls (PCBs), and lead-based paint (LBP) can be found in building components. These materials are considered environmental hazards and require special precautions if they will be removed in association with the demolition to prevent their entry into the environment. On occasion, manufacturers will label the equipment regarding the presence or absence of a hazardous material.

5.1 PCBs

PCBs range from clear, oily liquids to white or yellowish waxy solids, depending on the degree of chlorination. They are stable, thermoplastic and non-flammable materials that found chief use in insulation for electric cables and wires in the production of electric condensers and additives for extreme pressure lubricants. Light ballasts can contain about one ounce of the toxic substance. The transportation, disposal and spill clean-up of PCB-containing ballasts is regulated by the Toxic Substances Control Act (TSCA), which is found in 40 Code of Federal Regulations (CFR) Part 261.

Terracon conducted a representative visual assessment of light fixtures and pole and pad-mounted electrical transformers to characterize PCB content. Typically, ballasts manufactured prior to 1979 are presumed to contain PCBs unless clearly marked as containing “No PCBs”.

July 28, 2015 Terracon Project No. 58157036

Responsive Resourceful Reliable 5

Ballasts that do not contain a “No PCBs” label are presumed to be PCB-containing. Terracon observed that the majority of the lighting in the building was light emitting diodes (LED) and incandescent. However, three fluorescent lighting units were observed in the basement, which likely contain ballasts.

Transformers sometimes contain mineral oil which may contain minor amounts of PCB and could be considered “PCB contaminated” (PCB content of 50-499 ppm). During the assessment of the site, exterior pad-mounted and pole-mounted transformers were not observed in proximity to the building.

5.2 Mercury

Metallic mercury is a silver-white liquid at room temperature. Elemental and inorganic mercury compounds are used in manufacturing scientific instruments, electric equipment, mercury vapor lamps, and high intensity discharge (HID) lights. Mercury is considered a hazardous material due to its ability to bioaccumulate within the environment. Recycling mercury-containing components reduces the load of mercury entering the environment. The fluorescent light tubes observed in the basement may contain mercury. In addition, three mercury-containing thermostats were observed on the first floor. Prior to demolition, these items should be removed intact, packaged to prevent breakage and transferred to an approved recycling facility that recovers mercury.

5.3 CFC

A CFC is an organic compound that consists of carbon, hydrogen, chlorine, and fluorine. Many CFCs have been widely used as refrigerants, propellants, and solvents. Chlorofluorocarbons are believed to cause depletion of the atmospheric ozone layer.

Interior and exterior building areas were observed to potentially contain equipment (air conditioners and refrigerators), which may contain CFCs. Three air conditioner compressors and one water fountain were observed on the first floor during the assessment. Prior to demolition, CFCs (refrigerants) should be removed by a qualified recycling firm that recovers CFCs.

5.4 Lead Based Paint

Lead is regulated by the EPA and OSHA. The EPA regulates lead use, removal, and disposal, and OSHA regulates lead exposure to workers. The EPA defines LBP as paint, varnish, stain, or other applied coating that contains lead equal to or greater than 1.0 milligram per square centimeter (mg/cm2), 5,000 milligrams per kilogram (mg/kg), or 0.5% by dry weight as determined by laboratory analysis. For the purpose of the OSHA lead standard, lead includes

July 28, 2015 Terracon Project No. 58157036

Responsive Resourceful Reliable 6 metallic lead, all inorganic lead compounds, and organic lead soaps. A synopsis of the OSHA regulations (29 CFR 1926.62) and the applicability are as follows:

The OSHA Interim Lead Standard for Construction (29 CFR 1926.62) applies to all construction work where an employee may be occupationally exposed to lead. All work related to construction, alteration, or repair (including painting and decorating) is included. The lead-in-construction standard applies to any detectable concentration of lead in paint, as even small concentrations of lead can result in unacceptable employee exposures depending upon on the method of removal and other workplace conditions. Under this standard, construction includes, but is not limited to, the following:

Demolition or salvage of structures where lead or materials containing lead are present

Removal or encapsulation of materials containing lead

New construction, alteration, repair, or renovation of structures, substrates, or portions containing lead, or materials containing lead

Installation of products containing lead

Lead contamination/emergency clean-up

Transportation, disposal, storage, or containment of lead or materials containing lead on the site or location at which construction activities are performed

Maintenance operations associated with construction activities described above

The U.S. Department of Housing and Urban Development (HUD) and EPA require that tenants be notified of the presence of LBP in residential buildings and be provided with a copy of the HUD and EPA pamphlet Protect Your Family From Lead In Your Home. Tenants must also be notified of any renovation activity likely to disturb LBP in their unit or in common areas.

Terracon observed the interior painted surfaces to be in good condition with no areas of peeling paint. Peeling paint was observed throughout the building exterior with some paint chips present on the ground surface. The paint was the existing color of the building. While evaluating the building materials, Terracon exposed a second layer of siding beneath the outer layer. The second layer was horizontal wooden lap siding painted white with no peeling observed. White paint chips were not observed. No paint chips were submitted for laboratory analysis of lead.

5.5 Batteries

Batteries containing nickel-cadmium and lead-acid can be found in emergency lighting, exit signs, and alarm systems. The nickel-cadmium and lead-acid in these batteries are considered to be toxic.

July 28, 2015 Terracon Project No. 58157036

Responsive Resourceful Reliable 7

Interior and exterior building areas were not observed to contain emergency lighting and/or alarm systems that could potentially contain batteries. Terracon observed exit signs that did not contain batteries.

5.6 Radioactive Sources

There are several types of smoke detectors and fire alarms which could have radioactive sources. Ionization chamber and photoelectric smoke detectors are the two most common types available commercially.

Ionization chamber smoke detectors contain a small amount of radioactive material encapsulated in a metal chamber. Typically, the radioactive material is a composite of americium-241. During the assessment of the site, radioactive sources were not observed.

5.7 Mold

In conjunction with the site reconnaissance, Terracon observed the exterior and the accessible interior areas of the on-site building for visual evidence of water infiltration and suspect mold growth. The observations included visibly accessible surfaces in the building areas visited, and did not include observations of hidden conditions such as inaccessible areas, interior of wall cavities, interior of heating, ventilation and air conditioning (HVAC) systems, or behind intact wall coverings.

The source of excess moisture is typically related to leaky plumbing or roofing, but can also involve the building’s HVAC system. When excess moisture accumulates in buildings, mold growth will often occur. In the presence of sufficient moisture, different molds can grow on wood, paper, carpet, or insulating materials. Molds reproduce through spores that cannot be seen with the naked eye. When they settle on damp indoor surfaces, active mold growth can begin. Moisture control is the key to controlling mold growth in indoor environments.

Terracon did not observe obvious indications of significant water infiltration or visible mold growth at the time of the site reconnaissance. However, site personnel indicated mold remediation had been performed in the building in the past. In addition, a mold-like or mildew-like odor was present to varying degrees inside the building; the odor was most noticeable in the basement. The dehumidifier in the basement was not operational during the initial site walk, but personnel restarted the dehumidifier at that time. The walls of the basement showed some signs of effervescence, indicating possible moisture seepage.

July 28, 2015 Terracon Project No. 58157036

Responsive Resourceful Reliable 8

5.8 Biohazards

Terracon observed several mouse traps in the basement and on the second floor of the building. Skeletal remains of a mouse were observed in one of the traps on the second floor.

Mouse droppings were also observed.

5.9 Lead Soil Sampling

In addition, per your July 9, 2015 voicemail request, Terracon developed and implemented a limited plan for sampling lead in soil samples collected from around the building on July 11, 2015.

Terracon collected six shallow soil samples from around the building. Each soil sample was collected from the upper six inches and within two feet of the building wall. Sample 1 was collected on the north side of the building. Samples 2 and 3 were collected on the east side of the building. Sample 4 was collect near the southwest corner of the building. Sample 5 was collected just south of the main entrance on the west side of the building. Sample 6 was collected beneath the exterior stairway leading to the second floor on the west side of the building.

The samples were submitted under proper chain of custody procedures to a Wisconsin-certified laboratory for analysis of lead by US EPA Method 6010. The laboratory results identified lead concentrations ranging from 16.2 mg/kg to 208 mg/kg. The background threshold value (BTV) for lead in Wisconsin soils is 52 mg/kg. The presence of lead at concentrations above its BTV may be indicative of a release. Laboratory report and chain of custody are included in Appendix D.

Reporting the detections is required per Section 292.11, Wis. Stats, which is also known as the “Spills Law”. The statute requires that a person who possesses or controls a hazardous substance, which is discharged or who causes the discharge of a hazardous substance, shall notify the department immediately of any discharge not exempted by law.

However, Terracon is also aware that a petroleum underground storage tank (UST) system was formerly present at this site. A leak was identified and a leaking UST (LUST) case was opened by the Wisconsin Department of Natural Resources (WDNR) on April 25, 1990. The LUST case was assigned the Bureau of Remediation and Redevelopment Tracking System (BRRTS) #03- 04-000175 (http://dnr.wi.gov/botw/GetActivityDetail.do?adn=0304000175&siteId=3257100&crumb=1&search=b).

Elevated concentrations of lead were detected in several soil samples collected during the LUST case investigation. It is not obvious whether the concentrations of lead detected in the soil samples are elevated due to LBP falling from the building or from spilled leaded gasoline.

July 28, 2015 Terracon Project No. 58157036

Responsive Resourceful Reliable 9

5.0 FINDINGS AND RECOMMENDATIONS

The following asbestos containing materials were identified as a result of laboratory analysis or assumed to be asbestos containing:

Material Description Material Location Estimated Quantity RACM, CAT I, CAT II Non-friable

Black insulation paper Chimney flue (2nd floor kitchen)

50 Sq. Ft. RACM

Black Mastic under 9”x9” floor tiles 2nd Floor bathroom 25 Sq. Ft. CAT I Window Pane Glazing 2nd Floor Windows 100 Linear Ft. CAT II Wall patch – tar-like South wall of basement black patching around pipe 2 Cu. Ft. CAT II

Mortar Patch on Chimney Flue Basement Chimney 4 Cu. Ft. CATII Electrical Wiring Insulation (observed in Attic) black/white (assumed)

Throughout attic (possible other areas of building)

Unknown CAT II

Electrical components/ fixtures and junction boxes (assumed)

Unknown CAT II

The above-listed friable ACM (RACM) and Category II ACM must be removed prior to any activities (renovation and/or demolition) that may disturb the materials in accordance with applicable federal, state and local regulations. Category I non-friable ACM that is damaged or could be damaged to the extent that it could be crumbled, pulverized or reduced to powder when dry, making it friable, must also be removed prior to any activities (renovation and/or demolition) that may disturb this material in accordance with applicable federal, state and local regulations.

A summary of the classification, condition and approximate quantity of identified ACM is presented in Appendix A. The summary of sample locations is presented in Appendix B.

Laboratory analytical reports are included in Appendix C.

Terracon can provide the Client with a proposal for developing asbestos abatement specifications (project design) and for performing abatement oversight and air monitoring upon request.

The hazardous building materials identified during the hazardous material survey should be removed intact if possible, segregated, packaged, and recycled/disposed in accordance with applicable state and federal regulations prior to demolition of the building.

The presence of elevated concentrations of lead in the soil should be reported to the WDNR.

Terracon can assist with reporting to the WDNR. If they require, Terracon is experienced with conducting investigations and remediations in accordance with NR 700 series, Wisconsin

July 28, 2015 Terracon Project No. 58157036

Responsive Resourceful Reliable 10

Administrative Code (WAC). If desired, soil and/or groundwater sampling can be performed in conjunction with drilling performed for geotechnical purposes as a cost-saving measure.

6.0 LIMITATIONS/GENERAL COMMENTS

Terracon did not perform sampling which required demolition or destructive activities such as knocking holes in walls, dismantling of equipment or removal of protective coverings, beyond what was deemed acceptable to NPS personnel. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas which may pose a health or safety risk to Terracon personnel were not sampled. Sampling did not include suspect materials which could not be safely reached with available ladders/man-lifts.

This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed, and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by SFS Architecture for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report.

No warranty, express or implied is made.

APPENDIX A

LSB VC Haz Mat for NPS

32660 Little Sandy Bay Road, Bayfield Wisconsin

IDENTIFIED ASBESTOS CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)

HA No. Material Description Material Location % and Type Asbestos**

NESHAP

Classification Condition Estimated

Quantity* 17 Black insulation paper Chimney flue (2nd floor kitchen) 5% Chrysotile RACM Damaged 50 Sq. Ft.

19 Black Mastic under

9”x9” floor tiles 2nd Floor bathroom 2% Chrysotile Cat. I Non Friable Good 25 Sq. Ft.

22 Window Pane Glazing

2nd Floor Windows 3% Chrysotile RACM Damaged 100 Linear Ft.

31 Wall patch – tar-like South wall of basement black patching around pipe

10% Chrysotile Cat. I Non Friable Good (No Damage)

2 Cu. Ft.

32 Mortar Patch on Chimney Flue

Basement Chimney 5% Chrysotile Cat. I Non Friable Good (No Damage)

4 Cu. Ft.

*Estimated quantities are based on a cursory field evaluation, and actual quantities may vary significantly, especially if asbestos containing materials are present in hidden and/or inaccessible areas not evaluated as part of this survey.

**% & Type Asbestos = this column contains both the analytical result of the sample with the highest concentration of asbestos detected in the samples that make up the HA and the types of asbestos identified.

The materials listed in this table have been sampled and determined to contain asbestos in concentrations greater than 1%. When disturbed, various federal, state and local regulations may apply. These materials should be monitored for damage over time and repaired as necessary by appropriately trained personnel. Removal may be necessary before renovations and in most cases before a demolition. See Appendix B for a summary of samples collected. See Appendix C for detailed analytical results.

ASSUMED ASBESTOS CONTAINING MATERIALS BY HA

HA No. Material Description Material Location NESHAP Classification Condition Estimated

Quantity* N/A Electrical Wiring

Insulation (black) Observed on 2nd Floor (assumed throughout) CAT I Good Unknown

N/A Electrical components/ fixtures and junction boxes

Throughout Unknown Unknown Unknown

*Estimated quantities are based on a cursory field evaluation, and actual quantities may vary significantly, especially if asbestos containing materials are present in hidden and/or inaccessible areas not evaluated as part of this survey.

Assumed materials are materials that are commonly determined to contain asbestos that could not be sampled during the survey. Reasons for not sampling can include lack of accessibility (high ceilings), structural integrity (roofing) or other sampling limitations. Assumed asbestos containing materials should be monitored for damage and treated as asbestos containing material. These materials should be sampled before any renovation or demolition activities that may disturb them to determine their actual asbestos content.

APPENDIX B

NPS Sandy Bay Visitor Center 32660 Little Sandy Bay Road, Bayfield Wisconsin

ASBESTOS SURVEY SAMPLE LOCATION SUMMARY

HA No. Material Description Sample Number Sample Location Lab Results 01 Carpet Glue 01-MG7-01 Carpet Glue, Visitor Center None Detected - Carpet 01 Carpet Glue 01-MG7-01 Carpet Glue, Visitor Center None Detected - Glue 01 Carpet Glue 01-MG7-02 Carpet Glue, Visitor Center None Detected - Carpet 01 Carpet Glue 01-MG7-02 Carpet Glue, Visitor Center None Detected - Glue 01 Carpet Glue 01-MG7-03 Carpet Glue, Visitor Center None Detected - Carpet 01 Carpet Glue 01-MG7-03 Carpet Glue, Visitor Center None Detected - Glue 02 Add Description 02-FC5-04 Floor Tile, Transition Strip, Vinyl (Brown), No

Mastic None Detected - Cove Base

02 Add Description 02-FC5-05 Floor Tile, Transition Strip, Vinyl (Brown), No Mastic

None Detected - Cove Base

02 Add Description 02-FC5-06 Floor Tile, Transition Strip, Vinyl (Brown), No Mastic

None Detected - Cove Base

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-07 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Drywall Material

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-07 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Joint Compound

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-07 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Texture

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-08 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Drywall Material

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-08 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Joint Compound

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-08 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Texture transition strip transition strip

02-FT5-04

02-FT5-04

HA No. Material Description Sample Number Sample Location Lab Results 03 Gypsum Wallboard with

Joint Compound and Tape 03-WB1-09 Gypsum Wallboard with Joint Compound and

Tape, Visitor Center and Office None Detected - Drywall Material

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-09 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Joint Compound

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-09 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Texture

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-10 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Drywall Material

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-10 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Joint Compound

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-10 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Texture

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-11 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Drywall Material

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-11 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Joint Compound

03 Gypsum Wallboard with Joint Compound and Tape

03-WB1-11 Gypsum Wallboard with Joint Compound and Tape, Visitor Center and Office

None Detected - Texture

04 2' X 4' Ceiling Tile 04-CT4-12 2' x 4' Ceiling Tile None Detected - Acoustic Tile 04 2' X 4' Ceiling Tile 04-CT4-13 2' x 4' Ceiling Tile None Detected - Acoustic Tile 04 2' X 4' Ceiling Tile 04-CT4-14 2' x 4' Ceiling Tile None Detected - Acoustic Tile 05 Ceiling Wallboard Gypsum

Wallboard with Joint Compound and Tape

05-WB1-15 Gypsum Wallboard with Joint Compound and Tape, Ranger Office Ceiling

None Detected - Drywall Material

05 Ceiling Wallboard Gypsum Wallboard with Joint Compound and Tape

05-WB1-15 Gypsum Wallboard with Joint Compound and Tape, Ranger Office Ceiling

None Detected - Joint Compound

05 Ceiling Wallboard Gypsum Wallboard with Joint Compound and Tape

05-WB1-16 Gypsum Wallboard with Joint Compound and Tape, Ranger Office Ceiling

- No Drywall

05 Ceiling Wallboard Gypsum Wallboard with Joint Compound and Tape

05-WB1-16 Gypsum Wallboard with Joint Compound and Tape, Ranger Office Ceiling

None Detected - Joint Compound

05 Ceiling Wallboard Gypsum

Wallboard with Joint Compound and Tape

05-WB1-17 Gypsum Wallboard with Joint Compound and Tape, Ranger Office Ceiling

None Detected - Drywall Material

05 Ceiling Wallboard Gypsum Wallboard with Joint Compound and Tape

05-WB1-17 Gypsum Wallboard with Joint Compound and Tape, Ranger Office Ceiling

None Detected - Joint Compound

06 Mortar 06-MA3-18 Ceramic Floor Tile Grout, B Rooms None Detected - Ceramic Tile 06 Mortar 06-MA3-18 Ceramic Floor Tile Grout, B Rooms None Detected - Grout 06 Mortar 06-MA3-18 Ceramic Floor Tile Grout, B Rooms None Detected - Mortar 06 Mortar 06-MA3-19 Ceramic Floor Tile Grout, B Rooms None Detected - Ceramic Tile 06 Mortar 06-MA3-19 Ceramic Floor Tile Grout, B Rooms None Detected - Grout 06 Mortar 06-MA3-19 Ceramic Floor Tile Grout, B Rooms None Detected - Mortar 06 Mortar 06-MA3-20 Ceramic Floor Tile Grout, B Rooms None Detected - Ceramic Tile 06 Mortar 06-MA3-20 Ceramic Floor Tile Grout, B Rooms None Detected - Grout 06 Mortar 06-MA3-20 Ceramic Floor Tile Grout, B Rooms None Detected - Mortar 07 Grout 07-MA4-21 Ceramic Wall Tile Grout None Detected - Drywall Material 07 Grout 07-MA4-21 Ceramic Wall Tile Grout None Detected - Tan Mastic 07 Grout 07-MA4-21 Ceramic Wall Tile Grout None Detected - Ceramic Tile 07 Grout 07-MA4-21 Ceramic Wall Tile Grout None Detected - Grout 07 Grout 07-MA4-22 Ceramic Wall Tile Grout None Detected - Drywall Material 07 Grout 07-MA4-22 Ceramic Wall Tile Grout None Detected - Tan Mastic 07 Grout 07-MA4-22 Ceramic Wall Tile Grout None Detected - Ceramic Tile 07 Grout 07-MA4-22 Ceramic Wall Tile Grout None Detected - Grout 07 Grout 07-MA4-23 Ceramic Wall Tile Grout None Detected - Ceramic Tile 07 Grout 07-MA4-23 Ceramic Wall Tile Grout None Detected - Grout 07 Grout 07-MA4-23 Ceramic Wall Tile Grout None Detected - Tan Mastic 08 Black felt/tar paper 08-PM5-24 Exterior Wallpaper (Black) None Detected - Felt / Tar Paper 08 Black felt/tar paper 08-PM5-25 Exterior Wallpaper (Black) None Detected - Felt / Tar Paper 08 Black felt/tar paper 08-PM5-26 Exterior Wallpaper (Black) None Detected - Felt / Tar Paper 09 Wall Caulk 09-CA3-27 Exterior Wall Caulking (White) None Detected - Caulking 09 Wall Caulk 09-CA3-28 Exterior Wall Caulking (White) None Detected - Caulking 09 Wall Caulk 09-CA3-29 Exterior Wall Caulking (White) None Detected - Caulking 10 Wall Caulk 10-CA3-30 Exterior Wall Caulking (Gray) Patching None Detected - Caulking 10 Wall Caulk 10-CA3-31 Exterior Wall Caulking (Gray) Patching None Detected - Caulking 10 Wall Caulk 10-CA3-32 Exterior Wall Caulking (Gray) Patching None Detected - Caulking

11 Floor Caulk 11-CA4-33 Caulking / Patching on Wood Floors, Ranger

Office None Detected - Caulking

11 Floor Caulk 11-CA4-34 Caulking / Patching on Wood Floors, Ranger Office

None Detected - Caulking

11 Floor Caulk 11-CA4-35 Caulking / Patching on Wood Floors, Ranger Office

None Detected - Caulking

12 Window Pane Glazing 12-SC1-36 Exterior Window Glazing, by Attic Window None Detected - Window Glazing 12 Window Pane Glazing 12-SC1-37 Exterior Window Glazing, by Attic Window None Detected - Window Glazing 12 Window Pane Glazing 12-SC1-38 Exterior Window Glazing, by Attic Window None Detected - Window Glazing 13 Insulation Paper (Gray) 13-PM5-39 Paper Layer behind Wallboard, 2nd Floor

Room None Detected - Paper Backing

13 Insulation Paper (Gray) 13-PM5-40 Paper Layer behind Wallboard, 2nd Floor Room

None Detected - Paper Backing

13 Insulation Paper (Gray) 13-PM5-41 Paper Layer behind Wallboard, 2nd Floor Room

None Detected - Paper Backing

14 Wallboard (pressboard) 14-WB5-42 Pressboard-Type Wallboard, 2nd Floor None Detected - Fiber Board 14 Wallboard (pressboard) 14-WB5-43 Pressboard-Type Wallboard, 2nd Floor None Detected - Fiber Board 14 Wallboard (pressboard) 14-WB5-44 Pressboard-Type Wallboard, 2nd Floor None Detected - Fiber Board 15 Wallboard (pressboard) 15-WB5-45 Texture on Wallboard, in Attic Doors None Detected - Fiber Board 15 Wallboard (pressboard) 15-WB5-45 Texture on Wallboard, in Attic Doors None Detected - Paint 15 Wallboard (pressboard) 15-WB5-46 Texture on Wallboard, in Attic Doors None Detected - Fiber Board 15 Wallboard (pressboard) 15-WB5-46 Texture on Wallboard, in Attic Doors None Detected - Paint 15 Wallboard (pressboard) 15-WB5-47 Texture on Wallboard, in Attic Doors None Detected - Fiber Board 15 Wallboard (pressboard) 15-WB5-47 Texture on Wallboard, in Attic Doors None Detected - Paint 16 Breech/Flue Insulation 16-MI6-48 Breech / Flue Insulation / Mortar None Detected - Mortar 16 Breech/Flue Insulation 16-MI6-49 Breech / Flue Insulation / Mortar None Detected - Mortar 16 Breech/Flue Insulation 16-MI6-50 Breech / Flue Insulation / Mortar None Detected - Mortar 17 Black paper Duct Insulation 17-MI4-51 Chimney Flue Duct Paper 5% Chrysotile - Compound Material 17 Black paper Duct Insulation 17-MI4-52 Chimney Flue Duct Paper 5% Chrysotile - Compound Material 17 Black paper Duct Insulation 17-MI4-53 Chimney Flue Duct Paper 5% Chrysotile - Compound Material 18 Sheet Vinyl Flooring/Paper

Backing 18-FC1-54 Sheet flooring , fiber backing None Detected - Felt / Tar Paper

18 Sheet Vinyl Flooring/Paper Backing

18-FC1-55 Sheet flooring , fiber backing None Detected - Felt / Tar Paper

18 Sheet Vinyl Flooring/Paper

Backing 18-FC1-56 Sheet flooring , fiber backing None Detected - Felt / Tar Paper

19 9" x 9" Floor Tile and Mastic 19-FT1-57 9" x 9" Floor Tile (Beige) with Paper Glue (Black)

None Detected - Floor Tile

19 9" x 9" Floor Tile and Mastic 19-FT1-57 9" x 9" Floor Tile (Beige) with Paper Glue (Black)

2% Chrysotile - Brown Mastic

19 9" x 9" Floor Tile and Mastic 19-FT1-57 9" x 9" Floor Tile (Beige) with Paper Glue (Black)

None Detected - Floor Felt

19 9" x 9" Floor Tile and Mastic 19-FT1-58 9" x 9" Floor Tile (Beige) with Paper Glue (Black)

None Detected - Floor Tile

19 9" x 9" Floor Tile and Mastic 19-FT1-58 9" x 9" Floor Tile (Beige) with Paper Glue (Black)

2% Chrysotile - Brown Mastic

19 9" x 9" Floor Tile and Mastic 19-FT1-58 9" x 9" Floor Tile (Beige) with Paper Glue (Black)

None Detected - Floor Felt

19 9" x 9" Floor Tile and Mastic 19-FT1-59 9" x 9" Floor Tile (Beige) with Paper Glue (Black)

None Detected - Floor Tile

19 9" x 9" Floor Tile and Mastic 19-FT1-59 9" x 9" Floor Tile (Beige) with Paper Glue (Black)

2% Chrysotile - Brown Mastic

19 9" x 9" Floor Tile and Mastic 19-FT1-59 9" x 9" Floor Tile (Beige) with Paper Glue (Black)

None Detected - Floor Felt

20 Toilet Gasket 20-PM5-60 Waxy Gasket, Toilet None Detected - Wax 20 Toilet Gasket 20-PM5-61 Waxy Gasket, Toilet None Detected - Wax 20 Toilet Gasket 20-PM5-62 Waxy Gasket, Toilet None Detected - Wax 21 Roofing Membrane 21-RF6-63 Membrane Roof, South Roof None Detected - Black Sealant 21 Roofing Membrane 21-RF6-63 Membrane Roof, South Roof None Detected - Rubber Membrane 21 Roofing Membrane 21-RF6-63 Membrane Roof, South Roof None Detected - Grey Sealant 21 Roofing Membrane 21-RF6-64 Membrane Roof, South Roof None Detected - Black Sealant 21 Roofing Membrane 21-RF6-64 Membrane Roof, South Roof None Detected - Rubber Membrane 21 Roofing Membrane 21-RF6-64 Membrane Roof, South Roof None Detected - Grey Sealant 21 Roofing Membrane 21-RF6-65 Membrane Roof, South Roof None Detected - Black Sealant 21 Roofing Membrane 21-RF6-65 Membrane Roof, South Roof None Detected - Rubber Membrane 21 Roofing Membrane 21-RF6-65 Membrane Roof, South Roof None Detected - Grey Sealant 22 Window Pane Glazing 22-SC1-66 Window Glazing, South Windows, 2nd Floor None Detected - Window Glazing 22 Window Pane Glazing 22-SC1-67 Window Glazing, South Windows, 2nd Floor None Detected - Window Glazing 22 Window Pane Glazing 22-SC1-68 Window Glazing, South Windows, 2nd Floor 3% Chrysotile - Window Glazing

23 Insulation Material 23-FC5-69 Underlayment beneath Wood Floors, 2nd

Floor None Detected - Insulation

23 Insulation Material 23-FC5-69 Underlayment beneath Wood Floors, 2nd Floor

None Detected - Tar Paper

23 Insulation Material 23-FC5-69 Underlayment beneath Wood Floors, 2nd Floor

None Detected - Floor Felt

23 Insulation Material 23-FC5-70 Underlayment beneath Wood Floors, 2nd Floor

None Detected - Insulation

23 Insulation Material 23-FC5-70 Underlayment beneath Wood Floors, 2nd Floor

None Detected - Tar Paper

23 Insulation Material 23-FC5-70 Underlayment beneath Wood Floors, 2nd Floor

None Detected - Floor Felt

23 Insulation Material 23-FC5-70 Underlayment beneath Wood Floors, 2nd Floor

None Detected - Fiber Backing

23 Insulation Material 23-FC5-71 Underlayment beneath Wood Floors, 2nd Floor

None Detected - Insulation

23 Insulation Material 23-FC5-71 Underlayment beneath Wood Floors, 2nd Floor

None Detected - Tar Paper

23…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .