Appendix E Operation Maintenance and Monitoring Plan.pdf
PDF 90 KB Posted
- Attached to
- Ground water monitoring, modeling, and reporting
- Solicitation number
- NIHOF2010283
About this file
Appendix E Operation Maintenance and Monitoring Plan
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX E
Field Monitoring Forms
Operation, Maintenance and Monitoring Plan
Phase II Groundwater Remediation System Bitterroot Valley Sanitary Landfill
Ravalli County, Montana
PHASE IIA REMEDIATION SYSTEM
MONTHLY AND QUARTERLY MONITORING TASKS
Job Name: Phase IIA GW Remediation System, BVSL
Job No.: 9732221A
Cost Code: 150
Date Assigned: September, 2002
Complete by: First week of each month
Personnel Assigned: Don May, Liz Fagen , Oran Brazington
Time Allotted: 4-8 hours (Monthly), 8-12 (Quarterly)
Field Monitoring Tasks
MONTHLY (August, September, November, December, February, March, May, June)
Inspect all equipment inside remediation building for proper operation and check for plumbing leaks, water in the sump and flow meter operation.
Check Bear Creek outfall and insure there are no obstructions to flow.
Record all operational parameters listed on Phase IIA field forms located in the TRB (temperatures, pressures, influent and effluent water flow rates, air flow rates, valve settings, total volume of each meter and permanent volume of each meter).
Perform maintenance as required including cleaning air intake screen. (Blower must be shut down prior to cleaning air intake).
Prepare a list of any equipment items that need repair.
Check and clean the Y-strainer in the vault for well R-2.
QUARTERLY (October, January, April, July)
Complete all the Monthly monitoring tasks.
Collect an influent and effluent water sample for VOC analyses.
Inspect interior of air stripper via access ports.
Measure depth to water in wells listed on Water Level Form contained in the TRB.
N/projects/victor/phase2a:Routine Monitoring Tasks.doc
Personnel Date
Total/Permanent (gal) Total/Permanent (gal)
FR Influent Water Temp
CF Air Pressure P2
P Air Flow V
FR/manhole FR
CF/manhole CF Elect. Meter
FR/manhole FR
CF/manhole Turbine CF
FR/manhole Turbine CFx100
CF/manhole CF Elect. Meter
FR P
CF Turbine CF
P Turbine CF x 100
FR Clean Air Intake
CF
P
FR Maintenance Items:
CF
P
FR
CF
P
FR
CF
P
FR
CF
P
FR
CF
P
FR - flow rate in gallons per minute Temp - temperature in degrees Fahrenheit CF - cumulative flow in gallons V - velocity in feet per minute P - pressure in pounds per square inch Turbine - Turbine type flow accumulation meter.
P2 - pressure in inches of water column Elect. Meter - Electronic flow rate and accumulation meter.
DTW - depth to water in well n:/projects/victor/phase2a:Fieldform.xls
Bitterroot Valley Sanitary Landfill
R-1
R-2
R-10
R-1/2/10
R-9D
R-3S
Location Parameter
R-5S
R-6D
R-7S
R-8D
P um pi ng
W el ls R-4D
OPERATION & MONITORING DATA
A ir
S tri pp er
Effluent Water
MAINTENANCE
Bear Creek Discharge
D is ch ar ge P ip in g
Infiltration Trench
Location Parameter
Phase IIA Groundwater Remediation System
Well
DTW DTW DTW DTW DTW DTW
BR-GW-2
BR-GW-3
BR-GW-36D
BR-GW-37S
BR-GW-38D
BR-GW-39S
BR-GW-40D
BR-GW-41S
BR-GW-49S
BR-GW-50D
BR-GW-54D
BR-GW-55S
BR-GW-58S
BR-GW-81S
BR-GW-82D
P-1
P-2
P-3
R-1
R-2
R-3S
R-4D
R-5S
R-6D
R-7S
R-8D
R-9D
R-10
BR-GW-87S
BR-GW-89S
SA-8
SA-9
SA-14
SA-15
Date
QUARTERLY WATER LEVEL MEASUREMENTS
Phase II Groundwater Remediation System Monitoring
Bitterroot Valley Sanitary Landfill
PRE-CWSS
WELLS TO MONITOR
SEMIANNUAL EVENTS (September 2006)
WATER LEVELS WHAT TO SAMPLE FOR
WELL TOTAL DEPTH TO DATE DATE - TIME VOCs & NUMBER DEPTH WATER MEASURED SAMPLED Field Param.
BR-GW-2 71
BR-GW-3 24
BR-GW-8 25
BR-GW-9 98
BR-GW-10 29
BR-GW-30S 21
BR-GW-31D 90
BR-GW-32S 19
BR-GW-33S 20
BR-GW-34D 78
BR-GW-35S 19
BR-GW-36D 120
BR-GW-37S 63
BR-GW-38D 110
BR-GW-39S 60
BR-GW-40D 150
BR-GW-41S 64
BR-GW-42D 81
BR-GW-43S 25
BR-GW-46S 58
BR-GW-48S 45
BR-GW-49S 65
BR-GW-50D 114
Page 1 of 5 PRE-CWSS SEMIANNUAL
SEMIANNUAL EVENTS (September 2006)
WATER LEVELS WHAT TO SAMPLE FOR
WELL TOTAL DEPTH TO DATE DATE - TIME VOCs &
NUMBER DEPTH WATER MEASURED SAMPLED Field Param.
BR-GW-51D 76
BR-GW-52S 35
BR-GW-53S 49
BR-GW-54D 81
BR-GW-55S 17
BR-GW-56DD 179
BR-GW-58S 55
BR-GW-59S 60
BR-GW-60S 53
BR-GW-61DD 196
BR-OW-01D 99
BR-OW-02S 39
BR-GW-81S 27
BR-GW-82D 102
BR-GW-83D 97
BR-GW-85 78
BR-GW-86D 129.5
BR-GW-87S 67.5
BR-GW-88S 55
BR-GW-89S 59
BR-GW-90D 87
BR-GW-91D 86
BR-GW-92D 89
Page 2 of 5 PRE-CWSS SEMIANNUAL
SEMIANNUAL EVENTS (September 2006)
WATER LEVELS WHAT TO SAMPLE FOR
WELL TOTAL DEPTH TO DATE DATE - TIME VOCs &
NUMBER DEPTH WATER MEASURED SAMPLED Field Param.
SA-1 94
SA-2 96
SA-3 106
SA-4 126
SA-5 125
SA-8 120
SA-9 89
SA-13 86
SA-14 118
SA-16 120
SA-17 86
D-39 128
BR-GW-1 95
BR-GW-5 106
BR-GW-21 ?
Page 3 of 5 PRE-CWSS SEMIANNUAL
SEMIANNUAL EVENTS (September 2006)
WATER LEVELS WHAT TO SAMPLE FOR
WELL TOTAL DEPTH TO DATE DATE - TIME VOCs &
NUMBER DEPTH WATER MEASURED SAMPLED Field Param.
D-101 71
BR-GW-62DD 250
BR-GW-63DD 249
BR-GW-64DD 259
BR-GW-84D 158
BR-GW-65DD 265
BR-GW-66DD 270
BR-GW-67DD 276
BR-GW-68DD 270
BR-GW-69DD 267
BR-GW-70DD 250
BR-GW-71DD 260
BR-GW-72DD 273
BR-GW-73DD 273
BR-GW-74DD 256
BR-GW-75DD 262
BR-GW-76DD 276
BR-GW-77DD 263
BR-GW-78DD 270
BR-GW-79DD 259
BR-GW-80DD 260
R-1 70
R-2 70
R-3S 39
Page 4 of 5 PRE-CWSS SEMIANNUAL
SEMIANNUAL EVENTS (September 2006)
WATER LEVELS WHAT TO SAMPLE FOR
WELL TOTAL DEPTH TO DATE DATE - TIME VOCs &
NUMBER DEPTH WATER MEASURED SAMPLED Field Param.
R-4D 110
R-5S 29
R-6D 97
R-7S 30
R-8D 93
R-9D 120.5
R-10 120
INF NA
EFF NA
P-1 15
P-2 20
P-3 109
TRIP BLANK
Note Date Prepared
TRIP BLANK
Note Date Prepared
DUPLICATE
Duplicate of Well:___________________
DUPLICATE
Duplicate of Well:___________________
DUPLICATE
Duplicate of Well:___________________
FIELD BLANK Note Date Prepared
TEMP. BLANK
Note Date & Include with Each Cooler Temp. Only
TEMP. BLANK
Note Date & Include with Each Cooler Temp. Only
TEMP. BLANK Note Date & Include with Each Cooler Temp. Only
Notes:
WP / SP Well Pump / Sampling pump HB / G Hand Bail / Grab
No Activity
Page 5 of 5 PRE-CWSS SEMIANNUAL
WELLS TO SAMPLE FOR IRON & MANGANESE
SEMIANNUAL EVENTS
WATER LEVELS WHAT TO SAMPLE FOR
WELL TOTAL DEPTH TO DATE Total
NUMBER DEPTH WATER MEASURED Iron & Manganese
BR-GW-62DD 250
BR-GW-63DD 249
BR-GW-84D 158
BR-GW-65DD 265
BR-GW-66DD 270
BR-GW-67DD 276
BR-GW-68DD 270
BR-GW-69DD 267
BR-GW-70DD 250
BR-GW-71DD 260
BR-GW-73DD 273
BR-GW-74DD 256
BR-GW-77DD 263
BR-GW-80DD 260
TRIP BLANK
Note Date Prepared
TEMP. BLANK Note Date & Include with Each Cooler
Page 1 of 1 PRE-CWSS ANNUAL
File details come from the government source that posted it. Updated .