AI-3-02.pdf

PDF 163 KB Posted

Attached to
Recovery Presolication for PNRC II (CMC)
Solicitation number
NIHOF2010205PS
Issued by

About this file

AI-3-02.pdf

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEVEL G

107200

LEVEL Gi 110590

SEE

RCP

SEE

RCP

EQ

EQ

EQ

720 720

PAINTED GYP. BD CEILING

CEILING AS SCHEDULED

LIGHTING AS SCHEDULEDDOWN LIGHTING AS SCHEDULED

METAL JAMB PLATE

HOLOW METAL HEAD FRAME

HOLOW METAL SILL FRAME

GLASS & HOLLOW METAL FRAME

WINDOW SYSTEM AS SPECIFIED

WALL AS SCHEDULED

PAINTED GYP. BD

SOFFIT

CEILING AS SCHEDULED (ACT-1)

ELEVATOR VESTIBULEADMIN CORRIDOR

CENTER COVE ON CORRIDOR

MIN. FIXTURE RADIUS MIN. FIXTURE RADIUS

F

530 530

720 720

CEILING AS SCHEDULED

(PAINTED GYP. BD)

LIGHTING AS SCHEDULED, SEE ELEC.

PAINTED GYP. BD. OVER

METAL STUD WALL AS SCHEDULED

MIN. DIM. FOR LIGHT FIXTURE RADIUS

CENTER COVE ON CORRIDOR

BASE AS SCHEDULED

CL

BASE AS SCHEDULED

WALL AS SCHEDULED W/

EXTRA LAYER 20 mm GYP. BD.

GYP. BD. WALL BEYOND

GLASS & HOLLOW METAL FRAME

SYSTEM AS SPECIFIED

WALL AS SCHEDULED

CEILING AS SCHEDULED

BLOCKING

BLOCKING

METAL CHANNEL

METAL CHANNEL

METAL SILL TO MATCH WINDOW FRAME FINISH

METAL HEAD PLATE TO MATCH WINDOW FRAME FINISH

METAL JAMB PLATE TO MATCH WINDOW FRAME FINISH

STRUCTURAL METAL STUD

BRACING BELOW SILL

LEVEL 2

119200

LEVEL 2i 122590

LEVEL 2

119200

LEVEL 2i 122590

ALIGN

BASE AS SCHEDULED

2 LAYER GYP. BOARD,

(PAINTED) AS SCHEDULED

WINDOW AS SPECIFIED

CEILING AS SCHEDULED

CEILING AS SCHEDULED

SOFFIT:

16 MM GYP. BD. ON

61 MM METAL STUDS

METAL SILL TO MATCH

WINDOW FRAME FINISH

METAL BLOCKING

SOFFIT: 16 MM GYP. BD. ON

61 MM METAL STUDS

METAL STUD BRACED

BACK TO WALL

LIGHT FIXTURE AS

SCHEDULED

2 LAYER GYP. BOARD,

(PAINTED) AS SCHEDULED

STRUCTURAL METAL

BRACING BELOW SILL

AI-6-01

AI-6-01

COLUMN MOUNTED FIXTURE

WHERE LOCATED ON RCP

METAL HEAD PLATE TO MATCH

WINDOW FRAME FINISH

METAL JAMB PLATE TO MATCH

WINDOW FRAME FINISH

GLASS & HOLLOW METAL FRAME

SYSTEM AS SPECIFIED

METAL SILL TO MATCH

WINDOW FRAME FINISH

BLOCKING

STRUCTURAL METAL STUD

BRACING BELOW SILL

WALL AS SCHED

BASE AS SCHED

WALL AS SCHED

CEILING AS SCHED

SEE RCP

T E

RM

A EDP

L A

TH

H

F E

S

O

NT

S

MA

N

HU

VICERE

USA

Copyright © 2010 Perkins+Will

Sheet

T itl e

Approved

Checked

Drawn

Job Number

Date

Sheet Information

OWNER:

OFFICE OF RESEARCH

FACILITIES, DIVISION OF

PROPERTY MANAGEMENT

BETHESDA, MD 20892

T: 301.496.5131

LABORATORY PLANNING:

GBR PLANNERS

COLLABORATIVE INC.

2900 WESTCHESTER AVE SUITE 302

PURCHASE, NY 10577

T: 914.253.6744

CIVIL CONSULTANT:

WILLIAM H. GORDON

ASSOCIATES

4501 DALY DR.

CHANTILLY, VA 20151

T: 703.580.0409

STRUCTURAL CONSULTANT:

CAGLEY &

ASSOCIATES

6141 EXECUTIVE BLVD

ROCKVILLE, MD 20852

T: 301.881.9050

MEP CONSULTANT:

AFFILIATED ENGINEERS

INCORPORATED

401 N. WASHINGTON ST. STE 400

ROCKVILLE, MD 20850

T: 301.468.7766

ARCHITECT:

PERKINS + WILL

2100 M. ST NW SUITE 800

WASHINGTON, DC 20037

T: 202.737.1020

S E A L

J O H

N E

D W

A R

D P

O R

TE

R

N E

U R

O S

C

IE

N C

E R

E S

E A

R C

H C

E N

TE

R

P H

A S

E

II

A T

TH

E

N A

TI

O

N A

L

IN

S

TI

TU

TE

S O

F H

E A

LT

H

NAME

WRK REQ. NO.

PROJ. OFFICER

PROJ. DIR.

SUB. DATE

SUBMISSION

PROJ. NO.

STREET

CITY

STATE/ZIP

OTHER

BUILDING NO.

PRIME A/E

SUB A/E

CONSTR. CON.

FACILITY CODE

BUILDING NO.

A/E CON. NO.

A/E TASK NO.

CONS. CONTR.

CONS. WORK

251180

CONSTRUCTION CONTRACTOR

CONSTRUCTION WORK

PERKINS+ WILL

263-00-C-0206

A/E SUB FIRM

CONSTR. CON.

PORTER NEUROSCIENCE

9000 ROCKVILLE PIKE

BETHESDA

MARYLAND 20892

35 PHASE 2

PHILLIP W. NEUBERG, AIA

ROBERT MCDONALD, P.E.

FINAL BID DOCUMENTS

01/29/2010

NIH - HQC90516

LANDSCAPE CONSULTANT:

JORDAN HONEYMAN

LANDSCAPE ARCHITECTURE

711 FLORIDA AVE. NW

WASHINGTON, DC 20001

T: 202.986.0711

OFFICE OF

RESEARCH FACILITIES

DIVISION OF PROPERTY MANAGEMENT

JAN 29, 2010 GMP BID PROPOSAL SET

JOHNSON BERNAT

ASSOCIATES, INC.

1395 PICCARD DR. SUITE 350

ROCKVILLE, MD 20850

T: 301.963.1133

2/

/2

5:

:5

P

M C

:\D oc u m en ts a nd S et tin gs \e ra th j\D es kt op

\R ev it Lo ca l

F ile s\

.0

-W D

C

LO

C A

L\

.0

-W D

C (e ra th j).

r v t

AI-3-02

IN

TE

R I O

R W

A L L

S E

C T I

O N

Checker

Author

860179.000

JANUARY 29, 2010

Approver

1 : 204 ADMIN CORRIDOR WALL SECTION

1 : 203 MEETING ROOM SECTION

1 : 205 ADMIN CORRIDOR WALL SECTION 2

NOTE: FOR VERTICAL WALL DIMENSIONS SEE 3/ AI-2-01 NOTE: FOR VERTICAL WALL DIMENSIONS SEE 3/ AI-2-01

1 : 202 TYPICAL LAB WALL SECTION

NO ISSUE DATE

1 PRE-BID 2010-02-

1 : 201 PI OFFICE WALL SECTION

File details come from the government source that posted it. Updated .