AI-3-02.pdf
PDF 163 KB Posted
- Attached to
- Recovery Presolication for PNRC II (CMC)
- Solicitation number
- NIHOF2010205PS
About this file
AI-3-02.pdf
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL G
107200
LEVEL Gi 110590
SEE
RCP
SEE
RCP
EQ
EQ
EQ
720 720
PAINTED GYP. BD CEILING
CEILING AS SCHEDULED
LIGHTING AS SCHEDULEDDOWN LIGHTING AS SCHEDULED
METAL JAMB PLATE
HOLOW METAL HEAD FRAME
HOLOW METAL SILL FRAME
GLASS & HOLLOW METAL FRAME
WINDOW SYSTEM AS SPECIFIED
WALL AS SCHEDULED
PAINTED GYP. BD
SOFFIT
CEILING AS SCHEDULED (ACT-1)
ELEVATOR VESTIBULEADMIN CORRIDOR
CENTER COVE ON CORRIDOR
MIN. FIXTURE RADIUS MIN. FIXTURE RADIUS
F
530 530
720 720
CEILING AS SCHEDULED
(PAINTED GYP. BD)
LIGHTING AS SCHEDULED, SEE ELEC.
PAINTED GYP. BD. OVER
METAL STUD WALL AS SCHEDULED
MIN. DIM. FOR LIGHT FIXTURE RADIUS
CENTER COVE ON CORRIDOR
BASE AS SCHEDULED
CL
BASE AS SCHEDULED
WALL AS SCHEDULED W/
EXTRA LAYER 20 mm GYP. BD.
GYP. BD. WALL BEYOND
GLASS & HOLLOW METAL FRAME
SYSTEM AS SPECIFIED
WALL AS SCHEDULED
CEILING AS SCHEDULED
BLOCKING
BLOCKING
METAL CHANNEL
METAL CHANNEL
METAL SILL TO MATCH WINDOW FRAME FINISH
METAL HEAD PLATE TO MATCH WINDOW FRAME FINISH
METAL JAMB PLATE TO MATCH WINDOW FRAME FINISH
STRUCTURAL METAL STUD
BRACING BELOW SILL
LEVEL 2
119200
LEVEL 2i 122590
LEVEL 2
119200
LEVEL 2i 122590
ALIGN
BASE AS SCHEDULED
2 LAYER GYP. BOARD,
(PAINTED) AS SCHEDULED
WINDOW AS SPECIFIED
CEILING AS SCHEDULED
CEILING AS SCHEDULED
SOFFIT:
16 MM GYP. BD. ON
61 MM METAL STUDS
METAL SILL TO MATCH
WINDOW FRAME FINISH
METAL BLOCKING
SOFFIT: 16 MM GYP. BD. ON
61 MM METAL STUDS
METAL STUD BRACED
BACK TO WALL
LIGHT FIXTURE AS
SCHEDULED
2 LAYER GYP. BOARD,
(PAINTED) AS SCHEDULED
STRUCTURAL METAL
BRACING BELOW SILL
AI-6-01
AI-6-01
COLUMN MOUNTED FIXTURE
WHERE LOCATED ON RCP
METAL HEAD PLATE TO MATCH
WINDOW FRAME FINISH
METAL JAMB PLATE TO MATCH
WINDOW FRAME FINISH
GLASS & HOLLOW METAL FRAME
SYSTEM AS SPECIFIED
METAL SILL TO MATCH
WINDOW FRAME FINISH
BLOCKING
STRUCTURAL METAL STUD
BRACING BELOW SILL
WALL AS SCHED
BASE AS SCHED
WALL AS SCHED
CEILING AS SCHED
SEE RCP
T E
RM
A EDP
L A
TH
H
F E
S
O
NT
S
MA
N
HU
VICERE
USA
Copyright © 2010 Perkins+Will
Sheet
T itl e
Approved
Checked
Drawn
Job Number
Date
Sheet Information
OWNER:
OFFICE OF RESEARCH
FACILITIES, DIVISION OF
PROPERTY MANAGEMENT
BETHESDA, MD 20892
T: 301.496.5131
LABORATORY PLANNING:
GBR PLANNERS
COLLABORATIVE INC.
2900 WESTCHESTER AVE SUITE 302
PURCHASE, NY 10577
T: 914.253.6744
CIVIL CONSULTANT:
WILLIAM H. GORDON
ASSOCIATES
4501 DALY DR.
CHANTILLY, VA 20151
T: 703.580.0409
STRUCTURAL CONSULTANT:
CAGLEY &
ASSOCIATES
6141 EXECUTIVE BLVD
ROCKVILLE, MD 20852
T: 301.881.9050
MEP CONSULTANT:
AFFILIATED ENGINEERS
INCORPORATED
401 N. WASHINGTON ST. STE 400
ROCKVILLE, MD 20850
T: 301.468.7766
ARCHITECT:
PERKINS + WILL
2100 M. ST NW SUITE 800
WASHINGTON, DC 20037
T: 202.737.1020
S E A L
J O H
N E
D W
A R
D P
O R
TE
R
N E
U R
O S
C
IE
N C
E R
E S
E A
R C
H C
E N
TE
R
P H
A S
E
II
A T
TH
E
N A
TI
O
N A
L
IN
S
TI
TU
TE
S O
F H
E A
LT
H
NAME
WRK REQ. NO.
PROJ. OFFICER
PROJ. DIR.
SUB. DATE
SUBMISSION
PROJ. NO.
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
251180
CONSTRUCTION CONTRACTOR
CONSTRUCTION WORK
PERKINS+ WILL
263-00-C-0206
A/E SUB FIRM
CONSTR. CON.
PORTER NEUROSCIENCE
9000 ROCKVILLE PIKE
BETHESDA
MARYLAND 20892
35 PHASE 2
PHILLIP W. NEUBERG, AIA
ROBERT MCDONALD, P.E.
FINAL BID DOCUMENTS
01/29/2010
NIH - HQC90516
LANDSCAPE CONSULTANT:
JORDAN HONEYMAN
LANDSCAPE ARCHITECTURE
711 FLORIDA AVE. NW
WASHINGTON, DC 20001
T: 202.986.0711
OFFICE OF
RESEARCH FACILITIES
DIVISION OF PROPERTY MANAGEMENT
JAN 29, 2010 GMP BID PROPOSAL SET
JOHNSON BERNAT
ASSOCIATES, INC.
1395 PICCARD DR. SUITE 350
ROCKVILLE, MD 20850
T: 301.963.1133
2/
/2
5:
:5
P
M C
:\D oc u m en ts a nd S et tin gs \e ra th j\D es kt op
\R ev it Lo ca l
F ile s\
.0
-W D
C
LO
C A
L\
.0
-W D
C (e ra th j).
r v t
AI-3-02
IN
TE
R I O
R W
A L L
S E
C T I
O N
Checker
Author
860179.000
JANUARY 29, 2010
Approver
1 : 204 ADMIN CORRIDOR WALL SECTION
1 : 203 MEETING ROOM SECTION
1 : 205 ADMIN CORRIDOR WALL SECTION 2
NOTE: FOR VERTICAL WALL DIMENSIONS SEE 3/ AI-2-01 NOTE: FOR VERTICAL WALL DIMENSIONS SEE 3/ AI-2-01
1 : 202 TYPICAL LAB WALL SECTION
NO ISSUE DATE
1 PRE-BID 2010-02-
1 : 201 PI OFFICE WALL SECTION
File details come from the government source that posted it. Updated .