This document contains a NEPA environmental checklist and related federal contract opportunity. The NEPA checklist is for the B571 Nautilus Museum and Library partial roof replacement project at Naval Submarine Base New London in Groton, Connecticut. It details the project scope and assesses environmental impacts and requirements. Key requirements include stormwater management, cultural resource protections, and hazardous waste disposal procedures.

The related federal contract opportunity is a sealed bid solicitation for the B571 roof replacement project. The Navy seeks a firm-fixed price contract for a Women-Owned Small Business or Economically Disadvantaged Women-Owned Small Business contractor to furnish all labor, materials, equipment and services to fully replace one roof section and repair other areas. The NAICS code is 236220 for commercial and institutional building construction. Bids are due by the response date specified in the solicitation documents provided. Award will be made to the responsible offeror providing the lowest price proposal conforming to the invitation for bid.

View the file

Other files

File Type Posted
22B2500 Abstract.pdf PDF
Amendment 007.pdf PDF
Scope of Work V3.pdf PDF
Drawing A103 Plan Keynotes w Library Note.pdf PDF
Amendment 006.pdf PDF
Amendment 005.pdf PDF
Amendment 004.pdf PDF
Amendment 003.pdf PDF
Laydown Image.pdf PDF
Amendment 002.pdf PDF
Final RFI Responses.pdf PDF
Floor plans and RCPs.pdf PDF
Price Proposal Form V2.pdf PDF
Drawing A103 Plan and Keynotes V2.pdf PDF
Scope of Work V2.pdf PDF
RFI Responses Part I.pdf PDF
Amendment 001.pdf PDF
Site Visit Attendees.xlsx XLSX spreadsheet
Specifications V2.pdf PDF
Drawing - Building Sections.pdf PDF
B571-035.details.pdf PDF
Drawing - Roof Details.pdf PDF
Drawing - Plan and Keynotes.pdf PDF
Price Proposal Form.pdf PDF
Drawing -Building Sections.pdf PDF
HAZ Waste Mgmt Plan.pdf PDF
Scope of Work.pdf PDF
N4008522B2500.pdf PDF
Drawing -Original Plan.pdf PDF
Photo Sketches.pdf PDF
HAZMAT Report.pdf PDF
Specifications.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON

NEW FORM EFFECTIVE 07/10/2020. This NEPA Environmental Checklist (EC) is used to determine the environmental requirements associated with a proposed project. Complete the first 2 pages of the form, attach a site map and a SOW or 1391, and then submit to the PWD Environmental Division (EV). A complete EC with required attachments should be submitted a minimum of 15 days prior to project’s scheduled start date. If the project scope is modified or if project work has not been initiated within 1 year of the signature date, please contact EV for review/approval prior to initiating project activities.

GENERAL PROJECT INFORMATION

1 Activity Requesting: FEAD

2 Activity POC / Phone / email: Kalyani Baxi / 860 518 3491 / Kalyani.baxi@navy.mil

3 Name of Project: B571 Roof Replacement

4 Project Number (if any): 1655760

5 Project Location: B571 – Nautilus Museum and Library, Groton, CT

6 Project Type: Repair by Replacement

7 Description of the Project: The project replaces existing EPDM roof with modified bitumen roof.

8 Why is this project needed? The building has experienced leaks and the roofing survey suggests the roof is in poor condition and has life expectancy of only 2-4 years.

9 When project scheduled to begin? Fall 2021

PLANNING QUESTIONS

10a Total Project Area (sq. ft.) - (Include clear zones, soil disruption/disturbance area, lay down areas, etc) 600 sf for laydown area

10b Percentage of Project Area - that is currently Impervious (asphalt, bldgs, etc.) 100

10c Percentage of Project Area - that will be Impervious once project completed 100

10d Percentage of Project Area - that will be disturbed (excavated, graded, etc) 0

11 How will Stormwater be managed in the long-term (post-construction)? No change

12 How will Sanitary Sewage (wastewater) be managed in the long-term? No change

13 Will there be actions conducted in the water (dredging, new pilings, removal etc.)? If so indicate state what action(s). No

14 Will there be actions conducted in an area under an Agriculture outlease? No

DESIGN RELATED QUESTIONS YES NO UNSURE

15 Will trees be removed?

16 Will emission-generating equipment (e.g. bull dozer, back hoe, etc.) be utilized during construction?

17 Will the project remove, install or utilize a petroleum storage tank, that is >=55-gallons?

18 Will the project remove or install an Oil Water Separator?

19 Will the project relocate excavated material at the Installation? If yes where is it going?

Will the construction / repair actions generate by-products (power washing water, haz. waste, state regulated waste such as asbestos, PCB items, transformers, capacitors, switches, light ballasts, lead paint chips, florescent bulbs, waste oil, solvents, etc)? If so indicate what type of waste(s) will be generated. Pressure washing is required by the manufacturer in advance of the roofing application in order to obtain the 20-year roofing warranty.

21 Will the construction / repair actions require de-watering from excavations, trenches or manholes? If yes, circle where de-watering will occur?

DESIGN RELATED QUESTIONS YES NO UNSURE

22 Will there be new hard pipe connections or modifications to existing hard pipe connections using water from Groton Utilities, the Thames, or wells?

Will new hard pipe connections or modifications to existing hard pipe connections discharge wastewater to the sanitary sewer, storm sewer or the Thames River? If so circle discharge type.

24 Will there be UST or AST installation, modification, or removal? If so indicate which type of tank and which action.

25 Will there be installation, repair, modification or removal of any system containing refrigerants

(e. g. freon, halon)?

26 Will there be modifications, destruction, or disturbance of the shoreline, streams, groundwater tables, surface water bodies, or wetlands? If so, explain.

Will there be any excavation and/or dewatering with the potential to impact the designated CT Coastal Zone (i.e., 1,000 feet inland from the MHW line)? If so, what type of activity will occur that can potentially impact the coastal zone area?

28 New proposed use and/or application of pesticides, rodenticides and herbicides? If so, indicate which type.

29 Will the project require pile driving?

OPERATIONAL RELATED QUESTIONS YES NO UNSURE

30 Will emission-generating equipment be installed (ex. paint booth, emergency generators)? If so, what type of equipment will be installed?

31 Will there be any new processes or maintenance activities conducted? If so, describe what they are.

ADDITIONAL COMMENTS

Type here:

SAME 3/9/2021

Checklist Preparer, phone number and e-mail (if Same as Question #2 – Type “SAME”) Date

NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON

SUMMARY OF ENVIRONMENTAL REQUIREMENTS

(To Be Completed by Environmental Division Only) PLEASE NOTE: The Environmental review provided is only valid for 1 year. If the project scope has been modified or checklist has expired, please contact the SUBASENLON PW Environmental Division to re-evaluate the project.

Name of Project: B571 Roof Replacement

Project Number: 1655760

PLANNING REQUIREMENTS (Issues That Can Effect the Project’s Timeline, Cost, or Site Location) Environmental Aspect YES NO Environmental Requirement Project Impacts

National Env Policy Act (NEPA) CATEX CATEX = 1 week; EA = 12 months; EIS = 24 months Can’t award till NEPA complete

Threatened or Endangered Species Consultation with USFWS and/or NMFS required. Process may take 6 months

Marine Mammal Protection Act IHA or LOA Consultation with NMFS May take 4 to 18 months

Wetland Impacts Permits and possibly mitigation required. May take 7 months after

NEPA

Navigable Water Impacts Permits required. Takes 2-7 months after

NEPA

Agriculture Outlease Consultations with NAVFAC Real Estate required. Process may take 1 to 3 months.

Tree Mitigation Compensation for tree loss or mitigation is required. This may add costs to project.

Coastal Zone Mgmt Act Refer to Requir 1. Process takes 90 days.

Cultural Resources Refer to Requir 2. Process may take 1 to 6 months

Major Air Emission Source Permit is required. Process takes 6 months

Construction Emissions Refer to Comment 2. This process takes a week.

Installation Restoration Refer to Requirs 3 and 4. Process may take 4 months

Petroleum Contamination Follow guidance in CNRMA POL SOP. This may add costs to project.

DESIGN REQUIREMENTS (Issues To Be Addressed In Design Phase) Storm Water Best Mgmt

Practices, Erosion & Sediment Control

Required for projects that include excavation or other land disturbance. Incorporate into the design.

CT Storm Water Mgmt Permit Required for projects that will disturb ≥ 1 acre of land. Obtain before construction.

De-watering, Wastewater Mgmt Protective measures required for managing excess waters. Incorporate into the design.

Beach & Dune Management Refer to Requir 5. Incorporate into the design.

Spill Preventative Measures Secondary containment required for tanks ≥ 55 gal Incorporate into the design.

OPERATIONAL REQUIREMENTS (Issues To Be Addressed Prior To Use)

New Industrial Process Environmental Department Site Inspection required. Required before operation.

New Waste Generating Activity Environmental Department Site Inspection required. Required before operation.

ADDITIONAL REQUIREMENTS or COMMENTS Comment 1 The proposed action is within the scope of CATEX #8: Routine repair and maintenance of buildings, facilities, vessels, aircraft, ranges, and equipment associated with existing operations and activities. None of the exclusions from reliance on a CATEX applies in this case; therefore, the proposed action does not require further NEPA analysis.

The applicability of this CATEX determination is based on the full implementation of all environmental requirements identified below.

Comment 2 A Record of Non-Applicability was completed to document compliance with the General Conformity Rule, Section 176(c) of the Clean Air Act. The proposed action is exempt by rule per 40 CFR 93.153(iv).

Requir 1 Work at B571 occurs in the coastal zone; however, a Coastal Consistency Determination is not required provided that no deleterious material enters storm drains, manholes, or the Thames River.

Requir 2 Historic assets are displayed and stored in B571 and are on exhibit on the museum grounds. Work activities shall not alter, damage, or negatively impact any historic assets.

Requir 3 Land use controls (LUCs) for soil and groundwater are in place adjacent to the museum (Site 8) and a landfill cap is present at Site 8. Work activities shall not disturb, damage, or otherwise affect the integrity of the cap.

Requir 4 B571 is located in or near an IR zone/site. However, no ground-disturbing activities are included in the scope of work.

If ground-disturbing activities are planned, a dig permit shall be obtained prior to the initiation of such activity.

Requir 5 The contractor shall obtain a permit to discharge wastewater from the CT Department of Energy & Environmental Protection prior to initiating power washing. PW NLON EV Division Wastewater Program Manager (x2525) shall be notified in advance of any planned discharges to ensure compliance with permit requirements.

Requir 6 The manufacturer’s VOC data sheet(s) and SDS sheet(s) for any coatings or adhesives shall be provided to the PW NLON EV Division Air Program Manager for verification that the VOC content is within established CT Architectural, Industrial and Maintenance (AIM) limits and to the PW NLON EV Division EPCRA Manager.

Requir 7 The PWD Asbestos Program Manager shall be contacted for past asbestos survey data for B571. Existing facility HAZMAT surveys shall be reviewed prior to any facility disturbance. If suspect hazardous materials (such as asbestos and lead paint) are present and are anticipated to be disturbed under the scope of the project, surveys shall be conducted by qualified individuals in advance of construction activity. All survey results shall be provided to the PW NLON EV Division.

Requir 8 Disposal of any regulated waste shall be coordinated in advance with the PW NLON Hazardous Waste Program Office (x4298).

- Non-regulated solid waste (i.e., general trash, construction debris, and recyclable items) shall be properly managed and disposed of in accordance with Federal, State, Navy, and local regulations.

- Any regulated waste generated under the scope of this project shall be managed, stored, and disposed of in accordance with the SUBASENLON Hazardous Waste Management Plan.

Requir 9 Use of exterior storage and laydown areas in support of this project shall be done in compliance with SUBASENLON instructions and policies. Site must be evident of good housekeeping practices consistent with proper storm water management and control.

LCDR Christopher Sandmel; x4480;

christopher.sandmel@navy.mil

Environmental POC; phone number and email Signature and Date mailto:christopher.sandmel@navy.mil

DESIGN RELATED QUESTIONS
DESIGN RELATED QUESTIONS
2021-04-12T12:33:45-0400
SANDMEL.CHRISTOPHER.ADAM.1266626238

File details come from the government source that posted it. Updated .