This document contains an amendment to a solicitation and responses to questions from offerors. The solicitation is for a partial roof replacement project at the Naval Submarine Base New London in Groton, Connecticut. The work includes full replacement of one roof section and repair of other areas. The requirement is for a firm-fixed price contract set aside for women-owned small businesses or economically disadvantaged women-owned small businesses. Offerors must submit responses by the due date in the solicitation. The amendment provides responses to questions on warranty requirements, vapor barriers, cover boards, roof insulation and sheathing repairs, and accessibility to roof areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22B2500 Abstract.pdf | ||
| Scope of Work V3.pdf | ||
| Drawing A103 Plan Keynotes w Library Note.pdf | ||
| Amendment 006.pdf | ||
| Amendment 005.pdf | ||
| Amendment 004.pdf | ||
| Amendment 003.pdf | ||
| Laydown Image.pdf | ||
| Amendment 002.pdf | ||
| Final RFI Responses.pdf | ||
| Floor plans and RCPs.pdf | ||
| Price Proposal Form V2.pdf | ||
| Drawing A103 Plan and Keynotes V2.pdf | ||
| Scope of Work V2.pdf | ||
| RFI Responses Part I.pdf | ||
| Specifications V2.pdf | ||
| Amendment 001.pdf | ||
| Site Visit Attendees.xlsx | XLSX spreadsheet | |
| Drawing - Building Sections.pdf | ||
| B571-035.details.pdf | ||
| Drawing - Roof Details.pdf | ||
| Drawing - Plan and Keynotes.pdf | ||
| Drawing -Original Plan.pdf | ||
| Photo Sketches.pdf | ||
| HAZMAT Report.pdf | ||
| Specifications.pdf | ||
| Price Proposal Form.pdf | ||
| Drawing -Building Sections.pdf | ||
| HAZ Waste Mgmt Plan.pdf | ||
| NEPA.pdf | ||
| Scope of Work.pdf | ||
| N4008522B2500.pdf |
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFI Responses Please see the responses to recently received querries below . As there is less than one w eek left to bidding, please refrain from submitting additional RFI.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Dec-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008522B2500
X 9B. DATED (SEE ITEM 11)
27-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Dec-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
PWD NEW LONDON
BOX 400.BLDG 135
NAVAL SUBMARINE BASE NEW LONDON
GROTON CT 06349-5026
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008522B2500
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
- Is this FM insured?
See page 84 of Specs, Section 1.7 and page 93 of Specs, Section 1.1 for FM approval requirements.
- Is there a vapor barrier? If so, what would it be?
See page 87 of Specs, Section 2.4.1 for vapor barrier requirements
- A cover board is mentioned in the specs? Not shown on the drawing on Page A103.
Provide cover board per Specifications page 87, Section 2.2.
- For the Museum Area, there is an exposed acoustical ceiling. Will we have to Olybond (adhere) the insulation to the acoustical decking?
Yes.
- Is there access to the small roofs in the back of the building? Windows to climb out of?
Per RFI Part I, Question 3:
Please provide accessibility information to the rear smaller roofs (near Pond).
There is no direct access to the rear small roofs. The roofs may be accessed from the higher roof (main building roof) for the workers through a ladder that does not exist to any of those small roofs. A lull may have to be used for the materials and equipment transport.
- Can you verify new warranty length and wind speed (Specs say 135 mph for a MOD Bit roof) See page 99 of Specs, Section 1.8 “Warranty” for warranty information See 97 of Specs, Section 1.4.4 “Wind Uplift Resistance” , page 117 of Specs, Section 1.9 “Wind Uplift Resistance”, See page 88 of Specs, Section 2.5 “Fasteners” for wind speed information
- On Page A103 Roof Drawing, should we carry a unit price for wet or deteriorated roof insulation or gypsum board for infrared scanning sections?
Per RFI Part I, Question 20(b):
Drawing A103 note 2 Demolition & Construction Keynotes notes to – “assess roofing condition using infrared scanning identify any damage, deteriorated and wet roof areas. Repair all deteriorated and wet insulation and sheathing. Install new gypsum sheathing, insulation and EPDM roofing to match level and slope of existing roofing.” If infrared scans have been previously performed, please provide results. If the contractor is to include infrared scans in the proposal, areas of wet and or deteriorated roof cannot be determined before infrared scanning is performed. Should a certain percentage of roof be carried for replacement or square foot cost? Please clarify.
Include 15% roof area to be wet.