N68335-12-R-0089 RFP.doc
DOC document 809 KB Posted
- Attached to
- Mobile Maintenance Facilities (MMF)
- Solicitation number
- N68335-12-R-0089
About this file
Mobile Facilities
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N68335-12-R-0089 AMD 0006.doc | DOC document | |
| N68335-12-R-0089 AMD 0005.doc | DOC document | |
| N68335-12-R-0089 AMD 0004.doc | DOC document | |
| 133AS384.pdf | ||
| Attachment 7 MF SOW REV1.doc | DOC document | |
| N68335-12-R-0089 AMD 0002.doc | DOC document | |
| Exhibit C CDRL A003A.pdf | ||
| Attachment 6 NA-19-25-177--TechManual--2011-11-14.pdf | ||
| Exhibit B CDRL A003.pdf | ||
| 1339AS Drawings Addenda.pdf | ||
| 1339AS Coatings Addenda.pdf | ||
| N68335-12-R-0089 AMD 0001.docx | DOCX document | |
| MF SOW.doc | DOC document | |
| MF CDRLs Exhibit A.pdf | ||
| MF Logistics Statement of Work.doc | DOC document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section A - Solicitation/Contract Form
SECTION A
1) This will be a Fixed-Price Indefinite Delivery/ Indefinite Quantity (IDIQ) Contract for the procurement of six (6) First Article Test (FAT) Mobile Facility (MF) units, technical and logistics data items, and up to 400 MF Production units in accordance with Attachment 1, Statement of Work, Attachment 2, Integrated Logistics Support Statement of Work, Attachment 3, Drawing Package 1339AS463, and Exhibit A, DD Form 1423’s, Contract Data Requirements List.
2) A Single-Award contract is intended to be issued for this requirement.
3) The guaranteed minimum for this contract is six (6) FAT MF units (CLINS 0001-0006). The guaranteed minimum will be met upon D.O. 0001 upon award of the basic contract.
4) The maximum quantity that may be ordered under this contract is six (6) FAT MF units and up to 400 MF Production units.
5) Delivery Orders may be placed as follows:
Year 1- CLINs 0001-0006: Delivery Order 0001 will be placed upon award of the basic contract.
Year 1- CLINs 0007-0013 and 0042-0050: May be ordered from the date of contract award through 365 days after Government Release for Production.
Year 2- CLINs 0014-0020: May be ordered from the date of contract award through 730 days after Government Release for Production.
Year 3- CLINs 0021-0027: May be ordered from the date of contract award through 1,095 days after Government Release for Production.
Year 4- CLINs 0028-0034: May be ordered from the date of contract award through 1,460 days after Government Release for Production.
Year 5- CLINs 0035-0041: May be ordered from the date of contract award through 1,825 days after Government Release for Production.
6) THE ISSUANCE OF PRODUCTION DELIVERY ORDERS AND RELEASE FOR
PRODUCTION ARE SEPARATE EVENTS. BOTH MUST HAVE OCCURRED BEFORE
PRODUCTION MAY COMMENCE. IN NO CASE WILL RELEASE FOR PRODUCTION BE
GRANTED PRIOR TO SUCCESSFUL COMPLETION OF FIRST ARTICLE TEST (FAT)
UNIT TESTING AND ACCEPTANCE OF THE FAT REPORT (CDRL A003A).
7) FAT UNITS ARE SEPARATE FROM PRODUCTION UNITS AND WILL NOT BE COUNTED AS PRODUCTION UNITS.
8) Proposal validity shall be for 180 days or longer as annotated by the offeror in Block 12 of the cover page of the SF33.
9) The Government Contracts Point of Contact is:
Danielle DiLorenzo
CODE: 2.5.2.1.1
Phone: 732-323-7067
Fax: 732-323-2359
Email: danielle.dilorenzo@navy.mil Mail Proposals to:
NAWCAD Contracts Dept.
Attn: Danielle DiLorenzo, Code: 2.5.2.1.1
HWY 547 Bldg 562-3
Lakehurst, NJ 08733
In accordance with Section L, sealed offers with original and five (5) copies of the Technical and Past Performance Volumes and one (1) copy of the Cost Volume for furnishing the supplies or services in the Schedule are due by 3:00 PM Eastern Time on 24 July 2012. Proposals are not to be submitted via facsimile of electronically via e-mail.
NOTE: Attachment 003, Drawing Package 1339AS463, will be provided separately on a CD-ROM upon request.
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
First Article Test (FAT) MFA
FFP
Mobile Facility, Type A P/N 1339AS700-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; Attachment 3, "Drawing Package 133AS463"; and Exhibit A "DD Form 1423, Contract Data Requirements List"
FOB: Destination
NSN: 54111000000769
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
First Article Test (FAT) MFSOA
Mobile Facility, Side Opening Type A P/N 1339AS500-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; Attachment 3, "Drawing Package 133AS463" and Exhibit A "DD Form 1423, Contract Data Requirements List"
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
First Article Test (FAT) MFSOB
Mobile Facility, Side Opening Type B P/N 1339AS501-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; Attachment 3, "Drawing Package 133AS463" and Exhibit A "DD Form 1423, Contract Data Requirements List"
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
First Article Test (FAT) MFI
Mobile Facility, Integration unit P/N 1339AS900-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; Attachment 3, "Drawing Package 133AS463" and Exhibit A "DD Form 1423, Contract Data Requirements List"
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
First Article Test (FAT) MFSODD
Mobile Facility, Side Opening w/ Double Doors P/N 1339AS1000-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; Attachment 3, "Drawing Package 133AS463" and Exhibit A "DD Form 1423, Contract Data Requirements List"
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
First Article Test (FAT) MFSOC
Mobile Facility, Side Opening Type C P/N 1339AS1101-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; Attachment 3, "Drawing Package 133AS463" and Exhibit A "DD Form 1423, Contract Data Requirements List"
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type A P/N 1339AS700-1
Production Year One (1) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
61-80 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type B P/N 1339AS701-1
Production Year One (1) for Mobile Facility Type B P/N 1339AS701-1in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type A P/N 1339AS500-1
Production Year One (1) for Mobile Facility Side Opening Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type B P/N 1339AS501-1
Production Year One (1) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF Integration Unit P/N 1339AS900-1
Production Year One (1) for Mobile Facility Integration unit P/N 1339AS900-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO w/ DD P/N 1339AS1000-1
Production Year One (1) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type C P/N 1339AS1101-1
Production Year One (1) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type A P/N 1339AS700-1
Production Year Two (2) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type B P/N 1339AS701-1
Production Year Two (2) for Mobile Facility Type B P/N 1339AS701-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type A P/N 1339AS500-1
Production Year Two (2) for Mobile Facility Side Opening Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type B P/N 1339AS501-1
Production Year Two (2) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF Integration Unit P/N 1339AS900-1
Production Year Two (2) for Mobile Facility Integration unit P/N 1339AS900-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO w/ DD P/N 1339AS1000-1
Production Year Two (2) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type C P/N 1339AS1101-1
Production Year Two (2) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type A P/N 1339AS700-1
Production Year Three (3) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type B P/N 1339AS701-1
Production Year Three (3) for Mobile Facility Type B P/N 1339AS701-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type A P/N 1339AS500-1
Production Year Three (3) for Mobile Facility Side Opening Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type B P/N 1339AS501-1
Production Year Three (3) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF Integration Unit P/N 1339AS900-1
Production Year Three (3) for Mobile Facility Integration unit P/N 1339AS900-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO w/ DD P/N 1339AS1000-1
Production Year Three (3) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type C P/N 1339AS1101-1
Production Year Three (3) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type A P/N 1339AS700-1
Production Year Four (4) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type B P/N 1339AS701-1
Production Year Four (4) for Mobile Facility Type B P/N 1339AS701-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type A P/N 1339AS500-1
Production Year Four (4) for Mobile Facility Side Opening Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type B P/N 1339AS501-1
Production Year Four (4) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF Integration Unit P/N 1339AS900-1
Production Year Four (4) for Mobile Facility Integration unit P/N 1339AS900-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO w/ DD P/N 1339AS1000-1
Production Year Four (4) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type C P/N 1339AS1101-1
Production Year Four (4) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type A P/N 1339AS700-1
Production Year Five (5) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
Mobile Facility Type B P/N 1339AS701-1
Production Year Five (5) for Mobile Facility Type B P/N 1339AS701-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type A P/N 1339AS500-1
Production Year Five (5) for Mobile Facility Side Opening Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF Integration Unit P/N 1339AS900-1
Production Year Five (5) for Mobile Facility Integration unit P/N 1339AS900-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type B P/N 1339AS501-1
Production Year Five (5) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO w/ DD P/N 1339AS1000-1
Production Year Five (5) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
MF SO Type C P/N 1339AS1101-1
Production Year Five (5) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; and Attachment 3, "Drawing Package 133AS463".
Quantities Unit Price
1-20 EA
21-40 EA
41-60 EA
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
Program Schedule
IAW SOW Paragraph 3.1 and Exhibit A, CDRL A001
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
Bill of Materials
IAW SOW Paragraph 3.2 and Exhibit A, CDRL A002
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
Technical Interchange Meeting
IAW SOW Paragraph 3.3 and Exhibit A, CDRL A002A
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
FAT Plan
IAW SOW Paragraph 3.4 and Exhibit A, CDRL A003
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
FAT Report
IAW SOW Paragraph 3.6 and Exhibit A, CDRL A003A
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
Engineering Change Proposal (ECP) Short
IAW SOW Paragraph 3.8 and Exhibit A, CDRL A004
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
Request for Deviation (RFD)
IAW SOW Paragraph 3.8 and Exhibit A, CDRL A005
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
Request for Waiver (RFW)
IAW SOW Paragraph 3.8 and Exhibit A, CDRL A006
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
Engineering Change Proposal (ECP)
IAW SOW Paragraph 3.8 and Exhibit A, CDRL A007
MAX
Section C - Descriptions and Specifications
DESCRIPTIONS AND SPECIFICATION
Items 0001- 0006: The contractor shall manufacture, test and deliver the First Article Test (FAT) Mobile Facility (MF) units in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; Attachment 3, "Drawing Package 133AS463"; and Exhibit A "DD Form 1423, Contract Data Requirements List".
Items 0007-0041: The contractor shall manufacture, test and deliver MF Production units in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)" dated March 2012; Attachment 2, "Integrated Logistics Support SOW"; Attachment 3, "Drawing Package 133AS463"; and Exhibit A "DD Form 1423, Contract Data Requirements List".
Items 0042-0050: The technical data to be furnished hereunder shall be in accordance with Exhibit A, Contract Data
Requirements List, DD Form 1423.
The Contractor shall provide the supplies and/or services in accordance with Section J Attachment 001, Statement of Work (SOW); Attachment 002, Integrated Logistics Support Statement of Work (ILSSOW); Attachment 003, NAVAIR technical drawing package 1339AS463; and Exhibit A, Contract Data Requirements List (CDRLs).
CLAUSES INCORPORATED BY FULL TEXT
5252.211-9509
INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL (NAVAIR)(OCT 2005)
The Contractor's Technical Proposal Number [____TBD_____], dated [_____TBD_____], and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause 52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a “Specification” but the Government's Specification shall take precedence over the Contractor's technical proposal.
Section D - Packaging and Marking
CLAUSES INCORPORATED BY FULL TEXT
5252.247-9503
MARKING OF WARRANTED ITEMS (NAVAIR) (OCT 2005)
(a) Each item covered by a warranty shall be stamped or marked in accordance with MIL-STD-129, Marking for Shipment and Storage, and MIL-STD-130, Identification Marking of U.S. Military Property, current at the date of award. Where this is impracticable, written notice shall be attached to or furnished with the warranted item.
(b) Each item covered by a warranty shall have a written notice attached to or furnished with the warranted item, and marked with the following:
(1) National stock number or manufacturer’s part number.
(2) Serial number or other item identifier (if the warranty applies to uniquely identified items).
(3) Contract number.
(4) Indication that a warranty applies.
(5) Manufacturer or entity (if other than the contractor) providing the warranty.
(6) Date or time when the warranty expires.
(7) Indication of whether or not attempted on-site repair by Government personnel will void the warranty.
CLAUSES INCORPORATED BY FULL TEXT
5252.247-9507
PACKAGING AND MARKING OF REPORTS (NAVAIR) (OCT 2005)
(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M.
(b) The contractor shall prominently display on the cover of each report the following information:
(1) Name and business address of contractor.
(2) Contract Number/Delivery/Task order number.
(3) Contract/Delivery/Task order dollar amount.
(4) Whether the contract was competitively or non-competitively awarded.
(5) Name of sponsoring individual.
(6) Name and address of requiring activity.
5252.247-9508
PROHIBITED PACKING MATERIALS (NAVAIR) (JUN 1998)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
5252.247-9514
TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR) (SEP 1999)
Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Origin |
| Government |
| Origin |
| Government |
| 0008 |
| Origin |
| Government |
| Origin |
| Government |
| 0009 |
| Origin |
| Government |
| Origin |
| Government |
| 0010 |
| Origin |
| Government |
| Origin |
| Government |
| 0011 |
| Origin |
| Government |
| Origin |
| Government |
| 0012 |
| Origin |
| Government |
| Origin |
| Government |
| 0013 |
| Origin |
| Government |
| Origin |
| Government |
| 0014 |
| Origin |
| Government |
| Origin |
| Government |
| 0015 |
| Origin |
| Government |
| Origin |
| Government |
| 0016 |
| Origin |
| Government |
| Origin |
| Government |
| 0017 |
| Origin |
| Government |
| Origin |
| Government |
| 0018 |
| Origin |
| Government |
| Origin |
| Government |
| 0019 |
| Origin |
| Government |
| Origin |
| Government |
| 0020 |
| Origin |
| Government |
| Origin |
| Government |
| 0021 |
| Origin |
| Government |
| Origin |
| Government |
| 0022 |
| Origin |
| Government |
| Origin |
| Government |
| 0023 |
| Origin |
| Government |
| Origin |
| Government |
| 0024 |
| Origin |
| Government |
| Origin |
| Government |
| 0025 |
| Origin |
| Government |
| Origin |
| Government |
| 0026 |
| Origin |
| Government |
| Origin |
| Government |
| 0027 |
| Origin |
| Government |
| Origin |
| Government |
| 0028 |
| Origin |
| Government |
| Origin |
| Government |
| 0029 |
| Origin |
| Government |
| Origin |
| Government |
| 0030 |
| Origin |
| Government |
| Origin |
| Government |
| 0031 |
| Origin |
| Government |
| Origin |
| Government |
| 0032 |
| Origin |
| Government |
| Origin |
| Government |
| 0033 |
| Origin |
| Government |
| Origin |
| Government |
| 0034 |
| Origin |
| Government |
| Origin |
| Government |
| 0035 |
| Origin |
| Government |
| Origin |
| Government |
| 0036 |
| Origin |
| Government |
| Origin |
| Government |
| 0037 |
| Origin |
| Government |
| Origin |
| Government |
| 0038 |
| Origin |
| Government |
| Origin |
| Government |
| 0039 |
| Origin |
| Government |
| Origin |
| Government |
| 0040 |
| Origin |
| Government |
| Origin |
| Government |
| 0041 |
| Origin |
| Government |
| Origin |
| Government |
| 0042 |
| Destination |
| Government |
| Destination |
| Government |
| 0043 |
| Destination |
| Government |
| Destination |
| Government |
| 0044 |
| Destination |
| Government |
| Destination |
| Government |
| 0045 |
| Destination |
| Government |
| Destination |
| Government |
| 0046 |
| Destination |
| Government |
| Destination |
| Government |
| 0047 |
| Destination |
| Government |
| Destination |
| Government |
| 0048 |
| Destination |
| Government |
| Destination |
| Government |
| 0049 |
| Destination |
| Government |
| Destination |
| Government |
| 0050 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
| 5252.246-9514 |
| INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION |
| FEB 1995 |
5252.246-9512
INSPECTION AND ACCEPTANCE (NAVAIR) (OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by the cognizant DCMA office for source line items and the NAVAIR Program Team Lead, or designee, for the Destination line items, in accordance with the drawing package.
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
Section F - Deliveries or Performance
DELIVERY
Items 0001-0050: Deliveries of supplies, services and data items to be furnished hereunder shall be in accordance with FAR 52.211-8, “Time of Delivery”.
CLAUSES INCORPORATED BY REFERENCE
| 52.211-17 |
| Delivery of Excess Quantities |
| SEP 1989 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-29 |
| F.O.B. Origin |
| FEB 2006 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
52.211-8
TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
| ITEM NUMBER |
| MAX QTY |
| WITHIN DATE AFTER |
DELIVERY ORDER
DELIVERY ADDRESS
1 Each
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 180 days ADC IAW CDRL A003A.
MF Type A P/N 1339AS700-1
Completion of the First Article Test unit is required within 180 Days After Contract (DAC).
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0002 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 180 days ADC IAW CDRL A003A.
MF Side Opening Type A P/N 1339AS500-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0003 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 180 days ADC IAW CDRL A003A.
MF Side Opening Type B P/N 1339AS501-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0004 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 180 days ADC IAW CDRL A003A.
MF Integration Unit P/N 1339AS900-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0005 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 180 days ADC IAW CDRL A003A.
MF Side Opening w/ Double Doors P/N 1339AS1000-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0006 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 180 days ADC IAW CDRL A003A.
MF Side Opening Type C P/N 1339AS1101-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
MF Type A P/N1339AS700-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type A P/N1339AS700-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type A P/N1339AS700-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type A P/N1339AS700-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type A P/N1339AS700-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
| 0042-0050 |
| 1 Lot |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A. |
In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A.
Delivery is FOB Destination.
WITHIN DAYS AFTER
ITEM NO.
QUANTITY
DATE OF CONTRACT
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
WITHIN DAYS AFTER
ITEM NO.
QUANTITY
DATE OF CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
5252.216-9506
MINIMUM AND MAXIMUM QUANTITIES (NAVAIR) (MAR 1999)
As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is [Six (6) First Article Test (FAT) MF units (CLINs 0001-0006)]; the maximum quantity is [six (6) FAT MF units (CLINs 0001-0006), 400 MF Production units (CLINs 0007-0041) and associated data items (CLINs 0042-0050)].
5252.247-9505
TECHNICAL DATA AND INFORMATION (NAVAIR) (FEB 1995)
Technical Data and Information shall be delivered in accordance with the…
This is the start of the file's text. The full file is on GovTribe.