N68335-12-R-0089 AMD 0002.doc
DOC document 265 KB Posted
- Attached to
- Mobile Maintenance Facilities (MMF)
- Solicitation number
- N68335-12-R-0089
About this file
N68335-12-R-0089 AMD 0002 to provide clarifications to offerors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N68335-12-R-0089 AMD 0006.doc | DOC document | |
| N68335-12-R-0089 AMD 0005.doc | DOC document | |
| N68335-12-R-0089 AMD 0004.doc | DOC document | |
| 133AS384.pdf | ||
| Attachment 7 MF SOW REV1.doc | DOC document | |
| Exhibit C CDRL A003A.pdf | ||
| Attachment 6 NA-19-25-177--TechManual--2011-11-14.pdf | ||
| Exhibit B CDRL A003.pdf | ||
| 1339AS Drawings Addenda.pdf | ||
| 1339AS Coatings Addenda.pdf | ||
| N68335-12-R-0089 AMD 0001.docx | DOCX document | |
| MF SOW.doc | DOC document | |
| MF CDRLs Exhibit A.pdf | ||
| N68335-12-R-0089 RFP.doc | DOC document | |
| MF Logistics Statement of Work.doc | DOC document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMD 0002
1. The purpose of this amendment is to provide clarification to offerors on solicitation N68335-12-R-0089 Mobile Facilities (MF) as follows:
QUESTION 1:
Are First Article Test (FAT) shelters to be fully integrated shelters or bare shelters?
ANSWER 1:
Shelters shall be built to the drawing package specifications.
QUESTION 2:
Is there a potential of revising the schedule in order to make the delivery of FAT units 150 days After Date of Contract (ADC) and the completion of FAT and submission of FAT Report 240 days ADC?
ANSWER 2:
To clarify, within 60 days after contract, an acceptance test plan shall be provided in accordance with (IAW) CDRL A003; Contractor First Article Qualification Testing shall commence within 90 days ADC and is to be completed within 180 days ADC; and completion of the FAT units is required within 180 Days After Contract (DAC). The Government Technical Team finds 180 days sufficient time to complete FAT units and associated testing. The FAT Report is to be complete 210 DAC in accordance with CDRL A003A.
QUESTION 3:
Is a copy of TM NAVAIR 19-25-177 (referenced in the Integrated Logistics SOW) available?
ANSWER 3:
Attachment 6, “NAVAIR TM 19-25-177” is hereby added to Section J.
QUESTION 4:
What is the last day that offerors can submit questions and or clarification requests to the RFP and Technical Data Package?
ANSWER 4:
Questions can be submitted up until the solicitation closing date of 24 July 2012, however proposals are due at that time.
QUESTION 5:
We noticed that Section C on page 46 says the SOW should be dated March 2012. The SOW posted is dated January 2012. Which is correct?
ANSWER 5:
The correct date is March 2012. Revised SOW, Attachment 7, “SOW REV 1”, which supercedes Attachment 1, “MF SOW”, is hereby added to Section J.
QUESTION 6:
Based on the requirements as stated in the SOW paragraph 1.0, it is our interpretation that the specimen (coupon) testing per 1339AS463 para. 1.3.1 Table 1 will be for one set of representative specimens for the First Article Shelter Lot, and not six separate sets of specimens. Is this interpretation correct?
ANSWER 6:
Correct. Only one set of representative specimens for the First Article Shelter Lot consisting of the six (6) FAT units.
QUESTION 7:
SOW para. 3.5 states that “…all testing will be performed at the contractor’s location.”
However, SOW para. 1.2 notes that in preparation of the proposal narrative, offeror’s are to
“…list any vendors that will be used and the testing they will perform.” Therefore, it is our understanding that the use of outside qualified vendors to perform portions of the required
First Article Tests will be acceptable. Please confirm.
ANSWER 7:
The use of outside qualified vendors to perform portions of the required First Article Tests is acceptable.
QUESTION 8:
The FOB point on CLINs 0007 through 0041 is defined as FOB Origin in Section F delivery schedule but FOB Destination in Section B Supplies or Services. Please confirm.
ANSWER 8:
FOB Origin for CLINs 0007-0041. See revised Section B.
QUESTION 9:
CDRLs A003 First Article Test (FAT) Plan and A003A First Article Test (FAT) Report include under Block 16 1339AS701-1 Mobile Facility Type B (MFB). The MFB has not been included as a First Article requirement in this solicitation. Our interpretation is that the references to the 1339AS701-1 in these CDRLs are not applicable. Please confirm.
ANSWER 9:
The MFB 1339AS701-1 is not included as a First Article requirement and therefore not applicable to these CDRLs. See revised CDRLs, Exhibit B, “CDRL A003 REV1” and Exhibit C, “CDRL A003A REV1” in Section J.
QUESTION 10:
According to SOW para. 3.3, the government intends to conduct at least two technical interchange meetings prior to the manufacturing of the FAT units; the Post Award
Conference approximately 30 days after contract (DAC), and one in follow-up to the Bill of
Material (BOM) submittal 60 DAC. However, SOW para. 3.5 requires that the six (6) FAT unit be tested IAW CSC Testing 90 DAC. Since CSC Testing cannot occur until the units are complete, the combination of these requirements implies that the schedule for material procurement, subassembly, assembly, completion, and CSC testing of the six (6) FAT units must occur in approximately a thirty (30) day window. This appears to be in conflict with
Section F Deliveries wherein First Article Qualification Testing shall commence within 90
DAC. Based upon the Order of Precedence as defined by 52.215-8 it is our understanding that the First Article Qualification Testing, which includes CSC related requirements, shall commence within 90 DAC and complete within 180 DAC. Please confirm.
ANSWER 10:
First Article Qualification Testing, which includes CSC related requirements, shall commence within 90 DAC and complete within 180 DAC.
QUESTION 11:
Section F Deliveries CLINs 001 – 006 state that completion of the First Article Test unit is required within 180 DAC. These CLINs also state that the First Article Test Report (CLIN
0046) shall be submitted within 180 DAC IAW CDRL A003A. However, CDRL A003A
Block 12 defines date of first submission as 210 DAC, which allows a customary 30 day period for preparation of the final test report. Please confirm.
ANSWER 11:
FAT units and FAT testing activity is to be complete within 180 DAC and the FAT
Report submittal per CDRL A003A is to be complete 210 DAC. Section F has been revised.
QUESTION 12:
Section L Instructions Paragraph 4.0 states “…Offeror shall also submit copies of Volume 2
Past Performance information in paragraphs 2.1 and 2.2 two weeks prior to the submission date/time specified in Block 9 of Standard Form 33 of the RFP.” Inasmuch as paragraphs 2.1 and 2.2 represent the totality of Volume 2, this could be interpreted as requiring all of
Volume 2 Past Performance to be submitted two (2) weeks in advance of the rest of the proposal. However, under Volume 2 paragraph 2.1, page 105, third paragraph, it is stated that “All questionnaires shall be forwarded within two weeks from the RFP release date with enough lead-time so that responses can be received by the Government concurrent with the
Government’s receipt of the Offeror’s Past Performance information submitted as per paragraph 4.0. The Offeror shall include instructions for the customers to send completed questionnaires within two weeks of its receipt …” This would appear to indicate that
Volume 2 is expected to be submitted per the submission due date with the expectation that questionnaire responses can be received by the Government concurrently. It is our interpretation that 1) the questionnaires shall be forwarded within two (2) weeks from the
RFP release date, and that 2) a summary of the Customer’s Points of Contact per paragraph 2.2 be provided to the government two (2) weeks prior to the submission date/time of the
RFP, and that 3) Volume 2 is to be submitted per the submission date/time of the RFP.
Please confirm this interpretation.
ANSWER 12:
Only the questionnaires shall be forwarded within two (2) weeks from the
RFP release date. Volume 2 is to be submitted per the submission date/time of the RFP. Section L Instructions Paragraph 4.0 Proposal Submission, has been revised to remove “However, Offeror shall also submit copies of Volume 2 Past Performance information in paragraphs 2.1 and 2.2 two weeks prior to the submission date/time specified in Block 9 of Standard Form 33 of the RFP.”
2. Signed amendments shall be submitted in accordance with Section L of the solicitation.
3. The solicitation closing date is not extended.
4. Contracts POC: Danielle DiLorenzo, 732-323-7067 or danielle.dilorenzo@navy.mil
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0007
The FOB has changed from Destination to Origin.
CLIN 0008
The FOB has changed from Destination to Origin.
CLIN 0009
The FOB has changed from Destination to Origin.
CLIN 0010
The FOB has changed from Destination to Origin.
CLIN 0011
The FOB has changed from Destination to Origin.
CLIN 0012
The FOB has changed from Destination to Origin.
CLIN 0013
The FOB has changed from Destination to Origin.
CLIN 0014
The FOB has changed from Destination to Origin.
CLIN 0015
The FOB has changed from Destination to Origin.
CLIN 0016
The FOB has changed from Destination to Origin.
CLIN 0017
The FOB has changed from Destination to Origin.
CLIN 0018
The FOB has changed from Destination to Origin.
CLIN 0019
The FOB has changed from Destination to Origin.
CLIN 0020
The FOB has changed from Destination to Origin.
CLIN 0021
The FOB has changed from Destination to Origin.
CLIN 0022
The FOB has changed from Destination to Origin.
CLIN 0023
The FOB has changed from Destination to Origin.
CLIN 0024
The FOB has changed from Destination to Origin.
CLIN 0025
The FOB has changed from Destination to Origin.
CLIN 0026
The FOB has changed from Destination to Origin.
CLIN 0027
The FOB has changed from Destination to Origin.
CLIN 0028
The FOB has changed from Destination to Origin.
CLIN 0029
The FOB has changed from Destination to Origin.
CLIN 0030
The FOB has changed from Destination to Origin.
CLIN 0031
The FOB has changed from Destination to Origin.
CLIN 0032
The FOB has changed from Destination to Origin.
CLIN 0033
The FOB has changed from Destination to Origin.
CLIN 0034
The FOB has changed from Destination to Origin.
CLIN 0035
The FOB has changed from Destination to Origin.
CLIN 0036
The FOB has changed from Destination to Origin.
CLIN 0037
The FOB has changed from Destination to Origin.
CLIN 0038
The FOB has changed from Destination to Origin.
CLIN 0039
The FOB has changed from Destination to Origin.
CLIN 0040
The FOB has changed from Destination to Origin.
CLIN 0041
The FOB has changed from Destination to Origin.
SECTION F - DELIVERIES OR PERFORMANCE
The following have been modified:
52.211-8
TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
| ITEM NUMBER |
| MAX QTY |
| WITHIN DATE AFTER |
DELIVERY ORDER
DELIVERY ADDRESS
1 Each
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 210 days ADC IAW CDRL A003A.
MF Type A P/N 1339AS700-1
Completion of the First Article Test unit is required within 180 Days After Contract (DAC).
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0002 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 210 days ADC IAW CDRL A003A.
MF Side Opening Type A P/N 1339AS500-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0003 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 210 days ADC IAW CDRL A003A.
MF Side Opening Type B P/N 1339AS501-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0004 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 210 days ADC IAW CDRL A003A.
MF Integration Unit P/N 1339AS900-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0005 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 210 days ADC IAW CDRL A003A.
MF Side Opening w/ Double Doors P/N 1339AS1000-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
| 0006 |
| 1 Each |
Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.
The draft First Article Acceptance Test Plan (CLIN 0045) shall be submitted within 60 days ADC IAW CDRL A003.
The First Article Test Report (CLIN 0046) shall be submitted within 210 days ADC IAW CDRL A003A.
MF Side Opening Type C P/N 1339AS1101-1
(First Article Test units are separate from production units and will not be counted as production units.)
Contractor’s facility
MF Type A P/N1339AS700-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type A P/N1339AS700-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type A P/N1339AS700-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type A P/N1339AS700-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type A P/N1339AS700-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type B P/N 1339AS701-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type A P/N 1339AS500-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO Type B P/N 1339AS501-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Integration Unit P/N 1339AS900-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF SO w/ DD P/N 1339AS1000-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
MF Type C P/N 1339AS1101-1, Production Year Five, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
TBD
Delivery is FOB Origin and the delivery address(es) will be provided at time of delivery order award.
| 0042-0050 |
| 1 Lot |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A. |
In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A.
Delivery is FOB Destination.
WITHIN DAYS AFTER
ITEM NO.
QUANTITY
DATE OF CONTRACT
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
WITHIN DAYS AFTER
ITEM NO.
QUANTITY
DATE OF CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Exhibit A |
| Exhibit A CDRLs |
| Attachment 1 |
| SOW |
| Attachment 2 |
| ILSSOW |
Attachment 3
Attachment 4 *Drawing Package 1339AS
1339AS Drawings Addenda
| Attachment 5 |
| 1339AS Coatings Addenda |
*Attachment 3, Drawing Package 1339AS, will be provided separately on a CD-ROM upon request.
to:
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Exhibit A |
| Exhibit A CDRLs |
| Exhibit B |
| CDRL A003 REV1 |
| Exhibit C |
| CDRL A003A REV 1 |
| Attachment 1 |
| SOW |
| Attachment 2 |
| ILSSOW |
Attachment 3
Attachment 4 *Drawing Package 1339AS
1339AS Drawings Addenda
| Attachment 5 |
| 1339AS Coatings Addenda |
| Attachment 6 |
| NAVAIR TM 19-25-177 |
| Attachment 7 |
| SOW REV 1 |
*Attachment 3, Drawing Package 1339AS, will be provided separately on a CD-ROM upon request.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
L – [ 1 ] CONTENT OF PROPOSALS
PART A GENERAL INSTRUCTIONS
1.0 GENERAL
The Offeror is required to submit sufficient information concerning the following areas to enable Government personnel to fully ascertain capabilities of the Offeror to perform the requirements. The proposal must be sufficient in detail and scope to permit evaluation and provide the evaluators a clear understanding of the Offeror’s capability to meet or exceed the defined elements as required by the solicitation. All proposals must clearly and convincingly demonstrate that the Offeror has a thorough understanding of the requirements, associated risks and is able, willing and competent to devote the resources necessary to meet the requirements, and that the Offeror has valid and practical solutions for all requirements and potential risk areas. Offeror must respond to all requirements of the solicitation and not alter or rearrange the solicitation. The Offeror has the burden of proof to demonstrate compliance with all the evaluation factors identified in this solicitation. The Offeror is advised that the Government may incorporate into the final contract enhancing features included in the Offeror’s proposal deemed beneficial to the Government. With the exception of the Price volume, no cost or pricing information should appear in any other volume. Alternate proposals are acceptable.
In presenting material in the proposal, the Offeror is advised that quality of information is more important than quantity. Clarity, brevity, and logical organization should be emphasized during proposal preparation. The Offeror is responsible to present enough information to allow the Government to evaluate the proposed work effort, support, and approach, as well as the price proposal without opening discussions. Statements that the prospective Offeror understands, or can and/or will comply with, the specifications, and paraphrasing the requirements or parts thereof without supporting information are considered inadequate by the Government, and may render a rating of unacceptable. For the purpose of this solicitation, relevance is defined as something that has a logical connection with the matter under consideration. Such aspects of relevance include the type of effort (e.g., development, production, repair), the type of requirements (e.g., weapon systems, information systems, engineering services, scheduled depot maintenance), service similarity, service complexity, contract type, contract dollar value, the division of the company that will perform the work, and degree of participation by principal subcontractors, team members, or critical team members. Recency is defined as performance within 5 years of the date of this proposal submission.
The Offeror must include any data that illustrates the adequacy of the various assumptions, approaches, and solutions to problems. Failure to address a specific factor clearly may be considered a deficiency. There is no need to repeat information in more than one volume if an overlap exists; the detailed information must be included in the most logical place and summarized and referenced in other areas. Unnecessarily elaborate brochures or other presentation materials beyond that sufficient to present a complete and effective proposal is neither necessary nor desired.
The Offeror is expected to comply with all requirements of the RFP. The Government advises the Offeror that taking exception or deviating from any term or condition of the RFP may make an offer unacceptable, and the proposal unawardable, unless the RFP expressly authorizes such an exception or deviation with regard to that specific term or condition. The Government may consider any exception or deviation to any term or condition of the RFP that is not expressly authorized by the RFP to be a deficiency.
Throughout these instructions, a “principal subcontractor” is defined as a subcontractor who provides at least 10% of the proposed total price (excluding the Offeror’s profit/fee), for the contract. “Team member” is defined as those entities that make up a joint venture or any other partnership or teaming arrangement formed for the purpose of responding to this solicitation. “Critical team member” is defined as those entities of the Offeror that perform a critical function in the performance of the resulting contract, whether it is technical or financial, and/or that have important roles in any high or medium risk areas identified in the Offeror’s proposal.
2.0 PROPOSAL FORMAT
Written proposals must be formatted using a Times New Roman 12 pt normal font (no reduction permitted), single-spaced with 1-inch margins all around, and formatted for standard 8.5 x 11 inch paper. All pages shall be numbered with section and page numbers. When foldout pages are used they must not exceed 11 x 17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size but shall be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. Graphs shall be presented in no smaller than a 10 pt font and should contain a grid, which allows values to be read directly from the graph to the same accuracy that a 10 x 10 to the ½ inch grid provides. Graphic resolution shall be consistent with the purpose of the data presented.
The Offeror will provide one complete copy of the written proposal to the Procuring Contracting Officer (PCO) as electronic files fully compatible with Microsoft Office 2000 and for information not supported by MS Office products, with the latest Adobe Acrobat reader on a CD-ROM. The Offeror will ensure that the Price Volume is provided on a separate CD-ROM. Each CD-ROM is to be labeled for content and the Offeror’s name. If a discrepancy exists between the original paper copy of the proposal and the disk copy, the paper copy will take precedence.
The offeror must present proposal information in a manner that facilitates a one-to-one comparison between the information presented and this Proposal Instruction. Proposal information must be structured such that its paragraph number/letter is identical to the Proposal Instructions paragraph number to which it is responding, although the offeror may add lower tier subparagraphs. The offeror must provide reasons it will not provide information for a particular paragraph. The proposal information instructions are structured by paragraph numbers where first, second, third, and fourth parts correspond to the volume, book, section, and element, etc., in offeror’s proposal.
3.0 PROPOSAL CONTENT AND VOLUMES
Each volume of the proposal shall be submitted as one original and additional copies as specified in the table below. All volumes of the original proposal shall be delivered to the address provided in Section 4.0 prior to the closing date/time stated in this solicitation. Page limitations for each volume if any, are also specified in the table below; title and table of contents pages do not count towards page limit. Proposal pages beyond the specified maximum limit will not be reviewed as part of the evaluation.
Information submitted as an Annex to the proposal includes manuals, specifications, plans, procedures, and policies that exist as an official document of the company or facility, as well as other information requested in Part B Specific Instructions. Annexes do not have page limitations. The authorized Annex, if applicable, is summarized in the table below.
| Volume Number |
| Volume Title |
| Page Limit |
| Copies Required |
| 1 |
| TECHNICAL |
| 50 |
| 1 Original/5 Copies |
| 2 |
| PAST PERFORMANCE |
| 20 |
| 1 Original/5 Copies |
| 3 |
| PRICE |
| A complete, executed solicitation document (SF 33) |
| 1 Original/1 Copy |
Annex 1
(If needed)
| SUBCONTRACTING PLAN |
| N/A |
| 1 Original/5 Copies |
Each volume shall contain the following information:
· Cover and title page
· Title of proposal and proposal number as applicable
· Offeror’s name, address and POC
· RFP number
· Proposal volume/book number
· Copy number
· Table of Contents (The table of contents must provide sufficient detail to enable easy location of important elements)
· Use tabs and dividers
The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the Offeror’s proposal. The CRM shall be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information. The Offeror’s CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments. The CRM does not count against any of the proposal page limitations.
EXAMPLE OF A (CRM)
| Section L – Proposal Instructions |
| Government PWS/SOW |
| Section M – Evaluation Factor |
| Offeror’s Proposal Reference |
| CLIN Reference |
| Volume 1 Technical |
| Example: SOW Para 3.1 Program Schedule |
| 1 |
| Provide reference to Offeror’s Proposal Volume I – Technical. Example: Refer to appropriate page number in Offeror’s written proposal |
4.0 PROPOSAL SUBMISSION:
Clearly mark all packages with the solicitation number. The submission date for the original proposal, shall be no later than the date and time specified in Block 9 of Standard Form 33 of the RFP.
Offeror shall submit proposals via United States Postal Service or through a commercial carrier using the address provided below. Offeror shall not submit proposals by facsimile or electronically via email.
Naval Air Warfare Center AD (LKE)
Code: 2.5.2.1.1 (Danielle DiLorenzo)
Bldg 562-3
Hwy 547
Lakehurst, NJ 08733-5082
Solicitation Number: N68335-12-R-0089
Hand carried proposals may be delivered to Bldg 562-1, Rm 134 of the address above, attention: Danielle DiLorenzo and/or Cindy Scheper.
5.0 PROPOSAL PACKAGING:
The Offeror shall package the proposal volumes in cartons or equivalent packaging containers in the most efficient manner possible grouping like volumes to the maximum extent possible. Each container shall be single person portable. One container shall include all Original Proposal volumes including the original/signed documents.
Each box shall include a packing slip detailing the contents to include the volume number, title, and copy number. Also, each box should be stamped or marked “For Official Use Only” and “Source Selection Information – See FAR-2.101 and 3.104”.
6.0 CLASSIFIED DATA
All proposals must be UNCLASSIFIED
7.0 SOLICITATION CHANGES
For any changes and additional information for the solicitation please go to website:
https://www.fbo.gov/ or http://www.navair.navy.mil/doing_business/open_solicitations
PART B SPECIFIC INSTRUCTIONS
The proposal shall be subdivided into the following sections, in the order listed, and shall be written to match the following format:
Volume 1 Technical Factor
· Drawing Package Examination and Commentary
· Quality Assurance System
· Manufacturing Capabilities
· Integrated Logistics Support Plan
· Experience
· Small Business Utilization
Volume 2 Past Performance Factor
Volume 3 Price Factor
1.0 VOLUME 1: TECHNICAL
a. EXECUTIVE SUMMARY
The proposal shall include an Executive Summary as an introductory title page. The purpose of the Executive Summary is to provide the evaluators with an overview of the Offeror’s proposal and strategy. The Offeror shall include the following:
i. A concise abstract of the Offeror’s strategy for each of the evaluation criteria contained in the solicitation.
ii. Offeror Summary Table: The Offeror shall complete the table below. The Offeror shall include all subcontractors and team members who will be involved with the performance or management of the program work and should list all sites where the work will be performed. If a teaming or subcontracting arrangement is proposed, identify the work share, distribution elements, and ratios that each contractor will perform using the table below. Also provide a definition of the legal relationship between the entities if it is other than a Prime/Subcontractor relationship.
Contractor Name
(Indicate Price, Team Member or Sub) Place of Performance and/or DUNS # if applicable
| Brief Work Description and/or Program Responsibility |
| % of Total Proposed Price |
b. TECHNICAL INFORMATION
Note: This volume shall not contain any reference to cost or price aspects of the offer.
1.1 The technical section shall demonstrate the offeror’s understanding and ability to meet, or exceed, the RFP, SOW, Integrated Logistics Support SOW (ILSSOW), and Technical Data requirements. This section shall also include a discussion of the offeror’s understanding and ability to manufacture MFs in accordance with the Level III Drawing Package. The Offeror shall provide all information and data required to conduct a thorough and complete technical evaluation. The Offeror shall address the following elements in the proposal:
Drawing Package Examination and Commentary: The offeror shall examine the Level III drawings and documents and provide a commentary that demonstrates an understanding of the requirements and scope of the program. The commentary shall include a discussion of the offeror’s manufacturing organization’s ability to produce the MFs in accordance with the Drawing Package. The offeror shall address how they will meet the requirements of the drawings.
Quality Assurance System: The offeror shall discuss and provide detailed information on the offeror's quality assurance program, to include but not limited to their compliance with and registration under the stringent requirements of ISO 9001 equivalent or better.
Manufacturing Capabilities: The offeror shall describe in detail the necessary processes in the manufacturing cycle from the receipt of raw material to the completion of a finished unit. The proposal shall address the different fabrication processes employed in the production of a MF and the capability of the offeror to perform them. This narrative shall define the requirements for specialized equipment, tools (ie. jigs, dyes, etc.) and fixtures and how they will be used in the manufacturing process. The offeror shall discuss the availability of this specialized equipment, tools, and fixtures. The offeror shall discuss the impact of the processes and techniques they will use to produce MFs on their ability to comply with the specifications of the drawing package.
Describe in detail the manufacturing capability of the facilities that will be used to produce the MFs. The offeror shall discuss the anticipated production rate for this contract, and any other anticipated contracts that may be performed concurrently, and describe how the facilities will achieve this output. Describe the capability to produce to the maximum delivery requirements under the contract. The narrative shall address the overall size and layout of the plant, including equipment not mentioned above. In particular, the offeror shall address areas of the plant that are critical to production of the MFs.
Integrated Logistics Support Plan: The proposal shall clearly demonstrate the offeror’s understanding of the logistics requirements and demonstrate the current capability, capacity and approach for meeting or exceeding the logistics requirements per the ILSSOW. The offeror shall follow the ILSSOW paragraph by paragraph and shall include all pertinent information in sufficient detail to permit evaluation. The offeror shall provide a narrative that describes its understanding of the ILS requirements and plans to meet those requirements. Areas to be addressed include, but are not limited to, Technical Manual changes, style and format, design change notices, and Maintenance Planning/Provisioning documentation.
Experience: Provide information that describes the offeror, the offeror’s principal subcontractors’ and critical team members’ (as defined in Part A, Section 1.0) experience similar to that required for the instant contract. The offeror shall include their experience in any joint ventures, single legal entity arrangements, as well as acting as an independent prime. Identify the period of time and the related contracts. In general, recent experience will be considered more relevant than older experience. Provide an experience summary table, which lists the Offeror’s reference contracts on one axis (most recent contract to oldest) versus the areas identified in the paragraphs below. The Offeror shall complete the experience summary table below.
| Contract Number |
| Description |
| Experience using a customer provided drawing package |
| Experience with ISO Shelter Containers |
In addition, provide a copy of the Offeror’s Summary Table requested in Part B, Section 1.0 (ii), however, the column entitled “% of Total Proposed Price” is not needed for this volume.
Specifically describe and provide examples of experience, which demonstrates the offeror’s ability to perform the required effort as delineated within the specifications, SOW, and ILSSOW. In addition, explain why the experience should be considered relevant and the degree of relevance that the experience has to the solicitation requirements. Describe and compare the type of work, scope of effort, and the product/technology involved. Identify the period of time and the related contracts, as applicable. For each example, provide the contract number and title of the program, and dates under which the experience was gained. Where the offeror lacks experience in tasks, describe the associated risks when considering the proposed technical approach and describe the plan to compensate for these risks.
The offeror shall describe at least two (2) recent and relevant experiences for the production of equipment using a customer provided drawing package that were performed by the offeror within the last five (5) years. The offeror shall identify each relevant and recent experience by contract number. Relevant experiences would include producing equipment using a customer provided drawing package, as well as experience with ISO Shelter Containers.
Small Business Utilization:
(1) Strategies for using Small Business (SB) Concerns All offerors (Large and Small Businesses) shall address their strategies for utilizing SB concerns in the performance of this contract, whether as a joint venture, teaming arrangement or subcontractor. For purposes of this solicitation, SB shall also include Small Disadvantaged Business, Veteran-Owned SB, Service-Disabled Veteran-Owned SB, HUBZone SB, Women-Owned SB, and Historically Black Colleges or Universities (HBCU) and Minority Institutions (MI). Each subcategory of SB shall be addressed. (This strategy is separate from, but shall be consistent with, the Small Business Subcontracting Plan, if the Plan is required.) In describing its strategy for this solicitation, the offeror shall, as applicable:
Describe its approach to identifying SB Concerns;
Describe the extent of participation of SB Concerns on this contract, especially as principal subcontractors;
Describe the extent of commitment to use such SB Concerns;
Describe the complexity and variety of the work SB Concerns are to perform;
Identify what processes have been implemented to correct past inabilities to meet proposed goals;
Demonstrate (Large Business only) that its SB strategy is consistent with its SB Subcontracting Plan.
Provide targets, expressed as dollars and percentages of total contract values for SB participation. Targets of subcontractors must be listed separately. Note: This calculation is different from the calculation required by FAR 52.219-9 in the Subcontracting Plan, as the Plan requires percentage of subcontracting value;
Demonstrating Realism through Submission of Reports: To demonstrate the realism of the utilization strategy, the Large Business Offeror shall provide copies of the final or most recent SF 294s/Individual Subcontracting Reports (ISRs) for the most…