Cost Summary

Solicitation Number:
Prime Offeror:
Subcontractors:
DCAA & DCMA Point of Contact Information:
ELEMENTPROPOSEDOPTION 1
LaborELEMENTPROPOSED
Labor O/HCLIN 0004 Services/ODC
Labor FringeCost
SubcontractsFee
Subcontractor HandlingCPFF
Tavel/Misc. ODC and Shipping
G&ACLIN 0005 Material
MaterialCost
Material Handling
CLIN 0006 NSP CDRL$0.00
Subtotal
COMTOTAL OPTION 1
Fee/Profit

TOTAL

BASE PERIODOPTION 2
ELEMENTPROPOSEDELEMENTPROPOSED
CLIN 0001 Services/ODCCLIN 0007 Services/ODC
CostCost
FeeFee
CPFFCPFF
CLIN 0002 MaterialCLIN 0008 Material
CostCost

CLIN 0003 NSP CDRL $0.00 CLIN 0009 NSP CDRL $0.00

TOTAL BASE PERIOD TOTAL OPTION 2

Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor catagories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.

Year I

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 1)0.00%
Overhead-Contractor Site A (KTR FY 2)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 1)0.00%
G&A (KTR FY 2)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 1Contractor's Fiscal Year 2
Cost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 1)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 2)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 1)0.00%$ - 0$ - 0Overhead - Government Site B (KTR FY 2)0.00%$ - 0$ - 0
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%$ - 0$ - 0G&A (KTR FY 2)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor Cost$ - 0Total Indirect Labor Cost$ - 0

Total Prime Contractor Labor Cost $ 4.00 Total Prime Contractor Labor Cost $ - 0

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 1)0.00%$ - 0$ - 0G&A (KTR FY 2)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 $ 3,904.00 Total Labor Cost (Prime and Subcontractor Labor) 50 20 $ 3,900.00

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%$ - 0Fee on Prime0.00%$ - 0
Total Fee (for Prime and Subcontractor Labor)$ - 0Total Fee (for Prime and Subcontractor Labor)$ - 0

Total Labor Cost Plus Fixed Fee (CPFF) $ 3,904.00 Total Labor Cost Plus Fixed Fee (CPFF) $ 3,900.00

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
G&A (KTR FY 1)0.00%$ - 0G&A (KTR FY 2)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)$ 106,404.00Total CPFF (Labor and ODCs)$ 106,400.00
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

Year II

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 2)0.00%
Overhead-Contractor Site A (KTR FY 3)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 2)0.00%
G&A (KTR FY 3)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 2Contractor's Fiscal Year 3
Cost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 2)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 3)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 2)0.00%$ - 0$ - 0Overhead - Government Site B (KTR FY 3)ERROR:#N/AERROR:#N/AERROR:#N/A
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%$ - 0$ - 0G&A (KTR FY 3)0.00%ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor Cost$ - 0Total Indirect Labor CostERROR:#N/A

Total Prime Contractor Labor Cost $ 4.00 Total Prime Contractor Labor Cost ERROR:#N/A

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 2)0.00%$ - 0$ - 0G&A (KTR FY 3)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 $ 3,904.00 Total Labor Cost (Prime and Subcontractor Labor) 50 20 ERROR:#N/A

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%$ - 0Fee on Prime0.00%ERROR:#N/A
Total Fee (for Prime and Subcontractor Labor)$ - 0Total Fee (for Prime and Subcontractor Labor)ERROR:#N/A

Total Labor Cost Plus Fixed Fee (CPFF) $ 3,904.00 Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
G&A (KTR FY 2)0.00%$ - 0G&A (KTR FY 3)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)$ 106,404.00Total CPFF (Labor and ODCs)ERROR:#N/A
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

Year III

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 3)0.00%
Overhead-Contractor Site A (KTR FY 4)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 3)0.00%
G&A (KTR FY 4)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 3Contractor's Fiscal Year 4
Cost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 3)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 4)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 3)ERROR:#N/AERROR:#N/AERROR:#N/AOverhead - Government Site B (KTR FY 4)ERROR:#N/AERROR:#N/AERROR:#N/A
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%ERROR:#N/AERROR:#N/AG&A (KTR FY 4)0.00%ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor CostERROR:#N/ATotal Indirect Labor CostERROR:#N/A

Total Prime Contractor Labor Cost ERROR:#N/A Total Prime Contractor Labor Cost ERROR:#N/A

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 3)0.00%$ - 0$ - 0G&A (KTR FY 4)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 ERROR:#N/A Total Labor Cost (Prime and Subcontractor Labor) 50 20 ERROR:#N/A

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%ERROR:#N/AFee on Prime0.00%ERROR:#N/A
Total Fee (for Prime and Subcontractor Labor)ERROR:#N/ATotal Fee (for Prime and Subcontractor Labor)ERROR:#N/A

Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
G&A (KTR FY 3)0.00%$ - 0G&A (KTR FY 4)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)ERROR:#N/ATotal CPFF (Labor and ODCs)ERROR:#N/A
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

Year IV

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 4)0.00%
Overhead-Contractor Site A (KTR FY 5)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 4)0.00%
G&A (KTR FY 5)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 4Contractor's Fiscal Year 5
Cost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 4)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 5)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 4)ERROR:#N/AERROR:#N/AERROR:#N/AOverhead - Government Site B (KTR FY 5)ERROR:#N/AERROR:#N/AERROR:#N/A
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%ERROR:#N/AERROR:#N/AG&A (KTR FY 5)0.00%ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor CostERROR:#N/ATotal Indirect Labor CostERROR:#N/A

Total Prime Contractor Labor Cost ERROR:#N/A Total Prime Contractor Labor Cost ERROR:#N/A

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 4)0.00%$ - 0$ - 0G&A (KTR FY 5)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 ERROR:#N/A Total Labor Cost (Prime and Subcontractor Labor) 50 20 ERROR:#N/A

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%ERROR:#N/AFee on Prime0.00%ERROR:#N/A
Total Fee (for Prime and Subcontractor Labor)ERROR:#N/ATotal Fee (for Prime and Subcontractor Labor)ERROR:#N/A

Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
G&A (KTR FY 4)0.00%$ - 0G&A (KTR FY 5)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)ERROR:#N/ATotal CPFF (Labor and ODCs)ERROR:#N/A
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

Year V

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 5)0.00%
Overhead-Contractor Site A (KTR FY 6)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 5)0.00%
G&A (KTR FY 6)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 5Contractor's Fiscal Year 6
Cost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategorySCA Occupational Code/TitleST RateOT RateRT HoursOT HoursST AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 5)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 6)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 5)ERROR:#N/AERROR:#N/AERROR:#N/AOverhead - Government Site B (KTR FY 6)ERROR:#N/AERROR:#N/AERROR:#N/A
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%ERROR:#N/AERROR:#N/AG&A (KTR FY 6)0.00%ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor CostERROR:#N/ATotal Indirect Labor CostERROR:#N/A

Total Prime Contractor Labor Cost ERROR:#N/A Total Prime Contractor Labor Cost ERROR:#N/A

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 5)0.00%$ - 0$ - 0G&A (KTR FY 6)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 ERROR:#N/A Total Labor Cost (Prime and Subcontractor Labor) 50 20 ERROR:#N/A

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%ERROR:#N/AFee on Prime0.00%ERROR:#N/A
Total Fee (for Prime and Subcontractor Labor)ERROR:#N/ATotal Fee (for Prime and Subcontractor Labor)ERROR:#N/A

Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
Overhead - Contractor Site A (KTR FY 5)0.00%$ - 0G&A (KTR FY 6)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)ERROR:#N/ATotal CPFF (Labor and ODCs)ERROR:#N/A
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

File details come from the government source that posted it.