J-0200000-13_MAXIMO_Reporting.xlsx

XLSX spreadsheet 173 KB Posted

Attached to
Guam Base Operations Support Contract (BOSC) Federal contract opportunity
Solicitation number
N62742-13-R-1150
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

J-0200000-13 MAXIMO Reporting

View the file

Other files for this federal contract opportunity

Other files attached to Guam Base Operations Support Contract (BOSC), newest first.
File Type Posted
Solicitation_N62742-13-R-1150.pdf PDF
Amendment_0027.pdf PDF
JL-19_Unanswered_Questions.pdf PDF
Solicitation_N62742-13-R-1150.pdf PDF
JL-17_Questions_and_Answers.pdf PDF
Amendment_0025.pdf PDF
JL-16_Questions_and_Answers.pdf PDF
Amendment_0024.pdf PDF
Amendment_0023.pdf PDF
JL-15_Questions_and_Answers.pdf PDF
J-0600000-05_Workload_Data_Submissions_10DEC13.pdf PDF
11010.45_land_use_plans_2002.pdf PDF
nossainst_8020_22.pdf PDF
Amendment_0022.pdf PDF
NI_ICS_CA_dtd_26April2011.pdf PDF
navfac_p-458_vol._ii-7.pdf PDF
Amendment_0021.zip ZIP file
Amendment_0020.zip ZIP file
Amendment_0019.zip ZIP file
Amendment_0018.pdf PDF
J-0200000-09_GFE.xls XLS spreadsheet
JL-11_Photos.zip ZIP file
JL-4_Resources_Worksheet.xlsx XLSX spreadsheet
JB-1_Cost_Summary_Worksheet.xlsx XLSX spreadsheet
J-0200000-08_GFM.xls XLS spreadsheet
J-0200000-11_KTR_Owned.xls XLS spreadsheet
Annex_1000000_Supply_Material_Management_Section_C.pdf PDF
Annex_1700000_Base_Support_Vehicles_ _Equipment_Section_C.pdf PDF
J-0200000-10_Computers Phones _etc.xls XLS spreadsheet
JL-9_Pre-Proposal_Conference_Registration_Packet.zip ZIP file
J-0200000-07_GFF.doc DOC document
J-0200000-12_KTR-Leased Owned_Vehicles.xls XLS spreadsheet
Solicitation_N62742-13-R-1150.pdf PDF
Amendment_0001.pdf PDF
JE-1_Award_Fee_Award_Option_Plan.pdf PDF
Section_J_-_Attachments_Exhibit.zip ZIP file
Annex_7.zip ZIP file
Annex_1604.zip ZIP file
Annex_1602.zip ZIP file
Annex_1.zip ZIP file
Annex_2.zip ZIP file
Annex_10.zip ZIP file
Annex_1501.zip ZIP file
Annex_6.zip ZIP file
Annex_18.zip ZIP file
Annex_1605.zip ZIP file
Annex_1700.zip ZIP file
Annex_1606.zip ZIP file
Solicitation_N62742-13-R-1150.pdf PDF
Annex_1502.zip ZIP file
Show all 50

Guam Base Operations Support Contract (BOSC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions - Revision History

Brief Instructions to NAVFAC Contractors ( KTRs )
For new construction and for structural or equipment modifications/installation, KTRs are required to fill out and provide data back to NAVFAC in two templates Flat File - New Equipment and Flat File - CIMUs
Supporting information for KTR data submission in terms of the structure of templates, data definitions, value lists for fields are all provided in this workbook
The tab New CONST-RENOVATION contain details of the structure of data templates for Equipment and Structure/CIMU data.
For items marked "by NAVFAC", KTR should leave column name as a place holder. NAVFAC POC ( point of contact ) will prepopulate data OR will fill it in after data is received.
Both the Equipment and CIMU data templates have several common data fields. Values would be the same in several cases but all required field data MUST be filled in.
KTR should ask their NAVFAC POC for any questions
If a KTR uses their internal systems to create a flat file. the flat file must have a pipe delimiter to separate column data. That is the required format for NAVFAC.
Explanations for each tab in this workbook
Tab
Instructions -Revision HistoryThis tab will contains instructions and details of changes in each template version
1Work Order Flat FileKTR is required to use this format if using Flat File as format of submission.
4NEW CONST-RENOVATION SchemaThis sheet contains template data schema structure and instructions
5Master-System-SubSystemThis sheet provides the value list for the Master-System-Subsystem data fields 16, 17, 18
GlossaryContains key NAVFAC definitions
6UEM Asset ClassificationThis sheet provides the value list to fill out data fields 34, 35
7Asset Identify-Tag ListThis sheet provides guidance to KTR to identify assets ( Equipment and CIMU's ) which are > $2500
8UEM ( Utilities and Energy Management ) UniformatThis sheet provides guidance to KTR to identify UEM uniformat classifications for data fields 16, 17, 18
Ver 1.0, Sept 24, 2010Revision History
This section will inform KTR on what changes occurred with new versions of the template
3
4
5
6
7
8
9
10
11
12
13

Attachment J-0200000-13

1-Work Order Flat File

1) Work Order DataNote: This file is an attachment to the NAVFAC Contractor Data Guidance Document
WORK ORDER DATA FOR PWBL
0SPM Label in Work OrderAdditional informationField TypeNULLABLE

Y = field may be empty N = field must be entered Default if Left NULL Length Required for Direct Entry? (Reserved for future use.)

raj.rajendran: This column will be filled out once Work Order Tracking in MAXIMO 7.1 is available for UAT. KTR will have access to WO Tracking module to enter completion info for their work orders. For NEW equipment they have to fill out XL template sheets Responsibility for Data Identifies who has primary responsibility for creating and updating the data.

N = Navy K = Contractor Field Name (Name as it appears in Maximo table. For informational use only.)

1Approved DateDate/time when WO marked as "Approved" in Maximo by NAVFAC.Datetime
(date format: mm/dd/yyyy hh:mi:ss)YNWO8
2Work TypeWork Type category. Used as primary category element. Assigned by NAVFAC.VARCHAR2(15)N15NWORKTYPE
3Customer Work Order Number. Customer Reference No.Internal NAVFAC customer reference number. May be either BuMed (DMLSS) number or interim number assigned by NAVFAC trouble call desk.VARCHAR2(20)N20NWO4
4DESCRIPTIONShort description of work to be performed.VARCHAR2(150)Y150NDESCRIPTION
5Location:Building number; entered by NAVFAC trouble call desk.VARCHAR2(30)NBase location for site30NLOCATION
6Reported By: / Requested By:Name of person who reported requirement.VARCHAR2(30)Y30NREPORTEDBY
7WO13KTR internal tracking number for work order.VARCHAR2(1)Y1KWO13
8Status:Status of WO. List of values: Approved, Completed, Cancelled, Awaiting MaterialVARCHAR2(12)N12N, KSTATUS
9Status Date:Date the Status changes in Maximo. Automatically created by Maximo.DatetimeNNSTATUSDATE
10WO Priority:Indicator of priority of WO. Assigned by NAVFAC.INTEGERYNWOPRIORITY
11Actual Start:Date/time when work was started on the WO. Used for calculating response time metrics.DatetimeNKACTSTART
12Actual Finish:Date/time when work was completed on the WO. Used for calculating completion time metrics.DatetimeNKACTFINISH
13Supervisor/Person:Supervisor of person(s) performing work.VARCHAR2(25)Y25KLEADCRAFT
14Labor Hours: Actual ColumnActual number of labor hours expended on the work order.FLOATNKACTLABHRS
15Labor Cost: Actual ColumnActual labor cost expended on the work order.NUMBER(10,2)NKACTLABCOST
16Material Cost: Actual ColumnActual material cost expended on the work order.NUMBER(10,2)NKACTMATCOST
17Estimated Duration:Calculated field based on Target Start and Target Finish.FLOATNNESTDUR
18Equipment:Equipment number from label on equipment worked on.VARCHAR2(25)Y25KEQNUM
19Target: Finish ColumnDate/time work is targeted to start based on type of work and Approved Date. Automatically created by Maximo.DatetimeYNTARGCOMPDATE
20Target: Start ColumnDate/time work is targeted to finish based on type of work and Approved Date. Automatically created by Maximo.DatetimeYNTARGSTARTDATE
21Report Date: / Request Date:Date requirement was reported to NAVFAC trouble call desk.DatetimeYNREPORTDATE
22Lead Craft:Lead trade involved in work.VARCHAR2(25)Y25KSUPERVISOR
23Scheduled: Start ColumnDate/time work is scheduled to finish.DatetimeYKSCHEDSTART
24Scheduled: Finish ColumnDate/time work is scheduled to start.DatetimeYKSCHEDFINISH
25Modified Date:Last Date when WO was changed. Automatically updated by Maximo.DatetimeYNCHANGEDATE
26Modified By:Name of person who changed the worked order data. Automatically updated by Maximo.VARCHAR2(25)Y25NCHANGEBY
27PMNEXTDUEDATEDate next PM is due.DatetimeYNPMNEXTDUEDATE
28Is Task?What is desired here?VARCHAR2(1)Y1NISTASK
29Parent WO:Maximo WO number of parent WO. Generated by Maximo.VARCHAR2(10)Y10NPARENT
30Work Order:Maximo Work Order number, generated by Maximo.VARCHAR2(10)Y10NWONUM
31Addtl. Loc. InfoThis field provides more description information for locating specific equipment in the buildingVARCHAR2 (250)Y250NWOEQ3
32CLIN#CLIN from contract document, i.e. 0001, 0002, 0003, etc.VARCHAR2(30Y30KWOPM6
33Cust. Ref CodeInternal NAVFAC reference code.VARCHAR2(8)Y8NWOPM7
34Sub Work TypeWork Type category. Used as secondary category element.VARCHAR2(15)Y15NWOPM5
35Work Center / Financial Work Center:Work center to be assigned to KTR by FEC.VARCHAR2(8)Y8NWOASSIGNMNTQUEUEID

Tab &A

4- NEW CONST-RENOVATION Schema

NEW - RENOVATION SCHEMA
Revised 03/ 23/ 2011
4) CIMU ( Component Inventory Management Unit )4)NEW EQUIPMENT
This sheet provides info on data required by NAVFAC from NEW CONSTRUCTION/RENOVATION projectsThis sheet provides info on data required by NAVFAC from NEW CONSTRUCTION/RENOVATION projects
CIMU data is required when ANY work is done that changes the FACILITY structure or CIMU hierarchy and asset VALUE is > $2500EQUIPMENT data is required when ANY work is done that adds/replaces any existing NAVFAC Asset/Equipment of VALUE > $2500
KTR should also include Work Order, Project, Contract Ref in which the work was done.KTR should also include Work Order, Project, Contract Ref in which the work was done.
NON-EQUIPMENT FACILITY CIMU DATANEW ASSET ( Dynamic Equipment ) Data
0Column NameSample DataPopulated ByRequiredField TypeLengthComments0Column NameSample DataPopulated ByRequiredField TypeLengthDefinitions/Comments
1ORG_IDNAVFAC WashBy NAVFACyTEXT8Corresponds to FEC Identifier. Remains unchanged1ORG_IDNAVFAC EURAFSWABy NAVFACyTEXT8Corresponds to FEC Identifier. Remains unchanged for NAVFAC
2Site_IdPWDWASHBy NAVFACyTEXT8Corresponds to Base Area Identifier. Site Name (iNFADS)-The common identification or name for the site assigned by the Military Service, Washington HQ Service (WHS), or Agency.2Site_IdPWD RotaBy NAVFACyTEXT8Corresponds to Base Area Identifier. Site Name (iNFADS)-The common identification or name for the site assigned by the Military Service, Washington HQ Service (WHS), or Agency.
33Belongs To ( Parent Eq ID )By KTRyTEXT50If equipment is part of a assembly OR belongs to a larger unit. If Inventory Caegory is BOTH, then leave blank.
4Contract NumberBy KTRyTEXT25Contract No. or Project Reference on which work is being done4Contract NumberBy KTRyTEXT25Contract No. or Project Reference on which work is being done
5Task-Delivery Order NumBy KTRyTEXT25Task Order # or delivery order number for the project where work is being done.5Task-Delivery Order NumBy KTRyTEXT25Task Order # or delivery order number for the project where work is being done.
6Building Name0022 - NAVFACGet Info from NAVFACyTEXT1006Building Name0001 - TRANSMITTER BUILDINGBy KTR with informaion provided by NAVFACyTEXT100
7Drawing Reference Idby KTRyTEXT50Drawing Reference # for the Asset. Give AS BUILT drawing reference where this asset can be found. This is to help users locate equipment and related drawings7Drawing Reference IdBy KTRyTEXT50Drawing Reference # for the Asset. Give AS BUILT drawing reference where this asset can be found. This is to help users locate equipment and related drawings
8Asset IDBy KTRYRefer notes in comment8Equipment IDBAP2X0033012By KTRYTEXT25Existing MAXIMO ID

avelino.noble: avelino.noble:

Don't we need "Equipment ID" for equipment? This is the equivalent of the asset number.

9Asset TypeBy NAVFACValue will be Facilities OR Utilities9Asset TypeBy KTR with informaion provided by NAVFACFor the New Equipment flat file use Real Property Inventory Equipment (RPIE), UEM or both. Enter CIMU for the Non-equipment (CIMU) flat file
10Asset DescriptionSmoke AlarmsBy KTRTEXT10020 smoke alarms located in 3 floors10Asset DescriptionBy KTR with informaion provided by NAVFACData is required only if item is a CIMU
11Inventory CategoryDefault to BLANKBy NAVFACyTEXT4Default to CIMU for all records11Inventory CategoryDefault to BLANKBy KTR with informaion provided by NAVFACyTEXT4RPIE: Real Property Inventory Equipment, OR BOTH
1212Location DescriptionROOF TOP Pacakged Heat PumpBy KTRTEXT100More details on how/where to find the equipment within the building; should include specific location, room no./name
13Location CodeNORFOLK_Z140Get Info from NAVFACyTEXT30Building location code where CIMU is located13Location CodeNORFOLK_Z140By KTR with informaion provided by NAVFACyTEXT30Building location code where equipment is located; should include Base/area and Building number
14Notes on CIMU structureCIMU NotesBy KTRTEXT100How does CIMU relate to structure and other CIMU's14
1515Equipment DescriptionRTU PumpBy KTRTEXT100Detailed equipment description to identify unit
16Master System13 itemsby KTRyTEXT50Pick from Value List given in Master-System Uniformat Tab16Master System13 itemsBy KTRyTEXT50Pick from Value List given in Master-System Uniformat Tab
17System116 itemsBy KTRyTEXT50Pick from Value List given in Master-System Uniformat Tab17System116 itemsBy KTRyTEXT50Pick from Value List given in Master-System Uniformat Tab
18Sub System760 itemsBy KTRyTEXT50Pick from Value List given in Master-System Uniformat Tab18Sub System760 itemsBy KTRyTEXT50Pick from Value List given in Master-System Uniformat Tab
19Quantity20 smoke detectorsBy KTRyNUMERICDECIMALQty of items that comprise the CIMU. Can be 1 or more19Equipment Qty1By KTRyNUMERICDECIMALQuantity is set to 1.
20Design Life5By NAVFACTEXT3820DesignLife15By KTR with informaion provided by NAVFACTEXT38
21InstallDate2008By KTRyDATEUse BOD date. Install date of the RPIE.21InstallDate2008By KTRyDATEDate when equipment was certified or put into operation if date is before BOD . Otherwise, use BOD date.
22FCI100By NAVFACNUMERICDECIMALFacility Condition Index22FCIBy KTR with informaion provided by NAVFACFCI is NOT necessary for RPIE. FCI is a single value for a building and is calculated with the sum of all the building's deficiencies.
23Remaining Service Life5By KTRNUMERICDECIMALFor new equipment is generally equal to design life23Remaining Service Life15By KTR with informaion provided by NAVFACNUMERICDECIMALGenerally equal to design life for new structures and equipment. Actual remaining service life of the RPIE.
24DCRA+By NAVFACTEXT25Direct Condition Rating24DCRBy KTR with informaion provided by NAVFACDCR is NOT necessary for RPIE. DCR is handled at the CIMU level.
25Replacement Cost20*150=$3000By KTRyNUMERICDECIMAL25Replacement CostUnit Cost x QTYBy KTRyNUMERICDECIMALUnit Cost plus labor
26ManufacturerMCQUAYBy KTRyTEXT30
27Model Number0AH055FVDCBy KTRyTEXT50
28Serial NumberFB0404020053By KTRyTEXT50
29Manufacturer Warranty End Date2020By KTRDATEHow long warranty from Mfr available after BOD warranty expires
30Warranty Company Infoby KTRTEXT100Enter info of Warranty co if Manufacturer is not responsible for warranty
31CommentsGOOD CONDITION AIR HANDLER. L5 from Raw cost.By KTRTEXT100Comments to preserve warranty
32Status Date5/10/10By KTRDATEDate when this report was collected
33Asset StatusDEABy KTRTEXT8Should be "Operating" for NEW and "Decommisioned or DEA" for removed equipment
34CLASSIFICATION-IDpick listBy KTRyValue List from tab UEM Asset Classification
35CLASSFICATION DESCRIPTIONBy KTRyValue List from tab UEM Asset Classification
36Work Center???By NAVFACWork Center assigned to KTR

Values will be Facilities or Utliites. FEC POC should fill in after receiving data

Tab &A

Template definition

Interface: Asset File
Data Mapping
Current as of February 28, 2012
Site Specific: Yes
Cron Task Name: assetfile_<SITEID>
Type: Inbound
Source File Format: Pipe Delimited (.txt) - |
Converted File Format: N/A
Source File and Source Code
NamePositionNoteReq'd
AssetNum1Length Limit: 25Y
Changed Date2MM/DD/YYYYN
Description3Length limit: 100Y
Long Description4Length limit: 1000N
Master System5Must match Value ListY
System6Must match Value ListY
Sub-System7Must match Value ListY
Location8Must match Value ListY
Site ID9Must match Value ListY
Work Center (Person Group)10Must match Value ListY
Asset Type11Must match Value ListY
Asset Quantity12IntegerN
Inventory Category13Must match Value ListY
Purchase Price14IntegerN
Budgeted Cost15IntegerN
Replacement Cost16IntegerY
Meter Group17Must match Value ListN
Belongs To (Parent)18Must already exist in Maximo. Length Limit: 25N
Contract Number19Length Limit: 25N
Task/Delivery Order Number20Length Limit: 25N
Drawing Reference ID21Length Limit: 25N
Warranty Expiration Date22MM/DD/YYYYN
Status Date23MM/DD/YYYYN
Installation Date24MM/DD/YYYYN
Asset Status2520N
CLASSSTRUCTUREID26Must match Value ListN
Job Plan Code27Length Limit: 25N
Equipment Tag Number28Length Limit: 25N
Additional Loc Info29Length Limit: 100N
Manufacturer30Must match Value ListN
Model31Length Limit: 25N
Serial #32Length Limit: 25N

Business Logic

Business Logic
LogicDescription
Interface processesInserts and Updates
SITEIDIncluded in Source File
Required FieldsASSETNUM
ASSETTYPE
LOCATION
MASTERSYSTEM
SYSTEM
SUBSYSTEM
INVCAT
PERSONGROUP
INSTALLDATE
WARRANTYEXPDATE
Checks Domain ValuesLOCATIONS.LOCATION
MASTERSYSTEM from UNIFORMAT
SYSTEM from UNIFORMAT
SUBSYSTEM from UNIFORMAT
ASSETTYPE from SYNONYMDOMAIN
INVCAT from ALNDOMAIN
PERSONGROUP.PERSONGROUP
METERGROUP.GROUPNAME
ASSET.PARENT
CLASSSTRUCTURE.CLASSSTRUCTUREID
LOCASSETSTATUS from SYNONYMDOMAIN
MANUFACTURER from COMPANIES
Date Time/Format ConversionMM/DD/YYYY
Error HandlingIf Successful, source file will be named .processed in the SOURCEDIRECTORY

If Failed, .processed, .error and .log files will be created.

1) The .processed will contain all records that were successfully processed. 2) The .error will contain the original transaction with the error.

3) The .log will contain the error message.

Message ReprocessingIf the MBO cannot validate a value that comes in from the source (e.g. Invalid GL, Location etc.,) it will throw this error in Message Reprocessing. This is separate from the error handling that addresses issues with the original source file above.
Additional RequirementsRM Code needs to execute - Load Zone based on Location
Also load UNIFORMAT data based on Sub-System (UOM, CI, RSL, DL)
Ignore Status and Change Date. Let the MIF construct these.

Sample Data

Sample Data
Current as of February 22, 2012
AB042988|| FIRE-SMOKE DETECTOR @ RM 1007A|| D50 – ELECTRICAL| D5030 - COMMUNICATION AND SECURITY| D5030910 - COMMUNICATION/ALARM SYSTEMS| SUBPEA-1723|10301| WHPP5N|FACILITIES|1| RPIE|58.00|60.00|65.00||CNTRT1234|123GHR||05/12/2020|||operating||JP7865|EQ39
AB39727||Communication/Security Notifier|alarm system|D50 – ELECTRICAL|D5030 - COMMUNICATION AND SECURITY|D5030999 – OTHER|SCHOFIE-2225|10301|WHPP50|FACILITIES|1|RPIE|||||1039726|CNTRT2345|3455663|DR765532|||||operating||||
12P2X0023077||Mechanical Roll Up Door 8' x 10' Roll Up Door| L5- Description| B20 - EXTERIOR ENCLOSURE| B2030 - EXTERIOR DOORS| B2030410 - OVERHEAD DOORS| COMNAV-35|10301| WHPP50| FACILITIES|| RPIE|1534.98|1400.00|1550.00|| BLAC001148173|contract #||1234s
AAP2X00230770||L5-Field|B20 - EXTERIOR ENCLOSURE|B2030 - EXTERIOR DOORS|B2030410 - OVERHEAD DOORS|BARPOI-90|10301|WHPP50|FACILITIES|1|RPIE|||||BLAC001181665|||||||operating||||

Data Definitions

DEFINITIONSRevised 03/ 23/ 2011
Column NamePopulated ByRequiredDefinitionReference
ORG_IDBy NAVFACyCorresponds to FEC Identifier. Remains unchanged
Site_IdBy NAVFACyCorresponds to Base Area Identifier. Site Name (iNFADS)-The common identification or name for the site assigned by the Military Service, Washington HQ Service (WHS), or Agency.NAVFAC P-78, Real Property Inventory Procedures Manual, pg 5-341
Contract NumberBy KTRyProject Reference on which work is being done
Task-Delivery Order NumBy KTRyDelivery Order # for the project
Building NameGet Info from NAVFACyFacility Name (iNFADS)-A name assigned to a facility.NAVFAC P-78, Real Property Inventory Procedures Manual, pg 5-127
Drawing Reference Idby KTRyDrawing Reference # for the Asset. Give AS BUILT drawing reference where this asset can be found. This is to help users locate equipment and related drawings
Asset DescriptionBy KTRUNIFORMAT Level 4 Component Unit description of CIMU without the alpha-numeric UNIFORMAT code.

For Other, specify the sub-system.

See 5-3 Sub System

Inventory CategoryBy NAVFACyDefault to CIMU for all records
Location CodeGet Info from NAVFACyBuilding location code where CIMU is located
Notes on CIMU structureBy KTRHow does CIMU relate to structure and other CIMU's. Additonal information of the CIMU that is not already in Asset Description
Master Systemby KTRyPick from Value List given. UNIFORMAT classification – a standard classification of building components established by the National Institute of Standards and Technology (NIST).

Master System correlates with UNIFORMAT Level 2 Group Elements.

See 5-1 Master ICAP Training Manual, Task Element 1, pg 9

ICAP Training Manual, Task Element 1, pg 22 System By KTR y Pick from Value List given. System correlates with UNIFORMAT Level 3 Individual Elements.

See 5-2 SystemICAP Training Manual, Task Element 1, pg 22
Sub SystemBy KTRyPick from Value List given. Pick "ICAP Other" if no existing value is valid. Sub-System correlates with UNIFORMAT Level 4 Component Unit.
See 5-3 Sub SystemICAP Training Manual, Task Element 1, pg 22
QuantityBy KTRyQty of items that comprise the CIMU. Can be 1 or more
Design LifeBy NAVFACNormal useful life of building components. This is generally established by the manufacture and is measured in years.
See L4 Classification fileICAP Training Manual, Task Element 1, pg 9
InstallDateBy KTRyInstall date of the majority of components within the CIMU.ICAP Training Manual, Task Element 1, pg 9
FCIBy NAVFACFacility Condition Index. FCI is another useful tool in measuring a building’s condition. It is calculated as a ratio of the sum value of an identified requirements divided by the building’s PRV, the Navy formula is one minus the ratio times 100.
FCI is NOT necessary for CIMU. FCI is a single value for a building and is calculated with the sum of all the building's deficienciesICAP Training Manual, Task Element 2 & 3, pg 29
Remaining Service LifeBy KTRyGenerally equal to design life for new structures and equipment. Actual remaining service life of the majority of components within the CIMU.
See Design LifeICAP Training Manual, Task Element 1, pg 9
DCRBy NAVFACDirect Condition Rating. A measure of 9 condition ratings established by the Corps of Engineers. Ratings are from green plus (new) to red minus (total failure).ICAP Training Manual, Task Element 1, pg 9
Replacement CostBy KTRySum value of all child records associated with this CIMU.ICAP Training Manual, Task Element 1, pg 34
Asset TypeBy NAVFACValue will be Facilities OR Utliites. NAVFAC product line responsible for maintenance.
Asset IDBy KTRYThis is a unique asset # to be assigned by KTR . The # should be unique within the site id. FEC POC should provide a 4 digit unique code for each KTR working on project/region. KTR will prefix that code for all their Asset #. For Example BAFA12345. BAF could stand for Balfour and A would stand for KTR A working for Balfour at site. 12345 could be the unique asset # for all KTR A /Balfour assets within that site id. This value will be loaded into MAXIMO 7.1 when the script loads this file. This would work the same way for RPIE/CIMU and BOTH

Tab &A

5-Master-System-SubSystem

FACILITY AND UEM UNIFORMAT
Revised 03/ 23/ 2011
MASTERSYSTEMSYSTEMSUBSYSTEM
IDLISTNAMEDESCRIPTIONIDLISTNAMEDESCRIPTIONIDLISTNAMEDESCRIPTION
1MASTERSYSTEMA10 - FOUNDATIONS1SYSTEMA1010 - STANDARD FOUNDATIONS1SUBSYSTEMA101003 - DEWATERING
2SUBSYSTEMA1010110 - ICAP - Strip Footings
3SUBSYSTEMA1010210 - ICAP - Spread Footings
4SUBSYSTEMA1010250 - ICAP - Pile Caps
5SUBSYSTEMA1010999 - ICAP - Other
2SYSTEMA1020 - SPECIAL FOUNDATIONS6SUBSYSTEMA1020110 - ICAP - CIP Concrete Piles
7SUBSYSTEMA1020120 - ICAP - Precast Concrete Piles
8SUBSYSTEMA1020130 - ICAP - Steel Pipe Piles
9SUBSYSTEMA1020140 - ICAP - Steel H Piles
10SUBSYSTEMA1020160 - ICAP - Treated Wood Piles
11SUBSYSTEMA1020210 - ICAP - Grade Beams
12SUBSYSTEMA1020999 - ICAP - Other
3SYSTEMA1030 - SLAB ON GRADE13SUBSYSTEMA1030120 - ICAP - Plain/Reinforced
14SUBSYSTEMA1030999 - ICAP - Other

2 MASTERSYSTEM A20 - BASEMENT CONSTRUCTION 4 SYSTEM A2010 - BASEMENT EXCAVATION 15 SUBSYSTEM A201001 - EXCAVATION FOR BASEMENTS

5SYSTEMA2020 - BASEMENT WALLS16SUBSYSTEMA2020110 - ICAP - CIP Concrete
17SUBSYSTEMA2020140 - ICAP - Concrete Block
18SUBSYSTEMA2020150 - ICAP - Wood
19SUBSYSTEMA2020999 - ICAP - Other
20SUBSYSTEMA2020999 - ICAP - Other
3MASTERSYSTEMB10 - SUPERSTRUCTURE6SYSTEMB1010 - FLOOR CONSTRUCTION21SUBSYSTEMB1010220 - ICAP - CIP Concrete Beam and Slab
22SUBSYSTEMB1010238 - ICAP - Precast Concrete Beam and Plank
23SUBSYSTEMB1010244 - ICAP - Light Gauge Steel Floor System
24SUBSYSTEMB1010250 - ICAP - Composite Deck, Steel Bar Joists
25SUBSYSTEMB1010254 - ICAP - Comp Deck, Structural Steel Beam
26SUBSYSTEMB1010264 - ICAP - Wood Beam, Joist, and Deck
27SUBSYSTEMB1010998 - ICAP - Exterior Stairs
28SUBSYSTEMB1010999 - ICAP - Other
7SYSTEMB1020 - ROOF CONSTRUCTION29SUBSYSTEMB1020102 - ICAP - Wood Deck and Rafter
30SUBSYSTEMB1020108 - ICAP - Steel Deck, Beams and Bar Joist
31SUBSYSTEMB1020122 - ICAP - CIP Concrete Roof Construction
32SUBSYSTEMB1020137 - ICAP - Awning/Canopy
33SUBSYSTEMB1020901 - ICAP - CIP Concrete Beam and Slab
34SUBSYSTEMB1020902 - ICAP - Precast Concrete Beam and Plank
35SUBSYSTEMB1020999 - ICAP - Other

8 SYSTEM B1030 - ROOF CONSTRUCTION 36 SUBSYSTEM B103001 - ICAP - METAL STRUCTURAL FRAME

4MASTERSYSTEMB20 - EXTERIOR ENCLOSURE9SYSTEMB2010 - EXTERIOR WALLS37SUBSYSTEMB2010101 - ICAP - CIP Concrete
38SUBSYSTEMB2010104 - ICAP - Precast Concrete Panel (Ribbed)
39SUBSYSTEMB2010106 - ICAP - Precast Concrete Panel (Tilt Up)
40SUBSYSTEMB2010109 - ICAP - Concrete Block
41SUBSYSTEMB2010125 - ICAP - Solid Brick - Single Wythe
42SUBSYSTEMB2010126 - ICAP - Solid Brick - Double Wythe
43SUBSYSTEMB2010128 - ICAP - Stone Veneer w/Stud Backup
44SUBSYSTEMB2010130 - ICAP - Brick Veneer w/Stud Backup
45SUBSYSTEMB2010132 - ICAP - Masonry Composite
46SUBSYSTEMB2010134 - ICAP - Masonry Cavity
47SUBSYSTEMB2010140 - ICAP - Glass Block
48SUBSYSTEMB2010146 - ICAP - Metal Siding Panel
49SUBSYSTEMB2010148 - ICAP - Wood Cladding w/Stud Backup
50SUBSYSTEMB2010151 - ICAP - Stucco Wall
51SUBSYSTEMB2010152 - ICAP - E.I.F.S.
52SUBSYSTEMB2010999 - ICAP - Other
10SYSTEMB2020 - EXTERIOR GLAZED OPENINGS53SUBSYSTEMB2020102 - ICAP - Wood Windows
54SUBSYSTEMB2020104 - ICAP - Steel Windows
55SUBSYSTEMB2020106 - ICAP - Aluminum Windows
56SUBSYSTEMB2020210 - ICAP - Tubular Aluminum Framing
57SUBSYSTEMB2020220 - ICAP - Curtain Wall Panels
58SUBSYSTEMB2020999 - ICAP - Other
11SYSTEMB2030 - EXTERIOR DOORS59SUBSYSTEMB2030110 - ICAP - Glazed Doors
60SUBSYSTEMB2030210 - ICAP - Wood Doors
61SUBSYSTEMB2030220 - ICAP - Steel Doors
62SUBSYSTEMB2030230 - ICAP - Aluminum Doors
63SUBSYSTEMB2030410 - ICAP - Overhead Doors
64SUBSYSTEMB2030901 - ICAP - Hangar Doors
65SUBSYSTEMB2030999 - ICAP - Other
5MASTERSYSTEMB30 - ROOFING12SYSTEMB3010 - ROOF COVERING66SUBSYSTEMB3010105 - ICAP - Built-Up
67SUBSYSTEMB3010120 - ICAP - Single Ply Membrane
68SUBSYSTEMB3010130 - ICAP - Preformed Metal
69SUBSYSTEMB3010135 - ICAP - Formed Metal
70SUBSYSTEMB3010140 - ICAP - Shingle Tile
71SUBSYSTEMB3010320 - ICAP - Roof Deck Insulation
72SUBSYSTEMB3010610 - ICAP - Gutters
73SUBSYSTEMB3010620 - ICAP - Downspouts
74SUBSYSTEMB3010999 - ICAP - Other
13SYSTEMB3020 - ROOF OPENING75SUBSYSTEMB3020110 - ICAP - Skylights
76SUBSYSTEMB3020210 - ICAP - Hatches
77SUBSYSTEMB3020999 - ICAP - Other
6MASTERSYSTEMC10 - INTERIOR CONSTRUCTION14SYSTEMC1010 - PARTITIONS78SUBSYSTEMC1010102 - ICAP - Concrete Block
79SUBSYSTEMC1010120 - ICAP - Tile
80SUBSYSTEMC1010126 - ICAP - Drywall w/Stud Framing
81SUBSYSTEMC1010140 - ICAP - Plaster w/Stud Framing
82SUBSYSTEMC1010710 - ICAP - Interior Windows
83SUBSYSTEMC1010999 - ICAP - Other
15SYSTEMC1020 - INTERIOR DOORS84SUBSYSTEMC1020102 - ICAP - Special Doors
85SUBSYSTEMC1020114 - ICAP - Metal Door
86SUBSYSTEMC1020120 - ICAP - Wood Door/Wood Frame
87SUBSYSTEMC1020122 - ICAP - Wood Door/Metal Frame
88SUBSYSTEMC1020124 - ICAP - Wood Fire Doors/Metal Frames
89SUBSYSTEMC1020999 - ICAP - Other
16SYSTEMC1030 - FITTINGS90SUBSYSTEMC1030110 - ICAP - Toilet Partitions
91SUBSYSTEMC1030310 - ICAP - Lockers
92SUBSYSTEMC1030830 - ICAP - Cabinets
93SUBSYSTEMC1030831 - ICAP - Countertop
94SUBSYSTEMC1030999 - ICAP - Other
7MASTERSYSTEMC20 - STAIRS17SYSTEMC2010 - STAIR CONSTRUCTION95SUBSYSTEMC2010110 - ICAP - Stairs
96SUBSYSTEMC2010999 - ICAP - Other

18 SYSTEM C2020 - STAIR FINISHES

8MASTERSYSTEMC30 - INTERIOR FINISHES19SYSTEMC3010 - WALL FINISHES97SUBSYSTEMC3010230 - ICAP - Wall Covering
98SUBSYSTEMC3010380 - ICAP - Wall Tile
99SUBSYSTEMC3010999 - ICAP - Other
20SYSTEMC3020 - FLOORING100SUBSYSTEMC3020901 - ICAP - Carpet
101SUBSYSTEMC3020902 - ICAP - Carpet Tile
102SUBSYSTEMC3020903 - ICAP - Composition Sheet
103SUBSYSTEMC3020904 - ICAP - Concrete Topping
104SUBSYSTEMC3020905 - ICAP - Wood
105SUBSYSTEMC3020906 - ICAP - Terrazzo
106SUBSYSTEMC3020907 - ICAP - Vinyl Tile
107SUBSYSTEMC3020908 - ICAP - Cork Tile
108SUBSYSTEMC3020909 - ICAP - Rubber Sheet
109SUBSYSTEMC3020910 - ICAP - Porcelain Tile
110SUBSYSTEMC3020911 - ICAP - Quarry Tile
111SUBSYSTEMC3020912 - ICAP - Paint
112SUBSYSTEMC3020914 - ICAP - Ceramic Tile
113SUBSYSTEMC3020915 - ICAP - Access Flooring
114SUBSYSTEMC3020999 - ICAP - Other
21SYSTEMC3030 - CEILING FINISHES115SUBSYSTEMC3030105 - ICAP - Plaster
116SUBSYSTEMC3030110 - ICAP - Drywall
117SUBSYSTEMC3030210 - ICAP - Acoustical
118SUBSYSTEMC3030999 - ICAP - Other
22SYSTEMC3040 - INTERIOR FINISH ASSEMBLIES119SUBSYSTEMC304001 - BREAK ROOMS
120SUBSYSTEMC304005 - PASSAGE WAY
9MASTERSYSTEMD10 - CONVEYING23SYSTEMD1010 - ELEVATORS AND LIFTS121SUBSYSTEMD101001 - GENERAL CONSTRUCTION ITEMS
122SUBSYSTEMD1010110 - ICAP - Hydraulic Elevators
123SUBSYSTEMD1010140 - ICAP - Traction Geared Elevators
124SUBSYSTEMD1010150 - ICAP - Traction Gearless Elevators
125SUBSYSTEMD1010901 - ICAP - Lifts
126SUBSYSTEMD1010999 - ICAP - Other
24SYSTEMD1020 - ESCALATORS AND MOVING WALKS127SUBSYSTEMD1020110 - ICAP - Escalators
128SUBSYSTEMD1020210 - ICAP - Moving Walks
129SUBSYSTEMD1020999 - ICAP - Other
25SYSTEMD1090 - OTHER CONVEYING SYSTEMS130SUBSYSTEMD1090901 - ICAP - Conveyors
131SUBSYSTEMD1090902 - ICAP - Cranes and Hoists
132SUBSYSTEMD1090903 - ICAP - Pneumatic Tube System
133SUBSYSTEMD1090999 - ICAP - Other
10MASTERSYSTEMD20 - PLUMBING26SYSTEMD2010 - PLUMBING FIXTURES134SUBSYSTEMD2010110 - ICAP - Toilet
135SUBSYSTEMD2010210 - ICAP - Urinal
136SUBSYSTEMD2010310 - ICAP - Lavatory
137SUBSYSTEMD2010410 - ICAP - Sink
138SUBSYSTEMD2010430 - ICAP - Laboratory Sink
139SUBSYSTEMD2010510 - ICAP - Bathtub
140SUBSYSTEMD2010610 - ICAP - Group Wash Fountain
141SUBSYSTEMD2010710 - ICAP - Shower
142SUBSYSTEMD2010810 - ICAP - Drinking Fountain
143SUBSYSTEMD2010820 - ICAP - Water Cooler
144SUBSYSTEMD2010901 - ICAP - Emergency Shower
145SUBSYSTEMD2010902 - ICAP - Emergency Eye Wash
146SUBSYSTEMD2010903 - ICAP - Bidet
147SUBSYSTEMD2010999 - ICAP - Other
27SYSTEMD2020 - DOMESTIC WATER DISTRIBUTION148SUBSYSTEMD2020210 - ICAP - Water Heaters, Residential, Elec
149SUBSYSTEMD2020220 - ICAP - Water Heaters, Residential, Gas
150SUBSYSTEMD2020230 - ICAP - Water Heaters, Residential, Oil
151SUBSYSTEMD2020240 - ICAP - Water Heaters, Commercial, Elec
152SUBSYSTEMD2020250 - ICAP - Water Heaters, Commercial, Gas
153SUBSYSTEMD2020260 - ICAP - Water Heaters, Commercial, Oil
154SUBSYSTEMD2020901 - ICAP - Booster Pump
155SUBSYSTEMD2020902 - ICAP - Storage Tank
156SUBSYSTEMD2020903 - ICAP - Backflow Preventer
157SUBSYSTEMD2020904 - ICAP - Heat Transfer Package
158SUBSYSTEMD2020905 - ICAP - Piping/Fittings
159SUBSYSTEMD2020999 - ICAP - Other
28SYSTEMD2030 - SANITARY WASTE160SUBSYSTEMD2030901 - ICAP - Sanitary Waste Separator
161SUBSYSTEMD2030902 - ICAP - Waste/Vent Piping
162SUBSYSTEMD2030999 - ICAP - Other
29SYSTEMD2040 - RAIN WATER DRAINAGE163SUBSYSTEMD2040210 - ICAP - Roof Drains
164SUBSYSTEMD2040999 - ICAP - Other

30 SYSTEM D2090 - OTHER PLUMBING SYSTEMS 165 SUBSYSTEM D2090999 - ICAP - Other

11 MASTERSYSTEM D30 - HVAC 31 SYSTEM D3010 - ENERGY SUPPLY 166 SUBSYSTEM D3010999 - ICAP - Other

32SYSTEMD3020 - HEAT GENERATING SYSTEMS167SUBSYSTEMD3020126 - ICAP - Boiler, Electric, Hot Water
168SUBSYSTEMD3020128 - ICAP - Boiler, Electric, Steam
169SUBSYSTEMD3020130 - ICAP - Boiler Cast Iron Hot Water Gas
170SUBSYSTEMD3020134 - ICAP - Boiler, Cast Iron, Steam, Gas
171SUBSYSTEMD3020136 - ICAP - Boiler, Cast Iron Ht Wtr Gas/Oil
172SUBSYSTEMD3020138 - ICAP - Boiler, Cast Iron, Steam Gas/Oil
173SUBSYSTEMD3020901 - ICAP - Boiler, Cast Iron, Ht Wtr, Oil
174SUBSYSTEMD3020902 - ICAP - Boiler, Cast Iron, Steam, Oil
175SUBSYSTEMD3020903 - ICAP - Boiler, Solid Fuel
176SUBSYSTEMD3020904 - ICAP - Boiler Feedwater Tank
177SUBSYSTEMD3020905 - ICAP - Furnace
178SUBSYSTEMD3020906 - ICAP - Expansion Tank
179SUBSYSTEMD3020999 - ICAP - Other
33SYSTEMD3030 - COOLING GENERATING SYSTEMS180SUBSYSTEMD3030130 - ICAP - Chiller, Recip, Water Cooled
181SUBSYSTEMD3030135 - ICAP - Chiller, Recip, Air Cooled
182SUBSYSTEMD3030140 - ICAP - Chiller, Centrifugal, Wtr Cooled
183SUBSYSTEMD3030145 - ICAP - Chiller, Gas Abso, Wtr Cooled
184SUBSYSTEMD3030150 - ICAP - Chiller, Steam Abso, Wtr Cooled
185SUBSYSTEMD3030310 - ICAP - Cooling Tower, Galvanized
186SUBSYSTEMD3030320 - ICAP - Cooling Tower, Fiberglass
187SUBSYSTEMD3030330 - ICAP - Cooling Tower, Stainless Steel
188SUBSYSTEMD3030901 - ICAP - Condenser, DX, Air Cooled
189SUBSYSTEMD3030902 - ICAP - Condenser, DX, Evaporative
190SUBSYSTEMD3030903 - ICAP - Packaged DX Refrigerant System
191SUBSYSTEMD3030999 - ICAP - Other
34SYSTEMD3040 - DISTRIBUTION SYSTEMS192SUBSYSTEMD3040106 - ICAP - Air Handling Unit, Field Fab
193SUBSYSTEMD3040110 - ICAP - Air Handling Unit, Central Sta
194SUBSYSTEMD3040114 - ICAP - Air Handling Unit, Rooftop
195SUBSYSTEMD3040118 - ICAP - Fan Coil A/C, Cab Mnt, Two Pipe
196SUBSYSTEMD3040122 - ICAP - Fan Coil A/C, Cab Mnt, Four Pipe
197SUBSYSTEMD3040124 - ICAP - Fan Coil A/C, Duct Mount, 2 Pipe
198SUBSYSTEMD3040128 - ICAP - Fan Coil A/C, Duct Mount, 4 Pipe
199SUBSYSTEMD3040132 - ICAP - VAV Terminal
200SUBSYSTEMD3040136 - ICAP - VAV Terminal, Fan Powered
201SUBSYSTEMD3040220 - ICAP - Fan System, Centrifugal In-Line
202SUBSYSTEMD3040230 - ICAP - Fan System, Utility Set
203SUBSYSTEMD3040240 - ICAP - Fan System, Roof Exhaust
204SUBSYSTEMD3040250 - ICAP - Comm/Indu Vacuum Dust Collection
205SUBSYSTEMD3040260 - ICAP - Kitchen Exhaust/Make-Up Air
206SUBSYSTEMD3040330 - ICAP - Circulating Pump, End Suction
207SUBSYSTEMD3040340 - ICAP - Circulating Pump, Double Suction
208SUBSYSTEMD3040610 - ICAP - Heat Exchanger, Plate Type
209SUBSYSTEMD3040620 - ICAP - Heat Exchanger, Shell Tube
210SUBSYSTEMD3040901 - ICAP - Dehumidifier
211SUBSYSTEMD3040902 - ICAP - Humidifier
212SUBSYSTEMD3040903 - ICAP - Fan Coil A/C, DX
213SUBSYSTEMD3040999 - ICAP - Other
35SYSTEMD3050 - TERMINAL & PACKAGE UNITS214SUBSYSTEMD3050120 - ICAP - Unit Heaters, Gas
215SUBSYSTEMD3050130 - ICAP - Unit Heaters, Hydronic
216SUBSYSTEMD3050170 - Split Systems Air Cooled Condense Unit
217SUBSYSTEMD3050175 - ICAP - Rooftop A/C
218SUBSYSTEMD3050185 - ICAP - Computer Room Cooling Units
219SUBSYSTEMD3050201 - ICAP - Pkg A/C, Air Cooled, Elec Heat
220SUBSYSTEMD3050203 - ICAP - Pkg A/C, Air Cooled, HW Heat
221SUBSYSTEMD3050210 - ICAP - Pkg A/C, Water Cooled, Elec Heat
222SUBSYSTEMD3050220 - ICAP - Pkg A/C, Water Cooled, HW Heat
223SUBSYSTEMD3050230 - ICAP - Heat Pump, Wtr Source, Cent Sta
224SUBSYSTEMD3050235 - ICAP - Heat Pump, Water Source, Console
225SUBSYSTEMD3050240 - ICAP - Heat Pump, Duct Mnt, Horizontal
226SUBSYSTEMD3050245 - ICAP - Heat Pump, Air/Air, Roof Top
227SUBSYSTEMD3050255 - ICAP - Thru-Wall A/C Unit
228SUBSYSTEMD3050260 - ICAP - Thru-Wall Heat Pump
229SUBSYSTEMD3050530 - ICAP - Baseboard Heating
230SUBSYSTEMD3050901 - ICAP - Unit Heaters, Electric
231SUBSYSTEMD3050902 - ICAP - Unit Heater, Infrared
232SUBSYSTEMD3050904 - ICAP - Smoke Vents
233SUBSYSTEMD3050905 - ICAP - Hydronic Heating - Fin Tube
234SUBSYSTEMD3050999 - ICAP - Other
36SYSTEMD3060 - CONTROLS & INSTRUMENTATION235SUBSYSTEMD3060901 - ICAP - HVAC Controls, Electric, Digital
236SUBSYSTEMD3060902 - ICAP - HVAC Controls, Pneumatic
237SUBSYSTEMD3060903 - ICAP - Air Compressor
238SUBSYSTEMD3060999 - ICAP - Other

37 SYSTEM D3070 - SYSTEMS TESTING & BALANCING

38SYSTEMD3090 - OTHER HVAC SYSTEMS & EQUIPMENT239SUBSYSTEMD3090 - SPECIAL COOLING SYSTEMS AND DEVICES
240SUBSYSTEMD3090310 - ICAP - Fume Hood Exhaust System
241SUBSYSTEMD3090320 - ICAP - Garage Exhaust Systems
242SUBSYSTEMD3090901 - ICAP - Industrial Exhaust System
243SUBSYSTEMD3090902 - ICAP - Chemical Feedwater
244SUBSYSTEMD3090903 - ICAP - Air Curtain
245SUBSYSTEMD3090999 - ICAP - Other
12MASTERSYSTEMD40 - FIRE PROTECTION39SYSTEMD4010 - SPRINKLERS246SUBSYSTEMD4010310 - ICAP - Dry Pipe Systems
247SUBSYSTEMD4010350 - ICAP - Preaction Systems
248SUBSYSTEMD4010370 - ICAP - Deluge Systems
249SUBSYSTEMD4010390 - ICAP - Firecycle Systems
250SUBSYSTEMD4010410 - ICAP - Wet Pipe Systems
251SUBSYSTEMD4010999 - ICAP - Other
40SYSTEMD4020 - STANDPIPES252SUBSYSTEMD4020310 - ICAP - Riser
253SUBSYSTEMD4020999 - ICAP - Other

41 SYSTEM D4030 - FIRE PROTECTION SPECIALTIES 254 SUBSYSTEM D4030999 - ICAP - Other

42SYSTEMD4090 - OTHER FIRE PROTECTION SYSTEMS255SUBSYSTEMD4090901 - ICAP - Carbon Dioxide Extinguishing Sys
256SUBSYSTEMD4090902 - ICAP - Hood Fire Protection
257SUBSYSTEMD4090903 - ICAP - Backflow Preventer
258SUBSYSTEMD4090904 - ICAP - Fire Pumps
259SUBSYSTEMD4090920 - ICAP - Clean Agent Extinguishing System
260SUBSYSTEMD4090999 - ICAP - Other
13MASTERSYSTEMD50 - ELECTRICAL43SYSTEMD5010 - ELECTRICAL SERVICE & DISTRIBUTION261SUBSYSTEMD5010120 - ICAP - Electrical Service
262SUBSYSTEMD5010240 - ICAP - Switchgear
263SUBSYSTEMD5010901 - ICAP - Transfer Switch
264SUBSYSTEMD5010902 - ICAP - Transformer
265SUBSYSTEMD5010903 - ICAP - Motor Control Center
266SUBSYSTEMD5010905 - ICAP - Capacitor Bank
267SUBSYSTEMD5010906 - ICAP - Panelboards
268SUBSYSTEMD5010999 - ICAP - Other
44SYSTEMD5020 - LIGHTING & BRANCH WIRING269SUBSYSTEMD5020120 - ICAP - Electrical Distribution
270SUBSYSTEMD5020248 - ICAP - Interior Lighting, Fluorecent
271SUBSYSTEMD5020250 - ICAP - Interior Lighting, Incandescent
272SUBSYSTEMD5020252 - ICAP - Interior Lighting, High Int
273SUBSYSTEMD5020901 - ICAP - Exit Lighting
274SUBSYSTEMD5020902 - ICAP - Explosion Proof Lighting
275SUBSYSTEMD5020903 - ICAP - Exterior Lighting
276SUBSYSTEMD5020999 - ICAP - Other
45SYSTEMD5030 - COMMUNICATION AND SECURITY277SUBSYSTEMD5030910 - ICAP - Communication/Alarm Systems
278SUBSYSTEMD5030999 - ICAP - Other
46SYSTEMD5090 - OTHER ELECTRICAL SYSTEMS279SUBSYSTEMD5090210 - ICAP - Generators
280SUBSYSTEMD5090901 - ICAP - Emergency Lighting
281SUBSYSTEMD5090902 - ICAP - Lightning Protection (Arresters)
282SUBSYSTEMD5090903 - ICAP - Grounding System
283SUBSYSTEMD5090904 - ICAP - Uninteruptible Power Supply
284SUBSYSTEMD5090999 - ICAP - Other
14MASTERSYSTEME10 - EQUIPMENT47SYSTEME1010 - COMMERCIAL EQUIPMENT285SUBSYSTEME101001 - CHECKROOM EQUIPMENT
286SUBSYSTEME101003 - VENDING EQUIPMENT
287SUBSYSTEME101004 - LAUNDRY EQUIPMENT
288SUBSYSTEME101005 - SECURITY AND VAULT EQUIPMENT
289SUBSYSTEME101006 - TELLER AND SERVICE EQUIPMENT
290SUBSYSTEME101007 - MERCANTILE EQUIPMENT
291SUBSYSTEME101008 - OFFICE EQUIPMENT
48SYSTEME1020 - INSTITUTIONAL EQUIPMENT292SUBSYSTEME102002 - MEDICAL EQUIPMENT
293SUBSYSTEME102003 - LABORATORY EQUIPMENT
294SUBSYSTEME102005 - AUDITORIUM AND STAGE EQUIPMENT
295SUBSYSTEME102008 - INSTRUMENTAL EQUIPMENT
296SUBSYSTEME102009 - AUDIO-VISUAL EQUIPMENT
49SYSTEME1030 - VEHICULAR EQUIPMENT297SUBSYSTEME103001 - PARKING CONTROL EQUIPMENT
298SUBSYSTEME103002.02 - TRUCK OR DOCK LEVELER
299SUBSYSTEME103002.03 - TRUCK OR DOCK LIFTS
300SUBSYSTEME103002.04 - LOADING DOCK EQUIPMENT
301SUBSYSTEME103003 - WAREHOUSE EQUIPMENT
302SUBSYSTEME1030110 - ICAP - Vehicular Service Equipment
303SUBSYSTEME1030310 - ICAP - Loading Dock Equipment
304SUBSYSTEME1030999 - ICAP - Other

50 SYSTEM E1040 - INDUSTRIAL PROCESS EQUIPMENT

51SYSTEME1090 - OTHER EQUIPMENT305SUBSYSTEME109001 - BUILT-IN MAINTENANCE EQUIPMENT
306SUBSYSTEME109002 - FOOD SERVICE EQUIPMENT
307SUBSYSTEME109002 - SOLID WASTE HANDLING EQUIPMENT
308SUBSYSTEME109004 - RESIDENTIAL EQUIPMENT
309SUBSYSTEME109005 - UNIT KITCHEN
310SUBSYSTEME109009 - OBSERVATORY EQUIPMENT
311SUBSYSTEME109099.01 - BALERS
312SUBSYSTEME109099.03 - OTHER EQUIPMENT

15 MASTERSYSTEM E20 - FURNISHINGS 52 SYSTEM E2010 - FIXED FURNISHINGS 313 SUBSYSTEM E201099 - OTHER FIXED FURNISHINGS

53SYSTEME2020 - MOVEABLE FURNISHINGS314SUBSYSTEME202002 - MODULAR PREFABRICATED FURNITURE
315SUBSYSTEME202099 - OTHER MOVEABLE FURNISHINGS
16MASTERSYSTEMF10 - SPECIAL CONSTRUCTION54SYSTEMF1010 - SPECIAL STRUCTURES316SUBSYSTEMF101001 - PRE-ENGINEERED STRUCTURES
317SUBSYSTEMF101001.01 - K-SPAN BUILT STRUCTURES
318SUBSYSTEMF101002 - EXTERIOR UTILITY BUILDINGS
319SUBSYSTEMF101003 - AIR SUPPORTED STRUCTURES
320SUBSYSTEMF101099.01 - PAINT BOOTH
321SUBSYSTEMF101099.02 - PORTABLE OFFICE UNITS
55SYSTEMF1020 - INTEGRATED CONSTRUCTION322SUBSYSTEMF102001 - SPECIAL PURPOSE ROOMS
323SUBSYSTEMF102002 - INTEGRATED ASSEMBLIES
324SUBSYSTEMF102099 - OTHER INTERGRATED CONSTRUCTION
56SYSTEMF1030 - SPECIAL CONSTRUCTION SYSTEMS325SUBSYSTEMF103001 - VAULTS
326SUBSYSTEMF103002 - SOUND VIBRATION AND SEISMIC CONSTRUCTION
327SUBSYSTEMF103003 - RADIATION PROTECTION
328SUBSYSTEMF103099 - OTHER SPECIAL CONSTRUCTION SYSTEMS
57SYSTEMF1040 - SPECIAL FACILITIES329SUBSYSTEMF104001 - INTERIOR SWIMMING POOLS
330SUBSYSTEMF104002 - LIQUID AND GAS STORAGE TANKS
331SUBSYSTEMF104003 - KENNELS AND ANIMAL SHELTERS
332SUBSYSTEMF104004 - SITE CONSTRUCTED INCINERATORS
333SUBSYSTEMF104005 - ICE RINKS
334SUBSYSTEMF104099 - OTHER SPECIAL FACILITIES
58SYSTEMF1050 - SPECIAL CONTROLS AND INSTRUMENTATION335SUBSYSTEMF105001 - RECORDING INSTRUMENTATION
336SUBSYSTEMF105002 - BUILDING AUTOMATION SYSTEMS
17MASTERSYSTEMF20 - SELECTIVE BUILDING DEMOLITION59SYSTEMF2010 - BUILDING ELEMENTS DEMOLITION337SUBSYSTEMF201001 - SUBSTRUCTURE AND SUPERSTRUCTURE
338SUBSYSTEMF201002 - EXTERIOR ENCLOSURE
339SUBSYSTEMF201003 - ROOFING
340SUBSYSTEMF201004 - INTERIOR CONSTRUCTION AND FINISHES
341SUBSYSTEMF201005 - CONVEYING SYSTEMS
342SUBSYSTEMF201006 - MECHANICAL SYSTEMS
343SUBSYSTEMF201007 - ELECTRICAL SYSTEMS
344SUBSYSTEMF201008 - EQUIPMENT AND FURNISHINGS
60SYSTEMF2020 - HAZARDOUS COMPONENTS & SUPERSTRUCTURE345SUBSYSTEMF202001 - SUBSTRUCTURE AND SUPERSTUCUTRE
346SUBSYSTEMF202002 - EXTERIOR ENCLOSURE
347SUBSYSTEMF202003 - ROOFING
348SUBSYSTEMF202004 - INTERIOR CONSTRUCTION AND FINISHES
349SUBSYSTEMF202005 - CONVEYING SYSTEMS
350SUBSYSTEMF202006 - MECHANICAL SYSTEMS
351SUBSYSTEMF202007 - ELECTRICAL SYSTEMS
352SUBSYSTEMF202008 - EQUIPMENT AND FURNISHINGS
353SUBSYSTEMF202009 - OTHER HAZARDOUS SELECTIVE BUILDING DEMO
18MASTERSYSTEMG20 - SITE IMPROVEMENTS61SYSTEMG2010 - PAVEMENTS354SUBSYSTEMG201002.01 - CURBS AND GUTTERS
355SUBSYSTEMG201002.02 - DRAINS
356SUBSYSTEMG201003.01 - FLEXIBLE ASPHALT PAVEMENTS
357SUBSYSTEMG201003.02 - RIGID CONCRETE PAVEMENTS
358SUBSYSTEMG201004 - MARKINGS AND SIGNAGE
359SUBSYSTEMG201005 - GUARDRAILS AND BARRIERS
360SUBSYSTEMG201099.01 - COMPOSITE
361SUBSYSTEMG201099.02 - PAVERS
362SUBSYSTEMG201099.03 - UNIMPROVED/GRAVEL
62SYSTEMG2020 - PARKING LOTS363SUBSYSTEMG202005.01 - GUARD RAIL AND POSTS
364SUBSYSTEMG202005.02 - WHEEL STOPS
365SUBSYSTEMG202007 - PARKING METERS
63SYSTEMG2030 - PEDESTRIAN PAVING366SUBSYSTEMG203003.01 - ASPHALT PEDESTRIAN PAVING
367SUBSYSTEMG203003.02 - CONCRETE PEDESTRIAN PAVING
368SUBSYSTEMG203003.03 - PAVERS PEDESTRIAN PAVING
64SYSTEMG2040 - SITE IMPROVEMENTS & AMMENITIES369SUBSYSTEMG204001.01 - FENCES AND GATES
370SUBSYSTEMG204001.02 - FENCES - CHAIN LINK
371SUBSYSTEMG204001.03 - FENCES - MISCELLANEOUS METAL
372SUBSYSTEMG204002 - RETAINING WALLS
373SUBSYSTEMG204005 - SIGNAGE
374SUBSYSTEMG204006.01 - FOUNTAINS, POOLS AND WATERCOURSES
375SUBSYSTEMG204006.02 - FOUNTAINS
376SUBSYSTEMG204008.01 - TERRACE AND PERIMETER WALLS
377SUBSYSTEMG204008.02 - STONE WALL
378SUBSYSTEMG204008.03 - FREE STANDING BRICK WALL
379SUBSYSTEMG204009 - FLAG POLES
380SUBSYSTEMG204099 - TRUCK SCALES
381SUBSYSTEMG204099.01 - SITE FURNISHINGS
382SUBSYSTEMG204099.02 - SITE SEATING
383SUBSYSTEMG204099.03 - HANDRAIL - PIPE RAILINGS
384SUBSYSTEMG204099.04 - CIGARETTE RECEPTACLE
385SUBSYSTEMG204099.05 - GUARD RAILS AND POSTS
386SUBSYSTEMG204099.06 - TRASH CANS
387SUBSYSTEMG204099.07 - MAILBOXES
388SUBSYSTEMG204099.08 - TURNSTILES
389SUBSYSTEMG204099.09 - OUTDOOR COVERING
65SYSTEMG2050 - LANDSCAPING390SUBSYSTEMG205004 - LAWNS AND GRASSES
391SUBSYSTEMG205005 - EXTERIOR PLANTS
392SUBSYSTEMG205006 - PLANTERS
393SUBSYSTEMG205007.01 - IRRIGATION PIPING
394SUBSYSTEMG205007.02 - IRRIGATION BACKFLOW PREVENTION
395SUBSYSTEMG205007.03 - IRRIGATION CONTROLS
396SUBSYSTEMG205099 - LANDSCAPING
19MASTERSYSTEMG30 - SITE MECHANICAL UTILITIES66SYSTEMG3010 - WATER SUPPLY397SUBSYSTEMG301001.01 - WELL SYSTEMS
398SUBSYSTEMG301001.02 - WELLS
399SUBSYSTEMG301003.01 - WATER STORAGE TANKS
400SUBSYSTEMG301003.02 - SITE PIPING, POTABLE WATER
401SUBSYSTEMG301004 - SITE PIPING, FIRE PROTECTION WATER
402SUBSYSTEMG301006 - SITE PIPING, NON POTABLE WATER
403SUBSYSTEMG301007 - PUMPING STATIONS
404SUBSYSTEMG301008.01 - PACKAGE WATER TREATMENT PLANTS
405SUBSYSTEMG301008.02 - PACKAGED WATER WASTE TREATMENT PLANTS
67SYSTEMG3020 - SANITARY SEWER406SUBSYSTEMG302001.02 - SITE PIPING, SANITARY SEWER
407SUBSYSTEMG302002 - MANHOLES AND CLEANOUTS
408SUBSYSTEMG302003 - LIFT STATIONS
409SUBSYSTEMG302005.01 - SEPTIC DISPOSAL SYSTEMS
410SUBSYSTEMG302005.02 - SEPTIC TANKS
411SUBSYSTEMG302006 - DRAIN FIELDS
412SUBSYSTEMG302099 - WASTEWATER TREATMENT TANKS
68SYSTEMG3030 - STORM SEWER413SUBSYSTEMG303001 - SITE PIPING, STORM SEWER
414SUBSYSTEMG303002 - MANHOLES
415SUBSYSTEMG303003 - LIFT STATIONS
416SUBSYSTEMG303004.01 - CATCH BASINS
417SUBSYSTEMG303004.02 - DITCHES AND CULVERTS
418SUBSYSTEMG303005 - HEADWALLS
419SUBSYSTEMG303007 - RETENTION PONDS
420SUBSYSTEMG303099.01 - STORM DRAINAGE
421SUBSYSTEMG303099.02 - SUBDRAINAGE
69SYSTEMG3040 - HEATING DISTRIBUTION422SUBSYSTEMG304001 - HOT WATER SUPPLY SYSTEM
423SUBSYSTEMG304002 - STEAM SUPPLY
424SUBSYSTEMG304004 - CONDENSATE RETURN
425SUBSYSTEMG304006 - PUMPING STATIONS
70SYSTEMG3050 - COOLING DISTRIBUTION426SUBSYSTEMG305001 - CHILLED WATER PIPING
427SUBSYSTEMG305004 - WELLS FOR COOLING / HEATING
428SUBSYSTEMG305005 - PUMPING STATIONS
429SUBSYSTEMG305006 - COOLING TOWERS ON SITE
71SYSTEMG3060 - FUEL DISTRIBUTION430SUBSYSTEMG306001 - SITE PIPING, FUEL DISTRIBUTION
431SUBSYSTEMG306003 - FUEL DISPENSING STATIONS
432SUBSYSTEMG306004 - FUEL STORAGE TANKS
433SUBSYSTEMG306007 - NK SYSTEMS
434SUBSYSTEMG306099 - FUEL EQUIPMENT

72 SYSTEM G3090 - OTHER SITE MECHANICAL UTILITIES 435 SUBSYSTEM G3090 - INDUSTRIAL WASTE SYSTEMS

20MASTERSYSTEMG40 - SITE ELECTRICAL UTILITIES73SYSTEMG4010 - ELECTRICAL DISTRIBUTION436SUBSYSTEMG401001 - SUBSTATIONS
437SUBSYSTEMG401004 - OVERHEAD POWER DISTRIBUTION
438SUBSYSTEMG401006 - UNDERGROUND POWER DISTRIBUTION
439SUBSYSTEMG401099 - PIPED ENERGY DISTRIBUTION
74SYSTEMG4020 - SITE LIGHTING440SUBSYSTEMG402001 - FIXTURES AND TRANSFORMERS
441SUBSYSTEMG402003 - POLES
442SUBSYSTEMG402005 - WIRING CONDUITS AND DUCTBANKS
443SUBSYSTEMG402006 - SITE LIGHTING CONTROLS
75SYSTEMG4030 - SITE COMMUNICATIONS & SECURITY444SUBSYSTEMG403001 - SITE COMMUNICATIONS SYSTEMS
445SUBSYSTEMG403003 - FIRE AND WATCH SYSTEM
446SUBSYSTEMG403007 - ELEC/COMMUNICATION STRUCTURES
447SUBSYSTEMG403098 - SITE SECURITY AND ALARM SYSTEMS
21MASTERSYSTEMG90 - OTHER SITE CONSTRUCTION76SYSTEMG9010 - SERVICE AND PEDESTRIAN TUNNELS448SUBSYSTEMG901001.01 - SERVICE TUNNELS
449SUBSYSTEMG901001.02 - UTILITY TUNNEL
450SUBSYSTEMG901001.03 - TUNNELS - UTILITY
451SUBSYSTEMG901001.04 - INITIAL TUNNEL SUPPORT SYSTEMS
452SUBSYSTEMG901001.05 - BORING OR JACKING CONDUITS
453SUBSYSTEMG901001.06 - MICROTUNNELING
454SUBSYSTEMG901001.07 - TRENCH BOXES
455SUBSYSTEMG901001.08 - PEDESTRIAN TUNNELS
77SYSTEMG9090 - OTHER SITE SYSTEMS & EQUIPMENT456SUBSYSTEMG909001.01 - VEHICULAR BRIDGES
457SUBSYSTEMG909001.02 - PREFABRICATED BRIDGES
458SUBSYSTEMG909002 - RAILROAD TRACKS AND BEDS
459SUBSYSTEMG909002.01 - RAILROAD TRACK
460SUBSYSTEMG909002.02 - RAILROAD GRADE CROSSINGS
461SUBSYSTEMG909002.03 - RAILROAD TRAIN SCALES
462SUBSYSTEMG909003 - SNOW MELTING SYSTEMS
22MASTERSYSTEMH10 - WATERFRONT STRUCTURES78SYSTEMH1010 - SUBSTRUCTURE463SUBSYSTEMH101001 - PILES
464SUBSYSTEMH101002 - SHEET PILES
465SUBSYSTEMH101003 - CAISSONS
466SUBSYSTEMH101004.01 - TIE BACK ANCHOR - PILES
467SUBSYSTEMH101004.02 - TIE BACK ANCHOR - DEADMENUBICLES
468SUBSYSTEMH101005 - STEEL TIE RODS
469SUBSYSTEMH101006 - GRAVITY WALL

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .