navfac_p-458_vol._ii-7.pdf

PDF 4 MB Posted

Attached to
Guam Base Operations Support Contract (BOSC) Federal contract opportunity
Solicitation number
N62742-13-R-1150
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

NAVFAC P458 Volume II-7 (Standards and Guides for Utilitiesman)

View the file

Other files for this federal contract opportunity

Other files attached to Guam Base Operations Support Contract (BOSC), newest first.
File Type Posted
Solicitation_N62742-13-R-1150.pdf PDF
JL-18_Questions_and_Answers.pdf PDF
Amendment_0027.pdf PDF
Amendment_0026.pdf PDF
Solicitation_N62742-13-R-1150.pdf PDF
Solicitation_N62742-13-R-1150.pdf PDF
Amendment_0025.pdf PDF
Solicitation_N62742-13-R-1150.pdf PDF
JL-16_Questions_and_Answers.pdf PDF
Amendment_0023.pdf PDF
J-0600000-05_Workload_Data_Submissions_10DEC13.pdf PDF
Solicitation_N62742-13-R-1150.pdf PDF
11010.45_land_use_plans_2002.pdf PDF
nossainst_8020_22.pdf PDF
Amendment_0022.pdf PDF
NI_ICS_CA_dtd_26April2011.pdf PDF
Amendment_0021.zip ZIP file
Amendment_0020.zip ZIP file
Amendment_0019.zip ZIP file
Amendment_0018.pdf PDF
J-0200000-12_KTR-Leased Owned_Vehicles.xls XLS spreadsheet
Solicitation_N62742-13-R-1150.pdf PDF
Amendment_0001.pdf PDF
JE-1_Award_Fee_Award_Option_Plan.pdf PDF
JL-10_Questions_and_Answers.pdf PDF
J-0200000-09_GFE.xls XLS spreadsheet
JL-11_Photos.zip ZIP file
JL-4_Resources_Worksheet.xlsx XLSX spreadsheet
JB-1_Cost_Summary_Worksheet.xlsx XLSX spreadsheet
J-0200000-08_GFM.xls XLS spreadsheet
J-0200000-11_KTR_Owned.xls XLS spreadsheet
Annex_1000000_Supply_Material_Management_Section_C.pdf PDF
Annex_1700000_Base_Support_Vehicles_ _Equipment_Section_C.pdf PDF
Section_J_-_Attachments_Exhibit.zip ZIP file
Annex_7.zip ZIP file
Annex_1604.zip ZIP file
Annex_1602.zip ZIP file
Annex_1.zip ZIP file
Annex_2.zip ZIP file
Solicitation_N62742-13-R-1150.pdf PDF
Annex_1502.zip ZIP file
Annex_1502A.zip ZIP file
Annex_1700A.zip ZIP file
Annex_10.zip ZIP file
Annex_1501.zip ZIP file
Annex_6.zip ZIP file
Annex_18.zip ZIP file
Annex_1605.zip ZIP file
Annex_1700.zip ZIP file
Annex_1606.zip ZIP file
Show all 50

Guam Base Operations Support Contract (BOSC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERSONNEL READINESS

CAPABILITY PROGRAM

NAVFAC P-458

AUGUST 1985

Standards and Guides for Utilitiesman

Volume II-7

DISTRIBUTION LIST

(1 copy each unless indicated otherwise)

SNDL

39B 39c 39D 39E 39G 39R C55A

PA32

PB41

FP49

FJl8 FKAlC FKNll

F KN2

F KN8

FTl

FTS

FT18

FT20

FT37

FT60

FT78

COMCBLANT/COMCBPAC (4 copies each) COM2OTHNCR (6 copies) COM3lSTNCR (4 copies) NMCBs 1, 62, 74, 133; 3, 4, 5, 40 (15 copies each) PHIBCBTWO/PHIBCBONE (2 copies each) UCT ONE/UCT TWO (2 copies each) CBMU 302 (2 copies)

C OMRNC F

NODAC (Code 20) CBUs 410, 411, 412, 414, 415, 420, 421, 422 CBUs 405, 406, 409, 413, 416, 417, 418

CBU 403

COMNAVMILPERSCOM (NMPC 4011)

COMNAVFACENGCOM (09M1, 06)

NAVCIVENGRLAB (Code L03AB)

CBC

NAVSUPUNIT STATE DEPT WASH DC (6 copies)

CNET

CNTECHTRA

CBUs 401, 402, 404, 407, 408, 419 NAVCONSTRACEN (10 copies each)

NAVSCOLCECOFF

NAVEDTRASUPPCENPAC (2 copies) NAVEDTRAPRODEVCEN (3 copies)

COM RNCR ONE

COM RNCR TWO

COM RNCR THREE

COM RNCR FIVE

COM RNCR SIX

COM RNCR SEVEN

COM RNCR EIGHT

COM RNCR NINE

COM RNCR TWENTY (6 copies) COM RNCR TWENTY ONE (8 copies) COM RNCR THIRTY (2 copies) COM RNCR THIRTY ONE (6 copies) RNMCB 2 (14 copies) RNMCB 12 (13 copies) RNMCB 13 (15 copies) RNMCB 14 (17 copies) RNMCB 15 (20 copies) RNMCB 16 (12 copies) RNMCB 17 (14 copies) RNMCB 18 (26 copies)

RNMCB 20 (17 copies) RNMCB 21 (16 copies) RNMCB 22 (18 copies) RNMCB 23 (14 copies) RNMCB 24 (18 copies) RNIKCB 25 (19 copies) RNMCB 26 (18 copies) RNMCB 27 (15 copies) RNMCB 28 (18 copies)

COMRNCBPAC

COMRNCBLANT

RNCBC PORT HUENEME (3 copies) RNCBC GULFPORT (3 copies)

RNCBC DAVISVILLE

RNCFSU 3 (6 copies) RNCFSU 4 (6 copies) RNCFSU 1 (6 copies) RNCFSU 2 (6 copies) DIR PEP, NAS, EL TORO, CA (13 copies)

COMNRIUWG ONE

COMNRIUWG TWO

Additional copies may be obtained from:

Naval Construction Battalion Center (Code 151, Port Hueneme, CA 93043.

ii

FOREWORD

The Personnel Readiness Capability Program (PRCP) provides all levels of manage-ment in the Naval Construction Force with timely personnel information which will increase management’s capabilities in planning, decision making, and control. The PRCP is an integrated system that identifies the required occupational skills; provides means for determining qualified personnel; and correlates formal training programs and skills. The effectiveness of the system depends on the continued efforts of the individual units to update this information.

This Manual (P-458) has been divided into three volumes to facilitate use by staff personnel and PR C P interviewers. Volume I contains standard skill definitions applicable to the Naval Construction Force. Volume II, the Standards and Guides, consists of seven separate manuals, one for each Seabee rating. It is the interviewer’s principal tool in collecting and updating skill data. Volume III contains the systems documentation.

COMCBPAC/COMCBLANT/COMRNCF Instruction 1500.2OF identifies and defines the skills required to meet peacetime and contingency missions, and specifies the required number of personnel that should be trained in each skill. Recognizing that actual performance is the best determining factor in judging a person’s qualification, this is not always possible or practicable in the Seabees. Therefore, an integral part of the PRCP is the Standards and Guides by which a person’s qualifications are determined through an interview. Standardization is an important element in this system and adherence to the Standards and Guides cannot be overemphasized. Further, the interviews should be conducted by personnel competent in the skills of their rating.

As each skill will not be used during every deployment, a system of Special Construction Battalion Training courses has been developed by the the Chief of Naval Technical Training. These provide the opportunity to actually perform the skill under controlled conditions. Therefore, successful completion of these courses warrants assigning the appropriate skill level.

Recommendation from individual commands for establishment, deletion, or changes to PRCP skills have been a major source for enhancement of PRCP and are encouraged.

Request for inclusion on the automatic distribution list or revision of number of copies required should be submitted via respective type Commander (COMCBPAC/ COMCBLANT/COMRNCF) and be addressed to Commanding Officer, Naval Construction Battalion Center (Code 155C), Port Hueneme, CA 93043-5000.

This revision is a complete reprint and includes the latest change at the time of revision. This publication cancels and supersedes the PRCP, NAVFAC P-458, Volume II-7, June 1982.

J. P. JONES, JR.

Rear Admiral, CEC, U.S. Navy Commander Naval Facilities Engineering Command Chief of Civil Engineers iii

RECORD OF CHANGES

CONTENTS

Page

C

Part I

Part II

Section

Introduction . . . . . . . . . . . . . . . . . . . . . . . . 7-l

General Instruction . . . . . . . . . . . . . . . . . . . . . 7-3

1. Responsibility as an Interviewer

2. Understanding the Guides

SampleGuide(ExhibitsIhIU

3. Steps for Interviewing

4. Suggestions for the Interviewer

5. Standard Action Statements

Part III

Part Iv

Glossary of Standard Terms . . . . . . . . . . . . . . . . . . 7-13

List of Standards and Guides for Individual General Skills - Skill Numbers 000 through 090

Part v List of Standards and Guides for Individual Utilitiesman Skills - Skill Numbers 700 through 760

Part VI List of Standards and Guides for Individual Special Skills - Skill Numbers 800 through 824 . . . -

Part VII List of Standards and Guides for A&Mary Skills - Skill Numbers 901 through 981

Part VIII List of Crew Experience - Skill Numbers 1000 through 1010 .

Index . . . . . . . . . . . *

. . . 7-3 . . . 7-4 . 7-5, 7-6 . . . 7-7 . . . 7-8 . . . 7-10

. . . 7-15

. . . 7-21

. . . 7-65

. . . 7-75

. . . 7-83

. . Index- 1 vii i

PART I

INTRODUCTION

Standards and Guides provide PRCP Interviewers with a standard interviewing procedure. By closely following this procedure, all Interviewers, regardless of duty assignment within the Naval Construction Force, should be able to classify personnel interviewed to a determined Skill Level within an acceptable degree of uniformity.

The Standards and Guides itemize the numerous tasks which Seabees must be capable of performing before they are assigned a Skill Level within any of those Skills required to perform contingency or peacetime construction operations as specified in the COMCBPAC/ COMCBLANT/COMCRNCF Instruction 1500.20 series.

Each PRCP Interviewer must be thoroughly indoctrinated in and be completely familiar with the “Instructions for Interviewers” explained herein before attempting to interview anyone. Failure to comply with this provision can only lead to a state of confusion for both the Interviewer and Interviewee and a subsequent degradation of the Program.

7-l

PART II

GENERAL INSTRUCTIONS

SECTION 1

RESPONSIBILITY AS AN INTERVIEWER

You have been appointed as a PRCP Interviewer because of your demonstrated experience and knowledge in a particular Skill or Skill Level. As an interviewer, it will be your responsibility to interview other Seabees to determine if they, too, are qualified in these same Skills.

It is possible that you will only be assigned to interview in one Skill area. This does not mean, however, that you are not equally proficient (and you may even excel) in other Skills. An important aspect of this type of interviewing system is that it will get more and more persons involved in evaluating their own capabilities by comparing them to those required by the &Iaval Construction Force. This should create more interest in self-improvement. It is felt, for example, that the majority of Interviewers will naturally try to learn more about the skill(s) they are responsible for; and through the interviews, they will learn how others think about, talk about, and perform these skills.

c

7-3

SECTION 2

UNDERSTANDING THE GUIDES

Page l-5, entitled “166 - Plastering,” which is an Individual Builder Skill, shall serve as our sample guide (Exhibit I).

Directly under this is the Contents which lists the Skill Levels and the Tasks for this Skill.

The number 166 is a numerical code which identifies this particular Builder Skill. All Individual Skills are assigned a three-digit code number. Each rating is assigned a block of one hundred of these three-digit numbers. For example, Builder Skills are all assigned in the loo-199 block, Construction Electrician in the 200-299 block, Construction Mechanic in the 300-399 block, and so on.

Listed directly under the Skill is: .l Skill Level 1. This is the way the various Skill Levels are coded. In other words, .l is Skill Level 1, .2 is Skill Level 2, and .3 is Skill Level 3.

Beneath each Skill Level are the Individual Tasks required of that Skill Level.

Each Task is assigned a two-digit code: .Ol, .02, etc.

The complete numerical designation for any given Task consists of the Skill Number - 166, the Skill Level Number - .l, and the Individual Task Number - .Ol; and together they would become - 166.1.01.

The next part of our Sample Guide is the Skill Definition(s) for Skill 166 - Plastering.

Here we find the scope of this particular Skill and the requirements for each Skill Level.

The final section of our Sample Guide, on page 4-6, (Exhibit ID, has five parts: (1) the TASK NUMBER - 166.1.01; (21 the TASK description - Operate and maintain gasoline driven, portable mortar mixer; (3) the ACTION STATEMENTS; (4) the TASK ELEMENTS;

and (5) the TASK ELEMENT MATRIX, which indicates the ACTION STATEMENTS to apply with each TASK ELEMENT.

To illustrate the MATRIX function, refer to TASK ELEMENT .03 - Start engine. Extend a line to the right and enter the MATRIX. Find an “X” under Column A and also under Column F. This indicates ACTION STATEMENTS A and F are to be applied to the TASK ELEMENT .03 - Start engine.

7-4

SAMPLE GUIDE

166 - Plastering

CONTENTS

166 Skill Definition

.l Skill Level 1

.Ol Operate and maintain gasoline driven, portable mortar mixer

.02 Apply stucco over masonry walls

.03 Apply stucco over concrete walls

.04 Apply stucco over metal lath

SKILL DEFINITION

Skill Level 1: Individual must identify and explain the purpose of tools, equipment, and materials required to mix and apply portland cement plaster (stucco); mix stucco to specified proportion and consistency, using machine or hand methods; prepare masonry and concrete bases to receive scratch coats;

apply scratch coats over metal lath, masonry, and concrete walls; apply brown and finish coats; and finish stucco by wood floating or steel troweling.

Skill Level 2: Not applicable.

Exhibit I

7-5

SAMPLE GUIDE

166.1.01 TASK: Operate and maintain gasoline driven, portable mortar mixer.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B.

C.

D.

E.

List significant tools and equipment used in this procedure.

Describe principal materials used in this procedure.

Discuss the parameters of this procedure.

Explain results if this procedure is NOT performed properly or if it is neglected.

F.

G.

Discuss safety precautions to be observed.

Perform the steps of this procedure when practical.

TASK ELEMENTS: ABCD

.Ol Perform prestart check.

.02 Fuel and lubricate.

.03 Start engine.

.04 Adjust operating speed.

.05 Secure engine.

.06 Perform operator’s maintenance.

a. Cleaning.

.07 Operate under actual conditions.

X x x

X

X X

X xxx x x

EPC

X

X

X

X

X

Exhibit II

7-6

SECTION 3

STEPS FOR KNTERVLEWNG

STEP 1: Tell the interviewee what skill and skill level the interviewee is being interviewed for. If possible, give advance notification.

STEP 2: Ask the interviewee if the interviewee has been to a “C” School or has been assigned an NEC Wavy Enlisted Classification).

If the interviewee has an NEC in the skill for which the interviewee is being interviewed, the interviewee is automatically assigned to that skill level without being interviewed for any of the lower skill levels.

In certain skills, an NEC is not the highest level of competence, and in the case of Diver, there are three NECs assigned, designating skill levels.

STEP 3: Read the TASK to the interviewee to acquaint the interviewee with the area to be discussed. Rephrase as: “The first thing we are going to discuss for Skill Level 1 of Plastering is the operation and operator’s maintenance of the gasoline driven, portable mortar mixer.”

STEP 4: Read the TASK ELEMENT to the interviewee by applying it through the ACTION STATEMENT. It should be read something like: “Describe the sequence of steps when performing a prestart check, and explain the reasons for each.”

The TASK ELEMENT MATRIX ties each TASK ELEMENT to its required

ACTION STATEMENT(S).

The various STANDARD ACTION STATEMENTS are discussed more fully on pages 7-10, 7-11, and 7-12.

STEP 5: Use a positive approach when interviewing. The interviewee either does or does not know the skill. This is left up to your satisfaction as the interviewer. All TASKS must be accomplished for each skill level. The results of the interview are then introduced into the PRCP System.

7-7

SECTION 4

SUGGESTIONS FOR THE INTERVIEWER

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

Study and understand your ‘Guides.”

Study the related “knowledge” aspects of your skill area.

Practice with other interviewers your technique of rephrasing and combining TASK ELEMENTS with the ACTION STATEMBNTS.

Select a place for interviewing where there are few distractions. Most people will talk more freely if others are not standing around listening. The area should be free from noise and as comfortable as possible. If you can supply coffee or even iced drinking water, it will help toward making the interview a success.

Show enthusiasm. Nothing “turns off” the interviewee quicker than an “I don’t care whether you qualify or not” attitude.

Attempt to place the interviewee at ease by explaining the purpose of the interview. For example:

a. To determine specific capabilities so the right person gets to the right job.

b. To let the interviewee know what he actually expected to be known and done.

C. To determine, when there are deficiencies, what type training the person should receive.

Explain to the interviewee that the interviewee should discuss what is honestly known of the skill and that the interviewee should not be embarrassed if not everything is known that is covered in the “Guides.” Many persons advance in rate who have never had the opportunity to perform certain practical factors because there was no equipment available to train on, or there was no work of a particular type going on where they were stationed.

Some interviewees will have trouble expressing themselves. As the interviewer, you have to lead the conversation by asking short questions pertinent to the TASK

BLEMBNT.

These “Guides” are only intended to touch on the more important aspects of the skill. As an expert in the skill, you will probably have a desire to ask questions in areas not covered. THIS MUST BE AVOIDED as then there will be no standard. If you feel strongly that the “Guides” should be improved in certain areas, discuss your recommendations with the PRCP coordinator.

Do not argue with statements which the interviewee believes or knows to be wrong.

Make sure that you have accurately interpreted and verify the task statements and data (NEC, mandatory school completion1 required by the skill level.

7-8

12. Certain ACTION STATEMENTS which require “steps” or “lists” can be handled easier if you take brief notes during the interview. Then if something important is omitted you can ask about it. It may be convenient to have the interviewee take notes also. A notebook of this information would be invaluable for future interviews. Tape recorders are a very convenient means of measuring the results of your interviewing technique; however, you must always consider their effect on the interviewee. Many persons get nervous when using a “mike.”

13. Verify doubtful points by asking questions, repeating back, or actually observing the operation in question later in the field.

14. Evaluate the results of each task and let the interviewee know if the interviewee is qualified to your satisfaction.

7-9

SECTION 5

STANDARD ACTION STATEMENTS

1. SKETCH OR POINT OUT THE SIGNIFICANT FEATURES OF THIS PROCEDURE

a. When this ACTION STATEMENT is used, the interviewee will be required to make a simple sketch of the item(s) used for the particular TASK ELEMENT; or the interviewer will provide a simple drawing on which the interviewee will point out the significant features.

b. One of the verbs (sketch or point out) may have been deleted, depending on what is actually required.

c. Whenever the point-out method is used, the interviewer must use the drawing included in the guide.

2. DESCRIBE THE SEQUENCE OF STEPS OF THIS PROCEDURE AND EXPLAIN THE

REASONS FOR EACH

a. This ACTION STATEMENT is used when there is a chain of events within a given

TASK ELEMENT.

b. The interviewee will be required to describe these events in a logical sequence, explaining the reason for each as he proceeds.

3. LIST SIGNIFICANT TOOLS/EQUIPMENT/MACHlNES USED IN THIS PROCEDURE

a. This ACTION STATEMENT is applied when specific tools/equipment/machines must be used to perform certain TASK ELEMENTS.

b. Any of the three items (tools, equipment, machines1 may have been deleted, depending on actual requirements. The interviewer must use his/her experience to determine which of the three items are applicable for any given TASK ELEMENT.

4. DESCRIBE PRINCIPAL MATERIALS USED IN THIS PROCEDURE

a. This ACTION STATEMENT is used when specific materials must be used in the performance of certain TASK ELEMENTS.

5. DISCUSS THE CONTROL/COORDINATION REQUIRED WHILE PERFORMING THIS

PROCEDURE

a. This ACTION STATEMENT is used when there is someone who must be contacted or notified before a TASK ELEMENT can begin, continue, or be completed.

7-10

I

I

I

6. DISCUSS THE PARAMETERS OF THIS PROCEDURE

a.

b.

A PARAMBTER, as used in these “Guides,” is defined as a variable such as temperature, pressure, flow rate, voltage, current, frequency, etc., which can be measured, monitored, or checked in any way during the procedure. Normally, this should be something which can be expressed in numbers.

The term PARAMETER is often confusing to the novice. Perhaps the best explanation you can give to the Interviewee is that the word PARAMETER must always be thought of as answering two questions: (11 What is the important variable -- for example, temperature - that must be considered when performing the TASK ELEMENT? and (2) What are the limits -- just how hot or cold - of this variable as applied to the specific situation? For example, if the task element states that you must “boil water,” then the parameters would be 212” F at sea level.

7. DESCRIBE INDICATIONS THAT WOULD BE OBSERVED DURING THIS PROCEDURE

a. Indications would be such things as lights, breakers, bus-ties, valves, meters, gages, noise, vibration, smoke, etc. The interviewee would be required to describe those things which would indicate that equipment, machines, etc., are running properly or that a product is being assembled or constructed correctly.

8. DESCRIBE ASSISTANCE REQUIRED WHILE PERFORMING THIS PROCEDURE

a. This ACTION STATEMENT is used when technical, professional, physical, legal, or other assistance is required to perform the procedure properly.

9. EXPLAIN RESULTS IF THIS PROCEDURE IS NOT PERFORMED PROPERLY OR IF IT

IS NEGLECTED

a. This ACTION STATEMENT is used to ensure that the Interviewee fully comprehends what would happen if the procedure is not done properly or is forgotten. Results could be equipment or personnel casualties, a security break, or a product which would not fulfill its intended use or last its full life expectancy.

10. DISCUSS SAFETY PRECAUTIONS TO BE OBSERVED

a. This ACTION STATEMENT will require the interviewee to describe those safety precautions which are unique to this procedure that must be observed to prevent injury to himself/herself or other personnel. Normally, this statement should not be used to discuss very broad or general safety precautions.

ll. PERFORM THE STEPS OF THIS PROCEDURE WHEN PRACTICAL

a. This ACTION STATEMENT is applied when it is felt that the interviewee should perform the procedure because it would be the only true way of seeing if the interviewee could do it correctly.

b. Practical performance (except as noted in ACTION STATEMENT 121 is not mandatory in these guides.

7-11

12. PERFORM THE STEPS OF THIS PROCEDURE )

a. This ACTION STATEMENT is used when the procedure can be performed on paper, such as a mathematics problem.

13. MISCELLANEOUS ACTION STATEMENTS

a. Occasionally, a non-standard ACTION STATEMENT has been devised to cover a specific situation. They are used like any standard ACTION STATEMENT.

7-12

PART III

GLOSSARY OF STANDARD TERMS

ACTION STATEMENT: An action statement tells the interviewer what type of information he/she must seek from the interviewee. Each action statement is identified in the “Guides” by a capital letter, for example, A, B, etc. This letter designation may vary from task to task, depending on the number actually used.

SKILL: A skill is a specific art or trade. For PRCP purposes, skills are described broadly as either a “manipulative” or a “knowledge” Skill. At present, all PRCP skills are identified in five categories: (1) Individual General Skills, (2) Individual Rating Skills, (31 Individual Special Skill, (4) Military Skills, and (51 Crew Experience.

S KILL DEFINITION: A skill definition defines those tasks which an individual must be capable of performing in a given skill area in order to meet specific construction or contingency requirements. Each skill definition is expressed in one, two, or three skill levels. The majority of skill definitions have been written in terms of the manipulative aspects of the skill rather than the knowledge aspects.

SKILL LEVEL:

TASK:

A skill level is a smaller grouping of tasks within the skill which identifies a recognized or required degree of accomplishment.

Each skill may contain one, two, or three skill levels. Tasks in Skill Level 1 are always less complex than those in Skill Level 2;

and in Skill Level 2, they would be less complex than those in Skill Level 3. In fact, almost every level 2 or 3 requires that the individual must have qualified in the preceding skill level. There is no similarity between skill levels in terms of complexity. For exgple, a Skill Level 1 in Light Frame Construction performs relatively routine tasks; whereas in Ceramic Tile Setting, Skill Level 1 encompasses the entire trade and the individual must hold an NEC (Navy Enlisted Classification) in order to qualify.

A task is simply a specified portion of the overall skill level.

Many tasks cover relatively broad areas; others may be quite specific and brief. In the “Standards and Guides,” each task has been broken down into several smaller “jobs,” which we have termed TASK ELEMENTS.

TASK ELEMENT: A task element is a basic part of each task. As an interviewer, you will interview primarily from the task elements with their related action statements. Quite often, task elements are separated into one or more smaller parts to ensure coverage of some important aspect.

7-13

Skill Number Skill Title

000 General Mathematics

030 Planning and Estimating

040 Material Liaison Office Operations

050 Construction Inspection

080 Instructing

090 Safety

PART IV

LIST OF

STANDARDS AND GUIDES

FOR

INDIVIDUAL GENERAL SKILLS

Page

1-16

1-16

1-16 l-20 l-20 l-20

Instructions for Interviewers

When interviewing persons in these Individual General Skills, you simply read the skill level definition to them and ask whether or not they (11 have the required experience, (2) have completed the applicable training, (3) have the required NEC (Navy Enlisted Classification), (4) have met the time requirement, or (51 have met any other stated requirement in the definition. Normally, you should expect a simple “yes” or “no” answer.

It should be noted that much of the information needed to satisfy these general skill requirements can be gleaned from the interviewee’s service record or from the company training record. This should be done whenever possible to cut down on interviewing time.

Then, when the interviewee is in for interviewing, it will be just a matter of verification or of updating.

7-15

SKILL DEFINITION

000 - General Mathematics

Skill Level 1: Individual must be able to solve problems and perform computations relative to his/her rating involving percentages, ratio and proportion, area and volume, powers and roots, including the use of the Pythagorean Theorem; compute areas and volumes of prisms, parallelograms, trapezoids, cubes, cylinders, cones and pyramids including frustums;

determine the radius, diameter and circumference of circles; convert standard U.S. weights and measures to the metric system and vice versa.

Skill Level 2: Not applicable.

030 - Planning and Estimating

Skill Level 1: (See Individual Rating Skill of Planning, Estimating, and Scheduling, Skill Level 1.)

Skill Level 2: Not applicable.

040 - Material Liaison Office Operations

CONTENTS

040 Skill Definition

.l Skill Level 1

.Ol Maintaining records and files, expediting flow of project material, and caring for and maintaining security of materials in storage.

.2 Skill Level 2

.Ol Perform duties of Material Liaison Office (ML01 recordkeeper, delivery crew leader, and be familiar with Critical Path Method (CPM) scheduling.

SKILL DEFINITION

Skill Level 1: Individual must keep records and files of construction materials stored in MLO; receive project material, inventory and verify by line item with MTO/BM requirements or against requisition and bills of material; issue material by project; maintain a tickler system to determine delivery schedule, shortages, delays or other foreseeable logistic problems and initiate followup action as necessary; coordinate and expedite flow of project material; compile report of quantity and types of material on hand and keep inventory records; prepare NAVSUP Form 1114m, Stock Record Card, and post all project material receipts, issues, borrows, inventory adjustments and requisitions outstanding; make reports of excess material;

and care for and maintain security of project material storage in MLO.

7-16

040 - Material Liaison Office Operations (continued)

SKILL DEFINITION

Skill Level 2: Skill Level 1 plus individual must be able to perform the duties of ML0 recordkeeper, coordinator, and delivery crew leader, and be able to relate construction activities to material requirements by using the principles and techniques of CPM scheduling.

040.1.01 TASK: Maintaining records and files, expediting flow of project material, and caring for and maintaining security of materials in storage.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A. Describe the sequence of steps of this procedure.

B. List the significant reference used in this procedure.

C. Discuss forms used in this procedure.

D. Explain results if this procedure is not performed.

E. Explain what coordination is required while performing this procedure.

F. Perform the steps of this procedure when practical.

TASK ELEMENTS: ABCllEP

.Ol Maintains records and files of project material. xxxxxx

a. Active project material file.

b. Completed project material file.

c. Excess project material file.

d. Material borrowed from other projects.

.02 Maintain material status reports.

.03 Expedite flow of project material.

a. Use of NAVSUP Form 1250.

b. Use of Stock Record Cards.

c. Receiving of materials.

d. Inspection of incoming materials.

e. Segregate and tag material.

f. Posting of receipts.

xxxxxx xxx xx xxxxxx xx xx x x xxxx x

7-17

040.1.01 TASK: Maintaining records and files, expediting flow of project material, and caring for and maintaining security of materials in storage (continued).

TASK ELEMENTS: ABCDEP

g. Effect issue of material. xxxxxx

h. Stage and deliver materials. X xxxx

i. Posting material issues. xxxx x

.04 Initiate procurement of material required. xxxxxx

.05 Take necessary action required based on information received from various material status reports.

a. Followup.

b. Tracer.

c. Reorder.

d. Message report.

.06 Care of material.

-07 Maintain security of materials in storage.

xxxxxx xxxxxx xxxxxx xxx x x

X xx

a. Warehouses.

b. Supply compound.

c. Scrap and salvage yard.

040.2.01 TASK: Perform duties of ML0 recordkeeper, coordinator, delivery crew leader, and be familiar with CPM scheduling.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A. Describe the sequence of steps of this procedure.

B. Discuss significant reference used in this procedure.

C. Explain results if this procedure is not performed properly or is neglected.

D. Discuss forms used in this procedure.

E. Discuss the coordination required while performing this procedure.

F. Describe assistance required while performing this procedure.

G. Perform the steps of this procedure when practical.

7-18

040.2.01 TASK: Perform duties of ML0 recordkeeper, coordinator, delivery crew leader, and be familiar with CPM scheduling (continued).

TASK ELEMENTS: ABCDEPC

.Ol Perform duties of ML0 recordkeeper.

a. Time stamps. X

b. Check material availability. xxxx X

c. Annotate NAVSUP Form 1250. xxxx X

d. Posting to Stock Record Card. xxxx X

e. Conduct inventory of material. X xx X

.02 Perform duties of ML0 coordinator and delivery crew leader.

a. Verify quantity/stock.

b. Annotate NAVSUP Form 1250.

c. Stage and deliver material.

d. Followup action.

e. Conduct inventory of material.

.03 Relate construction activities to material requirements through CPM scheduling techniques.

a. CPM schedules.

b. A&TO worksheets.

c. Bills of Material.

X xxx x xxxx X

X xxxxx xx xx x

X xx X xxx xx xxxxxx xxxxxx

7-19

050 - Construction Inspection

Skill Level 1: Individual must have at least six (61 months experience as Construction Inspector.

Skill Level 2: Not applicable.

080 - Instructing

Skill Level 1: Individual must have had basic experience as an instructor or significant practical experience as instructor (civilian vocational training).

Skill Level 2: Individual must have successfully completed any recognized DOD instructor course.

I

Skill Level 3: Not applicable.

090 - Safety

Skill Level 1: Individual must have completed the Construction Safety course and designated as Company/Detachment Safety Petty Officer.

Skill Level 2: Skill Level 1 plus the individual must have had at least one deployment experience as a Battalion Safety Inspector.

7-20

Skill Number

PART V

LIST OF

STANDARDS AND GUIDES

FOR

INDIVIDUAL UTILITIESMAN SKILLS

Skill Title

Planning, Estimating, and Scheduling

Plumbing

Shore-Based Boilers

Pumps and Compressors

Water Treatment

Sewage Disposal and Advanced Base Field Sanitation

Air Conditioning and Refrigeration

Page

7-22

7-23

7-35

7-38

7-43

7-52

7-60

7-21

703 - Planning, Estimating, and Scheduling

703 Skill Definition

.l Skill Level 1

.Ol Complete a P 82 E Course on the Steelworker Rating

Skill Level 1

Skill Level 2:

SKILL DEFINITION

Individual must be able to determine efficient crew sizes and assignments;

to determine equipment, manpower, and material requirements; to utilize Federal Supply Catalogs and manufacturer’s parts manuals; and to read, interpret, and prepare Critical Path Method (CPM) schedules, and precedence diagrams.

NOTE: This skill level satisfies the requirements for Skill Level 1 of 030 - Planning and Estimating.

Not applicable.

7-22

710 - Plumbing

710 Skill Definition

.l Skill Level 1

.Ol Install sewage collection systems

.02 Install interior plumbing

.03 Install water distribution systems

.04 Install steam piping systems

.05 Install galley equipment

.06 Gas cutting and welding pipe/tube

.2 Skill Level 2

.Ol Lay out piping systems

.02 Test newly installed piping systems

.03 Maintenance of interior plumbing fixtures

-04 Maintain water distribution systems

.05 Maintain galley equipment

.06 Gas cutting pipe/tubes

7-23

110 - Plumbing (continued)

Skill Level 1: Individual must select, use, and care for handtools, equipment, and machines commonly used for measuring, marking, cutting, threading, and joining the following types of pipe; steel, wrought iron, copper, plastic, cast iron, cement-asbestos, concrete, and vitrified clay; and gas cut pipe/tubes using air/oxy-acetylene or methylacetylene-propadiene (MAPP) gas. Individual must also install plumbing systems for water, steam, air, fuel, sewage and rough-in plumbing for building; install fixtures and accessories such as bath tubs, water closets, sinks and urinals; apply insulation on steam, hot and cold water piping systems; and hook up equipment such as hot water heaters, water coolers, and galley equipment such as steam chests, coppers, dishwashing machines, ranges and ovens, both gas and oil fired.

Skill Level 2: Skill Level 1 plus utilize drawings and specifications to determine grade, bedding, and backfilling requirements , and types of materials; to locate risers and position of sleeves in walls, floors and footings; to establish rough-in measurements; to designate the spacing of pipe supports for all types of piping systems. Also, the individual must read and interpret grade stake marks used in laying out trenches; utilize batter boards and grade lines; specify the location and size of thrust blocks; make service connection on transite pipe; cut machine pipe and install transite pipe utilizing lathe; perform hydrostatic and gravity tests on newly installed piping systems; treat and test water in new distribution systems; be able to operate drilling tapping machines; maintain all types of piping systems specified in Skill Level 1, including such items as faucets, valves, pressure regulators, fire hydrants, and galley equipment; and diagnose trouble and make repairs or adjustments in any of the above.

Skill Level 3: Not applicable.

7-24

710.1.01 TASK: Install sewage collection systems.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A.

B.

C.

D.

E.

P.

TASK ELEMENTS:

Describe the sequence of steps of this procedure and explain the reasons for each.

List significant tools/equipment/machines used in this procedure.

Describe principal materials used in this procedure.

Discuss safety precautions to be observed.

Explain results if this procedure is not performed properly or if it is neglected.

Perform the steps of this procedure when practical.

ABCDEP

.Ol Install cast iron soil pipe fittings.

a. Measure pipe.

b. Cut pipe.

c. Make joints.

.02 Install vitrified clay and concrete pipe.

a. Cut pipe.

b. Join bell and spigot pipe and fittings.

.03 Install plastic pipe and fittings.

a. Cut pipe.

b. Make joints.

x x

X x x X xxxxx xx X x x x x x

X X x x x

7-25

710.1.02 TASK: Install interior plumbing.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B. List significant tools/equipment/machines used in this procedure.

i c . Discuss safety precautions to be observed.

D, Explain results if this procedure is not performed properly or if it is neglected.

E. Perform the steps of this procedure when practical.

TASK ELEMENTS:

.Ol Install copper pipe and fittings.

a. Measure pipe.

b. Cut pipe.

c. Make joints.

.02 Install threaded pipe.

a. Cut and ream pipe.

b. Thread pipe.

(1) Use threading machine.

c. Join pipe and fittings.

.03 Insulate pipe and fittings.

a. Hot water.

b. Cold water.

.04 Install fixtures and accessories.

a. Install water closet.

b. Install urinals.

c. Install sinks.

A

X

X

X

X

X

X

X

X

X

BCDE

X

X xx

X

X xx

X xx

X

X

X

X X

X X

X X

7-26 b

I .

710.1.03 TASK: Install water distribution systems.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A.

B.

C.

D.

E.

TASK ELEMBNTS:

Describe the sequence of steps of this procedure and explain the reasons for each.

List significant tools/equipment/machines used in this procedure.

Discuss safety precautions to be observed.

Explain results if this procedure is not performed properly or if it is neglected.

Perform the steps of this procedure when practical.

4. I! c 2 E .Ol Install cement-asbestos pipe and fittings. X

a. Measure pipe. X

b. Cut pipe. X xx

c. Make connections. xx x

.02 Install cast iron water pipe and fittings X

a. Cut pipe. X xx

b. Make flange connections. xx x

(1) Tighten bolts. X

.03 Use Mueller tapping machine. xxxxx

7-27

710.1.04 TASK: Install steam piping systems. ) i

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below: I

A. Describe the sequence of steps of this procedure and explain the I reasons for each. 4

I

B. Discuss safety precautions to be observed.

I

C. Explain results if this procedure is not performed properly or if it is neglected. \

D. Perform the steps of this procedure when practical.

TASK ELEMENTS:

.Ol Install pipe supports.

.02 Install dielectric union. x x

.03 Slope piping. x x

-04 Measure and cut premolded pipe insulation. xxx

.OS Install premolded insulation. xxxx

.06 Mix and form insulation on fittings and valves. xxxx

a. Apply brattice cloth. x x

710.1.05 TASK: Install galley equipment.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B. List significant tools/equipment/machines used in this procedure

C. Describe principal materials used in this procedure.

D. Describe assistance required while performing this procedure.

E. Discuss safety precautions to be observed.

P. Explain results if this procedure is not performed properly or if it is neglected-, G. Perform the steps of this procedure when practical.

7-28

710.1.05 TASK: Install galley equipment (continued).

TASK ELEMENTS:

.Ol Install steam-operated equipment.

.02 Install dishwashing machines.

.03 Install gas-/oil-fired ranges.

.04 Install gas-/oil-fired ovens.

ABCIlePG x x xx xxxxxx x x xx xxx xxx

7-29

710.1.06 TASK: Gas cutting pipe/tubes. J

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B. List significant tools used in this procedure.

C. Describe principal materials used in this procedure.

D. Discuss the parameters of this procedure.

E. Describe indications that would be observed during this procedure.

P. Explain results if this procedure is not performed properly or if it is neglected.

G. Discuss safety precautions to be observed.

H. Perform the steps of this procedure when practical.

TASK ELEMENTS:

.Ol Set-up gas cutting equipment.

a. Secure cylinders.

b. Connect oxygen regulator and hose.

c. Connect MAPP gas regulator and hose.

.02 Prepare pipe/tube for:

a. Cutting.

.03 Cut pipe/tube.

a. Select and attach cutting torch and tip. X

b. Adjust gas pressures.

(1) Oxygen.

(2, MAPP.

c. Light torch and adjust flame.

d. Position torch and cut.

ABCllEPGlf

X j

X

X

X

X

X

X

X

X xx xxx xxx

X xx

X xx x xxx xxx xxx x x

7-30

710.2.01 TASK: Lay out piping systems.

A.

B.

Sketch the significant features of this procedure.

Describe the sequence of steps of this procedure and explain the reasons for each.

C.

D.

E.

Describe principal materials used.

Discuss the control/coordination required to perform this procedure.

Explain results if this procedure is not performed properly or if it is neglected.

F. Perform the steps of this procedure when practical.

TASK ELEMENTS:

.Ol Read blueprints and specifications. X X

a. Determine slope/pitch.

b. Locate risers.

C. Establish rough-in measurements.

d. Specify thrust blocks.

e. Determine hangar spacing

X X

X X

X X

X X

X X

.02 Lay out trenching lines

a. Install batter boards.

b. Read grade stakes

c. Designate bedding requirement.

.03 Locate sleeves in walls and footings.

.04 Characteristic of tapping.

X

X xxx xx xxx xx xx

X xx xxx

7-31

710.2.02 TASK: Test newly installed piping systems.

A. Describe the sequence of steps of this procedure and explain the reason for each.

B. List significant equipment used in this procedure.

c. Discuss the parameters of this procedure.

D. Discuss safety precautions to be observed.

E. Describe indications that would be observed during this procedure.

P. Perform the steps of this procedure when practical.

TASK ELEMENTS: ABCIZEF

.Ol Perform a hydrostatic test. xxxxxx

.02 Perform a gravity test. X

710.2.03 TASK: Maintenance of interior plumbing fixtures.

Apply these ACTION STATEMBNTS to the TASK ELEMENTS listed below:

A. Apply the sequence of steps of this procedure and explain the reasons for each.

B. List significant tools and equipment used in this procedure.

C. Discuss safety precautions to be observed.

D. Perform the steps of this procedure when practical.

TASK ELEMENTS: ABCD

.Ol Reseat faucets. xx x

.02 Repair tank-type water closets. X X

.03 Use closet augers. X xx

.04 Repair regulating valves. X xx

.05 Repair flushometer valves. X xx

7-32

710.2.04 TASK: Maintain water distribution systems.

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B. Explain results if this procedure is not performed properly or or if it is neglected.

C. Describe indications that would be observed during this procedure.

D. Perform the steps of this procedure when practical.

TASK ELEMENTS: A B c 11

.Ol Repair fire hydrants. xx x

.02 Repair globe valves. X X

.03 Repair pressure-reducing valves. xxxx

.04 Locate underground pipe using pipe/cable detector from NMCB TOA xxx

7-33

710.2.05 TASK: Maintain galley equipment. ) ;

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B. Describe assistance required while performing this procedure.

C. Discuss safety precautions to be observed.

D. Explain results if this procedure is not performed properly or if it is neglected.

E. Describe indications that would be observed during this procedure. i

F. Perform the steps of this procedure when practical.

TASK ELEMENTS:

.Ol Use voltmeter to diagnose trouble.

.02 Use tachometer to diagnose trouble. x x X

.03 Repair or adjust dishwashing machines. xxx x

.04 Repair or adjust steam chests. x x x

.05 Repair or adjust gas-/oil-fired ranges. x x xx

.06 Repair or adjust gas-/oil-fired ovens. x x xx

7-34 i ( 720 - Shore-Based Boilers

I CONTENTS

720 Skill Definition

.l Skill Level 1

.Ol Operate packaged boilers (through 150 PSI) and auxiliary equipment.

.2 Skill Level 2

.Ol Maintain boilers and auxiliary equipment

Skill Level 1:

Skill Level 2:

Skill Level 3: Not applicable.

SKILL DEFINITION

Individual must be capable of operating packaged firetube boilers (up to 100 hp) and auxiliary equipment such as feedwater and condensate return pumps and heat exchangers. Operation includes prestarting checks, lighting-off, taking water level readings, performing operator’s mainte-nance, securing and logging all operating conditions.

Skill Level 1 plus maintains packaged boilers and auxiliary equipment, using test equipment and hand and power tools; adjusts and repairs steam, oil, and air pressure controls, temperature control, water level control and modutrol; replace refractory, tubes, gaskets, and safety valves; and adjusts or repairs auxiliary equipment such as the burner, feedwater pump, steam injector, steam traps, heat exchanger, and miscellaneous regulators, meters, and gages.

7-35 e 1

X

720.1.01 TASK: Operate packaged boilers (through 150 PSIG and Auxiliary Equipment). ‘I i

Apply these ACTION STATBMBNTS to the TASK ELEMENTS listed below: I

A. Describe the sequence of steps of this procedure and explain the reason for each.

B. Discuss safety precautions to be observed.

C. Explain results if this procedure is not performed properly or if it is I neglected.

D. Describe indications that would be observed.

E. Perform the steps of this procedure when practical.

TASK ELEMENTS: ABCD

.Ol Perform prestart check on boiler and auxiliary equipment xxxx

a. Check water level. X xx

b. Position valves. xxxx

.02 Light-off boiler. xxxx X

.03 Operate boiler and auxiliary equipment.

a. Take water level readings. X xx

b. Log operating conditions. x x

c. Check fuel level and steam pressure. X xx

.04 Perform operator’s maintenance. xxxx

a. Inspect boiler visually X xx

.05 Secure boiler. xxxx

X

7-36

720.2.01 TASK: Maintain boilers and auxiliary equipment.

A.

B.

C.

D.

E.

F.

TASK ELEMENTS:

.Ol Adjust the steam pressure control.

.02 Adjust regulators.

.03 Adjust gages.

.04 Adjust water level control.

.05 Adjust modutrol.

-06 Replace refractory.

.07 Replace tubes.

.08 Replace gaskets.

.09 Replace safety valves.

.lO Clean and test steam injector.

.ll Clean and test heat exchanger.

Describe the sequence of steps of this procedure and explain the reasons for each.

Describe principal materials used in this procedure.

Discuss the parameters of this procedure.

Discuss safety precautions to be observed.

Describe indications that would be observed during this procedure.

Perform the steps of this procedure when practical.

A B.

X

X

X

X

X x x

X x x

X

X

X

CD

X

X

X

X

X

X

X

E E

X xx xx xx xx

X

X

X xx

7-37

730 - Pumps and Compressors

730 Skill Definition

.l Skill Level 1

.Ol Install and operate internal combustion engines

.02 Install and operate pumps

.03 Install and operate compressors

.04 Perform preventive maintenance on compressors

.2 Skill Level 2

.Ol Maintain pumps

SKILL DE PINITION

Skill Level 1: Individual must select, use, and care for tools, equipment, and materials required to install all types of pumps and compressors, including the prime mover; operate and perform operator’s maintenance on internal combustion engines and all types of pumps and compressors; keep logs of operating conditions; and perform preventive maintenance on small stationary compressors.

Skill Level 2: Skill Level 1 plus diagnose trouble in pumps and compressors and make repairs and adjustments for such things as failure to deliver water, excessive vibration, and overheating; utilize testing equipment; and perform preventive maintenance on pumps.

7-38

730.1.01 TASK: Install and operate internal combustion engines.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B.

C.

Describe principal materials used in this procedure.

Explain results if this procedure is not performed properly or if it is neglected.

D. Perform the steps of this procedure when practical.

TASK ELEMENTS: ABCD

.Ol Prepare foundation.

.02 Install holddowns.

.03 Position engine.

.04 Perform prestart check.

.OS Operate engine.

a. Read gages.

b. Log operating conditions.

.06 Perform operator’s maintenance.

a. Inspect visually.

b. Lubricate.

.07 Secure engine.

X xx xxxx

X XX

X xx

X xx x x x x

X xx

X x x

X xx

7-39

730.1.02 TASK: Install and operate pumps.

Apply these ACTION STATEMENTS to the TASK ELWIBNTS listed below:

A.

B.

C.

D.

E.

P.

G.

TASK ELEMENTS:

Describe the sequence of steps of this procedure and explain the reasons for each.

Describe principal materials used in this procedure.

Discuss the parameters of this procedure.

Discuss safety precautions to be observed.

Explain results if this procedure is not performed properly or if it is neglected.

Describe indications that would be observed during this procedure.

Perform the steps of this procedure when practical.

.Ol Prepare foundation.

.02 Install holddowns.

.03 Position pump.

a. Level the pump.

.04 Perform prestart check.

a. Position valves.

b. Prime pump.

.OS Operate pump.

a. Start pump.

b. Read gages.

c. Log operating conditions.

.06 Perform operator’s maintenance.

a. Inspect visually.

b. Adjust packing.

c. Lubricate.

.07 Secure pump.

a. Discharge valve.

xx

X

X

X

X x

X

X

X

X

X

7-40

730.1.03 TASK: Install and operate compressors.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B. Explain results if this procedure is not performed properly or if it is neglected.

C. Describe indications that would be observed during this procedure.

D. Perform the steps of this procedure when practical.

TASK ELEMENTS: A. !! c xl

.Ol Prepare foundation. xx

.02 Install holddowns. xx

.03 Position compressor. X

a. Level compressor. xx

b. Level prime mover. xx

c. Connect and align compressor to the prime mover. xx

.04 Perform prestart check. X X

a. Check oil. X

b. Position valves. xx

.OS Start and operate compressor. X xx

a. Read gages.

.06 Perform operator’s maintenance.

X

X X

a. Lubricate.

b. Log operating conditions.

-07 Secure compressor.

X xx xx x i

a. Position valves. X

7-41

730.1.04 TASK: Perform preventive maintenance on compressors.

Apply these ACTION STATEMENTS to the TASK ELEMBNTS listed below:

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B. Explain results if this procedure is not performed properly or if it is neglected.

C. Perform the steps of this procedure when practical.

TASK ELEMENTS: ABC

.Ol Replace filters. xxx

.02 Change oil in small stationary units. xxx

730.2.01 TASK: Maintain pumps.

Apply these ACTION STATEMENTS to the TASK ELEMENTS listed below:

A. Describe the sequence of steps of this procedure and explain the reasons for each.

B. List significant tools used in this procedure.

C. Discuss the parameters of this procedure.

D. Explain results if this procedure is not performed properly or if it is neglected.

E. Describe indications that would be observed during this procedure.

P. Perform the steps of this procedure when practical.

TASK ELEMENTS:

.Ol Determine why pump fails to deliver water and make repairs.

ABCIIEP

X X

.02 Check for misalignment and make adjustments/repairs. xx X

a. Use dial indicator. x x xx

.03 Diagnose overheated pump and make repairs. X X

.04 Perform preventive maintenance. X X

7-42 j c

1 -

C

740 - Water Treatment

CONTENTS

740 Skill Definition

.l Skill Level 1

.Ol Install water purification system and distillation unit

.2 Skill Level 2

-01 Operate water purification system and distillation unit

.02 Test and treat water for potable uses

.3 Skill Level 3

.Ol Install and operate deep-well pumps

-02 Determine safe yield of wells

.03 Install large, permanent-type water treatment plants and their components

.04 Explain operating principles of large water treatment plants and their components

.OS Perform technical maintenance on advanced base type water treatment and test equipment

Skill Level 1:

Skill Level 2:

Skill Level 3:

SKILL DEFINITION

Individual must select, use, and care for tools and equipment required to set up advanced base type water purification systems, including the positioning and connecting of water pumps, detention, coagulation, and storage tanks, water treatment plant-filter units, chlorinator units, and softener units.

Skill Level 1 plus operate advanced base type water purification units, including chemical injector and filter units, chlorinators, and softeners;

operate and perform operator’s maintenance on distfflation unit; log all operating conditions; and sample, treat, and test water for chlorine, turbidity, hardness, PH, and salinity for…