Questions and Answers.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Cellular Signal Distributed Antenna System Federal contract opportunity
- Solicitation number
- N6134020R0083
About this file
This is a combined synopsis and solicitation for a cellular signal distributed antenna system project. The Naval Air Warfare Center Training Systems Division requires demolition of an existing system and installation of a new digital distributed antenna system at specified buildings on its Orlando campus. The system must support all current 3G and 4G frequencies and be ready for 5G. Delivery is required by September 1, 2020. Evaluation will be based on lowest price for technically acceptable proposals. The solicitation includes questions and answers providing additional details on technical requirements, deliverables, and terms of the project.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contractor Questions | Government Answers |
| Is a design required along with the quote? | Yes, Contractor is to provide a design as part of their proposal IAW SOW paragraph #13 |
| As a response to the amended scope, you have asked for the minimum UL and DL speed . In our experience minimum UL and DL speeds have many variables involved to give an expected value. Speed of UL and DL can be obtained only once final design and commissioning is done. Please clarify? | Government requirement is a minimum of -70dbm. Contractor is to state the UL and DL speeds expected to be achieved based on the equipment proposed |
| Please confirm if there are existing Racks in Head End Room & Remote Locations? Do we include a price for racks for both Active Fiber DAS Equipment and Operator/s Equipment? | There are no available racks, and all proposed equipment should be included in the proposal |
| Currently, mmWave is not deployed in Inbuilding solutions. Is that a mandatory requirement? | Government does not have a specfic requirement for mmWave as long as all Government requirements can be met. |
| Are ladders, carts, scissor/fork lifts available at the project location ? or will that be on actual cost plus basis when the vendor raises the Invoice ? | None of the items listed will be provided by the Government. The solicitation has not identified any Government Furnished Equipment. The contractor is to include costs for all necessary equipment as part of their price proposal in accordance with SOW paragraph # 12 |
| Do the telecom/wiring closets require/have existing fire rated backboard, standard plywood, drywall, or concrete for mounting the equipment ? | YES, all telecom closets have the fire rated standard plywood for mounting the necessary hardware |
| Are there existing battery backup systems in place that can be used for the Active Fiber DAS system ?or is the vendor responsible to provide battery backup for the Active DAS Headend in the quote ? | There are no battery backups in place for this effort. Contractor is responsible to provide any battery backups they deem necessary as part of their proposal. |
| Are there any secure areas for Storage of equipment at site during the install? Or does the vendor have to provide a Conex on site for secure Storage of all the equipment during the install phase ? | Government will provide space in our secure warehouse. Contractor must coordinate drop off/pick up with the Government. Warehouse is available between 6am and 6pm M-F |
| Are there designated secure areas for storage of equipment when we ship to site? | Government will provide space in our secure warehouse. Contractor must coordinate drop off/pick up with the Government. Warehouse is available between 6am and 6pm M-F |
| Is there space available at the project site for Conex to store equipment? | Government will provide space for one Conex container with no diminsions greater than 8'x10'. |
| Is there existing fiber connectivity that may be used or do we have to install our own new Fiber for connectivity to the Headend and remotes? | No, there is no fiber that is available for this effort. Any necessary fiber must be proposed and priced as part of the proposal. |
| Will there be an extension in the project end date from September 01, 2020 ? | No, Government regulations does not allow us to extend this date due to the end of our fiscal year, and money cannot be used from year to year. At this time, we do not foresee any extensions for this project. |
| Is there a designated cable path in place from the mechanical room ( where Headend) will be installed to the Deflorez building? If not, will we have to use an aerial route or route it underground? | The mechanical room is slightly adjacent to the main building, but there is a standard aerial cabling path that goes into the main building. |
| Since T-Mo and Sprint have officially merged should we assume T-Mo/Sprint as one service provider with combined bands? | Contractor should not assume that T-Mobile and Sprint are one provider. Contractor is to determine the appropiate solution to meet the Government requirement. |
| Requirements #4: Is the coverage area requirement 95% per floor minus the exclusion areas that have been identified? | All areas should have coverage (100%) with the exception of the identified resticted areas. No equipment is to be within 10 feet of the restricted areas IAW the SOW paragraph #8 |
| With 5G DAS solutions not mature/available today, is a 5G ready/upgradable solution acceptable? | Government requirement is that the system be 5G ready IAW with SOW paragraph #3 |
| Requirements #5 and 6: As per the RFP requirements, we will propose fiber to the edge DAS solution. The system will be capable of supporting future 5G but the price will include all 4G bands and services excluding 5G. Is this acceptable? | The Government requirement is that the system be 5G ready. |
| Requirements #17: Do we need to provide pricing for the maintenance? | Contractor is to identify all costs necessary to meet the requirements and identify if they are a one time cost or a recurring cost to include maintenance if applicable IAW SOW paragraph # 13 |
| Is there a need to provide training to the staff? | The SOW does not include any training requirements. |
| Requirements #20: Should the OSF fiber between Mech Bldg. to demark location in Deflorez bldg. be excluded from our scope assuming that it will be provided by others? | Fiber between buildings should be included in the scope. All expenses and purchases shall be included in the proposed price. IAW with SOW paragraph # 5 and #6 |
| Since this is a highly secure federal bldg. do we provide ‘specialized’ labor (similar to union)? Is there need for installers with security clearance? | No specilized labor is required. No security clearance is required. Contractors must be a U.S. citizen and free of felonies, and a background check will need to be cleared in order to receive non-escort access to non-restricted areas IAW SOW paragraphs #11, #13, #26, and #28 |
| Can you define the technical specifications for “5G-ready”? Is the requirement for a DAS that currently supports mmWave 5G; or can be easily upgraded to support mmWave 5G when required? | The governments requirement is for a DAS that is 5G ready. Contractor is required to determine whether mmWave is necessary to meet the Governments requirement. |
| Does the Navy currently have a DAS deployed that meets the 5G-ready requirement? | We do not currently have anything in place . |
| Please clarify “the connection from the HE to the antenna should be fiber”? Are DAS with coax from the remote units to antennas unacceptable? | |
| No coaxial cable should be used on this project. | |
| Does the customer want all the Carrier Bands of support listed to be included in each RAU (Antenna remote) from Day 1 or to minimize to 4 bands on Day 1 and add other bands in the future for additional cost at that time? | All requirements are to be met when install is complete |
| Signal sources are never guaranteed to be provided by carriers, and even if they agree to provide it can take many months to arrive. Does the customer want to include signal source costs to get the services on-air Day 1? | Yes, Contractor is to provide all signal sources once project is complete but no later than 1 Sep 2020. Contractors price proposal shall include the cost as part of their price proposal IAW with SOW paragraph #12, #13, and #27 |
| Is a Benchmark Data report available for the current existing macro coverage of the carriers inside the building? | there is no benchmark data available. |
| Regarding the -70 signal level requirement. (Requirement 4.a.i) Is it an acceptable alternative to deliver the signal levels based on the requirements and recommendations of the wireless carriers? Note that exceeding -70 may not be compatible with carrier specifications as typically the wireless providers look for coverage for the high bands to be around -95 dBm RSRP with 6dB of dominance over the macro. Additionally, -70 may also exceed FCC EMF limits. | Government requirement is a minimum of -70dbm. Alternative proposals will not be accepted by the Government |
| Does the requirement for being 5G ready for all major carriers include support for all bands listed or just provide support for 1 of the listed bands? For example for Verizon, does the system need to provide the ability to add both 28 GHz (n261 Band) and 39 GHz future support or is providing accessibility for adding 28 GHz or 39 GHz sufficient? | Contractor is required to deliver a system that is 5G ready to support any bands listed in the SOW that are currently available in the market place. |
| Requirement 5 states: "Connection from the head equipment to the main reception antenna/antennas shall be fiber to support the 5G digital platform." Is the requirement of this RFQ that the platform be a Digital DAS or for the platform to provide support for 5G? | The governments requirement is to provide a digital DAS that is also 5G ready IAW SOW paragraph #3 |
| Under item 3 of the DAS SOW document, the requirement states that “The system shall be 5G ready for all major carriers.” What does being “5G Ready” entail? | Contractor is required to deliver a system that is 5G ready to support any bands listed in the SOW that are currently available in the market place IAW SOW paragraph #3 |
| Under item 3 of the DAS SOW document, is supporting solely the low (600MHz – 2.3GHz) and mid (2.5GHz – 6GHz) band spectrum carrier signals acceptable for purposes of this RFP? there are no systems available in the current marketplace that support 5G signals in the millimeter wave spectrum (28GHz, 39GHz, etc.). | Contractor is required to deliver a system that is 5G ready to support any bands listed in the SOW that are currently available in the market place IAW SOW paragraph #3 |
| The NAICS code of 334290, is for Equipment Manufacturing, which excludes DAS integrators since we do not manufacturer the equipment. Those that manufacture the DAS equipment, do not install or coordinate with the operators for commissioning. Are there any other NAICS codes that qualify for this RFQ? | After further review the Government has determined the appropiate NAICS code to be 334220 vice 334290 and will be changed in this amendment. |
| Must the DAS support all 3G and 4G frequencies listed under 2.a.i and 2.a.ii on day 1 with the quoted equipment? | Yes, the contractor must meet all SOW requirements |
| We interpret “5G ready” as the infrastructure will support the 5G frequencies, but additional equipment will be needed when it becomes available and not to be included in this quote. Is this correct? | Contractor is required to deliver a system that is 5G ready to support any bands listed in the SOW that are currently available in the market place. |
| Per 4.a.i., -70dbm signal strength is not the standard measurement for LTE. Is -92 dbm RSRP acceptable as per the wireless carrier’s standards? | Government requirement is a minimum of -70dbm IAW sow paragraph # 4(a)(i) |
| Is it acceptable to leave out the carriers signal sources in the assumption that they (AT&T, VZW,TMO) will provide a solution? | No this is not acceptable and the requirements of sow must be met. |
| Please provide building and room dimensions for Floors 1,2,and 3 on the drawings | No additional Building and room dimensions is available. |
| Is the mechanical building attached to the DeFlorez Building or free standing? | Building is Free standing |
| I didn’t see an SF1442 bid form attached to the solicitation in SAMs so are just free handing the bids according to the outlined CLIN’s? | Will be provided in this amendment |
| Should our pricing include the network elements ….the entire system? | Contractor should include all costs they deem necessary to meet the Government requirements. |