N61340-20-R-0083 Solictation.pdf

PDF 1014 KB Posted

Attached to
Cellular Signal Distributed Antenna System Federal contract opportunity
Solicitation number
N6134020R0083
Issued by
Department of the Navy Naval Air Systems Command

About this file

This is a combined synopsis and solicitation for cellular phone tower installation services. Key details include the requirement to procure demolition of an existing system under CLIN 0001 and installation of a new distributed antenna system under CLIN 0002 at Naval Air Warfare Center Training Systems Division in Orlando, Florida by September 1, 2020. The solicitation is set aside for small businesses and offers are due by April 13, 2020. Evaluation will be based on lowest price for technically acceptable proposals. Required specifications include supporting major cellular carriers on multiple frequency bands and complying with all relevant construction codes and regulations.

View the file

Other files for this federal contract opportunity

Other files attached to Cellular Signal Distributed Antenna System, newest first.
File Type Posted
N61340-20-R-0083 Solictation v2.pdf PDF
COVID Self Screening Questions.pdf PDF
Davis Bacon Wage Determination Orange County.pdf PDF
Final Combined Synopsis-Solicitation Cell Phone Tower Installation R0083 AV2.docx DOCX document
NAWCTSD_Local_Commuting_Area.pdf PDF
Questions and Answers.xlsx XLSX spreadsheet
Mechanical Bldg_Floor Plan.pdf PDF
3rd Floor Cellular Coverage Map with Telecom Closets.pdf PDF
2ndFloorCellularCoverageMap.pdf.pdf PDF
Final Combined Synopsis-Solicitation Cell Phone Tower Installation R0083.docx DOCX document
2nd Floor Cellular Coverage Map with Telecom Closets.pdf PDF
Cellular AP Locations.pdf PDF
DAS_SOW_NAWCTSD_ORLANDO_r11.docx DOCX document
3rdFloorCellularCoverageMap.pdf.pdf PDF
1st Floor Cellular Coverage Map with Telecom Closets.pdf PDF
1stFloorCellularCoverageMap.pdf PDF
Questions and Answers 4-10-2020.xlsx XLSX spreadsheet
Cellular AP Locations.pdf PDF
Questions and Answers 4-6-2020.xlsx XLSX spreadsheet
Mechanical Bldg_Floor Plan.pdf PDF
1st Floor Cellular Coverage Map with Telecom Closets.pdf PDF
2nd Floor Cellular Coverage Map with Telecom Closets.pdf PDF
3rd Floor Cellular Coverage Map with Telecom Closets.pdf PDF
DAS_SOW_NAWCTSD_ORLANDO_r3.docx DOCX document
2ndFloorCellularCoverageMap.pdf.pdf PDF
3rdFloorCellularCoverageMap.pdf.pdf PDF
1stFloorCellularCoverageMap.pdf PDF
DAS_SOW_NAWCTSD_ORLANDO_r2.docx DOCX document
Combined Synopsis-Solicitation Cell Phone Tower Installation R0083.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

See statement of w ork in section 00 10 00

To any contractor proposing for this effort that is traveling from outside the local commuting area of NAWCTSD w ill be mandated to a (14) fourteen day quarantine period prior to entering NAWCTSD facilities. Acknow ledgement of this requirement is needed in the amended proposal.

HOWARD E RODRIGUEZ 407-380-4409

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

30-Mar-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAWCTSD 253

CODE 2.5.3.1.1

12211 SCIENCE DRIVE

ORLANDO FL 32826-3224

N61340

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N6134020R0083 14

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N6134020R0083

Section 00 10 00 - Solicitation

DISTRIBUTED ANTENNA SYSTEM

NAWCTSD ORLANDO

Cellular Signal Distributed Antenna System 12211 Science Drive Orlando, FL 32826

OBJECTIVE

NAWCTSD Orlando is seeking to install Active Fiber DAS to upgrade and remove the current cellular antenna system in order to provide reliable coverage within the DeFlorez building located at 12211 Science Drive, Orlando, FL 32826.

The building’s current system consists of the following:

1. Dual-Band Bi-Directional Amplifier- NOT FUNCTIONING

2. 6 Each In-Line Booster for PCS (1900 MHz) and CEL (800 MHz) coverage area

3. Dual Band Line Amp Kit

4. 1 Panel Donor Antenna PCS (1900 MHZ)

5. 1 Yagi Donor Antenna CEL (800Mhz)

6. 1 Non Penetrating Antenna Mast

7. 36 Indoor Omni Directional Distribution Antennas

8. Assorted couplers, power dividers, jumpers, coaxial cable, plenum coaxial cable, and connectors

Requirements

1. Active Fiber DAS able to support approximately 1800 users in a three floor building approximately 263K square feet.

2. No device is to be added within 10 feet of restricted areas identified in floor plan attachments.

3. Support cellular signal coverage for all major carriers (AT&T, T-Mobile, Sprint, Verizon).

4. Support multiple frequencies 2G, 3G, 4G/LTE, 5G, VHF bands used by each carrier.

5. Installation, parts, materials will be provided by the vendor.

6. Cost should include all associated fees with system design, system components along with specifications, commissioning of the system, warranty plans, service level agreements, carrier agreements, licensing, project management, labor, and lifecycle.

7. Cost to decommission and remove old system and infrastructure as a separate itemized price.

8. Must be FCC compliant and adhere to all relevant cellular signal laws and regulations.

9. Adhere to all local, state and federal codes for the installation of any equipment.

10. Work must be completed and invoiced prior to September 1, 2020.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Lot Demolition Cost for the existing system

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 Lot Installation Cost for the new system

FFP

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 01-SEP-2020 NAWCTSD

EFRAIN RIVERA

12211 SCIENCE DR

ORLANDO FL 32826-3224

(407) 380-8283

N61340

0002 01-SEP-2020 (SAME AS PREVIOUS LOCATION)

N61340

WAGE DETERMINATION

"General Decision Number: FL20200218 05/15/2020 Superseded General Decision Number: FL20190218 State: Florida Construction Type: Building County: Orange County in Florida.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/21/2020 2 03/27/2020 3 05/15/2020

ASBE0067-003 03/01/2020

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 28.93 16.68

CARP1905-003 06/01/2017

Rates Fringes CARPENTER (Includes Form Work)...$ 22.65 9.85

ELEV0139-002 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 44.12 34.765

5/20/2020 beta.SAM.gov https://beta.sam.gov/wage-determination/FL20200218/3?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_se… 2/5

FOOTNOTE:

A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.

Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; The Friday after Thanksgiving Day; and Christmas Day.

ENGI0487-022 07/01/2016

Rates Fringes OPERATOR: Forklift..............$ 23.25 9.20 OPERATOR: Mechanic..............$ 32.05 9.20 OPERATOR: Oiler.................$ 23.50 9.20

ENGI0673-016 05/01/2016

Rates Fringes OPERATOR: Crane Gantry Crane; Bridge Crane..$ 26.09 13.00 Tower Crane; Crawler Crane; Truck Crane; Hydro Crane.......................$ 28.25 13.00

IRON0402-001 01/01/2019

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 23.69 12.70

* SFFL0821-004 01/01/2020

Rates Fringes SPRINKLER FITTER (Fire Sprinklers)......................$ 29.18 19.75

SHEE0015-006 07/01/2014

Rates Fringes SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 18.00 11.76

SUFL2014-027 08/16/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 19.39 0.00

ELECTRICIAN, Includes Low Voltage Wiring...................$ 19.58 6.39

IRONWORKER, REINFORCING..........$ 22.81 11.58

IRONWORKER, STRUCTURAL...........$ 17.92 0.00

LABORER: Common or General, Including Cement Mason 5/20/2020 beta.SAM.gov https://beta.sam.gov/wage-determination/FL20200218/3?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_se… 3/5 Tending and Pipelaying...........$ 13.59 4.28

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 18.69 3.27 OPERATOR: Bulldozer.............$ 15.40 1.90 OPERATOR: Grader/Blade..........$ 18.97 0.00

OPERATOR: Loader................$ 17.83 0.00 OPERATOR: Roller................$ 14.43 4.78 PAINTER: Brush, Roller and Spray............................$ 13.22 0.00 PIPEFITTER, Includes HVAC Pipe and Unit Installation.......$ 22.29 7.72

PLUMBER..........................$ 19.42 0.00

ROOFER...........................$ 17.60 1.39

TILE SETTER......................$ 17.25 1.74

TRUCK DRIVER: Dump Truck........$ 12.95 2.28 TRUCK DRIVER: Lowboy Truck......$ 14.24 0.00 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage 5/20/2020 beta.SAM.gov https://beta.sam.gov/wage-determination/FL20200218/3?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_se… 4/5 determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

5/20/2020 beta.SAM.gov https://beta.sam.gov/wage-determination/FL20200218/3?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_se… 5/5

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

Section 00 70 00 - Conditions of the Contract

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.209-2 Prohibition on Contracting with Inverted Domestic

Corporations--Representation

NOV 2015

52.212-1 Instructions to Offerors--Commercial Items OCT 2018 52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2020 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-50 Combating Trafficking in Persons JAN 2019 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-1 Buy American--Supplies MAY 2014 52.225-3 Buy American --Free Trade Agreement--Israeli Trade Act MAY 2014 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.233-1 Disputes MAY 2014 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.247-34 F.O.B. Destination NOV 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006

252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7008 Sources of Electronic Parts MAY 2018

CLAUSES INCORPORATED BY FULL TEXT

52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer's notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/far/ or http://farsite.hill.af.mil.

252.204-7006 BILLING INSTRUCTIONS (OCT 2005)

When submitting a request for payment, the Contractor shall--

(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and

(b) Separately identify a payment amount for each contract line item included in the payment request.

(End of clause)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0337

Issue By DoDAAC N61340

Admin DoDAAC** S3306A

Inspect By DoDAAC N61340

Ship To Code N61340

Ship From Code N/A

Mark For Code N61340

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC HAA653

Other DoDAAC(s) N/A

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

File details come from the government source that posted it. Updated .