About this file

This combined synopsis/solicitation requests quotes for a cellular signal distributed antenna system project at Naval Air Warfare Center Training Systems Division in Orlando, Florida. The Navy seeks to install an active fiber DAS to upgrade coverage for approximately 1800 users across three buildings totaling 263,000 square feet, supporting all major carriers on 2G through 5G frequencies. Quotes are due by April 13, 2020 with project completion aimed for September 1, 2020. The small business set-aside will be awarded as a firm-fixed-price contract to the responsible offeror providing the best value based on technical acceptability and lowest price.

View the file

Other files for this federal contract opportunity

Other files attached to Cellular Signal Distributed Antenna System, newest first.
File Type Posted
N61340-20-R-0083 Solictation v2.pdf PDF
Davis Bacon Wage Determination Orange County.pdf PDF
NAWCTSD_Local_Commuting_Area.pdf PDF
Questions and Answers.xlsx XLSX spreadsheet
N61340-20-R-0083 Solictation.pdf PDF
COVID Self Screening Questions.pdf PDF
Final Combined Synopsis-Solicitation Cell Phone Tower Installation R0083 AV2.docx DOCX document
3rd Floor Cellular Coverage Map with Telecom Closets.pdf PDF
2ndFloorCellularCoverageMap.pdf.pdf PDF
Final Combined Synopsis-Solicitation Cell Phone Tower Installation R0083.docx DOCX document
2nd Floor Cellular Coverage Map with Telecom Closets.pdf PDF
Cellular AP Locations.pdf PDF
DAS_SOW_NAWCTSD_ORLANDO_r11.docx DOCX document
3rdFloorCellularCoverageMap.pdf.pdf PDF
1st Floor Cellular Coverage Map with Telecom Closets.pdf PDF
1stFloorCellularCoverageMap.pdf PDF
Mechanical Bldg_Floor Plan.pdf PDF
Questions and Answers 4-10-2020.xlsx XLSX spreadsheet
Cellular AP Locations.pdf PDF
Questions and Answers 4-6-2020.xlsx XLSX spreadsheet
2nd Floor Cellular Coverage Map with Telecom Closets.pdf PDF
3rd Floor Cellular Coverage Map with Telecom Closets.pdf PDF
Mechanical Bldg_Floor Plan.pdf PDF
1st Floor Cellular Coverage Map with Telecom Closets.pdf PDF
2ndFloorCellularCoverageMap.pdf.pdf PDF
3rdFloorCellularCoverageMap.pdf.pdf PDF
1stFloorCellularCoverageMap.pdf PDF
DAS_SOW_NAWCTSD_ORLANDO_r2.docx DOCX document
Combined Synopsis-Solicitation Cell Phone Tower Installation R0083.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAWCTSD ORLANDO

Cellular Signal Distributed Antenna System 12211 Science Drive Orlando, FL 32826

OBJECTIVE

NAWCTSD Orlando is seeking to install Active Fiber DAS to upgrade and remove the current cellular antenna system in order to provide reliable coverage within the DeFlorez building located at 12211 Science Drive, Orlando, FL 32826.

The building’s current system consists of the following:

1. Dual-Band Bi-Directional Amplifier- NOT FUNCTIONING

2. 6 Each In-Line Booster for PCS (1900 MHz) and CEL (800 MHz) coverage area

3. Dual Band Line Amp Kit

4. 1 Panel Donor Antenna PCS (1900 MHZ)

5. 1 Yagi Donor Antenna CEL (800Mhz)

6. 1 Non Penetrating Antenna Mast

7. 36 Indoor Omni Directional Distribution Antennas

8. Assorted couplers, power dividers, jumpers, coaxial cable, plenum coaxial cable, and connectors

Requirements

1. Active Fiber DAS able to support approximately 1800 users in a three floor building approximately 263K square feet.

2. No device is to be added within 10 feet of restricted areas identified in floor plan attachments.

3. Support cellular signal coverage for all major carriers (AT&T, T-Mobile, Sprint, Verizon).

4. Support multiple frequencies 2G, 3G, 4G/LTE, 5G bands used by each carrier.

5. Installation, parts, materials will be provided by the vendor.

6. Cost should include all associated fees with system design, system components along with specifications, commissioning of the system, warranty plans, service level agreements, carrier agreements, licensing, project management, labor, and lifecycle.

7. Cost to decommission and remove old system and infrastructure as a separate itemized price.

8. Must be FCC compliant and adhere to all relevant cellular signal laws and regulations.

9. Adhere to all local, state and federal codes for the installation of any equipment.

10. Work must be completed and invoiced prior to September 1, 2020.