ENG 19F4A (SAN DIEGO) CDRLs_AA_(10 JUN19).pdf
PDF 155 KB Posted
- Attached to
- Surface Fire Fighting Trainer Smoke/Fog Generation System Federal contract opportunity
- Solicitation number
- N6134020R0013
View the file
Other files for this federal contract opportunity
Show all 50
Surface Fire Fighting Trainer Smoke/Fog Generation System has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
AA TDP ______ TM _______ OTHER ENGINEERING DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FFT 19F4A S/N 1
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
AA01 TEST/INSPECTION REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-80809B SOW PARA 3.2.8.5 NAWCTSD ENGR
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED 3TIME SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
N/A SEE BLK 16 Reg Repro
16. REMARKS NAWCTSD ENGR 1
1. BLKS 12: FIRST AND SECOND SUBMISSION SHALL BE DUE 15 DAYS AFTER
COMPLETION OF DEVELOPMENTAL TESTING DT-2 AND DT-5.
2. BLK 13: FINAL SUBMISSION SHALL BE DUE 30 DAYS AFTER GOVERNMENT
ACCEPTANCE OF THE TRAINER(S).
3. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
4. BLK 14: SUBMISSION SHALL BE DELIVERED IN MICROSOFT© WORD 2016
FORMAT AND VIA ELECTRONIC MEDIA (CD-ROM).
5. BLK 9: THE FOLLOWING STATEMENTS SHALL BE INCLUDED ON THE
DELIVERABLE:
DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR ADMINISTRATIVE OR
OPERATIONAL USE, 1 NOVERMBER 2012. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING
SYSTEMS DIVISION, PE, CODE 4684, 12211 SCIENCE DR., ORLANDO, FL 32826-
3224.
NAWCTSD ILSM 1
NAWCTSD ISEO 1
NAWCTSD PJM LTR ONLY
NAWCTSD PCO LTR ONLY
15. TOTAL ▬▬▬▬► 0 0 3
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
A. SANTOS, NAWCTSD ENGR R. SOTO-ALBINO PROGRAM MANAGER
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _6_ Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
AA TDP ______ TM _______ OTHER ENGINEERING DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FFT 19F4A S/N 1
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
AA02 REVISION TO EXISTING GOVERNMENT
DOCUMENTS
TRAINER TEST PROCEDURES AND RESULTS
REPORT (TTPRR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-80925A SOW PARA 3.2.8.3 NAWCTSD ENGR
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED 3TIME/R SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
N/A SEE BLK 16 Reg Repro
16. REMARKS NAWCTSD ENGR 1 1
1. BLK 12: FIRST SUBMISSION (DRAFT) SHALL BE DUE 30 DAYS PRIOR TO
CRITICAL DESIGN REVIEW (CDR).
2. BLK 13: SECOND SUBMISSION SHALL BE DUE 30 DAYS PRIOR TO TEST
READINESS REVIEW (TRR).
3. BLK 13: FINAL SUBMISSION SHALL BE DUE 30 DAYS AFTER GOVERNMENT
ACCEPTANCE AND SHALL INCLUDE CORRECTIONS OF RED LINES FROM ALL
TESTING EVENTS.
4. REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE
CONTRACT.
5. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
6. BLK 14: SUBMISSION SHALL BE DELIVERED IN MICROSOFT© WORD 2016
FORMAT AND VIA ELECTRONIC MEDIA (CD-ROM).
7. BLK 9: THE FOLLOWING STATEMENTS SHALL BE INCLUDED ON THE
OPERATIONAL USE, 1 NOVERMBER 2012. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING
NAWCTSD ILSM 1 1
NAWCTSD ISEO 1 1
15. TOTAL ▬▬▬▬► 2 1 3
A. SANTOS, NAWCTSD ENGR R. SOTO-ALBINO, PROGRAM MANAGER
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _2_ of _6_ Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
AA TDP ______ TM _______ OTHER ENGINEERING DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FFT 19F4A S/N 1
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
AA03 ENGINEERING CHANGE PROPOSAL (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80639D SOW PARA 3.1.1.6.1 NAWCTSD ENGR
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
SEE BLK 16 Reg Repro
16. REMARKS
NAWCTSD ENGR 1
1. BLK 4: CONTRACTOR FORMAT ACCEPTABLE.
2. BLKS 12/13: SUBMISSIONS SHALL BE DUE AS REQUIRED THROUGH THE END
OF THE CONTRACT.
3. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE/
REJECTION OF EACH SUBMISSION.
4. BLK 14: SUBMISSION SHALL BE DELIVERED IN MICROSOFT© WORD 2016
5. THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
OPERATIONAL USE, 1 NOVEMBER 2012. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _3_ of _6_ Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
AA TDP ______ TM _______ OTHER ENGINEERING DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FFT 19F4A S/N 1
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
AA04 REQUEST FOR VARIANCE (RFV)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80640D SOW PARA 3.1.1.6.1 NAWCTSD ENGR
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
N/A SEE BLK 16 Reg Repro
1. BLK 4: CONTRACTOR FORMAT ACCEPTABLE.
2. BLKS 12/13: SUBMISSIONS SHALL BE DUE AS REQUIRED THROUGH THE END
OF THE CONTRACT.
3. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
4. BLK 14: SUBMISSION SHALL BE DELIVERED IN MICROSOFT© WORD 2016
FORMAT AND VIA ELECTRONIC MEDIA (CD-ROM).
5. THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR ADMINISTRATIVE OR
OPERATIONAL USE, 1 NOVEMBER 2012. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _4_ of _6_ Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704- 0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
AA TDP ______ TM _______ OTHER ENGINEERING DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FFT 19F4A S/N 1
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
AA05 SCIENTIFIC AND TECHNICAL REPORTS SOFTWARE DESIGN DESCRIPTION
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80711A SOW PARA 3.2.2.2 NAWCTSD ENGR
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED 2TIME/R SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
Draft Final
1. THE SDD SHALL BE DEVELOPED IAW SECTIONS 5.1, 6.4, 6.12, 6.16 AND 6.19 OF
IEEE 12207.1-1997, IEEE 1471-2000, AND IEEE 1016-2009.
2. THE SDD SHALL BE COMPOSED OF VOLUMES, WHERE EACH VOLUME SHALL
CONTAIN THE INFORMATION PERTAINING TO ONE CSCI.
3. FIRST SUBMISSION SHALL PROVIDE INFORMATION IAW SECTIONS 5.1 AND 6.12
OF IEEE 12207.1-1997 AND IEEE 1471-2000.
4. SECOND SUBMISSION SHALL INCORPORATE INFORMATION IAW SECTIONS 6.4,
6.16, AND 6.19 OF IEEE 12207.1-1997 AND IEEE 1016-2009.
5. BLK 12: FIRST SUBMISSION DUE 14 DAYS AFTER TP SRR/SFR.
6. BLK 13: SECOND SUBMISSION DUE 14 DAYS PRIOR TO CDR. REVISIONS DUE AS
REQUIRED THROUGH THE END OF THE CONTRACT. REVISIONS SHALL
INCORPORATE CHANGE BARS IN MARGINS TO IDENTIFY AREAS OF
MODIFICATION TO THE DOCUMENT.
7. GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION
OF EACH SUBMISSION.
8. BLK 14: SUBMISSION SHALL BE DELIVERED IN MICROSOFT© WORD 2016 FORMAT
AND VIA ELECTRONIC MEDIA (CD-ROM).
9. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE
OPERATIONAL USE, 1 NOVERMBER 2012. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING
SYSTEMS DIVISION, PE, CODE 4684, 12211 SCIENCE DR., ORLANDO, FL 32826-
3224.
NAWCTSD ILSM 1
NAWCTSD ISEO 1
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _5_ of _6_ Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
AA TDP ______ TM _______ OTHER ENGINEERING DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FFT 19F4A S/N 1
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
AA06 SCIENTIFIC AND TECHNICAL REPORTS SOFTWARE PRODUCT SPECIFICATION
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80711A SOW PARA 3.2.2.6.2 NAWCTSD ENGR
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED 2TIME/R SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
1. BLK4: SECTION 10.2 OF DI-MISC-80711A SHALL NOT APPLY.
2. THE SOFTWARE PRODUCT SPECIFICATION SHALL BE DEVELOPED IAW IEEE
16326, EIA 12207.1 AND ISO/IEC 12207, AND THE ANNEX TO EXHIBIT AA06.
3. THE SPS SHALL INCLUDE AS AN APPENDIX, THE TRAINER SYSTEM COLD
START AND SOFTWARE BUILD PROCEDURES. SEE ANNEX TO EXHIBIT AA06.
4. THE SPS SHALL INCLUDE ELECTRONIC FORMAT DELIVERY OF THE SOFTWARE
CONFIGURATION ITEMS (INCLUDING DATABASES) REQUIRED TO ACCOMPLISH
THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.
COMMERCIAL ITEM SOFTWARE SHALL BE DELIVERED ON THEIR ORIGINAL
MEDIA WITH THE ASSOCIATED LICENSE, PRODUCT KEY, AND ACTIVATION
CODE. NON-COMMERCIAL ITEM SOFTWARE, EXCLUDING VISUAL SYSTEM
RUNTIME DATABASES, SHALL BE DELIVERED WITH COMPLETE SOURCE CODE.
5. BLK 12: FIRST SUBMISSION SHALL BE AT START OF GPI (DT-3) AND SHALL NOT
INCLUDE MEDIA FOR COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL
MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR
GOVERNMENT USE DURING GPI TESTING.
6. BLK 13: SECOND SUBMISSION SHALL BE AT START OF GFI (DT-5) AND SHALL
NOT INCLUDE MEDIA FOR COMMERCIAL ITEM SOFTWARE. CONTRACTOR
SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR
GOVERNMENT USE DURING GFI TESTING. FINAL SUBMISSION SHALL BE
CONCURRENT WITH GOVERNMENT ACCEPTANCE AND SHALL INCLUDE THE
ELECTRONIC DELIVERY OF THE SOFTWARE CONFIGURATION ITEMS
(INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO
ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION
PROCEDURES. REVISIONS AS REQUIRED THROUGH THE END OF THE
CONTRACT. REVISIONS SHALL INCORPORATE CHANGE BARS IN MARGINS TO
IDENTIFY AREAS OF MODIFICATION TO THE DOCUMENT.
7. GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
8. BLK 14: SUBMISSION SHALL BE DELIVERED IN MICROSOFT© WORD 2016
9. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE
DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE AND U.S. DOD
CONTRACTORS ONLY FOR ADMINISTRATIVE OR OPERATIONAL USE, 1 NOVEMBER 2012. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING
SYSTEMS DIVISION, PE, CODE 4684, 12211 SCIENCE DR., ORLANDO, FL 32826-3224
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _6_ of _6_ Pages
ANNEX to EXHIBIT AA06
Software Product Specification
1. MEDIA
A unique set of physical media shall be prepared and delivered for each computational subsystem. Physical media shall not be shared between subsystems. Each piece of physical media shall be labeled. Labeling of media shall be formatted consistently; permanently attached to the physical media; identify the software vendor name, product name, version number, release date, the contractor’s unique configuration control identifier, the total number of media pieces that compose each configured item, and the individual media piece number within a multi-piece set, such as “Disk 2 of 5” or “DVD 1 of 3”.
2. SOURCE CODE
All source code software, for which the government has the rights to, shall be delivered to NAWCTSD Engineer, NAWCTSD ISEO, and NAWCTSD ILSM. The government shall have the ownership and rights to all developed source code software.
3. SUBSYSTEM COLD START PROCEDURES
(1) Shall provide the information and describe the procedures to configure BIOS and other user configurable firmware from their factory default settings.
(2) Shall provide the information and describe the procedures to install and configure the operating system(s)
(3) Shall provide the information and describe the procedures create required to user accounts
(4) Shall provide the configuration information and describe the procedures to install and configure network connectivity
(5) Shall provide the configuration information and describe the procedures to install and configure the operating system hardware device drivers
(6) Shall provide the configuration information and describe the procedures to install and configure the information assurance controls
(7) Shall provide the configuration information and describe the procedures to install and configure the subsystem software application(s)
(8) Shall provide the information and describe the procedures to install and configure the deliverable source code
(9) Shall provide the information and describe the procedures to compile, link, and build the delivered software source code into executable program(s)
(10) Shall provide the information and describe the procedures to introduce Government-authorized source code changes and rebuild, replace, and upgrade the existing executable program(s)
(11) Shall consist of detailed descriptive actions to be performed, the expected result following the action, and an area to document abnormalities, discrepancies, errors, and pass/fail status
(12) Shall break down complex sequences of actions into discrete steps
(13) Shall provide detailed descriptive action to be performed; the expected result following the action; and an area to document abnormalities, discrepancies, errors, and pass/fail status
(14) Shall be accomplished without referring to external documentation and references
(15) Shall list the physical software media required to perform the cold-start
(16) Shall include the commercial item software activation data, such as serial numbers, key codes, and hardware dongles, fobs and keys.
4. SUBSYSTEM INSTALLATION AND CONFIGURATION PROCEDURES
(1) Shall provide the information and describe the procedures to configure BIOS and other user configurable firmware from their factory default settings.
(2) Shall provide the information and describe the procedures to restore the subsystem system software, such as the operating system, applications, and data to the original delivered configuration.
(3) Shall provide the information and describe the procedures to configure the subsystem software for use within the training device such as user accounts, network connectivity, and information assurance controls
(4) Shall consist of detailed descriptive action to be performed; the expected result following the action; and an area to document abnormalities, discrepancies, errors, and pass/fail status
(5) Shall break down complex sequences of actions into discrete steps
(6) Shall be accomplished without referring to external documentation and references
(7) Shall list the physical software media required to perform the cold-start
(8) Shall include the commercial item software activation data, such as serial numbers, key codes, and hardware dongles, fobs and keys
1. MEDIA
File details come from the government source that posted it. Updated .