RFC_011.docx

DOCX document 17 KB Posted

Attached to
CVN Camels Federal contract opportunity
Solicitation number
N4523A-1-R-0033
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to CVN Camels, newest first.
File Type Posted
Attachment_2_-_CVN_CAMELS_5-Way_Breakdown_-_Corrected_DEC2016.xls XLS spreadsheet
Amendment_3.docx DOCX document
Amendment_2.docx DOCX document
Amendment_1.docx DOCX document
RFC_011_Material_List_ANS.docx DOCX document
Wooden_Fender_PSNS.docx DOCX document
RFC_009_revision_Wood_Fenders_ANS.docx DOCX document
RFC_009_(2).docx DOCX document
RFC_008_Drawings_4_ANS.docx DOCX document
RFC_005_Drawings_ANS.docx DOCX document
RFC_006_Drawings_2_ANS.docx DOCX document
RFC_007_Drawings_3_ANS.docx DOCX document
RFC_001_Blocking_Plan_ANS.docx DOCX document
RFC_004_Wood_Treatment_ANS.docx DOCX document
RFC_003_Vessel_Delivery_ANS.docx DOCX document
RFC_002_Draft_ANS.docx DOCX document
N4523A17R0002.pdf PDF
Attachment_3_-_CDRLs_and_DIDs_-_C.pdf PDF
Attachment_1_-_Request_for_Clarification_-_A.docx DOCX document
Attachment_2_-_CVN_CAMELS_5-Way_Breakdown_-_B.xls XLS spreadsheet
SOW_Everett_Camels.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST:
QUESTION NO:
REQUIREMENT:
REQUISITION NO.: N4523A-17-R-0002

ITEM NO: 3.3.6

TITLE: Structural Modifications

ISSUING OFFICE POC(CODE 446):

LeAundria Shaheed: (360) 476-4053 LeAundria Shaheed@navy.mil

PARA. NO: 3.3.6
PAGE NO:
CONTRACTOR
PLANNER’S NAME:
ATTACH. NO:
CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION: In drawing SK10832 sheet 3 List of material is the material list for 1 camel or is it for both of the camels? And are we only to build and install 1 mooring bit on each camel?

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N
DWG/REF CHG. Y/N
RQMTS CHG: Y/N
MAT'L CHG: Y/N
TECHNICAL REVIEW:
SERIAL NO:

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING

OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST

FOR PROPOSAL.

File details come from the government source that posted it. Updated .