Amendment_1.docx
DOCX document 151 KB Posted
- Attached to
- CVN Camels Federal contract opportunity
- Solicitation number
- N4523A-1-R-0033
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_CVN_CAMELS_5-Way_Breakdown_-_Corrected_DEC2016.xls | XLS spreadsheet | |
| Amendment_3.docx | DOCX document | |
| Amendment_2.docx | DOCX document | |
| RFC_011_Material_List_ANS.docx | DOCX document | |
| RFC_011.docx | DOCX document | |
| Wooden_Fender_PSNS.docx | DOCX document | |
| RFC_009_revision_Wood_Fenders_ANS.docx | DOCX document | |
| RFC_009_(2).docx | DOCX document | |
| RFC_008_Drawings_4_ANS.docx | DOCX document | |
| RFC_005_Drawings_ANS.docx | DOCX document | |
| RFC_006_Drawings_2_ANS.docx | DOCX document | |
| RFC_007_Drawings_3_ANS.docx | DOCX document | |
| RFC_003_Vessel_Delivery_ANS.docx | DOCX document | |
| RFC_001_Blocking_Plan_ANS.docx | DOCX document | |
| RFC_004_Wood_Treatment_ANS.docx | DOCX document | |
| RFC_002_Draft_ANS.docx | DOCX document | |
| Attachment_1_-_Request_for_Clarification_-_A.docx | DOCX document | |
| N4523A17R0002.pdf | ||
| Attachment_3_-_CDRLs_and_DIDs_-_C.pdf | ||
| Attachment_2_-_CVN_CAMELS_5-Way_Breakdown_-_B.xls | XLS spreadsheet | |
| SOW_Everett_Camels.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4523A-17-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 18-Nov-2016 12:00 AM to 29-Nov-2016 12:00 AM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
STATEMENT OF WORK ERRATA 1
Statement of Work (SOW)
1.0 General Requirements: This document invokes the requirements applicable to the docking and maintenance work to be performed on Quantity (2 EA) CVN Camels. Work performed and accomplished shall be in accordance with the highest quality workmanship standards and practices commonly accepted in the commercial marine industry and the technical references listed herein. The Contractor is responsible for understanding and complying with all requirements specified herein. The requirements listed herein work in conjunction with the technical drawings and other references to describe the essential features, functions, and requirements of the work performed.
1.1 Vessel Characteristics:
CVN CAMEL, SERIAL NO. 68967-2
| Length: |
| 67 FT |
| Draft: |
| 3 FT |
| Width: |
| 66 FT |
| Dead Weight: |
| 112 tons |
| Hull Type: |
| Steel Pontoon |
| Age: |
| Unknown |
CVN CAMEL, SERIAL NO. 68967-4
| Length: |
| 67 FT |
| Draft: |
| 3 FT |
| Width: |
| 66 FT |
| Dead Weight: |
| 116 Tons |
| Hull Type: |
| Steel Pontoon |
| Age: |
| Unknown |
1.1.1 Each Camel is comprised of 2 equal sections that are bolted together, that may be temporarily separated.
1.1.2 Each pontoon is 4 feet diameter X 30 feet length.
1.1.3 See 2 sketches below for CVN Camel configurations:
1.2 Scope Overview: Coordinate with the Contracting Officer, via the Contracting Officer’s Representative (COR) to deliver each vessel to the Contractor’s facility. Dock, wash, and clean the exterior surfaces of each vessel upon docking. Modify and repair fendering systems. Blast and preserve 100 percent of exterior camel structural surfaces and pontoons. Touch-up preserve pontoon tanks. Perform visual and ultrasonic testing of pontoons and structure. Replace pontoon zinc anodes. Undock each vessel. Arrange and coordinate the delivery of each vessel back to the Government with the Contracting Officer via the COR.
1.3 Definitions: As used throughout this Specification, the following definitions and terms have meanings as indicated:
1.3.1 Unless otherwise stated, “as shown”, “as indicated”, “as detailed”, or other words of similar import refer to the contractual documents including reference documents and publications.
1.3.2 The words “as directed”, “as approved”, “when authorized” or words of similar import refer to the direction, requirements, permission, approval, or acceptance by the Contracting Officer.
1.3.3 The term “Objective Quality Evidence” (OQE) shall mean current, accurate, and complete objective documentation and information submitted together as a complete data package sufficient that a qualified and disinterested third party could analyze and evaluate whether technical requirements were achieved.
1.3.4 Where “in accordance with Regulatory Body requirements” is stated, the industrial efforts shall be in accordance with the appropriate commercial regulatory body requirements unless otherwise authorized by the Government.
1.3.5 The term “marine” or “marine quality” means an item constructed of materials unaffected by moisture, sea spray, extremes in temperature or other hazards of the marine environment, and designed and constructed to perform its intended functions under marine operating conditions.
1.3.6 The term “herein” means the applicable section(s) of this Specification.
1.3.7 The term “NAVSEA” means the Naval Sea Systems Command, one of five system commands, responsible for engineering, building, supporting, and maintaining the Navy’s fleet of vessels.
1.4 Arrival Conference: The Government will arrange an arrival conference with the Contractor after contract award.
1.5 Required Documents: Administrative requirements of this SOW shall commence at contract award and be updated throughout the contract period.
1.5.1 Prepare and keep current schedules necessary for the purpose of establishing an orderly and systematic accomplishment of production work and material ordering.
1.5.2 Maintain a list of all subcontractors with extent of work to be accomplished by each subcontractor.
1.5.3 Maintain a list of manufacturer’s Technical Representatives to be provided per the particular specification requirement.
1.5.4 Maintain a list of Contractor’s National Fire Protection Association (NFPA) Marine Chemist certifying gas-free conditions for this project and a list identifying Contractor employees designated as “Competent Persons” in accordance with 29 CFR 1915.7, including date trained.
1.5.5 Maintain a Welder Qualification List, with name, type of qualification(s) and date of last qualification test for each qualification and a list of qualified silver brazers.
1.5.6 Maintain ASTM F-718 and Safety Data Sheets (SDS) for all materials to be used by the Contractor to accomplish the requirements of this contract.
1.5.7 Maintain a list of key Contractor personnel with names, positions, telephone numbers, e-mail addresses, and emergency contact information.
1.5.8 Maintain a copy of the Contractor’s Inspection and Quality Control System with copies of all related forms, reports, and other supporting documentation.
1.5.9 Maintain a copy of the Contractor’s Environmental Protection and Hazardous Waste Management Plan, including Risk Management/Mitigation plans specific to this contract.
1.5.10 Maintain copies of required federal, state and local environmental notifications and permits for performance of the work (or a schedule of when they will be obtained).
1.6 Progress Meetings: Weekly progress meetings shall be held at the Contractor’s facility near the vessels. The day and time of the meeting shall be set by the COR upon consultation with the Contractor. A review of percentage completion for each work item shall be conducted including the Contractor’s assessment of schedule adherence. Production schedule, corrective action reports, material lead times and other issues shall be discussed.
1.7 Availability Requirements:
1.7.1 Arrange for and transport each vessel from the Government facility at Everett Naval Station, WA to the Contractor’s repair facility. Upon completion of all work coordinate delivery of each vessel to the Government facility at Everett Naval Station, WA. Provide all materials, labor, and insurance bonds necessary for the safe transport of each vessel to and from the Contractor’s facility and for the period that each vessel is located at the Contractor’s repair facility.
1.7.1.1 Vessel pickup and delivery shall be scheduled with the COR 5 working days prior to pickup and delivery.
| 1.7.2 | Provide heated/air conditioned office space measuring a minimum of 160 square feet and located within 1/4 mile of the vessels from 2 days prior to project start to 2 days after project completion for use by the COR. | |
| 1.7.2.1 | The office space shall be equivalent to Satellite model 820MO, 8 feet X 20 feet interior size, with lockable doors and platform with stairs. |
1.7.2.2 The office space shall be lockable, secure, and safe for personnel and equipment.
| 1.7.2.3 | Provide quantity 2 each keys for all doors and quantity 2 each master keys to fit all locks to the COR. |
| 1.7.2.4 | Furnish quantity One each work station with the following at each workstation: |
1.7.2.4.1 Quantity (One EA) duplex 110 volt receptacle.
1.7.2.4.2 Quantity (One EA) desk, 30 inches wide x 48 inches in length, with chair. Chair shall be adjustable in height, with swivel and adjustable arm rests.
1.7.2.4.3 Quantity (One EA) CAT-5 cable connection at 35 MBPS minimum download speed for a COR supplied desktop/laptop computer. This connection shall be separate from Contractor’s computer servers/networks.
1.7.2.4.4 Quantity (One EA) trash can.
1.7.2.5 Provide Quantity (One EA) parking space adjacent to the office space of 1.7.2 for the entire contract period
1.7.2.5.1 Designate each parking space with a sign stating "PSNS PARKING ONLY".
1.7.3 Document the result of each test/inspection requirement within this SOW.
1.8 Care of Vessels: The Contractor shall be responsible for the care of vessel equipment, materials, and components related to the work being performed as follows:
1.8.1 Vessels shall be maintained in a broom clean condition on a daily basis.
1.8.1.1 Remove and dispose of industrial debris and extraneous materials from each vessel on a daily basis.
1.8.2 Temporary protective measures shall be taken to avoid wear and damage to each vessel and all associated components. Water shall not be allowed to accumulate in tanks or structure during work performance.
1.8.2.1 Open areas in structure shall be covered to prevent water entry.
1.8.3 Install and maintain blanks/plugs, nuts and bolts, painted blaze orange for use as FME (foreign material exclusion) immediately upon openings in equipment to prevent entry of foreign material and protect flanges and threaded areas. Existing system fasteners used for blanking that will be used for installation are excluded from the requirement for blaze orange color. The use of cloth, polyvinyl sheet, paper, tape, and rubber sheeting as FME is prohibited. All FME material must be applied to avoid damage to surfaces/components being protected.
1.8.4 All preservation coatings shall be fully cured prior to final delivery to the Government.
1.8.5 Tanks shall be clean, dry, and pass Government inspection prior to being closed.
1.9 Workmanship: Workmanship provided by Contractor employees shall be consistent with the highest standards of commercial marine practices and regulatory bodies. The Government reserves the right to accept or reject material and workmanship nonconformance. Noncompliance with Contractor’s quality control processes will influence past performance rating provided on contract evaluation. Plating and structural member cuts shall be neatly and accurately made with edges cleaned and prepared for welding. Sharp edges shall be ground smooth to avoid injury to personnel. Equipment shall not leak oil, water or other type of fluids. Equipment shall be protected against weather hazards.
1.9.1 At the time of delivery, work performed shall meet the performance requirements specified. In the event that deficiencies are discovered during the Guarantee period, an opportunity will be afforded the Contractor to witness, inspect and comment on such deficiencies. Materials and articles used for work performed shall be of commercial marine quality, conforming to the requirements of the Regulatory Bodies listed herein, unless specified to be otherwise.
1.9.2 The decision that an area is inaccessable shall be determined by inspection and agreed to by the COR prior to proceeding with the requirements of this SOW.
1.10 Corrective Action Request (CAR): The Contractor is solely responsible for implementation of the Inspection and Quality Control System submitted in 1.5.8. Government observer(s) will monitor production work performed at any time where work is ongoing. If, during the performance of work, the Government observer(s) witness work that: fails to meet specifications within this SOW, would lead to an unsatisfactory end product, damages Government Property, is a Safety Violation; the observer will alert the COR and advise the Contractor of the deficiency. Conditions that fail to meet specifications within this SOW may result in the Contractor being issued a CAR. Contractor shall respond in writing within 48 hours of CAR receipt to the COR concerning the corrective action taken to remedy the issue and prevent future occurrences.
1.11 Condition Found / Inspection Discrepancy Report (CFR/IDR): Utilize FIGURE A (or Company correspondance containing same information) in transferrable media, to communicate to the Contracting Officer concerning all conditions found, discrepancies noted, and other information requiring formal documentation. Provide the Contractor’s recommendation for corrective action and include Contractor’s estimated pricing (man-hours and materials) to correct the condition found. Provide all inspection results including detailed measurements, photographs, sketches, and other means to accurately detail inspection results using FIGURE A, with attachments as necessary. The Government will review and respond to the submitted report. Additional repairs related to the found condition will be tasked if determined necessary by the Government. In the event difficulty is encountered in meeting requirements or difficulty is anticipated in complying with the contract schedule dates, immediately notify the Contracting Officer via verbal communication with the COR. Government receipt of notifications are not to be construed as a waiver of the requirements, delivery schedule, or waiver of rights or remedies provided by law or under this contract, or any other requirements in the SOW relating to jeopardy of contract schedule dates. Reports and notifications do not authorize the Contractor to perform additional work not covered by the contract or authorized by the Contracting Officer.
1.11.1 Each CFR shall specify serial number(s) of the camel(s) it relates to.
FIGURE A - CONDITION FOUND/INSPECTION DISCREPANCY REPORT
CFR Number________ Date: ______________
| From: | ________________________________ (Contractor Authorized Representative) |
| To: | PSNS & IMF, NWRMC IND MAN, C400, Contracting Officer |
| Via: | PSNS & IMF, NWRMC IND MAN, C400, Contracting Officer’s Representative (COR) |
Vessel: CVN CAMELS
SERIAL NO. 68967-2_______ SERIAL NO. 68967-4_______
Section of Contract Affected: _____________________________________________
Description:
Impact:
Recommended Action:
C400 Response:
| ___________________________________________ | __________________ | |
| Signature of C400 Representative | Date |
Page ___ of ____
1.12 Interferences: Contractor pricing offered shall include removal and re-installation of all interferences associated with performance of the required work. The fact that interference is not shown on a plan or specifically identified in the specification item is not justification for a contract change. A physical check of each work site prior to bid submittal is strongly encouraged.
1.13 Safety Requirements: Comply with the requirements of 29 CFR Part 1910, 29 CFR Part 1915, and 29 CFR Part 1926, state and local laws, rules, and ordinances during contract performance and as follows:
1.13.1 General: Contractor shall be responsible for the compliance of the above requirements by all subcontractor personnel performing work related to this contract. In cases of conflict between the above regulations, the stricter of the requirements shall take precedence.
1.13.2 Accidents and Injuries: Immediately report injuries to Contractor and subcontractor employees to the COR. Investigation shall be completed within 7 work days of each accident/injury. Document a report that includes narratives of the circumstances leading up to and including the injury and any actions (immediate and contemplated) taken to mitigate future reoccurrences of injuries.
1.13.3 Scaffolding: PSNS & IMF has established additional standards above the OSHA minimum requirements when PSNS & IMF personnel are required to access or work from any scaffolding and associated ladders. These additional requirements are hereby invoked and are applicable to Contractor assembled scaffolding and ladders at any location where PSNS & IMF personnel administer the contract. Scaffolds and ladders shall meet the requirements of 29 CFR 1910.27, 29 CFR 1910.28 and as follows:
1.13.3.1 Install a swinging gate guardrail at each scaffold ladder and through-platform access opening.
1.13.3.1.1 Install standard railing around the non-access sides and a swinging gate guardrail on the entrance side of through-platform access openings.
1.13.3.1.2 Install standard toe-boards around all scaffold floor openings, except at the entrance to the swinging gate guardrail, on all exposed sides of through-platform access openings.
1.13.3.2 Install each ascending ladder section with a landing platform and with each ladder section platform in an offset position from the previous or adjacent ladder section for heights above 21 feet. Position each ladder perpendicular to each landing or work platform to the greatest extent practicable.
1.13.3.3 Install commercial scaffolding that is configured and designed by a qualified person when OSHA, ANSI, and manufacturers’ designed guidelines exist. Construct, load, and maintain scaffolding in accordance with the qualified person’s design.
1.13.3.4 Develop detailed engineered drawings and specifications for scaffolds when OSHA, ANSI, or manufacturers’ designed guidelines do not exist, such as for “hanging scaffolding”. Drawings and specifications shall be designed by a registered professional engineer and meet the following:
1.13.3.4.1 Maintain on the jobsite a copy of the detailed engineering drawings and specifications showing the sizes and spacing of members and the calculations developed for the engineered design(s).
1.13.3.4.2 Construct, load, and maintain scaffolding in accordance with the registered professional engineer’s design.
1.13.3.5 Install a commercially available scaffold tag system on all scaffolds. The tagging system, as a minimum, shall be prominently attached to the scaffold structure, consist of green colored “Okay to Use” tag(s), red colored “Danger” tag(s), and accomplish the following:
1.13.3.5.1 Ensure that only qualified Competent Person’s apply tags;
1.13.3.5.2 Ensure that any scaffolds not properly tagged shall not be used;
1.13.3.5.3 Apply all tags on the scaffold structure as close as practicable to each ladder access and/or entry point;
1.13.3.5.4 Apply a red tag to indicate to users that the scaffold is being dismantled, is not yet completely erected, or for some reason is unsafe for use;
1.13.3.5.5 Apply a green tag to indicate to users that the scaffold is safe for use and is compliant with all OSHA regulations and other applicable requirements;
1.13.3.5.6 Ensure green tags contain the following information as a minimum: the location of the scaffolding structure; a unique reference number to identify each separate scaffolding structure, the date the scaffolding structure was first erected; the name(s) of the scaffold builder(s); the load rating of the scaffold structure; and the Competent Person’s printed name and signature.
1.14 Hot Work/Welding: Prior to performance of any hot work on each vessel, certify a safe atmosphere exists in and around the work area before starting any work that may produce the heat of ignition, sparks or flame. Accomplish steps to make each area safe for hot work. A copy of the gas free certification shall be posted at the work site for the entire period that personnel entry into and around the work area is required.
1.14.1 All welding equipment and materials shall comply with the applicable requirements of American National Standards Institute/American Welding Society (ANSI/AWS) D1.1, Structural Welding Code requirements. Welding shall be sequenced to keep the thermal expansion of structures to a minimum.
1.14.2 Remove existing preservation / coatings prior to each expected welding, cutting, and hotwork operation.
1.14.2.1 Preservation / coatings shall be removed 4 inches in each direction and each opposite side.
1.14.3 Perform visual inspection of new welds, to determine conformance, in accordance with the requirements of ASTM International. All new welds shall be 100 percent visually inspected. All defects shall be repaired in accordance with approved procedures. All welders shall be certified in accordance with AWS requirements.
1.14.4 Perform radiographic, ultrasonic, magnetic particle or dye penetrant inspection of new welds, when invoked by the requirements of section 3.0 of this SOW, in accordance with ASTM requirements.
1.14.5 Maintain documentation of each proposed access cut and a list of each proposed bolted/riveted access removal. Documentation is not required where access cuts are authorized per a NAVSEA approved drawing.
1.15 Threaded Fasteners: Except as otherwise specified herein, or on the drawings listed, threaded fasteners shall be in accordance with applicable ASTM standards. Coarse thread series shall be used unless the component’s design indicates a necessity to use fine thread series. Hole diameters for mounting bolts shall not exceed the diameters produced using standard size drill bits. Black oxide coated brass and cadmium plated fasteners are prohibited. Where drawings specify the use of brass fasteners on a fuel or fuel oil tank, CRES 316 fasteners shall be substituted in lieu of brass. Consult the requirements of MIL-STD-777 and NSTM Chapter 075 for guidance in instances where there is a question as to the material to be utilized.
1.15.1 Threads on externally threaded fasteners, after being installed and tightened, shall protrude a minimum of 2 threads to a maximum of 5 threads beyond the face of the nut with the exception of minimum thread protrusion for self-locking (plastic insert) nut installations. For those installations, bolt or stud end minimum thread protrusion shall be flush with the face of the nut. For self-locking nuts, the bolt or stud end shall protrude a maximum of 5 threads beyond the face of the nut after the nut is tightened.
1.15.2 Clean, chase, and tap exposed threaded areas of each fastener and threaded socket.
1.15.3 Tighten threaded fasteners in the sequence, patterns, and the torque values, when not otherwise specified, using the requirements of Section 4, paragraph 075-4.1 through 075-4.6.2 of NSTM Chapter 075 for guidance.
1.16 PRESERVATION: Accomplish all preservation installation and repairs as follows:
1.16.1 Measure, record, and maintain objective quality evidence (OQE) information on current year Appendices One through 7 throughout the entire performance of preservation operations. OQE information for the process being performed shall be made immediately available for onsite review upon request by the COR.
1.16.1.1 Electronic copies of Appendices One through 7 can be downloaded from the National Surface treatment (NST) Center website at: http://www.nstcenter.biz/tech-documents/qa-appendices/ “CONTRACTORS”.
1.16.2 Comply with the coating manufacturer’s F-718 requirements for the establishment and maintenance of environmental conditions and for coating thickness applications throughout the entire removal and preservation operation(s).
1.16.3 Apply contrasting colors between the primer, stripe, intermediate, and topcoat using coating products that are from the same manufacturer; that are compatible with each other; that are a different color from both the preservation over which it is being applied and the next coat in the system; and in accordance with the manufacturer’s F-718.
1.16.4 Apply stripe coats to all edges, weld seams, welds of attachments and appendages, cutouts, corners, butts, foot/handholds, including back side of piping, underside of beams and other mounting hardware (non-flat surface) after each previous full coat has dried. The stripe coat shall encompass and extend a minimum of One-inch beyond the intersection of two flat surface planes, each radii edge, and all perpendicular shapes, edges, or angles.
1.16.5 Mask and/or install temporary expandable foreign material exclusion (FME) plugs, blanks, or other hard and durable protective covers, painted blaze orange, in hull openings and surfaces to prevent system contamination or equipment damage from abrasive blasting, surface preparation, and preservation operations. The use of cloth, polyvinyl sheet, paper, tape, rubber sheeting, and wood or wood products as FME prevention devices is prohibited.
1.16.5.1 Establish and maintain an FME log, record, and identify the location of each protective covering installed and removed, including each corresponding and specific measurement(s), location(s), and/or area(s) in relationship to structural members or from suitable hull reference points.
1.16.5.2 Remove each temporary FME plug, blank, and protective covering, record removal date in FME log, and restore each system to its original configuration upon final completion of testing, blasting, and preservation operations.
1.16.6 Solvent clean surfaces prior to the start of each blasting and/or preservation operation. Accomplish the requirements of Surface Preparation Specification SSPC-SP-1 of Systems and Specifications, SSPC Painting Manual, Volume 2.
1.16.7 Accomplish touch-up preservation for new and disturbed surfaces to match surrounding coating system(s) in accordance with paint manufacturer’s F-718.
1.16.8 Feather edges of well adhered paint remaining after cleaning for all surface preparation methods. Visible areas of defective existing paint shall be removed until an area of completely intact and adhering paint is attained around the defective area by feathering (tapering) the edges of tightly adhering existing paint at an approximate 30 degree slope into the newly prepared bare metal surface thus preventing application of new paint over loose or cracked paint.
1.16.9 Paints shall not be thinned.
1.17 Environmental and Hazardous Waste Management: Comply with all federal, state, and local laws, codes, regulations, acts, ordinances, and rules for Environmental Protection and Hazardous Waste Management / Disposal, including obtaining required licenses, generator identification number, and permits. Designate one employee responsible for Environmental and Hazardous Waste Management. All contract, manifests, invoices, and other documents related to the removal, storage, handling, transportation or disposal of hazardous waste shall bear a generator identification number issued to the Contractor pursuant to applicable law. Take actions to mitigate creation of hazardous waste by recycling and other available methods. All hazardous waste generated by work under this contract is anticipated to be Contractor generated and shall be the responsibility of the Contractor. Estimated hazardous waste associated with work required in these Specifications is listed below:
Product
Amount
Cleaning Solvents
50 gallons
Paint (enamel, latex, epoxy, thinners, oil based, rubber, non-skid, lacquer, varnishes, removers)
50 gallons
Rags (contaminated with a known source)
100 pounds
Blast Media and paint chips contaminated with heavy metals and other contaminants
6,000 pounds
Tank water contaminated with heavy metals and other contaminants
500 gallons
Tank solids contaminated with heavy metals and other contaminants
100 pounds
Hazardous waste generated during the actual performance of the work may vary in type or amount from the waste listed above. The above is an estimate of the amount of waste anticipated to be generated; not an estimate of the amount of work in generating that waste.
1.17.1 The Contractor shall ensure that their cost proposal for the work proposed herein includes reasonable compensation for all anticipated cost of managing and disposing of the wastes listed above, and/or created or generated in the execution of the delivery order issued, in accordance with the requirements of 42 USC 6901-6992 Rev 1996, 49 USC 5103, 10 USC 7311 Rev 1/22/11. The Contractor shall include a 5-way break down of the anticipated costs associated with this effort in their offer. Pursuant to the requirements of Paragraph (b) of 10 USC 7311 Rev 1/22/11, total cost greater or less than the above dollar amount when authorized by the Contracting Officer will be the subject of an equitable adjustment.
1.17.2 Consider coatings to contain heavy metals (e.g. lead, chromium, cadmium), hexavalent chromium, crystalline silica, and/or other toxic or hazardous substances until laboratory analysis establishes otherwise. Comply with all procedures and precautions required for employee protection, sampling, removal, and disposal.
1.17.3 Consider insulation, lagging, and mastics to be asbestos-containing material (ACM) until it can be established by laboratory analysis, or other reliable method(s), that the material does not contain asbestos. Ensure compliance with the requirements of 29 CFR 1915.1001.
1.17.4 Consider materials, debris, and/or residue associated with ventilation systems to contain toxic/hazardous substances including but not limited to cadmium, chromium, and PCB’s until laboratory analysis establishes otherwise.
1.18 Materials: All Contractor furnished materials (CFM) installed shall be new. Materials shall be as indicated on the listed drawings, publications or as specified in this Specification. The use of asbestos, polychlorinated biphenyl (PCB), magnesium, cadmium, or mercury in any materials is prohibited.
1.18.1 This SOW includes requirements for long lead time materials. Contractor is hereby advised to order these materials at contract award.
1.19 Label Plates: Label plates installed in locations exposed to the weather shall be CRES and shall be prepared by the “Metal-Photo” process and sealed to exclude moisture between the plate and the mounting surface. Label plates shall be installed to assure maximum visibility. Label plates shall be attached with corrosion-resistant steel (CRES) screws or adhesive, using drawing S2803-980209 Rev L for guidance. Where adhesive is used, surface preparation shall be in strict accordance with the adhesive manufacturer’s instructions. Test label plates shall be attached on or adjacent to all equipment or components tested without interference to equipment or component operation. The label shall identify the equipment or component, the test load, the dynamic and static load (if applicable), the rated load, the date of testing, and the activity performing the test, using the layout format of drawing S2803-980209 Rev L for guidance.
1.20 Integrated Logistic Support: Maintain legible original copies in approved transferrable media, of manufacturer supplied operating instructions, warranty information, service manuals and other supporting documents for all new equipment and parts to the COR, for items supplied by the Contractor.
1.21 Gas Free: Provide certified Marine Chemist, Certified Industrial Hygienist (CIH) services, and Shipyard Competent Person services as required by 29 CFR 1915 and as follows:
1.21.1 Maintain of a listing of the Contractor’s designated Shipyard Competent Persons, including Contractor certification that the Competent Persons’ training has been completed within the past year to the COR.
1.21.2 Maintain certifications for the duration of the time that work is being accomplished, employees require access and prior to hot work being accomplished on each vessel.
1.21.3 Post, update, and maintain gas free certificates at each access entry to the area certified.
1.22 General Requirements for Testing: Test all Contractor affected equipment, systems and subsystems for compliance with this SOW and Commercial Marine standards and practices. Demonstrate workmanship, alignment, strength, rigidity, water tightness, functionality, and suitability for the purpose intended.
1.22.1 Develop a Test Plan for each Test required by this SOW, containing paragraph number or listed applicable reference requiring Tests; identification of each component/system; description of each Test; accept/reject criteria; date scheduled; Government notifications; date completed; and each Test result.
1.22.1.1 Fully integrate the Test Plan with the Contractor’s production schedule.
1.22.1.2 Provide the number of tests for a given system, component, or installation required to demonstrate required satisfactory performance. This section specifies tests to be performed in support of the work performed.
1.22.2 Provide a detailed description of preoperational checks to be conducted, operations to be performed, and the parameters to be satisfied. Develop data sheets which provide spaces for recording the quantitative values measured during the test, for each test procedure. Specify the minimum and maximum allowable tolerance limits for each measured value. Develop signature sheets for fill-in by the person conducting the test, the Government witness present, and the date of the test. Block diagrams, simplified schematics or diagrams may be used to clarify the procedure or test method. Include a comment sheet to record significant events and observations by either the Government witness or Contractor.
1.22.3 Provide materials, supplies, utilities, equipment, calibrated equipment/ instrumentation, services and personnel to accomplish each test. Incorporate safety precautions into each test procedure. Prepare all test documentation during the development and implementation of the acceptance test.
1.22.3.1 Whenever Government and/or Ships Force support is required for the operation of vessel equipment and/or systems, a minimum of 2 workday’s prior notification of the operational/test support requirement shall be provided to the COR.
1.22.3.2 Tests and equipment/systems operation requiring Government and/or Ship’s Force operational support shall be scheduled for accomplishment during normal day shift working hours, as much as practicable.
1.22.3.3 Provide a minimum of 3 workdays prior notification to the COR for tests and equipment/system operations requiring Government and/or Ships Force operational support for work being performed on weekends, after normal dayshift working hours, and immediately before and/or after Federal holidays.
1.22.3.4 The COR or his representative shall receive notification a minumum of 24 hours prior to each test/inspection. Equipment shall not be adjusted during acceptance testing. The COR may countersign the acceptance test/inspection report, however the Government’s signature does not constitute approval or concurrence in any aspect of the testing/inspection, other than the presence of the Government at the test.
1.22.3.5 Gage range shall be such that test pressure is in the middle third of each scale.
1.22.4 Perform tests using the applicable test procedure for systems and subsystems. Demonstrate compliance with the Specification requirements by satisfactory completion of the test. Complete all work prior to initial testing of that particular system or subsystem and in a timeframe sufficient to allow for correction of deficiencies prior to dock trials, sea trials, or other applicable milestones established in these specifications. Perform adjustments and testing prior to each scheduled acceptance test.
1.22.4.1 Stop the test if the equipment, system, or subsystem tested fails to satisfy the acceptance criteria of the established test procedure. Identify the cause and correct.
1.22.5 Document the result of each test requirement throughout this SOW.
2.0 REFERENCES: All references shall be of the latest issue and/or revision or as indicated in the Consolidated List of References. It is incumbent on the Contractor to maintain current commercial specifications and be thoroughly familiar with Federal, State and Local laws, regulations and ordinances. Contractor is prohibited from using Government provided technical information for any purpose other than that contemplated by the specifications. Contractor is prohibited from further use, release, or disclosure of this information. References provided on CD-ROM, including any information contained thereon, must be destroyed in accordance with the instructions included on the CD-ROM label, at completion of the contract. After award, for those Contractors in receipt of a CD-ROM and not awarded a delivery order, the CD-ROM including any information contained thereon, shall be destroyed in accordance with the instructions included on the CD-ROM label.
2.1 Order of Precedence: Unless otherwise noted within this specification, hierarchy, priority, or order of precedence of requirements shall be as follows:
| 2.1.1 | Specification Definite Item | |
| 2.1.2 | Specification General Requirement | |
| 2.1.3 | Military/Navy Drawings | |
| 2.1.4 | Military/Navy Technical Manuals | |
| 2.1.5 | Commercial Drawings | |
| 2.1.6 | Commercial Technical Manuals | |
| 2.1.7 | Commercial or Industrial Standards | |
| 2.1.8 | Commercial Practices |
2.2 Discrepancies: Drawing, technical reference, or other discrepancies associated with this specification shall be reported using the Request for Specification Clarification form, during proposal, or the “Condition Found / Inspection Discrepancy Report” form (FIGURE A) during delivery order period of performance.
ERRATA 1
CONSOLIDATED LIST OF REFERENCES
The following publication and drawing requirements are applicable to this SOW:
| Publication Number |
| Title |
| 1) |
| 29 CFR Part 1910 |
| Occupational Safety and Health Standards |
| 2) |
| 29 CFR Part 1915 |
| Occupational Safety and Health Standards for Shipyard Employment |
| 3) |
| 29 CFR Part 1926 |
| Safety and Health Regulations for Construction |
| 4) |
| 10 USC 7311 |
| Repair or Maintenance of Naval Vessels: Handling of Hazardous Waste |
| 5) |
| 42 USC 6901-6992 |
| Resource Conservation and Recovery Act of 1976 |
| 6) |
| 49 USC 5103 |
| Hazardous Materials Transportation Authorization Act of 1994 |
| 7) |
| AWPA 2001 |
| American Wood Protection Association 2001 Book of Standards |
| 8) |
| ANSI/AWS D1.1 |
| American National Standards Institute/American Welding Society: Structural Welding Code Requirements |
| 9) |
| ASTM International |
| American Society for Testing and Materials |
| 10) |
| MIL-STD-777 |
| Schedule of Piping, Valves, Fittings and Associated Piping Components for Naval Surface Ships |
| 11) |
| NSTM Chapter 074 Volume One |
| Welding and Allied Processes |
| 12) |
| NSTM Chapter 075 |
| Naval Ship Technical Manual: Threaded Fasteners |
| 13) |
| NSTM Chapter 997 |
| Docking Instructions and Routine Work in Dry Dock |
| Drawing Number |
| Title |
| 1) |
| S2803-980209 Rev L |
| Bureau of Ships, Label Plates |
| 2) |
| 803-921865 Rev R |
| Cathodic Protection Hull Zinc Anodes |
| 3) |
| S2804-921819 Rev C |
| Distinguishing Figures for Misc. Vessels |
| 4) |
| SK-10832 |
| Camel Barge 68967 Structural Modifications |
3.0 WORK REQUIREMENTS:
3.1 DOCKING AND UNDOCKING: Accomplish the following to safely dock and undock each vessel as follows:
3.1.1 Personnel and equipment: Furnish qualified and experienced personnel, facilities, and the necessary equipment to safely dock and undock each vessel, including:
3.1.1.1 A Dock Master currently qualified and certified by the Contractor and accepted by the Government Docking Observer (GDO).
3.1.1.2 Supporting employees to accomplish the docking and undocking evolutions.
3.1.1.3 Tugs, pilots, and divers required for the complete transfer, docking, and undocking of each vessel. At the docking conference, the GDO will review and approve the number and size of the tugs to be used.
3.1.2 Docking Procedure: Develop a docking procedure prior to dry docking, which shall include the following:
3.1.2.1 Operating practices.
3.1.2.2 Safety and security plans.
3.1.2.3 Special precautions or actions required by the characteristics of the dock, marine railway, or other docking methods.
3.1.2.4 Pumping/flooding schedule.
3.1.2.5 Specific list, trim and stability requirements.
3.1.3 Blocking Plan: Develop a blocking plan to set and align the docking blocks in accordance with the requirements of NSTM Chapter 997.
3.1.3.1 Develop a docking plan in the form of a scaled drawing including: block size, block spacing, and location of vessel with respect to the blocks at landing. Position blocking to ensure that equipment on the surface of or protruding from the hull will not be damaged.
3.1.3.2 Determine the docking clearances utilizing references for guidance and the minimum clearance between the side of the vessel (including fixed projections) and permanent dock structure (such as catwalks, crane rails, etc.). Minimum clearance shall be 12 inches for bringing the vessel into or out of dock and performing any work inside the dock. Ensure a 40 inch minimum clearance between the keel and dock floor for vessels with more than 12 inches of dead rise and a 60 inch minimum clearance between the keel and dock floor for vessels with less than 12 inches of dead rise.
ERRATA 1 3.1.3.3 The blocking plan shall be accompanied by a written request for approval to the GDO a minimum of 5 One working days prior to the scheduled docking date. The use of haul, fixed, or fitted blocks shall be clearly stated.
3.1.3.4 The use of universal docking blocks is prohibited.
3.1.3.5 Maintain supporting data substantiating that:
3.1.3.5.1 The block loading pressures are limited to a maximum of 20 long tons per square foot.
3.1.3.5.2 The number, distance from centerline, and square footage of the side blocks per side is sufficient to resist overturning moments.
| 3.1.3.5.3 | At least 90 percent of blocks land on longitudinal strength members or main transverse bulkheads. | |
| 3.1.4 | Crib and Brace Blocking: | Ensure that crib and brace blocking are in accordance with the requirements of NSTM Chapter 997, using the drawing applicable to the docking facility. |
3.1.4.1 The aspect ratio for un-cribbed keel blocks shall not exceed 2.0 where the aspect ratio is defined as the height divided by the horizontal dimension for the longitudinal and transverse direction, each checked separately.
3.1.4.2 Side blocks with a longitudinal dimension less than 24 inches shall be longitudinally braced or cribbed when their height as measured from the base to the highest corner of the soft cap exceeds 3 times the longitudinal dimension. Bracing shall be in accordance with NSTM CH 997.
3.1.4.3 Blocking shall be constructed of hardwood or composite hardwood/concrete and soft caps, with at least 2 inches of soft cap thickness. Blocking material construction requirements are as follows:
3.1.4.3.1 The term “hardwood”, for the purposes of this contract, includes White Oak, California Laurel, Oregon Myrtle, Iron Wood, Blue Gum, American Rock Elm, or preserved Red Oak. The normal lifespan for hardwood blocking is approximately 10 years.
3.1.4.3.2 Woods acceptable for use as soft caps are Douglas Fir, Tamarack, Long Leaf Pine, or Hemlock.
3.1.4.3.3 Composite blocking showing evidence of spalling and cracks or chipped and damaged concrete is not acceptable.
3.1.4.4 Blocking showing evidence of excessive crushing, warping, cracking, checking, rotting, or damage from dogging, loss of contact at edges caused by cracking or unequal shrinkage or deterioration to an extent no longer being capable of supporting a prescribed load over full bearing areas is not acceptable and shall be replaced.
3.1.5 Setting and Alignment of Docking Blocks: Furnish, set, record, and align the blocks in accordance with the Government approved Contractor blocking plan and in accordance with the requirements of NSTM Chapter 997. Prepare dry dock for inspection at least 24 hours prior to the proposed docking. Notify and accomplish an inspection of the blocking with the GDO in a timeframe sufficient to make blocking changes. Develop documentation of the inspection showing blocking, sighting marks on dock coping relative to block locations, spacing, offsets, heights, and shaping to the GDO at least 4 hours prior to flooding the dry dock. Immediately prior to flooding the dry dock, perform a final inspection with the GDO to ensure that no loose trash, wood, equipment, and other extraneous matter could float up during flooding and interfere with/delay the docking operation.
3.1.6 Docking Conference: Perform a docking conference attended by the GDO and COR, the Contractor’s Dock Master, the pilot who will be present during the docking evolution, and required dive personnel within 4 working days prior to the scheduled docking of the vessel. The Dock Master shall discuss the time of docking, tide situation, weather conditions, tug and pilot arrangements, line handling, electrical shore power, grounding, safety issues, safety concerns, other services and procedures.
3.1.7 Docking the Vessels: Dry dock each vessel without strain. Immediately after docking, electrically connect the vessel hull at the bow and stern of vessel for protection against lightening and other static charges in accordance with the requirements of NSTM Chapter 074 Volume One, and NSTM Chapter 997.
3.1.7.1 Notify the GDO a minimum of 48 hours prior to actual docking, shifting, or undocking of vessel.
| 3.1.7.1.1 | Contact the COR for current GDO contact information. | |
| 3.1.7.2 | Dry dock facilities shall have an alternate / back up electrical power generating and distributing source to furnish all electrical requirements for docking and undocking of vessel, in the event of a loss of main power source. |
3.1.8 Post Docking: Prepare and inspect each vessel underwater hull surface as follows:
3.1.8.1 Immediately after docking, perform a visual inspection of the underwater portions of each vessel with the GDO for damage and deterioration. Inspect the fit on the blocks and furnish necessary shimming between the blocking and the hull to prevent hull movement and to ensure 100 percent block contact with the hull structure.
3.1.8.2 Within 8 hours of docking, wash the underwater hull and fittings with fresh water at a minimum of 3,000 PSIG nozzle pressure to remove dirt, slime, marine growth, fouling and other foreign substances.
3.1.8.3 Comply with federal, state, and local laws and ordinances for disposal of wash water and debris removed from underwater portions of the vessel.
3.1.9 Shifting the Vessels: Relocate each vessel on the dry dock blocks to permit 100 percent preservation and painting of areas initially covered by the dry dock blocks. Relocation of each vessel shall occur after the proper cure time has elapsed after application of the final coat of hull preservation.
3.1.10 Undocking the Vessels: After completion of work, undock each vessel at a time and date agreed upon by the GDO and the Contractor. Perform an undocking conference similar to the Docking Conference of 3.1.6 within 3 days of undocking. Immediately prior to flooding the dry dock, perform an inspection with the GDO to ensure that no loose trash, wood, equipment, and other extraneous matter could float up during flooding and interfere with/delay the undocking operation.
3.1.10.1 Immediately after each vessel lifts off the blocks stop flooding the dry dock. Accomplish a watertight integrity check of each vessel with the COR. Continue flooding of the dock when directed by the GDO.
3.1.10.2 After each vessel has cleared the blocks, perform a visual inspection of the underwater hull surfaces to ensure that no soft caps are adhered to the hull surfaces. Perform a visual inspection of the docking blocks to account for all soft caps and to ensure that no blocks are adhered to the underwater hull structure of the vessel.
3.1.11 Docking Observer: The Docking Observer is the Government official certified by the Government as qualified to execute the duties of a Docking Observer. The presence of the Docking Observer is for protecting the Navy’s interests, not to give direction to the Contractor. However, the Docking Observer shall have the authority to stop the docking, undocking or launching evolution when the vessel safety or other Navy interests are jeopardized. This authority does not imply limitations on or responsibility for the actions of the Contractor’s Dock Master.
3.1.12 Final Docking Report: Develop a final docking report (NAVSEA forms 9997/1 through 9997/5, as necessary) upon completion of undocking. Electronic versions of the final docking report, in portable document format (PDF) and MSWord format are available from the GDO upon request.
3.2 PONTOON REPAIRS: Accomplish pontoon repairs as follows:
3.2.1 Identify Distinguishing Figures and Markings: Identify and record existing distinguishing color schemes, markings, and figures in sketch form listing colors, locations, sizes, and distinguishing marking(s), and figure(s) information.
3.2.2 Zinc Anodes: Remove existing and install new zinc anodes and fasteners in accordance with the requirements of drawing 803-921865 Rev R.
3.2.2.1 Install new Quantity (96 EA), 4 per individual pontoon) zinc anodes conforming to the requirements of Type ZHC-42 on the underwater portions of each pontoon of each vessel.
3.2.2.2 Identify and record exact location of each zinc anode.
3.2.2.3 Accomplish an electrical resistance test for each new zinc anode in accordance with General Note 4 of drawing 803-921865 Rev R.
| 3.2.2.3.1 | Notify the COR 48 hours prior to the start of electrical resistance testing. | |
| 3.2.2.4 | New zinc anodes shall remain free of preservation coatings. |
3.2.3 Blasting and Preservation: Remove existing and install new coating systems to 100 percent of each exterior pontoon surface, including appendage surfaces, excluding main deck support structure. Final top coat color configuration shall match the previously existing final color configuration using the information recorded in 3.2.1 for guidance. Use drawing S2804-921819 Rev C for guidance.
3.2.3.1 Near white blast clean accomplish the requirements of Surface Preparation Specification SSPC-SP-10 of Systems and Specifications, SSPC Painting Manual, Volume 2. Achieve a surface profile of 2-4 Mils, with no single reading less than One Mil or greater than 5 Mils.
3.2.3.2 Apply a 12-year service life, anticorrosive and antifouling coating system as follows: in accordance with the requirements of MIL-PRF-24647, Type II; 2 coats anticorrosive (AC); 3 coats antifouling (AF); installed in accordance with the manufacturer’s F-718.
3.2.3.2.1 All AC and AF coats in the product system shall be from the same manufacturer and compatible with each other.
3.2.4 Visual Inspection: Visual inspection accomplish 100 percent of each exterior pontoon surface for structural defects after abrasive blasting and application of primer.
3.2.4.1 Search for, mark, identify, and record defective (actual and suspect) areas showing signs of cracks, excessive pitting, corrosion, deterioration, damage, distortion, and unusual wear that may be detrimental to the structural and watertight integrity of the Vessel.
0.
0. 3.2.5 Ultrasonic Test (UT) Inspection: UT measurement inspection accomplish 100 percent of each exterior pontoon surface.
3.2.5.1 Measure and record, in columnar form, 720 sites (30 sites per pontoon) spaced evenly from one another and measured from port to starboard, top to bottom, forward to aft, using TABLE ONE below for guidance.
TABLE ONE
| Original Plating Thickness (inch) |
| Minimum Plate Thickness |
| Fractional |
| Decimal |
| Pound/SF |
| 25% Wastage |
| 1/16 |
| 0.063 |
| 2.55 |
This is the start of the file's text. The full file is on GovTribe.