RFC_009_(2).docx
DOCX document 18 KB Posted
- Attached to
- CVN Camels Federal contract opportunity
- Solicitation number
- N4523A-1-R-0033
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_CVN_CAMELS_5-Way_Breakdown_-_Corrected_DEC2016.xls | XLS spreadsheet | |
| Amendment_3.docx | DOCX document | |
| Amendment_2.docx | DOCX document | |
| Amendment_1.docx | DOCX document | |
| RFC_011_Material_List_ANS.docx | DOCX document | |
| RFC_011.docx | DOCX document | |
| Wooden_Fender_PSNS.docx | DOCX document | |
| RFC_009_revision_Wood_Fenders_ANS.docx | DOCX document | |
| RFC_008_Drawings_4_ANS.docx | DOCX document | |
| RFC_005_Drawings_ANS.docx | DOCX document | |
| RFC_006_Drawings_2_ANS.docx | DOCX document | |
| RFC_007_Drawings_3_ANS.docx | DOCX document | |
| RFC_003_Vessel_Delivery_ANS.docx | DOCX document | |
| RFC_002_Draft_ANS.docx | DOCX document | |
| RFC_001_Blocking_Plan_ANS.docx | DOCX document | |
| RFC_004_Wood_Treatment_ANS.docx | DOCX document | |
| Attachment_1_-_Request_for_Clarification_-_A.docx | DOCX document | |
| Attachment_2_-_CVN_CAMELS_5-Way_Breakdown_-_B.xls | XLS spreadsheet | |
| N4523A17R0002.pdf | ||
| Attachment_3_-_CDRLs_and_DIDs_-_C.pdf | ||
| SOW_Everett_Camels.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
| DATE OF REQUEST: 11-03-2016 |
| QUESTION NO: 009 |
| REQUIREMENT: Wooden Fender Repairs |
| REQUISITION NO.: N4523A-17-R-0002 |
ITEM NO: 3.3.2 and 3.3.3 TITLE: Wooden Fender Cleaning and Repairs
ISSUING OFFICE POC(CODE 446):
LeAundria Shaheed: (360) 476-4053 LeAundria Shaheed@navy.mil
| PARA. NO: 3.3.2 & 3.3.3 |
| PAGE NO: 23 |
| CONTRACTOR: |
| PLANNER’S NAME: |
| ATTACH. NO: |
| CONTRACTOR POC & PHONE: |
CONTRACTOR QUESTION:
Paragraph 3.3.2. calls for pressure washing the wooden fenders and then paragraph 3.3.3 calls for the fenders to be replaced.
Why do we need to wash fenders we are replacing?
DO NOT WRITE BELOW THIS LINE
| SPEC CHG: N |
| DWG/REF CHG. N |
| RQMTS CHG: N |
| MAT'L CHG: N |
| TECHNICAL REVIEW: C/411.1JT |
| SERIAL NO: 009 |
Paragraph 3.3.3 tasks the contractor with replacement of 6 wooden fenders per corner, as designated by the COR. The COR cannot determine the condition of the wooden fenders prior to washing. There are 9 wooden fenders per corner. The 3 wooden fenders per corner in the best condition will be re-used.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING
OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST
FOR PROPOSAL.
File details come from the government source that posted it. Updated .