About this file

This document provides an amendment notice and request for information responses for a solicitation seeking multiple 8(a) construction contracts of various facilities on Guam. The Naval Facilities Engineering Command Marianas issued Solicitation N40192-19-R-2830 seeking to award five indefinite delivery indefinite quantity construction contracts with a total value up to $75 million over five years to eligible 8(a) firms located in Hawaii or with a place of business in Guam. Interested firms must submit proposals by February 12, 2019. The amendment provides responses to requests for information on shop drawing requirements and laydown area availability.

_Amendment0005_05FEB19.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Award of Solicitation N40192-19-R-2830, 8(a) Multiple Award Construction Contract (8(a) MACC), Various Locations, Guam, newest first.
File Type Posted
_Amendment0004_01FEB19.pdf PDF
_Amendment0003_24JAN19.pdf PDF
_Amendment0002_18JAN19.pdf PDF
_Amendment0001_20DEC18.pdf PDF
_RFP_Part_A_Proposal_Forms_and_Documents_14DEC18.pdf PDF
_RFP_Part_C_Seed_Project_14DEC18.pdf PDF
_RFP_Part_D_Attachments_14DEC18.pdf PDF
_RFP_Part_B_Technical_Specifications_14DEC18.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5566574

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

8(a) Multiple Aw ard Construction Contract (8(a) MACC), Various Locations, Guam

See Continuation Page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Feb-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4019219R2830

X 9B. DATED (SEE ITEM 11)

14-Dec-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Feb-2019

CODE

COMMANDING OFFICER - NAVFAC MARIANAS

MAR MCON

PSC 455, BOX 195

FPO AP 96540-2937

N40192 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4019219R2830

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

A. Notice 4 is provided in response to requests for information and is provided herein as Enclosure (1). Notice 4 is provided for INFORMATION ONLY. The solicitation remains unchanged unless it is amended in writing.

B. The date for receipt of proposals remains unchanged at February 12, 2019 at 4:30pm local time.

C. Offerors shall acknowledge this amendment in Block 19 of the Standard Form 1442 with their proposals.

(End of Summary of Changes)

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING COMMAND MARIANAS

PSC 455, BOX 195

FPO AP 96540-2937

Solicitation N40192-19-R-2830

05 February 2019

NOTICE 4

PRE-PROPOSAL REQUESTS FOR INFORMATION AND RESPONSES

SOLICITATION N40192-19-R-2830

8(a) MULTIPLE AWARD CONSTRUCTION CONTRACT, VARIOUS LOCATIONS, GUAM

QUESTION (Q)42: Reference RFP Part C, UFGS Specification Section 01 11 00 Summary of Work, Paragraph 1.2.1 Project Description and Scope of Work, Subparagraph B.2.h. Are shop drawings required to be approved by a Professional Engineer as noted?

Answer (A)42: Yes, as indicated in the Summary of Work, shop drawings for both electrical and mechanical are required to be approved by a licensed professional engineer

Q43: Reference RFP Part C Seed Project. Will the government please indicate the number, type and location of all unoccupied units for the project?

A43: For bidding purposes, assume that all units and types will be occupied during construction.

It is difficult to project which units will be unoccupied at the time of construction as families PCS in/out on a regular basis (housing demand varies throughout the year).

Q44: Reference RFP Part C Seed Project. Will a designated laydown/staging area be provided for contractor? If so, please indicate acceptable locations.

A44: Yes, there will be an open field with hard surface available off of Mt. Lam Lam Street and Cocos Lane for a designated laydown/staging area.

N4019219R2830_Amend 0005_05FEB19
Encl (1)_RFI Notice 4