_Amendment0002_18JAN19.pdf
PDF 186 KB Posted
- Attached to
- Award of Solicitation N40192-19-R-2830, 8(a) Multiple Award Construction Contract (8(a) MACC), Various Locations, Guam Federal contract opportunity
- Solicitation number
- N4019219R2830
About this file
This document consists of an amendment to a solicitation and responses to questions from potential offerors. The amendment provides additional details for an 8(a) Multiple Award Construction Contract to perform new construction, renovation, repair, and maintenance projects at various federal facilities on Guam. The NAICS code for the opportunity is 236220 with a size standard of $36.5 million. The acquisition will result in five indefinite delivery, indefinite quantity contracts worth a total of $75 million over five years, with a $10,000 minimum guarantee on each. The pre-proposal conference will be held on January 15, 2019 and proposals are due February 12, 2019. Salvaged portable dehumidifiers must be delivered to the FHO office at Naval Base Guam after each construction phase. Only 8(a) firms located within the SBA Hawaii District Office's service area or with a bona fide place of business in Guam under NAICS 236220 may submit offers. The amendment provides responses to contractor questions to clarify requirements.
_Amendment0002_18JAN19.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| _Amendment0005_05FEB19.pdf | ||
| _Amendment0004_01FEB19.pdf | ||
| _Amendment0003_24JAN19.pdf | ||
| _Amendment0001_20DEC18.pdf | ||
| _RFP_Part_C_Seed_Project_14DEC18.pdf | ||
| _RFP_Part_D_Attachments_14DEC18.pdf | ||
| _RFP_Part_B_Technical_Specifications_14DEC18.pdf | ||
| _RFP_Part_A_Proposal_Forms_and_Documents_14DEC18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5566574
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
8(a) Multiple Aw ard Construction Contract (8(a) MACC), Various Locations, Guam
See Continuation Page 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4019219R2830
X 9B. DATED (SEE ITEM 11)
14-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jan-2019
CODE
COMMANDING OFFICER - NAVFAC MARIANAS
MAR MCON
PSC 455, BOX 195
FPO AP 96540-2937
N40192 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4019219R2830
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
A. In accordance with FAR 52.252-3 Alterations in Solicitation (APR 1984), portions of this solicitation are altered as follows:
1. RFP Part C, UFGS Specification Section 01 11 00 Summary of Work, Paragraph 1.4 Salvage Material and Equipment, is revised as follows:
“Items designated by the Contracting Officer to be salvaged remain the property of the Government.
Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 5 miles of the construction site.During construction phasing, coordinate with housing point of contact to drop off salvaged dehumidifier units at the FHO office located at Naval Base Guam after each construction phase.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location.
Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer. Salvage all existing portable dehumidifiers and turn over to base housing personnel.”
B. Notice 1 is provided in response to a request for information and is provided herein as Enclosure (1). Notice 1 is provided for INFORMATION ONLY. The solicitation remains unchanged unless it is amended in writing.
C. The date for receipt of proposals remains unchanged at February 12, 2019 at 4:30pm local time.
D. Offerors shall acknowledge this amendment in Block 19 of the Standard Form 1442 with their proposals.
(End of Summary of Changes)
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND MARIANAS
PSC 455, BOX 195
FPO AP 96540-2937
Solicitation N40192-19-R-2830
18 January 2019
NOTICE 1
PRE-PROPOSAL REQUESTS FOR INFORMATION AND RESPONSES
SOLICITATION N40192-19-R-2830
8(a) MULTIPLE AWARD CONSTRUCTION CONTRACT, VARIOUS LOCATIONS, GUAM
QUESTION (Q)1: How should the pages in this solicitation response be numbered?
Answer (A)1: Pages should be numbered sequentially.
Q2: Reference RFP Part A, Page 5 of 61, Section 3.1 Paragraph 2. Can tables or graphics have smaller than size 10 font?
A2: Yes.
Q3: Reference RFP Part A, Page 5 of 61, Section 3.1.h. If company information is updated on the SAM website, must representations and certifications also be included in the cover letter?
A3: If the company’s representations and certifications on the SAM website are already updated, then only Section 00600 of the RFP must be completed and submitted with the proposal.
Q4: Reference RFP Part A, Page 5-6 of 61, Section 3.1 and 3.2. How many hard copies and electronic copies are required for the Cover Letter and the RFP Part A Documents?
A4: At least one hard copy (original) and one electronic copy of the cover letter and RFP Part A documents should be provided.
Q5: Reference RFP Part A, Page 6 of 61, Section 3.3 Paragraph 1. Can the Technical Proposal be submitted electronically via flash drive?
A5: No, the electronic copy in Adobe Acrobat PDF format should be provided on compact disc
(CD).
Q6: Reference RFP Part A, Page 6 of 61, Section 3.3 Paragraph 1. Can the Price Proposal be submitted electronically via flash drive?
A6: No, the electronic copy in Adobe Acrobat PDF format should be provided on CD.
Q7: Reference RFP Part A, Page 6 of 61, Section 3.2 Paragraph 3. (a) What are the page limitations for the Technical Proposal?
(b) Are the Cover Page, Table of Contents, and Acronym List included in the page limitations?
A7: (a) The page limitations, as applicable, are specified for each evaluation factor in RFP Section 00210 Evaluation Factors for Award.
(b) No.
RFP N40192-19-R-2830
Notice 1
Q8: Reference RFP Part A, Page 8 of 61, Section 7 Paragraph. Do companies need to file a VETS-4212 before submission?
A8: No; however, potential awardees must file the required VETS-4212 report before contract award, if they are subject to the reporting requirements of 38 U.S.C. § 4212(d) for that fiscal year.
Q9: Reference RFP Part A, Page 20 of 61, Section 2.4.c.1. Section 2.4.c states, “Submit a minimum of three (3) and a maximum of five (5) construction projects that best demonstrates the Offeror’s experience on relevant projects that are similar in size, scope, and complexity to the RFP.” Can subcontractors also submit up to 5 projects or is the requirement for 5 projects per team?
A9: Subcontractor experience will not be considered. Experience of the Offeror is required.
Projects are limited to a total of five (5). Any projects submitted in excess of the five (5) will not be considered.
Q10: What font type is acceptable? Arial or Times New Roman?
A10: Any legible font is acceptable, as long as the font size is not less than size 10.
Q11: Reference RFP Part A, Section 00210 Evaluation Factors for Award, Paragraph 2.4b.
Requesting that relevant projects meeting the definition are considered at 90% completion.
A11: In accordance with the proposal submission requirements for Factor 1, Experience, relevant projects submitted for the Offeror shall be 100% completed within the past five (5) years from the date of issuance of the RFP (14 December 2013 through 14 December 2018).
QUESTION Q12: Reference RFP Part C, UFGS Specification Section 01 11 00 Summary of Work, Paragraph 1.4 Salvage Material and Equipment.
(a) Please confirm all items designated by the Contracting Officer to be salvaged. The typical removal drawings only show turnover of existing portable dehumidifier to the Government (base housing personnel).
(b) Please confirm the Government location where salvaged items are to be delivered with 5 miles of the construction site.
Answer A12: (a) The only item to be salvaged is the portable dehumidifier from each housing unit.
(b) During construction phasing, coordinate with housing point of contact to drop off salvaged dehumidifier units at the FHO office located at Naval Base Guam after each construction phase.
Refer to RFP Amendment 0002.
QUESTION Q13: Reference RFP Part A, Section 00800 Labor Requirements, Paragraph 14 Supervision. Please confirm the SSHO requirements for the seed project are lower than Level 4 competency.
Answer A13: Yes; SSHO requirements for this seed project are lower than Level 4. The SSHO may be a collateral duty of either the superintendent, QC manager, or other designated employee.
RFP N40192-19-R-2830
Notice 1
QUESTION Q14: Reference RFP Part C, Drawing T-100. General Note # 7 states that the contractor shall perform a hazardous material assessment prior to starting the work.
(a) Has the Government completed a hazardous assessment and if so is it available to the bidders for review?
(b) Has the Government completed a general survey report and if so is it available to the bidders for review?
Answer A14: (a) No; these housing units were built in 2009 and there is no hazardous materials report available.
(b)No; there is no general survey report available, but per RFP requirements, sample testing is still required by contractor to re-confirm no hazardous materials present where work is being performed.
QUESTION Q15: Reference RFP Part A, FAR Clause 52.246-21. As this is a phased construction schedule, we ask if the warranty period will also be phased, whereas the one (1) year warranty period starts at the phased beneficial occupancy?
Answer A15: Yes, one (1) year warranty starts at the phased beneficial occupancy and should be tracked and documented accordingly for each housing unit.
QUESTION Q16: (a) Please confirm the Government review time for submittals (work / calendar days).
(b) Please confirm the Government review time for RFIs (work / calendar days).
Answer A16: (a) The Government review period for submittals is 14 calendar days. Refer to RFP Part C.
(b) The Government will generally address pre-proposal RFIs within 3 business days; however, RFI responses are normally consolidated for issuance via an amendment to the solicitation and therefore may not be provided within the 3-business-day timeframe. For post-award RFIs, the Government will review and provide responses as soon as possible or at least by the requested date.
QUESTION Q17: Reference RFP Part A, Factor 1, Experience, Exhibit B. Due to the long timeline for the start and end of our construction projects, would it be acceptable to use an 11x17 page in landscape format for Exhibit B Project Timeline?
Answer A17: No, please adhere to the size requirement of 8.5”x11” paper as indicated in RFP Part A, Section 00100 Instructions to Offerors, Paragraph 3.1. Projects included in the timeline are limited to those projects submitted under Factor 1, Experience. Start and end dates should correspond with the five (5) year period defined in the solicitation. Offerors may provide the summary project timeline sheet in either portrait or landscape format.
QUESTION Q18: Reference RFP Part A, Factor 4, Technical Approach to the Seed Project.
(a) Cut Sheets: Are we to assume that the not to exceed six (6) double sided pages can be counted in the Technical Narrative page count?
(b) Construction Schedule and Phasing Plan: Are we to assume that the 1x11x17 page can be counted in the Technical Narrative page count?
Answer A18: (a)&(b) Page limitations for the cut sheets and construction schedule and phasing plan are separate from the page limitations for the technical narrative.